0% found this document useful (0 votes)
2 views

Project

The document outlines the guidelines and requirements for a final group project in Total Quality Management for BSIB Informatics students. It emphasizes the importance of originality, with strict penalties for plagiarism, and provides a detailed rubric for evaluation based on company operations analysis, problem identification, recommendations, and oral presentation. The project must be submitted by July 18, with presentations scheduled from July 20 to July 26.

Uploaded by

am.ha10189
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Project

The document outlines the guidelines and requirements for a final group project in Total Quality Management for BSIB Informatics students. It emphasizes the importance of originality, with strict penalties for plagiarism, and provides a detailed rubric for evaluation based on company operations analysis, problem identification, recommendations, and oral presentation. The project must be submitted by July 18, with presentations scheduled from July 20 to July 26.

Uploaded by

am.ha10189
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

College of Administrative and Financial Sciences

FINAL
Bachelor PROJECT
of Science for BSIBInformatics
in Business 645
3rd Term, SY 2022-2023
2nd Trimester, AY 2019-2020

 Marks will be awarded for the thoroughness in your approach


 NO marks would be awarded for the entire project if any part is found to be copied directly
from printed materials or from another student.
 Complete this cover sheet and attach it to your IN COURSE PROJECT OUTPUT.

Student Declaration:
I declare that:
I understand what is meant by plagiarism (illegal copying of one’s work)
The implication of plagiarism is tantamount to cheating (work will get no pts.)
This project is all my own work and I have acknowledged any use of the published and
unpublished works of other people.
Student’s Signature:………………….. Date:…………………………..
Total number of pages including this cover page

Program Course Section Due Date Date Submitted


Time/Days
Soft Copy – July 18
Presentation – July 20th- 26th ,
based on schedule
Course Title Total Quality Management

Student’s Full Name

Professor’s Name
Teacher’s/Marker’s Rubrics
Comments
1. Analysis composed of the following 25 pts
1.1 Discussion of Company Operations 5pts
1.2 Discussion and problem identification in any 10pts
areas of : ( Choose only 1 area )
a. Quality Certification
b. Use of Quality Tools in Problem Solving
c. PDCA/Kaizen or 5S
d. Employee Empowerment
e. Quality Awards if applicable
f. TQM Implementation
g. Management Support and Leadership for TQM
1.3 Proposed recommendations and detailed plan of 10pts
action to address the identified problem area
2. Oral Presentation and Peer Evaluation 20 pts
Marker’s
45 pts
Name

Project Guidelines
1. This is a group project with a maximum of 5 students in Group.
2. You can choose globally or locally operating companies ( factory based )
3. The group should only focus in only one area, choosing from :

a. Quality Certification of the Company


b. Use of Quality Tools in Problem Solving
c. PDCA/Kaizen or 5S Implementation
d. Implementation of the Employee Empowerment
e. Quality Awards if applicable
f. TQM Implementation
g. Management Support and Leadership for TQM

4. References should be included.


5. Plagiarism should not exceed 20% using the approved plagiarism checker which is
Turnitin
6. It should be submitted through Moodle on July 18
7. Presentation will be scheduled from July 20 - July 26 and will be scheduled per group.
8. No presentation will be done without acceptable plagiarism report.
9. The faculty in charge will also be checking the similarity of the projects among the
submitted projects in the class.
Rubrics for Marking:

5pts 4pts 3pts 1-2pts


9-10 pts 7-8pts 4-6pts 1-3 pts

Company Entire operations have Discussion of the Discussion of the Discussion does not give a
Operations( 5 pts been discussed operations lacks very operations lacks vital clear picture of how the
) comprehensively minor detail information company operates
Problem The chosen area has The chosen area has The chosen area has The chosen area has been
identification in been discussed been discussed but been discussed but discussed in a way that
the area chosen comprehensively in lacks minor lacks many major does not show solid
for discussion terms of its current information in terms information in terms understanding of the area
related to quality operations and of its current of its current of concern , especially its
( 10 pts ) issues/problems operations and operations and current operations and
issues/problems issues/problems issues/problems
Recommendation The recommendations The recommendations The recommendations Very little of the
( 10 pts ) address the issues address the issues do not address all the recommendation address
identified and action identified although the issues identified and the issues identified and
plan is presented the action plan lacks minor the action plan lacks the action plan is not at all
details of the proposed details many details responsive to the issue.
recommendation
Oral Presentation 5 4 2-3 1
Mastery of the The way the oral The way the oral The way the oral The oral presentation done
project /Ability to presentation done presentation done presentation done shows no knowledge of the
Answer the shows strong shows confidence and shows little project and no questions
Questions confidence and mastery of the project confidence and less are answered correctly.
( 5 pts ) mastery of the project, although one or two mastery of the project
All questions are questions are and questions are not
answered correctly answered well answered well
5 4 2-3 1
PPT and E-copy PPT is done in bullet PPT is done in bullet PPT is not done in PPT is not done in bullet
of the Project type ( not pasted from type ( not pasted from bullet type but simply type but simply pasted
( 5 pts) word file) word file) pasted from word file, from word file
And includes images And with very less no pictures/images , there are no
and graphs. pictures/images and and graphs. pictures/images and
The project has graphs. The project has graphs.
complete and The project lacks insufficient The project itself gives very
comprehensive minor details and also information and there insufficient information on
information and there is little mistakes are several major critical information. Several
presented well in terms in terms of spacing, mistakes in terms of major mistakes in terms of
of spacing, margin, margin, consistency of spacing, margin, spacing, margin,
consistency of font and font and sizes. consistency of font consistency of font and
sizes. Grammar and and sizes. sizes, grammar and
Grammar and sentences There are also serious sentence construction are
sentences construction construction has very grammar and done wrongly.
are correct minor correction sentences
required construction mistakes

You might also like