0% found this document useful (0 votes)
14 views139 pages

Jmr Report

The document lists various construction activities and structures with their corresponding dates and units, primarily focusing on a cement plant project. It includes details on boundary walls, batching plants, cyclone buildings, and packing plants, among others. The activities span from October 2023 to April 2024, indicating ongoing construction efforts.

Uploaded by

rahul.surana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views139 pages

Jmr Report

The document lists various construction activities and structures with their corresponding dates and units, primarily focusing on a cement plant project. It includes details on boundary walls, batching plants, cyclone buildings, and packing plants, among others. The activities span from October 2023 to April 2024, indicating ongoing construction efforts.

Uploaded by

rahul.surana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 139

SR

DATE NAME OF STRUCTURE UNIT


NO

1 17-Oct-23 BOUNDARY WALL SOUTH SIDE XI

2 17-Oct-23 PROPOSED GRINDING UNIT II XI

3 1-Nov-23 SOUTH WEST SITE BOUNDARY WALL XI


4 1-Nov-23 WEST SIDE BOUNDARY WALL XI
5 1-Nov-23 WEST SIDE BOUNDARY WALL XI

6 6-Nov-23 BATCHING PLANT-01 XI

7 7-Nov-23 SOUTH WEST SITE BOUNDARY WALL XI


8 7-Nov-23 WEST SIDE BOUNDARY WALL XI
9 10-Nov-23 SOUTH SIDE BOUNDARY WALL XI
10 10-Nov-23 SOUTH SIDE BOUNDARY WALL XI
11 10-Nov-23 SOUTH SIDE BOUNDARY WALL XI
12 10-Nov-23 BATCHING PLANT-01 XI

17` 17-Jan-23 cyclone building and ducting complex XI

14 17-Jan-23 cyclone room Inside wall XI

15 19-Jan-24 cyclone building and ducting complex XI

16 20-Jan-24 cyclone building and ducting complex XI

17 20-Jan-24 cyclone building and ducting complex XI

18 22-Jan-24 cooler building fan foundation XI


19 27-Jan-24 coolar building fan fountation XI

20 27-Jan-24 coolar ESP XI

21 27-Jan-24 coolar ESP XI

22 27-Jan-24 cooler building fan foundation XI

23 27-Jan-24 cyclone building XI

24 29-Jan-24 cooler building fan foundation XI

25 29-Jan-24 cooler building fan foundation XI

26 29-Jan-24 cooler building fan foundation XI

27 29-Jan-24 cooler building fan foundation XI

28 29-Jan-24 AQC BOILER FOOTING PCC XI


29 29-Jan-24 cooler building fan foundation XI

30 29-Jan-24 RABH BAG HOUSE [LOAD CENTER] XI

31 29-Jan-24 cement selio 2nd XI

32 29-Jan-24 RABH BAG HOUSE [LOAD CENTER] XI

33 30-Jan-24 RABH[PJBH] BAG HOUSE [LOAD CENTER] XI


34 30-Jan-24 RABH[PJBH] BAG HOUSE [LOAD CENTER] XI
35 30-Jan-24 AQC BOILER XI
36 30-Jan-24 AQC BOILER XI
37 30-Jan-24 AQC BOILER XI
38 31-Jan-24 R M HOPPER FOOTING XI
39 31-Jan-24 R M HOPPER FOOTING XI

40 31-Jan-24 RABH[PJBH] BAG HOUSE [LOAD CENTER] XI

R M CYCLONE BUILDING (DUCTING


41 31-Jan-24 XI
COMPLEX)

42 31-Jan-24 PAINTING WORK FOR LABOUR HUTMENT XI

43 31-Jan-24 MILL FOUNDATION FOR PHASE 1ST XI

44 1-Feb-24 CEMENT selio 3RD XI

45 1-Feb-24 PREE HEATER CRAIN FOUNDATION XI

46 1-Feb-24 FABRICATION ERECTION WORK XI

47 1-Feb-24 FABRICATION ERECTION WORK XI

48 1-Feb-24 FABRICATION ERECTION WORK XI

49 1-Feb-24 FABRICATION ERECTION WORK XI

50 2-Feb-24 cement silo 2nd XI

51 2-Feb-24 milL FOUNDATION FOR PHASE 1ST XI

52 2-Feb-24 cement recirculation building XI

53 2-Feb-24 cement silo 1st XI

54 5-Feb-24 cement silo -04 XI

55 6-Feb-24 bucket elevator wall XI


56 7-Feb-24 cement silo -04 XI
57 7-Feb-24 packing PLANT XI
58 7-Feb-24 REQLAMER STACKER XI
59 7-Feb-24 CEMENT SILO 1ST XI
60 7-Feb-24 R M HOPPER FOOTING XI
61 7-Feb-24 FAN FOUNDATION COLLER BUILDING XI
62 7-Feb-24 FAN FOUNDATION COLLER BUILDING XI
63 7-Feb-24 FAN FOUNDATION COLLER BUILDING XI
64 7-Feb-24 FAN FOUNDATION COLLER BUILDING XI
65 7-Feb-24 FAN FOUNDATION COLLER BUILDING XI
66 8-Feb-24 FLY ASH SILO XI
67 8-Feb-24 KILN COOLER LOAD CENTER XI
68 8-Feb-24 KILN COOLER LOAD CENTER XI
69 8-Feb-24 KILN COOLER LOAD CENTER XI
70 8-Feb-24 KILN COOLER LOAD CENTER XI
71 29-Jan-24 main gate coloum pcc top XI
72 10-Feb-24 reclaimer & stacker XI
73 10-Feb-24 reclaimer & stacker XI
74 10-Feb-24 FLY ASH SILO XI
75 10-Feb-24 packing PLANT XI
76 12-Feb-24 reclaimer & stacker XI
77 12-Feb-24 stacker XI
78 12-Feb-24 KILN COOLER LOAD CENTER XI
79 12-Feb-24 toilets work XI
80 13-Feb-24 reclaimer & stacker XI
81 13-Feb-24 reclaimer & stacker XI
82 13-Feb-24 MILL FOUNDATION FOR PHASE XI
83 13-Feb-24 MILL FOUNDATION FOR PHASE 1ST XI
84 13-Feb-24 packing PLANT XI
85 13-Feb-24 PACKING PLANT PIT FOUNDATION XI
86 13-Feb-24 PACKING PLANT PIT FOUNDATION XI
87 13-Feb-24 PACKING PLANT XI
88 14-Feb-24 BOUNDARY WALL ES Site XI
89 14-Feb-24 PTBH Building load center XI
90 14-Feb-24 PACKING PLANT PIT FOUNDATION XI
91 14-Feb-24 PACKING PLANT XI
92 14-Feb-24 PACKING PLANT PIT FOUNDATION XI
93 15-Feb-24 PACKING PLANT XI
94 15-Feb-24 PACKING PLANT XI
95 15-Feb-24 PACKING PLANT XI
96 15-Feb-24 PACKING PLANT XI
97 15-Feb-24 PACKING PLANT XI
98 15-Feb-24 CEMENT MILL XI
99 16-Feb-24 PJBH BUILDING XI
100 16-Feb-24 RETAINING WALL RAFT XI
101 16-Feb-24 BRU XI
102 16-Feb-24 BRU FOOTING RAFT XI
103 16-Feb-24 FABRICATION ERECTION WORK XI
104 16-Feb-24 FABRICATION ERECTION WORK XI
105 17-Feb-24 BRU SHEAR WALL RAFT XI
106 17-Feb-24 BRU RETAINING WALL RAFT XI
107 17-Feb-24 BRU FOOTING RAFT XI
108 17-Feb-24 BLWALL NEAR BATCHING PLANT XI
109 19-Feb-24 BLWALL NEAR BATCHING PLANT XI
110 19-Feb-24 reclaimer & stacker XI
111 19-Feb-24 BATCHING PLANT XI
112 19-Feb-24 BATCHING PLANT XI
113 19-Feb-24 PACKING PLANT XI
114 19-Feb-24 PACKING PLANT XI
115 19-Feb-24 PACKING PLANT XI
116 20-Feb-24 BRU RETAINING WALL RAFT XI
117 20-Feb-24 BRU RETAINING WALL RAFT XI
118 20-Feb-24 BRU RETAINING WALL RAFT XI
119 20-Feb-24 PACKING PLANT XI
120 20-Feb-24 reclaimer & stacker XI
121 21-Feb-24 reclaimer & stacker XI
122 21-Feb-24 reclaimer & stacker XI
123 21-Feb-24 reclaimer & stacker XI
124 21-Feb-24 PACKING PLANT XI
125 21-Feb-24 BRU FOOTING RAFT XI
126 21-Feb-24 PACKING PALNT XI
127 21-Feb-24 LOAD CENTER 01 (SECOUNDRY CRUSHER) XI
128 21-Feb-24 LOAD CENTER 01 (SECOUNDRY CRUSHER) XI
129 21-Feb-24 PACKING PLANT XI
130 21-Feb-24 T. G. BUILDING XI
131 21-Feb-24 T. G. BUILDING XI
132 21-Feb-24 T. G. BUILDING XI
133 21-Feb-24 T. G. BUILDING XI
134 21-Feb-24 KILN COOLER LOAD CENTER XI
135 22-Feb-24 RAW WATER TANK XI
136 22-Feb-24 RETAINING WALL RAFT XI
137 22-Feb-24 PACKING PLANT XI
138 22-Feb-24 CEMENT MILL FEED HOPPER BUILDING XI
139 23-Feb-24 coolar building fan fountation XI
140 23-Feb-24 coolar building fan fountation XI
141 23-Feb-24 LOAD CENTER XI
142 26-Feb-24 RAW WATER TANK XI
143 26-Feb-24 T G BUILDING DUCT AREA XI
144 26-Feb-24 BRU WALL RAFT XI
145 26-Feb-24 BRU WALL RAFT XI
146 27-Feb-24 UNIT 11 ELECTRIC WORK XI
147 27-Feb-24 PACKING PLANT XI
148 27-Feb-24 PACKING PLANT XI
149 27-Feb-24 PACKING PLANT XI
150 27-Feb-24 PACKING PLANT XI
151 28-Feb-24 BRU FOOTING XI
152 28-Feb-24 HOPPER BUILDING XI
153 28-Feb-24 HOPPER BUILDING XI
154 28-Feb-24 HOPPER BUILDING XI
155 28-Feb-24 HOPPER BUILDING XI
156 28-Feb-24 HOPPER BUILDING XI
157 28-Feb-24 reclaimer & stacker D GRID XI
158 28-Feb-24 reclaimer & stacker D GRID XI
159 28-Feb-24 reclaimer & stacker D GRID XI
160 28-Feb-24 stacker FOOTING D GRID XI
161 29-Feb-24 PACKING PLANT PIT FOUNDATION XI
162 29-Feb-24 PACKING PLANT XI
163 29-Feb-24 PACKING PLANT XI
164 29-Feb-24 CEMENT MILL RECIRCULATION BUILDING XI
165 29-Feb-24 PACKING PLANT XI
166 29-Feb-24 HOPPER BUILDING XI
167 29-Feb-24 BRU FOOTING XI
168 1-Mar-24 CRUSHER EAST SIDE XI
169 1-Mar-24 CRUSHER EAST SIDE XI
170 1-Mar-24 CRUSHER EAST SIDE XI
171 1-Mar-24 CRUSHER EAST SIDE XI
172 1-Mar-24 CRUSHER EAST SIDE XI
173 1-Mar-24 BRU FOOTING XI
174 2-Mar-24 CEMENT MILL HOPPER BUILDING XI
175 4-Mar-24 T G BUILDING AIR COOLER XI
176 4-Mar-24 BRU XI
177 4-Mar-24 BRU XI
178 5-Feb-24 ACC BUILDING XI
179 2-Mar-24 FANCING WORK XI
180 14-Mar-24 BRU XI
181 14-Mar-24 BRU XI
182 14-Mar-24 BRU XI
183 14-Mar-24 CRUSHER EAST SIDE DEEP AREA XI
184 16-Mar-24 ACC BUILDING XI
185 16-Mar-24 ACC BUILDING XI
186 16-Mar-24 RAW WATER TANK XI
187 16-Mar-24 BRU FOOTING & WALL RAFT XI
188 16-Mar-24 FABRICATION ERECTION WORK XI
189 16-Mar-24 FABRICATION ERECTION WORK XI
190 16-Mar-24 FABRICATION ERECTION WORK XI
191 16-Mar-24 BRU XI
192 19-Mar-24 WOODEN WORK XI
193 19-Mar-24 PACKING PLANT XI
194 20-Mar-24 MAIN GATE XI
195 20-Mar-24 WEIGHT BRIDGE XI
196 20-Mar-24 WEIGHT BRIDGE XI
197 20-Mar-24 WEIGHT BRIDGE XI
198 20-Mar-24 PACKING PLANT XI
199 20-Mar-24 BATCHING PLANT ROOM WORK XI
200 20-Mar-24 STACKER D GRAID XI
201 20-Mar-24 CRUSHER HOPER RAFT XI
202 20-Mar-24 CRUSHER EAST SIDE XI
203 21-Mar-24 WEIGHT BRIDGE XI
204 21-Mar-24 SECOUNDRY CRUSHER DEEP AREA XI
205 21-Mar-24 SECOUNDRY CRUSHER DEEP AREA XI
206 21-Mar-24 SECOUNDRY CRUSHER DEEP AREA XI
207 21-Mar-24 SECOUNDRY CRUSHER DEEP AREA XI
208 21-Mar-24 PACKING PLANT BUCKET ELEVATOR XI
BRICK MASONARY WORK NEAR BATCHING
209 21-Mar-24 XI
PLANT
210 21-Mar-24 RCC FLOORING FOR KILN SHELL ASSLY. XI
211 30-Mar-24 LS SECONDARY CRUSHER DEEP AREA XI
212 30-Mar-24 LS SECONDARY CRUSHER DEEP AREA XI
213 2-Apr-24 BOUNDARY WALL OUTSIDE MAIN GATE XI
214 2-Apr-24 STACKER D GRID XI
215 3-Apr-24 STACKER D GRID XI
LATERITE HANDLING FRESTILE
216 3-Apr-24 XI
FOUNDATION
LATERITE HANDLING FRESTILE
217 3-Apr-24 XI
FOUNDATION
218 3-Apr-24 CEMENT MILL HOPPETR XI
219 3-Apr-24 STACKER D GRID XI
220 4-Apr-24 LOAD CENTER -07 XI
221 4-Apr-24 PAINTING WORK AT UNIT 11 XI
222 5-Apr-24 LOAD CENTER -07 XI
223 5-Apr-24 ELECTRIC WORK AT RAS XI XI
224 5-Apr-24 BOUNDARY WALL NEAR BATCHING PLANT XI
225 5-Apr-24 BATCHING PLANT ROOM WORK XI
226 6-Apr-24 RAS XI ELECTRIC WORK XI
227 6-Apr-24 R/R MEASONARY BOUNDARY WALL XI
228 8-Apr-24 RAS XI ELECTRIC WORK XI
229 8-Apr-24 RAS XI ELECTRIC WORK XI
230 9-Apr-24 LOAD CENTER 07 XI
231 9-Apr-24 PACKING PLANT XI
232 9-Apr-24 PACKING PLANT XI
233 11-Apr-24 PRIMERY CRUSHER HOUSE XI
234 11-Apr-24 PACKING PLANT XI
235 11-Apr-24 PACKING PLANT XI
236 11-Apr-24 LOAD CENTER -07 XI
237 11-Apr-24 LOAD CENTER -07 XI
238 12-Apr-24 PACKING PLANT XI
239 12-Apr-24 PACKING PLANT XI
240 12-Apr-24 BOUNDARY WALL XI
241 12-Apr-24 LOAD CENTER -07 XI
242 13-Apr-24 RRM- BOUNDARY WALL XI
243 13-Apr-24 RRM- BOUNDARY WALL XI
244 13-Apr-24 ELECTRIC WORK AT RAS XI XI
245 15-Apr-24 PACKING PLANT XI
246 15-Apr-24 WATER TREATMENT PLANT XI
247 16-Apr-24 WATER TREATMENT PLANT XI
248 16-Apr-24 PACKING PLANT XI
249 16-Apr-24 PACKING PLANT XI
250 16-Apr-24 PACKING PLANT XI
251 16-Apr-24 PACKING PLANT XI
252 16-Apr-24 PACKING PLANT XI
253 16-Apr-24 PRIMERY CRUSHER HOUSE XI
254 16-Apr-24 PRIMERY CRUSHER RETAINING RAFT XI
255 16-Apr-24 BOUNDARY WALL XI
256 17-Apr-24 PRIMARY CRUSHER XI
257 18-Apr-24 ELECTRIC WORK AT RAS XI XI
258 18-Apr-24 PRIMARY CRUSHER XI
259 19-Apr-24 WATER TREATMENT PLANT XI
260 19-Apr-24 WATER TREATMENT PLANT XI
261 19-Apr-24 N. PIT NEAR WATER TREATMENT PLANT XI
262 22-Apr-24 CEMENT MILL BAG HOUSE XI
263 22-Apr-24 CEMENT MILL BAG HOUSE XI
264 22-Apr-24 T G BFPHP AREA XI
265 23-Apr-24 T G BFPHP AREA XI
266 23-Apr-24 CEMENT MILL BAG HOUSE XI
267 24-Apr-24 CLINKER FEEDING HOPPER BUILDING XI
268 25-Apr-24 PACKING PALNT XI
269 25-Apr-24 PRIMERY CRUSHER TUNNEL SIDE XI
270 25-Apr-24 PRIMERY CRUSHER RETAINING RAFT XI
271 25-Apr-24 PRIMERY CRUSHER RETAINING RAFT XI
272 25-Apr-24 PACKING PLANT XI
273 26-Apr-24 CEMENT MILL BAG HOUSE XI
274 27-Apr-24 PACKING PALNT XI
275 27-Apr-24 PACKING PALNT XI
276 27-Apr-24 PACKING PALNT XI
277 27-Apr-24 PACKING PALNT XI
278 27-Apr-24 PACKING PALNT XI
279 27-Apr-24 CHIMNEY SOIL TOP LEVEL XI
280 29-Apr-24 CEMENT MILL BAG HOUSE XI
281 29-Apr-24 PRIMARY CRUSHER XI
282 29-Apr-24 RRM- BOUNDARY WALL XI
283 29-Apr-24 RRM- BOUNDARY WALL XI
284 29-Apr-24 CLINKER FEED HOPPER XI
285 29-Apr-24 CEMENT MILL BAG HOUSE XI
286 29-Apr-24 CEMENT MILL BAG HOUSE XI
287 30-Apr-24 CHIMNEY FOUNDATION ESP. BUILDING XI
288 30-Apr-24 LOAD CENTER - 07 XI
289 30-Apr-24 PACKING PLANT XI
290 2-May-24 WATER TREATMENT PLANT XI
291 3-May-24 PRIMERY CRUSHER HOPER SITE AREA XI
292 3-May-24 BAG HOUSE XI
293 3-May-24 PACKING PLANT XI
294 6-May-24 CEMENT MILL BAG HOUSE XI
295 6-May-24 FLY AISH SILO XI
296 6-May-24 D. M. TANK XI
297 6-May-24 ESP COOLER FAN FOUNDATION XI
298 6-May-24 FLY AISH SILO XI
299 8-May-24 PAINT WORK XI
300 10-May-24 LOAD CENTER -07 XI
301 10-May-24 BAG HOUSE XI
302 10-May-24 FLY AISH SILO OUTER SIDE STAIR CASE XI
303 10-May-24 LC -01 AT SECOUNDARY CRUSHER AREA XI
304 10-May-24 SECOUNDARY CRUSHER AREA XI
305 10-May-24 SECOUNDARY CRUSHER AREA XI
306 10-May-24 ESP COOLER FAN FOUNDATION XI
307 10-May-24 FLY AISH SILO OUTER SIDE STAIR CASE XI
308 11-May-24 PRIMERY CRUSHER XI
309 11-May-24 LOAD CENTER -07 XI
310 11-May-24 BAG HOUSE XI
311 16-May-24 PRIMERY CRUSHER TUNNEL SIDE XI
312 16-May-24 PRIMERY CRUSHER TUNNEL SIDE XI
313 16-May-24 SECOUNDARY CRUSHER AREA XI
314 16-May-24 BAG HOUSE CHIMNEY (STACK) XI
315 16-May-24 BAG HOUSE XI
316 18-May-24 RRM- BOUNDARY WALL XI
317 18-May-24 RRM- BOUNDARY WALL XI
318 18-May-24 RRM- BOUNDARY WALL XI
319 18-May-24 CEMENT MILL BAG HOUSE XI
320 18-May-24 CEMENT MILL BAG HOUSE CHIMNEY XI
CEMENT MILL BAG HOUSE FAN
321 18-May-24 XI
FOUNDATION
322 18-May-24 CEMENT MILL BAG HOUSE XI
323 21-May-24 WATER TANK XI
324 22-May-24 PACKING PLANT XI
325 22-May-24 PACKING PLANT XI
326 22-May-24 PACKING PLANT XI
327 22-May-24 PACKING PLANT XI
328 23-May-24 WATER TANK XI
329 23-May-24 PACKING PLANT XI
330 24-May-24 CEMENT SILO 3 XI
331 25-May-24 CONVEYOR BELT XI
332 25-May-24 SECOUNDARY CRUSHER AREA XI
333 25-May-24 R M HANDLING LC -9 XI
334 25-May-24 STAIR CASE FOR TAD 1 2 3 (KP - 03) XI
335 25-May-24 KILN FOUNDATION (NEAR RMH) XI
336 27-May-24 CONVEYOR BELT XI
337 27-May-24 SECOUNDARY CRUSHER AREA XI
338 27-May-24 CONVEYOR BELT XI
339 27-May-24 SECOUNDARY CRUSHER AREA XI
340 27-May-24 BAG HOUSE 01 XI
341 27-May-24 PACKING PLANT XI
342 27-May-24 BAG HOUSE 01 XI
343 27-May-24 BAG HOUSE XI
344 27-May-24 PRE HEATER XI
345 27-May-24 PACKING PLANT XI
346 28-May-24 STAIR CASE FOR TAD 1 2 3 (KP - 03) XI
347 29-May-24 SECOUNDARY CRUSHER AREA XI
348 29-May-24 LC - 01 XI
349 29-May-24 LC - 01 XI
350 29-May-24 CONVEYOR BELT XI
351 29-May-24 CONVEYOR BELT XI
352 29-May-24 SECOUNDARY CRUSHER AREA XI
353 30-May-24 NEAR COOLER BUILDING XI
354 31-May-24 CEMENT SILO - 03 STAIR CASE XI
355 31-May-24 CEMENT SILO - 03 STAIR CASE XI
356 31-May-24 CEMENT SILO - 03 STAIR CASE XI
357 1-Jun-24 CEMENT MILL BAG HOUSE XI
358 1-Jun-24 UF P.W.S.T. XI
359 1-Jun-24 DGWST AND PWST NEAR WTP XI
360 1-Jun-24 CEMENT MILL BAG HOUSE XI
361 3-Jun-24 DGWST AND PWST NEAR WTP XI
362 3-Jun-24 TRANSFER FOUNDATION XI
363 3-Jun-24 FABRICATION WORK XI
364 3-Jun-24 FABRICATION WORK XI
365 3-Jun-24 TRANSFER FOUNDATION XI
366 4-Jun-24 WEIGHT BRIDGE 2ND XI
367 4-Jun-24 WEIGHT BRIDGE 2ND XI
368 4-Jun-24 WEIGHT BRIDGE 2ND XI
369 4-Jun-24 NEAR COOLER BUILDING XI
370 4-Jun-24 BOUNDARY WALL NEAR RAILWAY LINE XI
371 4-Jun-24 BOUNDARY WALL FOR LABOUR COLONY XI

372 4-Jun-24 CONVEYAR BELT XI


373 4-Jun-24 D. M. TANK XI
374 5-Jun-24 D. M. TANK XI
375 5-Jun-24 COOLER BUILDING XI
376 5-Jun-24 D. M. TANK XI
377 7-Jun-24 COOLER BUILDING XI
378 7-Jun-24 ESP BUILDING (STAIR CASE) XI
379 7-Jun-24 PACKING PLANT XI
380 7-Jun-24 ELECTRICAL WORK UNIT- XI XI
381 8-Jun-24 ESP BUILDING (STAIR CASE) XI
382 8-Jun-24 ELECTRICAL WORK UNIT- XI XI
383 8-Jun-24 PACKING PLANT XI
384 11-Jun-24 PAINT WORK RAS XI XI
385 11-Jun-24 ELECTRICAL WORK UNIT- XI XI
386 11-Jun-24 ELECTRICAL WORK UNIT- XI XI

387 13-Jun-24 T. G. BUILDING DUCT AREA XI

388 15-Jun-24 CONVEYAR BELT XI


389 15-Jun-24 LOAD CENTER- 07 XI
390 15-Jun-24 CEMENT MILL BAG HOUSE XI
391 15-Jun-24 CONVEYAR BELT XI
392 18-Jun-24 PACKING PLANT XI
393 18-Jun-24 WATER TANK XI
394 18-Jun-24 PACKING PLANT XI
395 18-Jun-24 PACKING PLANT XI
396 20-Jun-24 BOUNDARY WALL XI
397 20-Jun-24 BOUNDARY WALL XI
398 21-Jun-24 PACKING PALNT XI
399 21-Jun-24 PRIMARY CRUSHER XI
400 21-Jun-24 SECOUNDARY CRUSHER AREA XI
401 21-Jun-24 PACKING PLANT XI
402 22-Jun-24 PACKING PLANT XI
403 22-Jun-24 PACKING PLANT XI
404 24-Jun-24 ELECTRIC WORK AT RAS XI XI
405 24-Jun-24 ELECTRIC WORK AT RAS XI XI
406 24-Jun-24 BOUNDARY WALL XI
407 24-Jun-24 BOUNDARY WALL XI
408 24-Jun-24 CONVEYAR BELT XI
409 25-Jun-24 SECOUNDARY CRUSHER AREA XI
410 25-Jun-24 WATER TANK PATHWAY XI
411 25-Jun-24 BOUNDARY WALL XI
412 25-Jun-24 BOUNDARY WALL XI
413 25-Jun-24 BOUNDARY WALL XI
414 25-Jun-24 BOUNDARY WALL XI
415 25-Jun-24 BOUNDARY WALL XI
416 25-Jun-24 BOUNDARY WALL XI
417 25-Jun-24 BOUNDARY WALL XI
418 26-Jun-24 PRIMARY CRUSHER AREA XI
419 26-Jun-24 BOUNDARY WALL XI
420 26-Jun-24 BOUNDARY WALL XI
421 26-Jun-24 INSTUMENT WORK XI
422 26-Jun-24 PACKING PLANT XI
423 26-Jun-24 PACKING PLANT XI
424 26-Jun-24 WATER TANK PATHWAY XI
425 27-Jun-24 P & M YARD SHEETING WORK XI

426 27-Jun-24 FABRICATION & ERECTION WORK XI

427 27-Jun-24 EXCAVATION WORK XI


428 27-Jun-24 BOUNDARY WALL XI
429 27-Jun-24 PIPE BED XI
430 27-Jun-24 PACKING PLANT XI
431 27-Jun-24 PACKING PLANT XI
432 27-Jun-24 RAS-XI MAIN GATE XI
433 28-Jun-24 ELECTRICAL WORK UNIT- XI XI
434 29-Jun-24 PACKING PLANT XI
435 29-Jun-24 PACKING PLANT XI
436 29-Jun-24 CEMENT SILO (GRADE SLAB) XI
437 1-Jul-24 PACKING PLANT XI
438 1-Jul-24 PACKING PLANT XI
439 1-Jul-24 SECOUNDARY CRUSHER AREA XI
440 1-Jul-24 STACKER AND RECLAIMER XI
441 1-Jul-24 STACKER AND RECLAIMER XI
442 2-Jul-24 SECOUNDARY CRUSHER AREA XI
02-07-2024
443 03-07-2024 RAILING WORK XI
444 3-Jul-24 PACKING PLANT XI
445 3-Jul-24 BOUNDARY WALL XI
446 3-Jul-24 BOUNDARY WALL XI
447 3-Jul-24 PACKING PLANT XI
448 4-Jul-24 PAINTING WORK AT UNIT 11 XI
449 4-Jul-24 BOUNDARY WALL XI
450 4-Jul-24 BOUNDARY WALL XI
451 4-Jul-24 BOUNDARY WALL XI
452 4-Jul-24 HUTMENT NEAR KHEDA PUMP HOUSE XI
453 5-Jul-24 WATER TREATMENT PLANT XI
454 6-Jul-24 WATER TREATMENT PLANT XI
455 9-Jul-24 CONVEYAR BELT XI
456 9-Jul-24 CONVEYAR BELT XI
457 10-Jul-24 CHIMANY XI
458 10-Jul-24 RCC FLOORING TAD2 & TAD3 XI
459 10-Jul-24 RCC FLOORING COOLER BUILDING & KP1 XI
460 10-Jul-24 BOUNDARY WALL XI
461 10-Jul-24 BOUNDARY WALL XI
462 10-Jul-24 BOUNDARY WALL XI
463 10-Jul-24 BOUNDARY WALL XI
464 10-Jul-24 BOUNDARY WALL XI
465 12-Jul-24 CONVEYAR FOOTING TR4 XI
466 12-Jul-24 MESS CUM R.M. HANDLING LC-9 XI
467 12-Jul-24 GYPSUM & LATERITE STORAGE SHED XI
468 12-Jul-24 CONVEYAR FOOTING TR4 XI
469 15-Jul-24 BRICKS BOUNDARY WALL XI
470 15-Jul-24 BRICKS BOUNDARY WALL XI
471 15-Jul-24 MESS CUM R.M. HANDLING LC-9 XI
472 16-Jul-24 PACKING PLANT XI
473 17-Jul-24 BOUNDARY WALL ( REVISED JMR) XI
474 19-Jul-24 BRU XI
475 19-Jul-24 FLY AISH SILO XI
476 19-Jul-24 PAINT WORK AT WEIGH BRIGE XI
477 19-Jul-24 PRIMARY CRUSHER BELT CON. BC-02 XI
478 19-Jul-24 PACKING PLANT XI
479 19-Jul-24 PACKING PLANT FAN FOUNDATION XI
480 19-Jul-24 FLY AISH SILO XI
481 19-Jul-24 LOAD CENTER -07 XI
482 22-Jul-24 SECOUNDARY CRUSHER AREA XI
483 22-Jul-24 PRIMARY CRUSHER BELT CON. BC-02 XI
484 22-Jul-24 T. R. 8 XI
485 22-Jul-24 RCC FLOORING (TAD1 & TAD2) XI
486 22-Jul-24 BOUNDARY WALL XI
487 22-Jul-24 BOUNDARY WALL XI
488 24-Jul-24 SHEETING WORK AT UNIT XI XI
489 24-Jul-24 BOUNDARY WALL XI
490 24-Jul-24 BOUNDARY WALL XI
491 24-Jul-24 PJBH BAG HOUSE (TRANSFARMER) XI
492 24-Jul-24 PJBH BAG HOUSE (TRANSFARMER) XI
493 24-Jul-24 PJBH LOAD CENTER XI

494 25-Jul-04 LC -01 TRANSFARMER FOUNDATION XI

495 25-Jul-04 PRIMARY CRUSHER BELT CON. BC-02 XI

496 25-Jul-04 L-S REJECT HOPPER XI

497 25-Jul-04 ESP BUILDING TUNNEL XI

498 29-Jul-24 RMH TT2 XI

499 29-Jul-24 GYPSUM & LATERITE STORAGE TANK XI

500 29-Jul-24 BRU XI

501 29-Jul-24 GYPSUM & LATERITE STORAGE TANK XI

502 19-Jul-24 LOAD CENTER -07 XI

503 23-Jul-24 T. R. 8 XI

504 27-Jul-24 RMH TT2 XI

505 30-Jul-24 TAIL END TUNNEL (CLINKER TANK ) N-3 XI

506 30-Jul-24 TAIL END TUNNEL (CLINKER TANK ) N-2 XI

507 30-Jul-24 TAIL END TUNNEL (CLINKER TANK ) N-1 XI

508 30-Jul-24 LIME STONE CRUSHER BC-6 XI

509 30-Jul-24 SECOUNDARY CRUSHER AREA XI

510 30-Jul-24 FLOORING KP-2 KP-3 XI

511 30-Jul-24 FLOORING KP-2 XI


512 30-Jul-24 FLOORING KP-1 KP-2 XI

513 30-Jul-24 FLOORING COOLER BUILDING & KP-1 XI

514 31-Jul-24 TEMPLE WORK XI

515 31-Jul-24 LIME STONE CRUSHER BC-6 XI

516 31-Jul-24 SECOUNDARY CRUSHER AREA XI


SECOUNDARY CRUSHER (BAGFILTER
517 31-Jul-24 XI
&FAN)
518 31-Jul-24 PRIMARY CRUSHER BELT CON. BC-02 XI
519 31-Jul-24 LC-01 AT CRUSHER XI
520 3-Aug-24 HANDRAILING WORK XI
521 10-Jun-24 LC-07 XI
522 16-Jun-24 CEMENT MILL BAG HOUSE XI
523 19-Jun-24 PACKING PLANT XI
524 20-Jun-24 PACKING PLANT XI
525 20-Jun-24 PACKING PLANT XI
526 21-Jun-24 PACKING PLANT XI
527 23-Jul-24 LOAD CENTER -07 XI
528 23-Jul-24 T. R. 8 XI
529 27-Jul-24 R.M.H. T.T.2 XI
530 6-Aug-24 PACKING PLANT XI
531 6-Aug-24 BRU TAIL PULLEY XI
532 6-Aug-24 CEMENT SILO 3 GRADE SLAB XI
533 9-Aug-04 TEMPLE WORK XI
534 9-Aug-04 WTP XI
535 9-Aug-04 ELECTRIC WORK AT RAS XI XI
536 10-Aug-24 LOAD CENTER 6 XI
537 12-Aug-04 COAL STOKE PILE CENTER WALL XI
538 12-Aug-04 WTP XI
539 12-Aug-04 T G BUILDING XI
540 12-Aug-04 T G BUILDING HOT WALL PIT XI
541 12-Aug-04 BRU XI
542 12-Aug-04 CEMENT SILO 3 GRADE SLAB XI
543 13-Aug-24 AQC BOILER XI
544 13-Aug-24 COAL STOKE PILE CENTER WALL XI
545 13-Aug-24 KILN COOLER LOAD CENTER 6 XI
546 14-Jul-24 TEMPLE WORK XI
547 14-Jul-24 KILN COOLER LOAD CENTER 6 XI
548 14-Jul-24 AQC BOILER XI
549 17-Aug-24 KILEN COOLER LOAD CENTER -6 XI
550 20-Aug-24 COOLER BUILDING XI
551 20-Aug-24 COOLER BUILDING XI
552 22.08.2024 COAL STOKE PILE XI
553 22.08.2024 COAL STOKE PILE XI
554 22.08.2024 COAL STOKE PILE XI
555 24.08.2024 BRU TTI XI

556 24.08.2024 LABOUR CAMP NEAR KHADA PAMP HOUSE XI

557 27.08.2024 coolar building PCC FLOORING XI


558 27.08.2024 AQC BUILDING FLOORING TOP LAVEL XI
559 27.08.2024 coolar building PCC FLOORING XI
560 28.08.2024 BRU TO TTI XI
561 28.08.2024 Indoor swlstation LC.10 XI
562 29.08.2024 Indoor swlstation LC.10 XI
563 30.08.2024 additiues feeding conveyour XI
564 30.08.2024 load center XI
565 31.08.2024 additiues feeding conveyour XI
566 31.08.2024 coal stoke pile XI
567 01.09.2024 RRM- BOUNDARY WALL XI
568 01.09.2024 RRM- BOUNDARY WALL XI
569 02.09.2024 HUTMAENT LABOUR CAMP XI
570 02.09.2024 LABOUR CABIN XI
571 02.09.2024 WATER TANK BOUNDARY XI
572 02.09.2024 WEIGHBRIDGE XI
573 03.09.2024 AIR COMPRESSER SET XI
574 03.09.2024 BACHING PLANT LG SET XI
575 03.09.2024 WULITY ROOM XI
576 03.09.2024 LABOUR COLONY XI
577 03.09.2024 BACHING PLANT WATER TANK XI
578 03.09.2024 CHEMICAL SET XI
579 03.09.2024 BOUNDARY WALL Y ANGLE XI
580 04.09.2024 TR2 XI
581 05.09.2024 TR2 XI
582 07.09.2024 NEAR WATER POND XI
583 07.09.2024 NEAR WATER POND XI
584 07.09.2024 LOD CENTER XI
585 07.09.2024 LOD CENTER XI
586 07.09.2024 COOLAR BUILDING XI
586 07.09.2024 COOLAR BUILDING XI
587 09.09.2024 COOLAR BUILDING XI
588 09.09.2024 COOLAR BUILDING XI
589 12.09.2024 CYCLONE BUILDING XI
590 12.09.2024 U-11 ELE PROJECT JOB WORK XI
591 14.09.2024 132 K SC LINE ON DC TOWER XI
592 14.09.2024 132 K DC LINE ON DC TOWER XI
593 16.09.2024 TR2 XI
594 16.09.2024 TR3 XI
595 16.09.2024 PACKING PLANT XI
596 16.09.2024 PACKING PLANT XI
597 18.09.2024 CLINKER LODING CONVEN XI
598 18.09.2024 LOD CENTER XI
599 18.09.2024 LC-10 XI
600 19.09.2024 LC-10 XI
601 19.09.2024 HYDRALIC ROOM XI
602 19.09.2024 BAG HOUSE XI
603 19.09.2024 CM BAG HOUSE XI
604 19.09.2024 COOLAR HOUSE XI
605 20.09.2024 RAS-XI PROJECT SITE XI
606 20.09.2024 RCC WTP SHED BUILDING XI
607 20.09.2024 TG BUILDING XI
608 20.09.2024 RMHTT1 XI
609 21.09.2024 TR-09 AND TR-10 XI
610 21.09.2024 TR-5 XI
611 21.09.2024 COAL STOCK PILE XI
612 21.09.2024 RMHTT1 XI
613 21.09.2024 GYPSUM LATERITE XI
614 23.09.2024 GYPSUM LATERITE XI
615 23.09.2024 COAL STOCK PILE XI
616 23.09.2024 PJBH FAN DUCT STRACTURE XI
617 24.09.2024 COAL STOCK PILE XI
618 24.09.2024 COAL STOCK PILE XI
619 24.09.2024 PJBH FAN DUCT STRACTURE XI
620 24.09.2024 TRANSFER TOWER RMTT-1 XI
621 25.09.2024 TRANSFER TOWER RMTT-1 XI
622 25.09.2024 CM BAG HOUSE XI
623 25.09.2024 RMH TT-7 XI
624 25.09.2024 GYPSUM LATERITE XI
625 25.09.2024 HOME PIPE LEYING WITH RRM XI
626 25.09.2024 HOME PIPE LEYING WITH RRM XI
627 26.09.2024 RMH TT-7 XI
628 27.09.2024 TR-5 XI
629 27.09.2024 TR-11 XI
630 27.09.2024 TR-12 XI
631 27.09.2024 TR-09 AND TR-10 XI
632 27.09.2024 TR-7 XI
633 27.09.2024 ROAD NEAR POWER PLANT XI
634 27.09.2024 RAS XI ELECTRIC WORK XI
635 28.09.2024 TR-7 XI
636 28.09.2024 TR-11 XI
637 28.09.2024 GYPSUM LATERITE XI
638 30.09.2024 ROAD NEAR LC-6 XI
639 30.09.2024 COAL STOCK PILE XI
640 30.09.2024 TR-3 AND TR-4 XI
641 30.09.2024 TR-5 XI
642 30.09.2024 TR-2 XI
643 01.09.2024 ADDEELIVE FEEDING CONVEYOUR XI
644 01.09.2024 ADDEELIVE FEEDING CONVEYOUR XI
645 01.09.2024 CS-2 INSID FLOOR XI
646 01.09.2024 KLINCOOLER LOAD CENTER LC-6 XI
647 01.09.2024 KLINCOOLER LOAD CENTER LC-6 XI
648 01.09.2024 UNIT 11 -FABRICATION- PARKING CANTEEN XI
649 01.09.2024 UNIT 11 -FABRICATION - RNCU CANTEEN XI
650 03.09.2024 LC-1 XI
651 03.09.2024 LC-1 XI
652 03.09.2024 LC-2 XI
653 03.09.2024 TR-1 XI
654 03.09.2024 COOL STOKE PILE XI
655 04.09.2024 LC-01 AT CRUSHER XI
656 04.09.2024 LC-01 AT CRUSHER XI
657 04.09.2024 DPC-TR1 XI
658 04.09.2024 BC-06 TR-3 XI
659 04.09.2024 SILLO AND ACC BUILDING XI
660 05.09.2024 COOLAR FAN XI
661 05.09.2024 WEIGHT BRIDGE XI
662 05.09.2024 BC-06 TR-12 XI
663 07.09.2024 RAW MATERIAL HANDLING LC-09 XI
664 07.09.2024 RAW MATERIAL HANDLING LC-09 XI
665 07.09.2024 RAW MATERIAL HANDLING LC-09 XI
666 07.09.2024 COOLAR FAN XI
667 08.09.2024 RAW MATERIAL HANDLING LC-09 XI
668 08.09.2024 RAW MATERIAL HANDLING LC-09 XI
669 08.09.2024 RAW MATERIAL HANDLING LC-09 XI
670 08.09.2024 LC-07 XI
671 08.09.2024 TR-10 XI
672 08.09.2024 CONV BCU XI
673 08.09.2024 BRU XI
674 08.09.2024 2 NO TOWER XI
675 08.09.2024 3 NO TOWER XI
676 08.09.2024 4 NO TOWER XI
677 08.09.2024 5 NO TOWER XI
678 08.09.2024 MCR 1-4 ( R2 XI
679 09.10.2024 COOLAR BUILDING XI
680 09.10.2024 RM HOPPER XI
681 09.10.2024 TR-2 XI
682 09.10.2024 OAD CENTER -6 XI
683 09.10.2024 LC-07 XI
684 09.10.2024 REJECT BELT FOUNDATION XI
685 09.10.2024 TR-06 XI
686 10.10.2024 TR-09 XI
687 10.10.2024 TR-08 XI
688 10.10.2024 TR-06 XI
689 10.10.2024 TT-1 XI
690 10.10.2024 TR-02 XI
691 10.10.2024 ADDITIVES FEEDING CONVEYAR XI
692 10.10.2024 TR-06 XI
693 10.10.2024 BC-01 AND TR-08 XI
694 10.10.2024 COMPRESSUR HOUSE FOOTING XI
695 10.10.2024 REJECT BELT FOUNDATION XI
696 10.10.2024 TR-02 XI
697 10.10.2024 RM HOPPER XI
698 10.10.2024 COOLAR BUILNDIN XI
699 12.10.2024 RAILING WORK MEASURMENT XI
700 12.10.2024 GR-1 , GR-2 XI
701 12.10.2024 CLINKER HANDELING NEAR LC-07 XI
702 12.10.2024 CABLE ROUTE MRC 1 TO 4 XI
703 12.10.2024 CABLE ROUTE TR 09 XI
704 12.10.2024 CABLE ROUTE MRC 1 TO 4 XI
705 12.10.2024 TR-02 XI
706 13.10.2024 TR -02 ( ADDITIONAL FOOTING CONVEYOUR XI
707 13.10.2024 GR 1 AND GR 2 XI
708 14.10.2024 PACKING PLANT XI
709 14.10.2024 LC-08 XI
710 14.10.2024 CLINKER TANK XI
711 14.10.2024 KILIN COOLER LOAD CENTER LC-06 XI
712 14.10.2024 KILIN COOLER LOAD CENTER LC-06 XI
713 14.10.2024 LC-08 XI
714 14.10.2024 TR-1 CONVEYOUR XI
715 14.10.2024 TR-05 XI
716 15.10.2024 LC-08 XI
717 15.10.2024 LOAD CENTER -06 XI
718 15.10.2024 CLINKER TANK XI
719 15.10.2024 KILIN COOLER LOAD CENTER LC-06 XI
720 15.10.2024 KILIN COOLER LOAD CENTER LC-06 XI
721 15.10.2024 TR-08 XI
722 15.10.2024 COMPRESSUR HOUSE FOOTING XI
723 15.10.2024 COAL STOCK PILE XI
724 15.10.2024 CL-08 XI
725 15.10.2024 TR-1 CONVEYOUR FOUNDATION XI
726 15.10.2024 TR-5 XI
727 16.10.2024 LOAD CENTER-06 XI
728 16.10.2024 LOAD CENTER-06 XI
729 16.10.2024 GYPSAN YARD XI
730 16.10.2024 TR-07 XI
731 16.10.2024 TR-07 XI
732 16.10.2024 ADDITIVE FEEDING CONVAER XI
733 16.10.2024 PACKING PLANT XI
734 16.10.2024 PACKING PLANT XI
735 16.10.2024 TR-11 XI
736 17.10.2024 LC-01 AT CRUSHER XI
737 17.10.2024 TR-11 XI
738 17.10.2024 PACKING PLANT XI
739 17.10.2024 PACKING PLANT XI
740 17.10.2024 TT-1 AND BRU XI
741 17.10.2024 TR-4 XI
742 17.10.2024 BC-06 , TR-06 XI
743 17.10.2024 BC-06 AND TR-02 XI
744 17.10.2024 TT-1 XI
745 17.10.2024 BC-07 , TR-03 XI
746 17.10.2024 TR-1 XI
747 18.10.2024 ADDITIVE FEEDING CONVAER XI
748 18.10.2024 CABLE RAFT ( TR-12 XI
749 18.10.2024 BRU XI
750 18.10.2024 BRU( POND SIDE
751 18.10.2024 PACKING PLANT XI
752 18.10.2024 PACKING PLANT XI
753 18.10.2024 PACKING PLANT XI
754 18.10.2024 PACKING PLANT XI
755 18.10.2024 ADDITIVE FEEDING CONVAER XI
756 18.10.2024 TR-02 XI
757 18.10.2024 OUTER SIDE ROAD XI
758 19.10.2024 MANDIR ( TOWNSHIP -
759 19.10.2024 BC2 R1 XI
760 19.10.2024 LC-01 XI
761 19.10.2024 CABLE ROUTE( MCP XI
762 19.10.2024 TR-08 XI
763 19.10.2024 TR-1 XI
764 19.10.2024 TR-04 XI
765 19.10.2024 OUTER SIDE ROAD XI
766 21.10.2024 BC2 , R1 XI
767 21.10.2024 BC-07 , TR-03 XI
768 21.10.2024 BC-07 , TR-04 XI
769 21.10.2024 TR-01 XI
770 21.10.2024 CABLE ROUTE( MCP XI
771 21.10.2024 LC-07 XI
772 21.10.2024 OUTER SIDE ROAD XI
773 22.10.2024 CLINKER HANDLINK CONVEYR XI
774 22.10.2024 LC-07 XI
775 22.10.2024 OUTER SIDE ROAD XI
776 10/23/2024 BRV XI
777 10/23/2024 CABLE ROUTE MCP-20 XI
778 10/23/2024 LC 07 XI
779 10/23/2024 PACKING PLANT XI
780 10/23/2024 PACKING PLANT XI
781 10/23/2024 OUTER SIDE ROAD XI
782 10/23/2024 CLHTT-2 XI
783 10/23/2024 TR3 XI
784 10/23/2024 LC 07 XI
785 10/24/2024 PACKING PLANT XI
786 10/24/2024 TR-4 XI
787 10/24/2024 TR-6 XI
788 10/24/2024 TR-5 XI
789 10/24/2024 RMH TT2 XI
790 10/24/2024 OUTER SIDE ROAD XI
791 10/24/2024 WATER TANK XI
792 10/25/2024 TR-5 XI
793 10/25/2024 CLHTT-2 XI
UNIT -11 CONSTRUCTION JOB AT VARIOUS
794 10/25/2024 XI
LOCATIONS
795 10/25/2024 WATER TANK XI
796 10/25/2024 TR-04 XI
797 10/26/2024 TR-01/BC-06 XI
798 10/26/2024 TR-04/BC-06 XI
799 10/26/2024 TR-08/BC-06 XI
800 10/26/2024 GR-04 XI
801 10/26/2024 TR-06 XI
802 10/26/2024 PACKING PLANT XI
803 10/26/2024 PACKING PLANT XI
804 10/26/2024 PACKING PLANT XI
805 10/26/2024 TR-05 XI
806 10/26/2024 GR-04 XI
807 10/26/2024 Coolen ESP Tunnel XI
808 10/27/2024 OUTER SIDE ROAD XI
809 10/28/2024 PACKING PLANT XI
810 10/29/2024 PACKING PLANT XI
811 10/29/2024 PACKING PLANT XI
812 10/29/2024 PACKING PLANT XI
813 10/29/2024 BRU XI
814 10/29/2024 TR-2 XI
815 10/29/2024 TR-2 XI
816 10/29/2024 TR-3 XI
817 10/29/2024 TR-3 XI
818 10/29/2024 TR-7 XI
819 10/29/2024 RMH TT XI
820 10/30/2024 RMH TT XI
821 10/30/2024 Stacker & reclaimer XI
822 11/4/2024 PACKING PLANT XI
823 11/4/2024 PACKING PLANT XI
824 11/4/2024 PACKING PLANT XI
825 11/4/2024 PACKING PLANT XI
826 11/4/2024 BRU XI
827 11/4/2024 COMPRESSUR HOUSE FOOTING XI
828 11/4/2024 COMPRESSUR HOUSE XI
829 11/4/2024 LATERITE CONVEYOR XI
830 11/4/2024 COMPRESSUR HOUSE XI
831 11/4/2024 COMPRESSUR HOUSE XI
832 11/4/2024 LC HANDLING LC02 XI
833 11/4/2024 CLINKER SILO XI
834 11/4/2024 FLY ASH SILO XI
835 11/5/2024 LC-07 XI
836 11/5/2024 FLY ASH SILO XI
837 11/5/2024 PACKING PLANT XI
838 11/5/2024 LATERITE CONVEYOR XI
839 11/5/2024 LS HANDLING LC02 XI
840 11/5/2024 LATERITE CONVEYOR XI
841 11/6/2024 LC07 XI
842 11/6/2024 PACKING PLANT XI
843 11/6/2024 PACKING PLANT XI
844 11/6/2024 PACKING PLANT XI
845 11/6/2024 ADDITIVE FEEDING CONVEYOR XI
846 11/6/2024 CLHTT-2 XI
847 11/6/2024 LATERITE CONVEYOR XI
848 11/6/2024 CLHTT-2 XI
849 11/6/2024 ADDITIVE FEEDING CONVEYOR XI
850 11/7/2024 PACKING PLANT XI
851 11/7/2024 PG BUILDING XI
852 11/7/2024 WTP SHED AREA XI
853 11/7/2024 CLINKER SILO XI
854 11/8/2024 PACKING PLANT XI
855 11/8/2024 PACKING PLANT XI
856 11/8/2024 PACKING PLANT XI
857 11/8/2024 COAL STOCK PILE XI
858 11/8/2024 LIME SSTONE CONVEYOR 11201 XI
859 11/8/2024 LC-2 XI
860 11/8/2024 SWITCH YARD XI
861 11/8/2024 WATER TANK AND PUMP HOUSE XI
862 11/8/2024 PRE HEATER XI
863 11/8/2024 CLINKER HANDLING CONVEYOR XI
864 11/9/2024 TR-08 XI
865 11/9/2024 PACKING PLANT XI
866 11/9/2024 CLHTT-2 XI
867 11/9/2024 EG-3&4 XI
868 11/9/2024 FLY ASH SILO XI
869 11/9/2024 FLY ASH SILO XI

870 11/11/2024 LABOUR COLONY XI

871 11/11/2024 PACKING PLANT XI


872 11/11/2024 PACKING PLANT XI
873 11/11/2024 COOLER BUILDING XI
874 11/11/2024 TR-8 XI
875 11/11/2024 LIME STONE CONVEYOR 11201 XI
876 11/11/2024 SWITCH YARD XI
877 11/11/2024 SWITCH YARD XI
878 11/11/2024 TR-4 XI
879 11/11/2024 SWITCH YARD XI
880 11/11/2024 SWITCH YARD XI
881 11/12/2024 TR-08 XI
882 11/12/2024 LHSTT-1 XI
883 11/12/2024 WATER TANK AND PUMP HOUSE XI
884 11/12/2024 COOLER BUILDING XI
885 11/12/2024 ADDITIVE FEEDING CONVEYOR XI
886 11/13/2024 TR-08 XI
887 11/13/2024 TR-01 XI
888 11/13/2024 GR-09 XI
889 11/13/2024 LHSTT-1 XI
890 11/13/2024 CLINKER HANDLING XI
891 11/13/2024 TR-04 XI
892 11/13/2024 TR-01 XI
893 11/13/2024 TUNNEL ELEVATOR XI
894 11/13/2024 CLINKER FEED HOPPER XI
895 11/13/2024 SWITCH YARD XI
896 11/14/2024 RMH TT1 XI
897 11/14/2024 BUCKET ELEVATOR XI
898 11/14/2024 TR-1 XI
899 11/14/2024 PACKING PLANT XI
900 11/14/2024 PACKING PLANT XI
901 11/14/2024 PACKING PLANT XI
902 11/14/2024 BAG HOUSE XI
903 11/14/2024 COAL STOKE PILE XI
904 11/14/2024 WATER TANK AND PUMP HOUSE XI
905 11/14/2024 CLINKER HOPPER BUILDING XI
906 11/14/2024 LABOUR HUTMAN XI
907 11/15/2024 GR-10;GR-11;GR-12 XI
908 11/15/2024 CLINKER HANDLING XI
909 11/15/2024 RMH TT1 XI
910 11/15/2024 BUCKET ELEVATOR XI
911 11/16/2024 PACKING PLANT XI
912 11/16/2024 RMHTT6 XI
913 11/16/2024 FOUNDATION FOR CONVEYOR XI
914 11/16/2024 GG182 XI
915 11/16/2024 FLY ASH SILO FEEDING XI
916 11/16/2024 RMHTT6 XI
917 11/16/2024 PACKING PLANT XI
918 11/16/2024 PACKING PLANT XI
919 11/16/2024 PACKING PLANT XI
920 11/16/2024 BAG HOUSE XI
921 11/16/2024 COAL STOCK PILE XI
922 11/16/2024 FOUNDATION FOR CONVEYOR XI
923 11/16/2024 COMPRESSOR HOUSE XI
924 11/16/2024 COMPRESSOR HOUSE XI
925 11/18/2024 F-9 ( MAGNETIC SEPERATOR) XI
926 11/18/2024 PACKING PLANT XI
927 11/18/2024 PACKING PLANT XI
928 11/18/2024 PACKING PLANT XI
929 11/18/2024 WATER TANK AND PUMP HOUSE XI
930 11/19/2024 PACKING PLANT XI
931 11/19/2024 PACKING PLANT XI
932 11/19/2024 PACKING PLANT XI
933 11/19/2024 PACKING PLANT XI
934 11/19/2024 ACC BUILDING XI
935 11/19/2024 GG1 &GG2 XI
936 11/19/2024 TR-06 XI
937 11/19/2024 ACC BUILDING XI
UNIT -11 CONSTRUCTION JOB AT VARIOUS
938 11/19/2024 XI
LOCATIONS
939 11/19/2024 COMPRESSOR HOUSE XI
940 11/19/2024 COMPRESSOR HOUSE XI
941 11/19/2024 HOT AIR DUCT XI
942 11/20/2024 TR-06 XI
943 11/20/2024 SWITCH YARD XI
944 11/20/2024 GR-9;GR-10;GR-11;GR-12 XI
945 11/20/2024 BC-07 AND TR-2 XI
946 11/20/2024 BC-07 AND TR-1 XI
947 11/21/2024 FLY ASH SILO XI
948 11/21/2024 FLY ASH SILO XI
949 11/21/2024 RC BUILDING XI
950 11/21/2024 PACKING PLANT XI
951 11/21/2024 PACKING PLANT XI
952 11/21/2024 PACKING PLANT XI
953 11/21/2024 PACKING PLANT XI
954 11/21/2024 TR-3 XI
955 11/21/2024 TR-3 XI
956 11/21/2024 HOT AIR DUCT XI
957 11/21/2024 HOT AIR DUCT XI
958 11/21/2024 SWITCH YARD XI
959 11/21/2024 CLINKER TANK XI
UNIT -11 CONSTRUCTION JOB AT VARIOUS
960 11/21/2024 XI
LOCATIONS
961 11/21/2024 220KV LINE TOWER XI
962 11/21/2024 LABOUR HUTMAN XI
963 11/22/2024 SWITCH YARD XI
964 11/22/2024 SWITCH YARD XI
965 11/22/2024 PACKING PLANT XI
966 11/22/2024 COMPRESSOR HOUSE XI
967 11/22/2024 CEMENT MILL FEEDING XI
968 11/22/2024 SWITCH YARD XI
969 11/22/2024 EXTRACTION TUNNEL F1 FOOTING XI
970 11/22/2024 TR-05 XI
971 11/23/2024 SWITCH YARD XI
972 11/23/2024 SWITCH YARD XI
973 11/23/2024 HOT AIR DUCT XI
974 11/23/2024 HOT AIR DUCT XI
975 11/23/2024 TR-05 XI
976 11/23/2024 LC-2 XI
977 11/25/2024 TR-09 XI
978 11/25/2024 TR-06 XI
979 11/25/2024 TR-01 XI
980 11/25/2024 TR-02 XI
981 11/25/2024 TR-01 XI
982 11/25/2024 TR-06 XI
983 11/25/2024 TR-01;TR-02;TR-03 XI
984 11/25/2024 PACKING PLANT XI
985 11/25/2024 PACKING PLANT XI
986 11/25/2024 BAG HOUSE XI
987 11/25/2024 CEMENT SILO XI
988 11/25/2024 TR-02 XI
989 11/25/2024 PRE HEATER XI
990 11/25/2024 CLINKER HANDLING XI
991 11/25/2024 HOT AIR DUCT XI
992 11/25/2024 TR-09 XI
993 11/25/2024 ACC BUILDING XI
994 11/26/2024 TR-06 XI
995 11/26/2024 CEMENT SILO XI
996 11/26/2024 ACC BUILDING XI
997 11/26/2024 TR-05 XI
998 11/26/2024 PACKING PLANT XI
999 11/26/2024 BAG HOUSE XI
1000 11/26/2024 COMPRESSOR HOUSE XI
1001 11/26/2024 COMPRESSOR HOUSE XI
1002 11/26/2024 TR-04 XI
1003 11/26/2024 ACC BUILDING XI
1004 11/27/2024 OUTER SIDE ROAD XI
1005 11/27/2024 PACKING PLANT XI
1006 11/27/2024 CMBH AIRSLIDE FOOTING XI
1007 11/27/2024 CMBH AIRSLIDE FOOTING XI
1008 11/27/2024 TR-05 XI
1009 11/27/2024 TR-04 XI
1010 11/27/2024 TR-06 XI
1011 11/28/2024 BRU MAGNETIC SEPERATOR XI
1012 11/28/2024 TALE PULLY XI
1013 11/28/2024 PACKING PLANT XI
1014 11/28/2024 PACKING PLANT XI
1015 11/28/2024 TALE PULLY XI
1016 11/28/2024 TR-06 XI
1017 11/28/2024 BRU MAGNETIC SEPERATOR XI
1018 11/28/2024 PACKING PLANT XI
1019 11/28/2024 COAL STOCK PILE XI
1020 11/28/2024 CLINKER HANDLING XI
1021 11/28/2024 SWITCH YARD XI
1022 11/28/2024 SWITCH YARD XI
1023 11/28/2024 COAL STOCK PILE XI
1024 11/29/2024 BUCKET ELEVATOR XI
1025 11/29/2024 BUCKET ELEVATOR XI

1026 11/29/2024 TT-3 CONVEYOR NO.111207 BC-03 XI

1027 11/29/2024 TT-3 CONVEYOR NO.111207 BC-03 XI

UNIT -11 CONSTRUCTION JOB AT VARIOUS


1028 11/29/2024 XI
LOCATIONS
1029 11/29/2024 SWITCH YARD XI
1030 11/29/2024 SWITCH YARD XI
1031 11/29/2024 COAL STOCK PILE XI
1032 11/30/2024 PACKING PLANT XI

1033 11/30/2024 CRUSHER CONVEYOR XI

1034 11/30/2024 CRUSHER CONVEYOR XI

1035 11/30/2024 OUTER SIDE ROAD XI


1036 11/30/2024 OUTER SIDE ROAD XI
1037 11/30/2024 COAL STOCK PILE XI
1038 11/30/2024 COAL STOCK PILE XI
1039 12/2/2024 SWITCH YARD XI
1040 12/2/2024 RR WALL XI
1041 12/2/2024 STACKER XI
1042 12/2/2024 PACKING PLANT XI
1043 12/3/2024 TR-07 XI
1044 12/3/2024 TR-07 XI
1045 12/3/2024 RMHTT3 XI
1046 12/3/2024 PACKING PLANT XI
1047 12/3/2024 RMHTT3 XI
1048 12/3/2024 SECONDARY CRUSHER TUNNEL BC-06 XI
1049 12/4/2024 OUTER SIDE ROAD XI
1050 12/4/2024 SWITCH YARD XI
1051 12/4/2024 PRE HEATER XI
1052 12/4/2024 SWITCH YARD XI
1053 12/4/2024 CEMENT SILO-3 XI
1054 12/4/2024 PRE HEATER XI
1055 12/4/2024 CLINKER FEED HOPPER XI
1056 12/5/2024 PACKING PLANT XI
1057 12/5/2024 BAG HOUSE XI
1058 12/5/2024 BAG HOUSE XI
1059 12/5/2024 RC BUILDING XI
1060 12/5/2024 BRU MAGNETIC SEPERATOR XI
1061 12/5/2024 BC-07 AND TR-10 XI
1062 12/5/2024 BRU MAGNETIC SEPERATOR XI
1063 12/5/2024 BC-07 AND TR-10 XI
1064 12/6/2024 RAW MILL RECIRCULATION BUILDING XI
1065 12/6/2024 RMHTT5 XI
1066 12/6/2024 PACKING PLANT XI
1067 12/6/2024 PACKING PLANT XI
1068 12/6/2024 BOUNDARY WALL OUTER XI
1069 12/6/2024 RMHTT5 XI
1070 12/7/2024 SWITCH YARD XI
1071 12/7/2024 PACKING PLANT XI
1072 12/7/2024 FEED HOOPER XI
1073 12/7/2024 FEED HOOPER XI
1074 12/7/2024 SWITCH YARD XI
1075 12/7/2024 CLINKER FEED HOPPER XI
1076 12/7/2024 SWITCH YARD XI
UNIT -11 CONSTRUCTION JOB AT VARIOUS
1077 12/9/2024 XI
LOCATIONS
1078 12/9/2024 RAW MILL RECIRCULATION BUILDING XI
1079 12/9/2024 COAL MILL BUILDING XI
1080 12/9/2024 PACKING PLANT XI
1081 12/9/2024 KP-03 XI
1082 12/9/2024 GYPSUM AND LATERITE STORAGE XI
1083 12/10/2024 OUTER SIDE ROAD XI
1084 12/10/2024 BAG HOUSE XI
1085 12/10/2024 BAG HOUSE XI
1086 12/12/2024 GYPSUM AND LATERITE yard XI
1087 12/13/2024 CLINKER TANK XI
1088 12/13/2024 SWITCH YARD XI
1089 12/13/2024 SWITCH YARD XI
1090 12/13/2024 COMPTESSER HOUSE XI
1091 12/13/2024 FEED HOOPER XI
1092 12/13/2024 FEED HOOPER XI
1093 12/13/2024 PACKING PLANT XI
1094 12/13/2024 PACKING PLANT XI
1095 12/13/2024 PACKING PLANT XI
1096 12/13/2024 PACKING PLANT XI
1097 12/13/2024 PACKING PLANT XI
1098 12/13/2024 PACKING PLANT XI
1099 12/13/2024 SWITCH YARD XI
1100 12/13/2024 SWITCH YARD XI
1101 12/14/2024 GYPSUM YARD SIDE XI
1102 12/14/2024 TR-10 XI
1103 12/14/2024 COAL MILL BUILDING XI
1104 12/14/2024 COAL MILL BUILDING XI
1105 12/14/2024 COAL MILL BUILDING XI
1106 12/14/2024 SWITCH YARD XI
1107 12/14/2024 CM HOPPER XI
1108 12/14/2024 BRU XI
1109 12/16/2024 SWITCH YARD XI
1110 12/16/2024 COPRESSOR HOUSE XI
1111 12/16/2024 EXTRACTION TUNNEL XI
1112 12/16/2024 SWITCH YARD XI
1113 12/16/2024 BS-02 TR-03 XI
1114 12/16/2024 BS-02 TR-02 XI
1115 12/16/2024 BS-07 TR-13 XI
1116 12/16/2024 BS-07 TR-13 XI
1117 12/16/2024 BC-02 TR-02 XI
1118 12/16/2024 SWITCH YARD XI
1119 12/16/2024 COMPRESSOR HOUSE XI
1120 12/16/2024 COMPRESSOR HOUSE XI
1121 12/16/2024 BS-02 TR-03 XI
1122 12/16/2024 BC-02 TR-07 XI
1123 12/16/2024 BC-02 TR-07 XI
UNIT -11 CONSTRUCTION JOB AT VARIOUS
1124 XI
12/17/2024 LOCATIONS
1125 12/17/2024 COAL STOCK PILE XI
1126 12/17/2024 LIME STOCK PILE SHED XI
1127 12/17/2024 COAL STOCK PILE XI
1128 12/17/2024 LIME STOCK PILE SHED XI
1129 12/17/2024 SECONDARY CRUSHER STOCK FDN(CHIMNEY) XI
1130 12/17/2024 SECONDARY CRUSHER TUNNEL BC-06 XI
1131 12/17/2024 SECONDARY CRUSHER TUNNEL BC-06 XI
1132 12/17/2024 SECONDARY CRUSHER BAG FILTER PART XI
1133 12/17/2024 SECONDARY CRUSHER TUNNEL BC-06 XI
1134 12/17/2024 SECONDARY CRUSHER TUNNEL BC-06 XI
1135 12/17/2024 COMPRESSOR HOUSE XI
1136 12/17/2024 R.M. HOPPER BUILDING XI
1137 12/17/2024 SWITCH YARD XI
1138 12/17/2024 CLINKER TANK XI
1139 12/18/2024 OUTER SIDE ROAD XI
1140 12/18/2024 RAW MILL RECIRCULATION BUILDING XI
1141 12/18/2024 ACC BUILDING XI
1142 12/18/2024 RAW MILL RECIRCULATION BUILDING XI
1143 12/18/2024 CABLE ROUTE MCR 15 XI
1144 12/18/2024 ACC BUILDING XI
1145 12/18/2024 PACKING PLANT XI
1146 12/18/2024 PACKING PLANT XI
1147 12/18/2024 CABLE ROUTE MCR 15 XI
1148 12/18/2024 CM HOPPER XI
1149 12/18/2024 TR-10 XI
1150 12/18/2024 TR-10 XI
1151 12/18/2024 AIR WASER TANK XI
1152 12/19/2024 CONVEYOR TR-09 XI
1153 12/19/2024 RM HOPPER XI
1154 12/19/2024 LC-10 XI
1155 12/19/2024 CLINKER TANK XI
1156 12/19/2024 CLINKER TANK XI
1157 12/19/2024 COMPRESSURE HOUSE XI
1158 12/19/2024 COMPRESSURE HOUSE XI
1159 12/19/2024 COMPRESSURE HOUSE XI
1160 12/19/2024 TR-10 XI
1161 12/19/2024 TR-9 XI
1162 12/19/2024 COAL STOCK PILE XI
1163 12/19/2024 LIME STOCK PILE SHED XI
1164 12/19/2024 LIME STOCK PILE SHED XI
1165 12/19/2024 KP-03 XI
UNIT -11 CONSTRUCTION JOB AT VARIOUS
1166 XI
12/20/2024 LOCATIONS
UNIT -11 CONSTRUCTION JOB AT VARIOUS
1167 XI
12/20/2024 LOCATIONS
1168 12/20/2024 CLINKER TANK XI
1169 12/20/2024 GYPSUM AND LATERITE SITE XI
1170 12/20/2024 COAL STOCK PILE XI
1171 12/21/2024 PACKING PLANT XI
1172 12/21/2024 PACKING PLANT XI
1173 12/21/2024 LIME STOCK PILE SHED XI
1174 12/21/2024 COAL STOCK PILE XI
1175 12/21/2024 COAL STOCK PILE XI
1176 12/21/2024 LIME STOCK PILE SHED XI
1177 12/21/2024 COAL STOCK PILE XI
1178 12/23/2024 TR-10 XI
1179 12/23/2024 TR-12 XI
1180 12/23/2024 TR-09 XI
1181 12/23/2024 TR-09 XI
1182 12/23/2024 PACKING PLANT XI
1183 12/23/2024 PACKING PLANT XI
1184 12/23/2024 COMPRESSOR HOUSE XI
1185 12/23/2024 COMPRESSOR HOUSE XI
1186 12/23/2024 CLINKER TANK XI
1187 12/23/2024 CLINKER TANK XI
1188 12/23/2024 TR-01 XI
1189 12/23/2024 COAL STOCK PILE XI
1190 12/23/2024 LIME STOCK PILE SHED XI
1191 12/23/2024 LIME STOCK PILE SHED XI
1192 12/23/2024 COAL STOCK PILE XI
1193 12/24/2024 PACKING PLANT XI
1194 12/24/2024 PACKING PLANT XI
1195 12/24/2024 COAL STOCK PILE XI
1196 12/24/2024 LIME STOCK PILE SHED XI
1197 12/24/2024 COAL STOCK PILE XI
1198 12/24/2024 CLINKER TANK XI
1199 12/24/2024 CLINKER TANK XI
1200 12/24/2024 CLINKER TANK XI
1201 12/24/2024 GYPSUM AND LATERITE SITE XI
1202 12/24/2024 TR-4 XI
1203 12/24/2024 PACKING PLANT XI
1204 12/24/2024 CEMENT MILL RECIRCULATION BUILDING XI
1205 12/25/2024 RAS TWONSHIP NAR NURSERY XI
1206 12/25/2024 RRM OF H TOWER XI
1207 12/25/2024 TEMPRORY TOILET BLOCK XI
1208 12/25/2024 COAL STOCK PILE XI
1209 12/25/2024 RAW MILL RECIRCULATION BUILDING XI
1210 12/25/2024 LC-07 XI
1211 12/25/2024 TR-01 XI
1212 12/25/2024 TR-01 XI
1213 12/25/2024 BRU XI
1214 12/26/2024 PACKING PLANT XI
1215 12/26/2024 PACKING PLANT XI
1216 12/26/2024 PACKING PLANT XI
1217 12/26/2024 CEMENT MILL RECIRCULATION BUILDING XI
1218 12/26/2024 RAW MILL RECIRCULATION BUILDING XI
1219 12/26/2024 SWITCH YARD XI
1220 12/26/2024 SWITCH YARD XI
1221 12/27/2024 PACKING PLANT XI
1222 12/27/2024 PACKING PLANT XI
1223 12/27/2024 LIME STOCK PILE SHED XI
1224 12/27/2024 COAL STOCK PILE XI
1225 12/27/2024 COAL MILL BUILDING XI
1226 12/27/2024 GYPSUM AND LATERITE XI
1227 12/27/2024 LATERITE CONVEYOR XI
1228 12/27/2024 LATERITE CONVEYOR XI
1229 12/27/2024 TR-01 XI
1230 12/28/2024 OUTER SIDE ROAD XI
1231 12/28/2024 TR-4 XI
1232 12/28/2024 LIME STOCK PILE SHED XI
1233 12/28/2024 COAL STOCK PILE XI
1234 12/28/2024 LC-6 XI
1235 12/28/2024 MCR 16&17 XI
1236 12/28/2024 PACKING PLANT XI
1237 12/28/2024 PACKING PLANT XI
1238 12/28/2024 CEMENT MILL RECIRCULATION BUILDING XI
1239 12/28/2024 SILO 2&3 XI
1240 12/30/2024 SILO 2&3 XI
1241 12/30/2024 ACC BUILDING XI
1242 12/30/2024 ACC BUILDING XI
1243 12/30/2024 ACC BUILDING XI
1244 12/30/2024 PIPE ROUTE FOOTING XI
1245 12/30/2024 PIPE ROUTE FOOTING XI
1246 12/30/2024 BRU RETAINING WALL XI
1247 12/30/2024 COAL MILL BUILDING XI
1248 12/30/2024 RAW MILL RECIRCULATION BUILDING XI
1249 12/30/2024 CYCLONE BUILDING XI
1250 12/30/2024 BRU RETAINING WALL XI
1251 12/30/2024 CEMENT BAG HOUSE XI
1252 12/30/2024 PACKING PLANT XI
1253 12/30/2024 PACKING PLANT XI
1254 12/30/2024 PACKING PLANT XI
1255 12/30/2024 TR-5 XI
1256 12/30/2024 TR-5 XI
UNIT -11 PAINTING JOB AT VARIOUS
1257 XI
12/31/2024 LOCATIONS
UNIT -11 PAINTING JOB AT VARIOUS
1258 XI
12/31/2024 LOCATIONS
1259 12/31/2024 TEMPRORY TOILET BLOCK XI
1260 12/31/2024 SECURITY BARRICADE XI
1261 12/31/2024 CEMENT SILO 2&3 XI
1262 12/31/2024 CEMENT SILO 2&3 XI
1263 12/31/2024 GYPSUM AND LATERITE SITE XI
1264 12/31/2024 TR-01 XI
1265 12/31/2024 TR-01 XI
1266 12/31/2024 SECONDARY CRUSHER BAG FILTER XI
1267 12/31/2024 SECONDARY CRUSHER TUNNEL BC-06 XI
1268 12/31/2024 SWITCH YARD XI
1269 12/31/2024 RAW MILL RECIRCULATION BUILDING XI
1270 12/31/2024 CYCLONE BUILDING XI
1271 1/1/2025 RAS TWONSHIP NEAR NURSERY XI
1272 1/1/2025 RAS TWONSHIP NEAR NURSERY XI
1273 1/1/2025 PRIMARY CRUSHER TUNNEL XI
1274 1/2/2025 PACKING PLANT XI
1275 1/2/2025 PACKING PLANT XI
1276 1/2/2025 PIPE ROUTE FOOTING XI
1277 1/2/2025 PIPE ROUTE FOOTING XI
1278 1/2/2025 SWITCH YARD XI
1279 1/2/2025 SWITCH YARD XI
1280 1/2/2025 SWITCH YARD XI
1281 1/2/2025 SWITCH YARD XI
1282 1/2/2025 SWITCH YARD XI
1283 1/2/2025 PH BOILER XI
1284 1/2/2025 PH BOILER XI
1285 1/3/2025 ACC BUILDING XI
1286 1/3/2025 ACC BUILDING XI
1287 1/3/2025 ACC BUILDING XI
1288 1/3/2025 mcr 12 &13 XI
1289 1/3/2025 MCR 16 &17 XI
1290 1/3/2025 PH BOILER XI
1291 1/3/2025 PH BOILER XI
1292 1/3/2025 RMH TT4 XI
1293 1/3/2025 RMH TT4 XI
1294 1/3/2025 MCR-11 XI
1295 1/3/2025 mcr 12 &13 XI
1296 1/3/2025 RAW MILL XI
1297 1/3/2025 RAW MILL XI
1298 1/4/2025 BRU XI
1299 1/4/2025 MCR 12 &13 XI
1300 1/4/2025 FEED HOOPER XI
1301 1/4/2025 MCR-11 XI
1302 1/6/2025 BC-04 XI
1303 1/6/2025 BC-04 XI
1304 1/6/2025 BC-04 XI
1305 1/6/2025 BC-07 XI
1306 1/6/2025 PIPE LINE XI
1307 1/6/2025 PIPE LINE XI
1308 1/6/2025 PIPE LINE XI
1309 1/6/2025 PIPE LINE XI
1310 1/6/2025 FEED HOOPER XI
1311 1/6/2025 MCR-17 XI
1312 1/6/2025 MCR-17 XI
1313 1/6/2025 CLINKER TANK XI
1314 1/6/2025 ACC BUILDING XI
1315 1/6/2025 ACC BUILDING XI
1316 1/7/2025 MCR -11 XI
1317 1/7/2025 TR-15 XI
1318 1/7/2025 BLENDING SILO XI
1319 1/7/2025 TRANSFER TOWER RMTT-1 XI
1320 1/7/2025 MCR -15 XI
1321 1/7/2025 MCR -15 XI
1322 1/7/2025 TR-2 XI
1323 1/8/2025 BOX CULVERT XI
1324 1/8/2025 RCC DRAIN XI
1325 1/8/2025 COAL HANDLING CONVEYOR XI
1326 1/8/2025 COAL STOKE PILE XI
1327 1/8/2025 LIME STOCK PILE SHED XI
1328 1/8/2025 BRU XI
1329 1/8/2025 BRU XI
1330 1/8/2025 SWITCH YARD XI
1331 1/8/2025 TR2 XI
1332 1/8/2025 TR2 XI
1333 1/8/2025 SWITCH YARD XI
1334 1/8/2025 SWITCH YARD XI
1335 1/8/2025 PACKING PLANT XI
1336 1/8/2025 PACKING PLANT XI
1337 1/9/2025 SILO 2 & 3 XI
1338 1/9/2025 SILO 2 & 3 XI
1339 1/9/2025 SILO 2 & 3 XI
1340 1/9/2025 SWITCH YARD XI
1341 1/9/2025 SWITCH YARD XI
1342 1/9/2025 PACKING PLANT XI
1343 1/9/2025 PACKING PLANT XI
1344 1/9/2025 BC-2 XI
1345 1/9/2025 BRU XI
1346 1/10/2025 RAS TOWNSHIP NEAR NURSERY XI
1347 1/10/2025 RAS TOWNSHIP NEAR NURSERY XI
1348 1/10/2025 TR2 XI
1349 1/10/2025 PIPE LINE XI
1350 1/10/2025 TEMPRORY TOILET BLOCK XI
1351 1/10/2025 TR-4 XI
1352 1/10/2025 TRANSFER TOWER CLHTT-1 XI
1353 1/10/2025 CLINKER HAND LINER XI
1354 1/10/2025 COAL STAKE PILE XI
1355 1/10/2025 LIME STOCK PILE SHED XI
1356 1/10/2025 MCR-11 XI
1357 1/11/2025 ACC BUILDING XI
1358 1/11/2025 ACC BUILDING XI
1359 1/11/2025 TR-3 XI
1360 1/13/2025 ACC BUILDING XI
1361 1/13/2025 ACC BUILDING XI
1362 1/13/2025 BRU XI
1363 1/13/2025 TR-3 XI
1364 1/13/2025 RECLAIMER BELT XI
1365 1/13/2025 RECLAIMER BELT XI
1366 1/13/2025 COAL MILL HOBBER XI
1367 1/13/2025 TR-5 XI
1368 1/13/2025 TR-5 XI
1369 1/13/2025 PACKING PLANT XI
1370 1/14/2025 BRU XI
1371 1/15/2025 TR-4 XI
1372 1/15/2025 CM BAG HOUSE XI
1373 1/15/2025 PIPE LINE FOOTING XI
1374 1/15/2025 PIPE LINE FOOTING XI
1375 1/15/2025 PIPE LINE FOOTING XI
1376 1/15/2025 CT MAKE TANK XI
1377 1/15/2025 ADDITIVE CONVEYOR XI
1378 1/16/2025 MAIN GATE XI
1379 1/16/2025 MAIN GATE XI
1380 1/16/2025 TR-1 XI
1381 1/16/2025 TR-1 XI
1382 1/16/2025 LC-8 XI
1383 1/16/2025 PACKING PLANT XI
1384 1/16/2025 PACKING PLANT XI
1385 1/17/2025 PH BOILER XI
1386 1/17/2025 TR-3 XI
1387 1/17/2025 CLHTT1 XI
1388 1/17/2025 PACKING PLANT XI
1389 1/17/2025 PACKING PLANT XI
1390 1/17/2025 RMH TT4 XI
1391 1/17/2025 TR-04 XI
1392 1/17/2025 PH BOILER XI
1393 1/17/2025 BC-1 XI
1394 1/17/2025 SILO 2 &3 XI
1395 1/18/2025 BAG HOUSE XI
1396 1/18/2025 GR-14 XI
1397 1/18/2025 GR-14 XI
1398 1/18/2025 GR-15 XI
1399 1/18/2025 CLHTT1 XI
1400 1/18/2025 TR3 XI
1401 1/18/2025 COAL HOT AIR DUCT XI
1402 1/18/2025 COAL HOT AIR DUCT XI
1403 1/18/2025 RMH TT4 XI
1404 1/18/2025 ROOT BLOWER XI
1405 1/18/2025 ROOT BLOWER XI
1406 1/18/2025 ROOT BLOWER XI
1407 1/18/2025 ROOT BLOWER XI
1408 1/18/2025 BC-04 XI
1409 1/20/2025 TR-14 XI
1410 1/20/2025 BC-1 XI
1411 1/20/2025 BC-1 XI
1412 1/20/2025 GR-15 XI
1413 1/20/2025 BAG HOUSE XI
1414 1/20/2025 LC-02 XI
1415 1/20/2025 LIMESTONE STACKER AND RECLAIMERS XI
1416 1/21/2025 COAL MILL HOBBER XI
1417 1/21/2025 BC-04 XI
1418 1/21/2025 BC-04 XI
1419 1/21/2025 PACKING PLANT LC-08 XI
1420 1/21/2025 PACKING PLANT LOADER AREA XI
1421 1/21/2025 PACKING PLANT LOADER AREA XI
1422 1/21/2025 COMPRESSOR HOUSE XI
1423 1/21/2025 COMPRESSOR HOUSE XI
1424 1/21/2025 LC-02 XI
1425 1/21/2025 LIMESTONE STACKER AND RECLAIMERS XI
1426 1/22/2025 BLENDING SILO XI
1427 1/23/2025 CYCLONE BUILDING XI
1428 1/23/2025 CYCLONE BUILDING XI
1429 1/23/2025 BC-09 XI
1430 1/23/2025 BC-07 XI
1431 1/23/2025 CLINKER TANK XI
1432 1/23/2025 LC-6 XI
1433 1/23/2025 CLINKER TANK XI
1434 1/23/2025 LC-6 XI
1435 1/23/2025 PIPE LINE XI
1436 1/23/2025 PIPE LINE XI
1437 1/23/2025 PACKING PLANT XI
1438 1/23/2025 PACKING PLANT XI
1439 1/23/2025 PACKING PLANT XI
1440 1/23/2025 ROOT BLOWER XI
1441 1/23/2025 ROOT BLOWER XI
1442 1/23/2025 GYPSUM LETERITE XI
1443 1/24/2025 BC-09 XI
1444 1/24/2025 CLHTT1 XI
1445 1/24/2025 COOLER BUIDING XI
1446 1/24/2025 LIME STONE STACKER AND RECLAIMER XI
1447 1/24/2025 GYPSUM & LATERITE XI
1448 1/24/2025 GYPSUM & LATERITE XI
1449 1/24/2025 PACKING PLANT XI
1450 1/24/2025 PACKING PLANT XI
1451 1/25/2025 OUTER SIDE ROAD XI
1452 1/25/2025 PACKING PLANT XI
1453 1/25/2025 PACKING PLANT XI
1454 1/25/2025 PACKING PLANT XI
1455 1/25/2025 COMPRESSOR HOUSE -LC XI
1456 1/25/2025 TEMPRORRY LABOUR COLONY-JAWANGARH XI
1457 1/25/2025 TEMPRORRY LABOUR COLONY-JAWANGARH XI
1458 1/27/2025 TEMPRORRY LABOUR COLONY-JAWANGARH XI
1459 1/27/2025 PACKING PLANT XI
1460 1/27/2025 PACKING PLANT XI
1461 1/27/2025 TR-08 XI
1462 1/27/2025 LC-07 XI
1463 1/27/2025 CLHTT1 XI
1464 1/27/2025 COOLER BUILDING XI
1465 1/27/2025 LIME STONE STACKER AND RECLAIMER XI
1466 1/27/2025 CYCLONE BUILDING XI
1467 1/27/2025 CYCLONE BUILDING XI
1468 1/28/2025 PACKING PLANT XI
1469 1/28/2025 PACKING PLANT XI
1470 1/28/2025 PACKING PLANT XI
1471 1/28/2025 CRUSHER HANDLING RECLAIMER XI
1472 1/28/2025 CRUSHER HANDLING RECLAIMER XI
1473 1/28/2025 ADDITIVE FEEDING CONVEYER XI
1474 1/28/2025 RAW MILL BAG HOUSE XI
1475 1/29/2025 LS REJECT HOOPER XI
1476 1/29/2025 LS REJECT HOOPER XI
1477 1/29/2025 WEIGH BRIDGE XI
1478 1/29/2025 LC-07 XI
1479 1/29/2025 TR-08 XI
1480 1/29/2025 ADDITIVE FEEDING CONVEYER XI
1481 1/29/2025 PACKING PLANT XI
1482 1/29/2025 GYPSUM & LATERITE XI
1483 1/29/2025 TEMPRORY TOILET BLOCK XI
1484 1/29/2025 TEMPRORY TOILET BLOCK XI
1485 1/29/2025 LIME STONE STACKER AND RECLAIMER XI
1486 1/29/2025 LIME STONE STACKER AND RECLAIMER XI
1487 1/29/2025 MCR 12 & 13 XI
1488 1/30/2025 GR 13,16,17,18 XI
1489 1/30/2025 BC-01 XI
1490 1/30/2025 LS REJECT HOPPER XI
1491 1/30/2025 LS REJECT HOPPER XI
1492 1/30/2025 TUNNEL 11102 XI
1493 1/31/2025 GR-13.16,17,18,19 XI
1494 1/31/2025 GR-19 XI
1495 1/31/2025 BRU RETAINING WALL XI
1496 1/31/2025 TEMPORARY TOILET BLOCK XI
1497 1/31/2025 PACKING PLANT XI
1498 1/31/2025 PH BOILER XI
1499 1/31/2025 MCR 12 &13 XI
1500 1/31/2025 CLINKER TANK XI
1501 1/31/2025 LIME STONE CRUSHER HANDLING XI
1502 1/31/2025 LIME STONE CRUSHER HANDLING XI
1503 1/31/2025 LIME STONE STACKER AND RECLAIMER XI
1504 1/31/2025 RAW MILL RECIRCULATION BUILDING XI
1505 1/31/2025 ESP HOPPER XI
1506 2/1/2025 PACKING PLANT XI
1507 2/1/2025 BRU RETAINING WALL XI
1508 2/1/2025 COAL HANDLING BC-02 XI
1509 2/1/2025 COAL HANDLING BC-02 XI
1510 2/1/2025 LIMESTONE STACKER & RECLAIMER XI
1511 2/1/2025 GYPSUM LETERITE XI
1512 2/3/2025 TEMPORARY LABOUR COLONY -JAWANGARH XI
1513 2/3/2025 TEMPORARY LABOUR COLONY -JAWANGARH XI
1514 2/3/2025 LC-09 XI
1515 2/3/2025 GYPSUM LETERITE XI
1516 2/4/2025 TR-01 XI
1517 2/4/2025 GYPSUM LETERITE XI
1518 2/4/2025 GYPSUM LETERITE XI
1519 2/4/2025 TEMPORARY TOILET BLOCK XI
1520 2/4/2025 HUME PIPE CABLE TRENCH CEMENT SILO XI
1521 2/4/2025 HUME PIPE CABLE TRENCH CEMENT SILO XI
1522 2/4/2025 LC-07 XI
1523 2/4/2025 TEMPLE WORK AT SCL RAS COLONY XI
1524 2/5/2025 PACKING PLANT XI
1525 2/5/2025 WEIGH BRIDGE XI
1526 2/5/2025 GR-19 XI
1527 2/5/2025 TR-1 XI
1528 2/5/2025 ROOT BLOWER & AIR SILO FAN XI
1529 2/5/2025 ROOT BLOWER & AIR SILO FAN XI
1530 2/5/2025 TR-6 & TR-7 XI
1531 2/5/2025 TR-6 & TR-7 XI
1532 2/6/2025 TR-1 XI
1533 2/6/2025 ROATING XI
1534 2/6/2025 COAL STOCK PILE XI
1535 2/6/2025 PIPE LINE XI
1536 2/6/2025 PIPE LINE XI
1537 2/6/2025 PACKING PLANT XI
1538 2/6/2025 OUTER ROAD XI
1539 2/6/2025 OUTER ROAD XI
1540 2/6/2025 QC LAB XI
1541 2/7/2025 COAL STOCK PILE XI
1542 2/7/2025 SAND PIT XI
1543 2/7/2025 SAND PIT XI
1544 2/7/2025 QC LAB XI
1545 2/8/2025 GYPSUM LATERITE STORAGE XI
1546 2/8/2025 GYPSUM LATERITE STORAGE XI
1547 2/8/2025 MAIN GATE BLDG XI
1548 2/10/2025 FLY ASH SILO XI
1549 2/10/2025 FLY ASH SILO XI
1550 2/10/2025 MAIN GATE BLDG XI
1551 2/10/2025 COAL MILL BUILDING XI
1552 2/10/2025 COAL MILL BUILDING XI
1553 2/10/2025 PACKING PLANT XI
1554 2/10/2025 RAW MILL RECIRCULATION BUILDING XI
1555 2/10/2025 COAL MILL BAG HOUSE XI
1556 2/11/2025 LC-07 XI
1557 2/11/2025 COMPRESSOR HOUSE AQC XI
1558 2/11/2025 WIGH BRIDGE 4 ;5 XI
1559 2/11/2025 GYPSUM LATERITE STORAGE XI
1560 2/11/2025 TR-5 XI
1561 2/11/2025 PRE-HEATER XI

XI

1562 2/11/2025 LC-6


1563 2/12/2025 SILO 2 &3 (BETWEEN) XI
1564 2/12/2025 OIL PIT XI
1565 2/12/2025 BRU RETAINING WALL XI
1566 2/12/2025 TR-4 XI
1567 2/12/2025 LC-6 (CONTROL ROOM) XI
1568 2/12/2025 LC-6 (INSTRUMENT ROOM) XI
1569 2/12/2025 LC-6 (SERVER ROOM)) XI
1570 2/12/2025 PH BOILER XI
1571 2/12/2025 COOLER BUILDING XI
1572 2/12/2025 TR-1 XI
1573 2/12/2025 MCR 11 TR4 XI
1574 2/12/2025 KUBER ENGINEERING XI
1575 2/12/2025 KUBER ENGINEERING XI
1576 2/13/2025 BRU RETAINING WALL XI
1577 2/13/2025 CEMENT MILL FEEDING XI
1578 2/13/2025 GYPSUM LATERITE STORAGE XI
1579 2/13/2025 GYPSUM LATERITE STORAGE XI
1580 2/13/2025 COOLER BUILDING XI
1581 2/13/2025 TR-1 XI
1582 2/13/2025 MCR-11 TR-4 XI
1583 2/13/2025 TR-20 XI
1584 2/14/2025 GYPSUM LATERITE STORAGE XI
1585 2/14/2025 WIGH BRIDGE 4 ;5 XI
1586 2/14/2025 WIGH BRIDGE 4 ;5 XI
1587 2/14/2025 CEMENT SILO 3&4 XI
1588 2/14/2025 CEMENT SILO 3&4 XI
1589 2/14/2025 COAL MILL BAG HOUSE XI
1590 2/14/2025 TR4 XI
1591 2/14/2025 GYPSUM LATERITE STORAGE XI
1592 2/14/2025 FLY ASH SILO XI
1593 2/14/2025 COOLER BUILDING XI
1594 2/14/2025 TR-20 XI
1595 2/14/2025 CRUSHER FAN STACK XI
1596 2/14/2025 CRUSHER BAG FILTER XI
1597 2/14/2025 CRUSHER BAG FILTER XI
1598 2/14/2025 CRUSHER COMPRESSOR XI
1599 2/15/2025 PACKING PLANT XI
1600 2/15/2025 PACKING PLANT XI
1601 2/15/2025 CRUSHER BAG FILTER XI
1602 2/15/2025 SECURITY BARRICADE XI
1603 2/15/2025 PJBH (STACK SUPPORT) XI
1604 2/15/2025 GYPSUM LATERITE XI
1605 2/15/2025 TR-8 XI
1606 2/17/2025 GYPSUM LATERITE XI
1607 2/17/2025 OUTER SIDE ROAD XI
1608 2/17/2025 OUTER SIDE ROAD XI
1609 2/17/2025 SCL RAS UNIT XI ELECTRIC WORK XI
1610 2/18/2025 HYDRAULIC ROOM XI
1611 2/18/2025 MS VENTILLATION XI
1612 2/18/2025 PIPE LINE XI
1613 2/18/2025 PIPE LINE XI
1614 2/18/2025 FLY ASH SILO XI
1615 2/18/2025 BRU XI
1616 2/18/2025 BRU XI
1617 2/18/2025 TR 20 &21 XI
1618 2/18/2025 WATER PIPE LINE NEAR LQBOUR COLONY XI
1619 2/18/2025 WATER PIPE LINE NEAR LQBOUR COLONY XI
1620 2/18/2025 FLY ASH SILO XI
1621 2/19/2025 GR-1;2 XI
1622 2/19/2025 TRANSFER TOWER XI
1623 2/19/2025 MAIN GATE BUILDING XI
1624 2/19/2025 SWITCH YARD XI
1625 2/19/2025 SWITCH YARD XI
1626 2/19/2025 SWITCH YARD XI
1627 2/20/2025 OUTER SIDE ROAD XI
1628 2/20/2025 MAIN GATE BUILDING XI
1629 2/20/2025 SWITCH YARD XI
1630 2/20/2025 SWITCH YARD XI
1631 2/20/2025 SWITCH YARD XI
1632 2/20/2025 TRANSFER TOWER XI
1633 2/20/2025 LIME STONE STACKER AND RECLAIMER XI
1634 2/20/2025 COOLER ESP XI
1635 2/20/2025 OUTER SIDE ROAD XI
1636 2/20/2025 OUTER SIDE ROAD XI
1637 2/20/2025 OUTER SIDE ROAD XI
1638 2/21/2025 WEIGH BRIDGE-5 XI
1639 2/21/2025 GR-1;2 XI
1640 2/21/2025 COOLER BUILDING XI
1641 2/21/2025 ESP BUILDING XI
1642 2/21/2025 COOLER BUILDING XI
1643 2/21/2025 FLY ASH SILO XI
1644 2/21/2025 LIME STONE STACKER AND RECLAIMER XI
1645 2/21/2025 TRANSFER TOWER XI
1646 2/21/2025 TRANSFER TOWER XI
SCL RAS UNIT XI HANDRAILING AND
XI
1647 2/21/2025 PAINTING WORK
1648 2/22/2025 COMPRESSOR HOUSE XI
1649 2/22/2025 TR-1 XI
1650 2/22/2025 PRIMARY CRUSHER STACK XI
1651 2/22/2025 GR -2:3;4;5 XI
TEMPRORARY LABOUR HUTMENT
XI
1652 2/22/2025 JAWANGARH COLONY
TEMPRORARY LABOUR HUTMENT
XI
1653 2/22/2025 JAWANGARH COLONY
1654 2/24/2025 PRIMARY CRUSHER XI
1655 2/24/2025 TR-2 XI
1656 2/24/2025 TEMPRORARY LABOUR HUTMENT XI
1657 2/24/2025 TEMPORARY LABOUR COLONY -JAWANGARH XI
1658 2/24/2025 OUTER SIDE ROAD XI
1659 2/24/2025 GR-2;3;4;5 XI
1660 2/24/2025 TT 02 XI
1661 2/24/2025 COAL MILL BUILDING XI
1662 2/24/2025 RMTT2 XI
1663 2/24/2025 PACKING PLANT XI
1664 2/24/2025 CEMENT SILO-02 INSIDE XI
1665 2/24/2025 MAHARAJA YARD & LABOUR COLONY XI
1666 2/25/2025 COAL MILL BUILDING XI
1667 2/25/2025 FLY ASH SILO XI
1668 2/25/2025 OUTER SIDE ROAD XI
1669 2/25/2025 OUTER SIDE ROAD XI
1670 2/25/2025 OUTER SIDE ROAD XI
1671 2/25/2025 NEAR SECURITY BARRICADE XI
1672 2/25/2025 TEMPORARY LABOUR COLONY -JAWANGARH XI
1673 2/25/2025 MCR-19 XI
1674 2/27/2025 GR-3 XI
1675 2/27/2025 GR-3 XI
1676 2/27/2025 PACKING PALNT XI
1677 2/27/2025 GYPSUM AND LATERITE HNADLING XI
1678 2/27/2025 GYPSUM AND LATERITE HNADLING XI
1679 2/27/2025 BRU XI
1680 2/27/2025 BRU XI
1681 2/27/2025 BRU XI
1682 2/27/2025 AQC BUILDING XI
1683 2/27/2025 COOLER BUILDING XI
1684 2/28/2025 BRU XI
1685 2/28/2025 GYPSUM AND LATERITE XI
1686 2/28/2025 GYPSUM AND LATERITE XI
1687 2/28/2025 OUTER SIDE ROAD XI
1688 2/28/2025 PJBH (STACK SUPPORT) XI
1689 2/28/2025 TR-1 XI
1690 2/28/2025 TR-5 XI
1691 2/28/2025 AQC BUILDING XI
1692 2/28/2025 AQC BUILDING XI
1693 2/28/2025 COOLER BUILDING XI
1694 2/28/2025 AQC BUILDING XI
1695 3/1/2025 CRUSHER FAN FOOTING BOTTOM XI
1696 3/1/2025 TR-1 XI
1697 3/1/2025 TR-5 XI
1698 3/3/2025 PSBH XI
1699 3/3/2025 OUTER SIDE ROAD XI
1700 3/3/2025 LIME STONE CRUSHER HANDLING XI
1701 3/3/2025 LIME STONE CRUSHER HANDLING XI
1702 3/3/2025 LIME STONE STACKER AND RECLAIMER XI
1703 3/3/2025 LIME STONE STACKER AND RECLAIMER XI
1704 3/3/2025 SCL RAS UNIT XI ELECTRIC WORK XI
1705 3/3/2025 TR-5 XI
1706 3/4/2025 GR-4 XI
1707 3/4/2025 GR-4 XI
1708 3/4/2025 PACKING PLANT XI
1709 3/4/2025 PACKING PLANT XI
1710 3/4/2025 COOLER BUILDING XI
1711 3/4/2025 COOLER BUILDING XI
1712 3/4/2025 LIME STONE STACKER AND RECLAIMER XI
1713 3/4/2025 LIME STONE STACKER AND RECLAIMER XI
1714 3/5/2025 GYPSUM CONVEYOR XI
1715 3/5/2025 GYPSUM CONVEYOR XI
1716 3/5/2025 COMPRESSOR HOUSE XI
1717 3/5/2025 CCR BUILDING UNIT XI XI
1718 3/5/2025 CCR BUILDING UNIT XI XI
1719 3/6/2025 AQC LAB- F5 XI
1720 3/6/2025 AQC LAB- F5 XI
1721 3/7/2025 COAL STAKE PILE XI
1722 3/7/2025 COAL STAKE PILE XI
1723 3/7/2025 BRU XI
1724 3/7/2025 GYPSUM LATERITEHANDLING CRUSHER XI
1725 3/8/2025 RM CYCLONE DUCT XI
1726 3/8/2025 LIMESTONE STACKER AND RECLAIMERS XI
1727 3/8/2025 RM CYCLONE DUCT XI
1728 3/8/2025 CYCLONE BUILDING XI
1729 3/8/2025 CLINKER HANDLING -TR-2 XI
1730 3/8/2025 CLINKER HANDLING -TR-2 XI
1731 3/8/2025 OUT ER SIDE ROAD XI

XI
1732 3/8/2025 OUTER SIDE ROAD ELECTRIC CHAMBER
1733 3/8/2025 COMPRESSOR HOUSE XI
1734 3/8/2025 COMPRESSOR HOUSE XI
1735 3/8/2025 CYCLONE BUILDING XI
1736 3/8/2025 PACKING PLANT XI
1737 3/8/2025 PACKING PLANT XI
1738 3/8/2025 GYPSUM LATERITE HANDLING XI
1739 3/10/2025 PACKING PLANT XI
1740 3/10/2025 LIMESTONE STACKER AND RECLAIMERS XI
1741 3/10/2025 LIMESTONE STACKER AND RECLAIMERS XI
1742 3/10/2025 LIMESTONE STACKER AND RECLAIMERS XI
1743 3/10/2025 SWITCH YARD XI
1744 3/10/2025 SWITCH YARD XI
1745 3/10/2025 SWITCH YARD XI
1746 3/10/2025 SWITCH YARD CABLE TRUNCH XI
1747 3/10/2025 SWITCH YARD CABLE TRUNCH XI
1748 3/10/2025 TEMPLE WORK RAS COLONY XI
1749 3/11/2025 PACKING PLANT XI
1750 3/11/2025 PACKING PLANT XI
1751 3/11/2025 GYPSUM LATERITE XI
1752 3/11/2025 GYPSUM LATERITE XI
1753 3/11/2025 TRANSFER TOWER GHTT1 XI
1754 3/11/2025 ROOT BLOWER XI
1755 3/11/2025 ROOT BLOWER XI
1756 3/12/2025 SWITCH YARD XI
1757 3/12/2025 HIGH TENSION LINE BOUNDARY WORK XI
1758 3/12/2025 SWITCH YARD XI
1759 3/12/2025 PACKING PLANT XI
1760 3/12/2025 GYPSUM FEEDING UNIT XI
1761 3/12/2025 TRANSFER TOWER XI
1762 3/13/2025 TRANSFER TOWER XI
1763 3/13/2025 LIMESTONE STACKER AND RECLAIMER XI
1764 3/13/2025 LIMESTONE STACKER AND RECLAIMER XI
1765 3/13/2025 CCR BUILDING UNIT XI XI
1766 3/15/2025 WATER TANK BOUNDARY WALL XI
1767 3/17/2025 PACKING PLANT XI
1768 3/17/2025 OUTSIDE ROAD XI
1769 3/17/2025 PIPE LINE XI
1770 3/17/2025 PIPE LINE XI
1771 3/17/2025 CCR BUILDING UNIT XI XI
1772 3/18/2025 LIMESTONE STACKER AND RECLAIMER XI
1773 3/18/2025 LIMESTONE STACKER AND RECLAIMER XI
1774 3/18/2025 LIMESTONE CRUSHER (HGTU) XI
1775 3/18/2025 LIMESTONE CRUSHER (HGTU) XI
1776 3/18/2025 CLINKER HANDLING XI
1777 3/18/2025 LIMESTONE STACKER AND RECLAIMER XI
SCL RAS UNIT XI WORKAT VARIOUS
XI
1778 3/19/2025 LOCATIONS
1779 3/19/2025 PACKING PLANT XI
1780 3/19/2025 PACKING PLANT XI
1781 3/19/2025 GYPSUM LATERITE XI
1782 3/19/2025 GYPSUM LATERITE XI
SCL RAS UNIT XI WORKAT VARIOUS
XI
1783 3/19/2025 LOCATIONS
1784 3/19/2025 ROOT BLOWER (C SILO 3) XI
1785 3/20/2025 PACKING PLANT XI
1786 3/20/2025 PACKING PLANT XI
1787 3/20/2025 CLINKER LOADING HOPPER XI
1788 3/20/2025 WEIGH BRIDGE XI
1789 3/20/2025 WEIGH BRIDGE XI
1790 3/20/2025 CLINKER TANK XI
1791 3/20/2025 BRU XI
1792 3/20/2025 BRU XI
1793 3/20/2025 COOLER BUILDING XI
1794 3/20/2025 QC LAB XI
1795 3/20/2025 LIMESTONE STACKER AND RECLAIMER XI
1796 3/20/2025 PACKING PLANT XI
1797 3/20/2025 TG BUILDING XI
1798 3/20/2025 TG BUILDING XI
1799 3/20/2025 TG BUILDING XI
1800 3/20/2025 ACC BUILDING XI
1801 3/20/2025 LC-6 CCR BUILDING XI
1802 3/20/2025 LC-6 CCR BUILDING XI
1803 3/20/2025 CLINAKER FEED HOOPER-ROAD WORK XI
1804 3/21/2025 PACKING PLANT XI
1805 3/21/2025 PACKING PLANT XI
1806 3/21/2025 PIPE LINE XI
1807 3/21/2025 PIPE LINE XI
1808 3/21/2025 COOLER BUILDING AIR DUCT XI
1809 3/21/2025 QC LAB BUILDING XI
1810 3/21/2025 CLINKAR TANK XI
1811 3/21/2025 OUTSIDE ROAD XI
1812 3/22/2025 GYPSUM LATERITE CONVEYOR FOOTING XI
1813 3/22/2025 GYPSUM LATERITE CONVEYOR FOOTING XI
1814 3/22/2025 OUTSIDE ROAD XI
1815 3/22/2025 GR-2;GR-3;TR-1 XI
1816 3/22/2025 GR-2;GR-3;TR-1 XI
1817 3/22/2025 PACKING PLANT XI
1818 3/24/2025 CLINKER LOADING HOPPER XI
1819 3/24/2025 CLINKER LOADING HOPPER XI
1820 3/24/2025 LIME STONE STACKER AND RECLAIMER XI
1821 3/24/2025 LIME STONE STACKER AND RECLAIMER XI
1822 3/24/2025 LIME STONE STACKER AND RECLAIMER XI
1823 3/24/2025 RCC DRAIN XI
1824 3/24/2025 WATER TANK XI
1825 3/24/2025 RAW MILL HOPPER CONVEYOR TR-5 XI
1826 3/24/2025 ESP BUILDING XI
1827 3/24/2025 BOX CULVERT XI
1828 3/24/2025 PIPE LINE XI
1829 3/24/2025 PIPE LINE XI
1830 3/24/2025 PIPE LINE XI
1831 3/25/2025 COOLER BUILDING XI
1832 3/25/2025 RAW MILL HOOPER CONVEYOR XI
UNIT -11 CONSTRUCTION JOB AT VARIOUS
XI
1833 3/25/2025 LOCATIONS
1834 3/26/2025 PACKING PLANT XI
1835 3/26/2025 PACKING PLANT XI
1836 3/26/2025 CLINKER LOADING HOPPER XI
1837 3/26/2025 CLINKER FEED HOOPER-ROAD WORK XI
1838 3/26/2025 ROOT BLOWER CEMENT SILO -3 XI
1839 3/26/2025 LC-6 XI
1840 3/26/2025 NIFP5 XI
1841 3/26/2025 NIFP5 XI
1842 3/26/2025 BRU XI

TEMPORARY TOILET BLOCK FOR LABOUR XI


1843 3/26/2025 HUTMENT SEPTIUC TANK
1844 3/27/2025 CLINKER LOADING HOPPER XI
1845 3/27/2025 CLINKER LOADING HOPPER XI
1846 3/27/2025 WEIGH BRIDGE -4 XI
1847 3/27/2025 WEIGH BRIDGE -4 XI
1848 3/27/2025 WATER TANK XI
1849 3/28/2025 LIMESTONE AND ADDITIVE CONVEYOR TR-01 XI
1850 3/28/2025 LIMESTONE AND ADDITIVE CONVEYOR TR-01 XI
1851 3/28/2025 PACKING PLANT XI
1852 3/28/2025 PACKING PLANT XI
1853 3/28/2025 PACKING PLANT XI
1854 3/28/2025 OUTSIDE ROAD XI
1855 3/28/2025 OUTSIDE ROAD XI
1856 3/28/2025 OUTSIDE ROAD XI
1857 3/29/2025 TT03 XI
1858 3/31/2025 BRU XI
1859 3/31/2025 BRU XI
1860 3/31/2025 BRU RETAINING WALL XI
1861 3/31/2025 BRU RETAINING WALL XI
1862 3/31/2025 COMPRESSOR HOUSE XI
1863 3/31/2025 COMPRESSOR HOUSE XI
1864 3/31/2025 TT03 XI
1865 4/1/2025 PACKING PLANT XI
1866 4/1/2025 GYPSUM FEEDING HOOPER XI
1867 4/1/2025 GYPSUM FEEDING HOOPER XI
1868 4/1/2025 TRANSFER TOWER XI
1869 4/1/2025 TRANSFER TOWER XI
1870 4/1/2025 GYPSUM FEEDING HOOPER XI
1871 4/1/2025 GYPSUM FEEDING HOOPER XI
1872 4/1/2025 TR-2 XI
1873 4/2/2025 BRU XI
1874 4/2/2025 BRU XI
1875 4/2/2025 BRU XI
1876 4/2/2025 BRU XI
1877 4/2/2025 TR-2 XI
1878 4/2/2025 LC-6 XI
1879 4/3/2025 ESP XI
1880 4/3/2025 TR-1 XI
1881 4/3/2025 GYPSUM CONVEYOR XI
1882 4/3/2025 GYPSUM CONVEYOR XI
1883 4/4/2025 RM HOPPER STACKER RECLAIMER XI
1884 4/4/2025 OUTER SIDE ROAD XI
1885 4/4/2025 OUTER SIDE ROAD XI
1886 4/4/2025 PRIMARY CRUSHER XI
1887 4/4/2025 PRIMARY CRUSHER XI
1888 4/4/2025 TT02 XI
1889 4/4/2025 AQC BUILDING XI
1890 4/4/2025 AQC BUILDING XI
1891 4/4/2025 TR-01 XI
1892 4/5/2025 COAL STOCK PILE XI
1893 4/5/2025 COAL STOCK PILE XI
1894 4/5/2025 LSP XI
1895 4/5/2025 COAL STOCK PILE XI
1896 4/5/2025 OUTSIDE ROAD XI
1897 4/5/2025 OUTSIDE ROAD XI
1898 4/5/2025 OUTSIDE ROAD XI
1899 4/7/2025 RM HOPPER STACKER RECLAIMER XI
1900 4/7/2025 TT02 XI
1901 4/7/2025 COOLER BUILDING XI
1902 4/7/2025 LC-6 XI
1903 4/8/2025 LIME STAKE PILE XI
1904 4/8/2025 COAL STAKE PILE XI
1905 4/8/2025 LIME STAKE PILE XI
1906 4/8/2025 COAL STAKE PILE XI
1907 4/8/2025 TR-2 XI
1908 4/8/2025 TR-2 XI
1909 4/8/2025 COMPRESSOR HOUSE XI
1910 4/8/2025 COMPRESSOR HOUSE XI
1911 4/9/2025 ESP CHIMNEY STAXCK XI
1912 4/9/2025 CLINKER LOADING HOPPER XI
1913 4/9/2025 GYPSUM LATERITE XI
1914 4/9/2025 GYPSUM LATERITE XI
1915 4/9/2025 BRU XI
1916 4/9/2025 BRU XI
1917 4/10/2025 COOLER BUILDING XI
1918 4/10/2025 LC-6 XI
1919 4/10/2025 GYPSUM LATERITE XI
1920 4/10/2025 GYPSUM LATERITE XI
1921 4/10/2025 GYPSUM LATERITE XI
1922 4/10/2025 GYPSUM LATERITE XI
1923 4/10/2025 PACKING PLANT-FLOORING & SKIRTING XI
1924 4/10/2025 CCR BLDG-FLOORING & SKIRTING XI
1925 4/10/2025 CCR BLDG-PAINTING XI
1926 4/10/2025 CCR BLDG-FALSE CEILING XI
1927 4/11/2025 GR-3 XI
1928 4/11/2025 GYPSUM LATERITE XI
1929 4/11/2025 GYPSUM LATERITE XI
1930 4/11/2025 ESP BUILDING XI
1931 4/11/2025 COOLER BUILDING XI
1932 4/11/2025 LC-6 XI
1933 4/11/2025 CLINKER LOADING HOPPER XI
1934 4/11/2025 CLINKER TANK XI
RAS-XI
CONTRATOR
LEVEL/WORK OUT WORK DONE BY CONTRACTOR JMR N.

PCC BOTTOM LEVEL M/S MANISHA CONSTRUCTION 1

NGL OF BOUNDARY WALL OF AREA 2


M/S KAILASH ENTERPRISES 2
( PROPOSED CEMENT MILL II)

PCC BOTTOM LEVEL M/S KUBER ENGINEERING 13


NGL FOR BOUNDARY WALL M/S SHREE DEVNARAYAN CONSTRUCTION 5
PCC BOTTOM LEVEL M/S SHREE DEVNARAYAN CONSTRUCTION 6

PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2430

PCC TOP LEVEL M/S KUBER ENGINEERING 14


PCC TOP LEVEL M/S SHREE DEVNARAYAN CONSTRUCTION 7
RR WALL TOP LEVEL FOR 750MM M/S KUBER ENGINEERING 15
RR WALL TOP LEVEL FOR 600MM M/S KUBER ENGINEERING 16
PCC BOTTOM LEVEL M/S KUBER ENGINEERING 17
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2432

PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2115

SAMOSA, M/S CHETAN PRAKASH 1 TO 5

PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2116

BOUNDARY WALL SHREE DEV NARAYAN CONSTRUCTION 10

BOUNDARY WALL SHREE DEV NARAYAN CONSTRUCTION 11

PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 1246


fan foundation pcc bottom lavel TCC BUILDERS PRIVATE LIMITED 2032

PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 1252

bottam level of tunnel TCC BUILDERS PRIVATE LIMITED 1253

PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 1251

Rafi TCC BUILDERS PRIVATE LIMITED 2119

pcc top level TCC BUILDERS PRIVATE LIMITED 2033

pcc top level TCC BUILDERS PRIVATE LIMITED 2034

pcc bottom level TCC BUILDERS PRIVATE LIMITED 2035

pcc bottom level TCC BUILDERS PRIVATE LIMITED 2036

pcc bottom level TCC BUILDERS PRIVATE LIMITED 2037


PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2038

PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2120

PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 1

PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2121

PCC TOP LEVEL FOR FOOTING TCC BUILDERS PRIVATE LIMITED 2123
PCC BOTTOM LEVEL FOR PCC WORK TCC BUILDERS PRIVATE LIMITED 2124
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2042
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2043
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2044
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 851
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 852

PCC TOP LEVL TCC BUILDERS PRIVATE LIMITED 2127

PCC TOP LEVL TCC BUILDERS PRIVATE LIMITED 2128

PAINTING WORK M/S JUGANU ASSOCIATE

PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 2

PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 3

M 20 WITH BOOM PRESSURE TCC BUILDERS PRIVATE LIMITED 201

BATCHING PLANT SHEETING WORK PARH ENGINEERING 1341

PRE HEATER BACK SIDE SHEETING WORK PARH ENGINEERING 1341

BATCHING PLANT SHEETING WORK PARH ENGINEERING 1341

BATCHING PLANT SHEETING WORK JAI SAVARIYA SAITH ENGINEERING 510

PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 4

PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 5

pcc bottom level GOEL CONSTRUCTION CO. PVT LTD 6

bottom level of pcc JAI SHREE INFRASTRUCTURE 857

pcc bottom level GOEL CONSTRUCTION CO. PVT LTD 10

plumb pcc bottom level TCC BUILDERS PRIVATE LIMITED 254


pcc top level GOEL CONSTRUCTION CO. PVT LTD 12
pcc top level GOEL CONSTRUCTION CO. PVT LTD 13
pcc top level JAI SHREE INFRASTRUCTURE 859
pcc top level JAI SHREE INFRASTRUCTURE 865
pcc top level JAI SHREE INFRASTRUCTURE 867
pcc top level TCC BUILDERS PRIVATE LIMITED 2056
pcc top level TCC BUILDERS PRIVATE LIMITED 2057
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2058
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2059
pcc top level TCC BUILDERS PRIVATE LIMITED 2060
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 14
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2129
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2130
for footing pcc top level TCC BUILDERS PRIVATE LIMITED 2131
bottom level of pcc TCC BUILDERS PRIVATE LIMITED 2132
boundary wall kuber engineering 1
bottom level of pcc JAI SHREE INFRASTRUCTURE 871
TOP LEVEL OF PCC JAI SHREE INFRASTRUCTURE 870
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 15
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 16
pcc bottom level JAI SHREE INFRASTRUCTURE 872
TOP LEVEL OF PCC JAI SHREE INFRASTRUCTURE 862
for footing pcc top level TCC BUILDERS PRIVATE LIMITED 2134
toilets work at ras 11 M/S BABULAL SAINI 1
pcc top level JAI SHREE INFRASTRUCTURE 873
pcc top level JAI SHREE INFRASTRUCTURE 874
pcc top level GOEL CONSTRUCTION CO. PVT LTD
pcc top level GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
TOP LEVEL OF RR wall M/S KUBER ENGINEERING 41
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 301
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 302
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
BATCHING PLANT SHEETING WORK PARH ENGINEERING
BATCHING PLANT SHEETING WORK PARH ENGINEERING `
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL M/S KUBER ENGINEERING 42
PCC TOP LEVEL M/S KUBER ENGINEERING 43
bottom level of pcc JAI SHREE INFRASTRUCTURE 876
ELECTRIC WORK UNIT 11 VEDRAJ ELECTRICALS
ELECTRIC WORK AT BATCHING PLANT VEDRAJ ELECTRICALS
GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
bottom level of pcc JAI SHREE INFRASTRUCTURE 877
TOP OF PCC JAI SHREE INFRASTRUCTURE 878
TOP OF PCC JAI SHREE INFRASTRUCTURE 879
bottom level of pcc JAI SHREE INFRASTRUCTURE 880
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
TOP LEVEL OF PCC SANJEEV KUMAR CONT. PVT, LTD.
TOP LEVEL OF PCC SANJEEV KUMAR CONT. PVT, LTD.
TOP LEVEL OF PCC SANJEEV KUMAR CONT. PVT, LTD.
TOP LEVEL OF PCC SANJEEV KUMAR CONT. PVT, LTD.
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2135
PCC BOTTOM LEVEL SANJEEV KUMAR CONT. PVT, LTD.
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
bottom level of pcc GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2062
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2061
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2137
PCC TOP LEVEL M/S S.K.C.P.L 9
PCC BOTTOM LEVEL M/S S.K.C.P.L 10
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
ELECTRIC WORK VEDRAJ ELECTRICALS
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 885
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 886
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 887
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 888
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 12
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 13
bottom level of pcc JAI SHREE INFRASTRUCTURE 14
bottom level of pcc JAI SHREE INFRASTRUCTURE 15
bottom level of pcc JAI SHREE INFRASTRUCTURE 17
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL M/S S. K. C. P. L. 12
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD B-17
PCC BOTTOM LEVEL M/S S. K. C. P. L. 16
FANCING WORK AT LABOUR COLONY BADARIYA RAI ENGINEERING
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 852
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 851
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 583
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 20
PCC TOP LEVEL M/S S. K. C. P. L. 19
PCC TOP LEVEL M/S S. K. C. P. L. 20
PCC TOP LEVEL M/S S. K. C. P. L. 22
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 855
SAFETY BORD JAI SAVARIYA SAITH ENGINEERING 541
FANCING SHEET WORK AT BOUNDARY JAI SAVARIYA SAITH ENGINEERING 539
STOOL JAI SAVARIYA SAITH ENGINEERING 540
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 851
WOODEN WORK AT RAS XI RIDHI SIDHI ENTERPRISES
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 761
R/R MESONORY WORK M/S SHREE DEVNARAYAN CONSTRUCTION 31
RAMP WORK AT EAST SIDE M/S SHREE DEVNARAYAN CONSTRUCTION 32
BRICKS MESONORY CHAMBER WORK M/S SHREE DEVNARAYAN CONSTRUCTION 33
RAMP DIVIDER AND FLOORING WORK M/S SHREE DEVNARAYAN CONSTRUCTION 34
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 760
R. R. WALL TOP LEVEL M/S KUBER ENGINEERING 45
bottom level of pcc JAI SHREE INFRASTRUCTURE 889
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 21
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 22
MAIN GATE RCC COLOUM WORK M/S SHREE DEVNARAYAN CONSTRUCTION 36
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 23
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 24
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 25
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 26
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 764
CUBE CURING TANK M/S MAHAVEER ENTERPRISES 150
bottom level of pcc TCC BUILDERS PRIVATE LIMITED 707
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 27
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 28
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 897
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 898
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 605

TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 606


PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 608
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 896
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 558
PAINTING WORK M/S CHETAN PRAKASH
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 559
ELECTRIC WORK RA-2 VEDRAJ ELECTRICALS
TOP LEVEL M/S KUBER ENGINEERING 46
BRICK WALL,PLASTER M/S KUBER ENGINEERING 47
ROOM ELECRIC WORK (RA-3) VEDRAJ ELECTRICALS
BOUNDARY WALL NEAR RAILWAY LINE M/S SHREE DEVNARAYAN CONSTRUCTION 37
BATCHING PLANT ELECTRIC WORK(RA-4) VEDRAJ ELECTRICALS
UNIT XI ELECRIC WORK (RA-1) VEDRAJ ELECTRICALS
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 562
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 777
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 778
PCC BOTTOM LEVEL (TUNNEL ) JAI SHREE INFRASTRUCTURE 30
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 780
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 781
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 563
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 564
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 782
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 783
TOP LEVEL OF WALL AND PLASTER M/S KUBER ENGINEERING 48
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 567
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR
PCC TOP LEVEL M/S SOPAL MAGNA GUJAR
NEMETI COLONY VEDRAJ ELECTRICALS
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 785
BOTTOM LEVEL OF PCC M/S S. K. C. P. L. 39
TOP LEVEL OF PCC M/S S. K. C. P. L. 40
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 786
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 787
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 788
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 789
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 790
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 31
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 32
TOP LEVEL R.R. MESSONARY M/S. KUBER ENGINEERING 49
BOTTOM LEVEL OF PCC JAI SHREE INFRASTRUCTURE 33
ELECTRICAL WORK RA-1 JYOTSHNA ENTERPRISES
BOTTOM LEVEL OF PCC JAI SHREE INFRASTRUCTURE 34
BOTTOM LEVEL OF PCC M/S S. K. C. P. L. 43
TOP LEVEL OF PCC M/S S. K. C. P. L. 44
TOP LEVEL OF PCC M/S S. K. C. P. L. 45
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 569
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 570
PCC BOTTOM LEVEL M/S S. K. C. P. L. 46
PCC TOP LEVEL M/S S. K. C. P. L. 49
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 571
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2159
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 856
TOP LEVEL OF PCC JAI SHREE INFRASTRUCTURE 36
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 37
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 38
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 857
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 574
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 858
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 859
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 860
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 861
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 862
BOTTOM LEVEL OF PCC TCC BUILDERS PRIVATE LIMITED 2160
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 576
BOTTOM LEVEL OF PCC JAI SHREE INFRASTRUCTURE 39
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR
PCC TOP LEVEL M/S SOPAL MAGNA GUJAR
TOP LEVEL OF PCC TCC BUILDERS PRIVATE LIMITED 2161
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 578
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 577
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2163
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 579
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 865
PCC TOP LEVEL M/S S. K. C. P. L. 54
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 40
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 586
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 866
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 589
PLUMB PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 591
PCC TOP LEVEL M/S S. K. C. P. L. 56
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2165
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 592
MECHANICAL PROJECT OFFICE (CCR) M/S CHETAN PRAKASH
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 251
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 252
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 253
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 41
BOTTOM LEVEL OF PCC JAI SHREE INFRASTRUCTURE 42
BOTTOM LEVEL OF PCC JAI SHREE INFRASTRUCTURE 44
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2166
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 254
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 45
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 255
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 256
TOP LEVEL OF PCC JAI SHREE INFRASTRUCTURE 47
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 48
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 50
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 258
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 259
BOUNDARY WALL M/S SOPAL MAGNA GUJAR
BOUNDARY WALL M/S SOPAL MAGNA GUJAR
BOUNDARY WALL M/S SOPAL MAGNA GUJAR
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 263
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 264
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 265
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 266
SOILING TOP LEVEL (PCC BOTTOM) M/S KUBER ENGINEERING 68
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 806
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 807
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 808
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 809
PCC TOP LEVEL M/S KUBER ENGINEERING 71
TOP LEVEL O PCC GOEL CONSTRUCTION CO. PVT LTD 810
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 659
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 55
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 56
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 256
PCC BOTTOM & BOTTOM TCC BUILDERS PRIVATE LIMITED 212
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 723
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 58
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 60
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 62
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 64
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 268
BOTTOM LEVEL OF FOOTING PCC GOEL CONSTRUCTION CO. PVT LTD 811
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 269
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 270
PRE HEATER TOP LEVEL OF PLUM TCC BUILDERS PRIVATE LIMITED 219
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 812
TOP LEVEL OF PCC TCC BUILDERS PRIVATE LIMITED 220
TOP OF PCC LEVEL JAI SHREE INFRASTRUCTURE 66
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 67
TOP OF PCC LEVEL (BOOM) JAI SHREE INFRASTRUCTURE 68
TOP OF PCC JAI SHREE INFRASTRUCTURE 69
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 70
TOP LEVEL OF PCC JAI SHREE INFRASTRUCTURE 73
BOTTOM LEVEL OF PCC/PLUM TCC BUILDERS PRIVATE LIMITED 1257
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 661
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 662
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 663
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 271
PCC TOP LEVEL M/S S. K. C. P. L. 62
PCC BOTTOM LEVEL M/S S. K. C. P. L. 63
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 275
PCC TOP LEVEL M/S S. K. C. P. L. 64
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 276
STEEL YARD STORE UNIT -XI JAI SAVARIYA SAITH ENGINEERING
STEEL YARD GATE JAI SAVARIYA SAITH ENGINEERING
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 277
RAMP WORK M/S SHREE DEVNARAYAN CONSTRUCTION 46
BRICKS MESONORY CHAMBER WORK M/S SHREE DEVNARAYAN CONSTRUCTION 51
RAMP DIVIDER WORK M/S SHREE DEVNARAYAN CONSTRUCTION 49
TOP LEVEL OF PLUM WITH MEASURMENT TCC BUILDERS PRIVATE LIMITED 1258
PCC TOP LEVEL M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR

TOP OF PCC BY BOOM JAI SHREE INFRASTRUCTURE 76


BOTTOM OF PCC M/S S. K. C. P. L. 65
BOTTOM OF PCC M/S S. K. C. P. L. 67
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 1259
TOP OF PCC M/S S. K. C. P. L. 68
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 1260
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2169
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 814
ELECTRIC WORK VEDRAJ ELECTRICALS
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2171
ELECTRIC WORK VEDRAJ ELECTRICALS
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 815
BOUNDARY WALL PAINT WORK M/S CHETAN PRAKASH
ELECTRICAL WORK JYOTSHNA ENTERPRISES
ELECTRICAL WORK JYOTSHNA ENTERPRISES
RECHECK LENGTH AND WIDTH FOR TOP
M/S S. K. C. P. L. 69
LEVEL
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 77
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 280
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 281
TOP OF PCC JAI SHREE INFRASTRUCTURE 78
BOTTOM OF PCC GOEL CONSTRUCTION CO. PVT LTD 816
BRICK WALL TOP LEVEL, PLASTER, NEERU M/S KUBER ENGINEERING 73
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 817
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 818
PCC BOTTOM LEVEL OF NALA M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL OF NALA M/S SOPAL MAGNA GUJAR
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 822
TOP LEVEL OF PCC JAI SHREE INFRASTRUCTURE 84
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 85
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 823
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 827
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 828
ELECTRIC WORK VEDRAJ ELECTRICALS RA- 11
ELECTRIC WORK VEDRAJ ELECTRICALS RA- 12
PCC TOP LEVEL OF NALA M/S SOPAL MAGNA GUJAR
PCC TOP LEVEL OF NALA M/S SOPAL MAGNA GUJAR
TOP OF PCC JAI SHREE INFRASTRUCTURE 93
TOP LEVEL OF PCC JAI SHREE INFRASTRUCTURE 97
BOTTOM OF PCC KUBER ENGINEERING 74
TOP LEVEL OF WALL AND PLASTER KUBER ENGINEERING 75
TOP LEVEL OF WALL AND PLASTER KUBER ENGINEERING 76
PCC BOTTOM OF NALA M/S SOPAL MAGNA GUJAR
R R MEASONARY WALL M/S SOPAL MAGNA GUJAR
PLASTER INNER AND OUTER SIDE M/S SOPAL MAGNA GUJAR
R R MEASONARY WALL M/S SOPAL MAGNA GUJAR
PLASTER INNER AND OUTER SIDE M/S SOPAL MAGNA GUJAR
TOP OF PCC JAI SHREE INFRASTRUCTURE 98
R R MEASONARY WALL M/S SOPAL MAGNA GUJAR
PLASTER INNER AND OUTER SIDE M/S SOPAL MAGNA GUJAR
WORK AT WEIGHT BRIDGE VEDRAJ ELECTRICALS RA-1
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 829
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 830
TOP LEVEL OF PCC KUBER ENGINEERING 77
SHEETING WORK PARTH ENGINEERING
ENTRY GATE BOUNDARY WALL
PARTH ENGINEERING
FABRICATION YARD
EXCAVATION OF EARTH PARTH ENGINEERING
PCC TOP LEVEL OF NALA M/S SOPAL MAGNA GUJAR
RRM PIPE BED M/S SOPAL MAGNA GUJAR
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 831
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 832
RCC COLUMN TOP LEVEL M/S KUBER ENGINEERING 78
ELECTRIC WORK VEDRAJ ELECTRICALS RA-13
BOTTOM LEVEL OF FOOTING PCC GOEL CONSTRUCTION CO. PVT LTD 833
BOTTOM LEVEL OF FOOTING PCC GOEL CONSTRUCTION CO. PVT LTD 834
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 671
TOP LEVEL OF FOOTING PCC GOEL CONSTRUCTION CO. PVT LTD 835
TOP LEVEL OF FOOTING PCC GOEL CONSTRUCTION CO. PVT LTD 836
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 99
TOP OF GP2 JAI SHREE INFRASTRUCTURE 262
TOP OF GP2 JAI SHREE INFRASTRUCTURE 263
TOP OF PCC JAI SHREE INFRASTRUCTURE 100

RAILING WORK AT RAS XI PITRAKRIPA ENTERPRISES


BOTTOM LEVEL OF FOOTING PCC GOEL CONSTRUCTION CO. PVT LTD 837
TOP LEVEL OF STONE MEASONARY M/S SOPAL MAGNA GUJAR
TOP LEVEL OF STONE MEASONARY M/S SOPAL MAGNA GUJAR
TOP LEVEL OF FOOTING PCC GOEL CONSTRUCTION CO. PVT LTD 838
PAINT WORK NEAR BATCHING PLANT JUGANU ASSOCIATE
MEASURMENT OF R R M M/S SOPAL MAGNA GUJAR
PLASTER INNER AND OUTER SIDE M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL M/S S. K. C. P. L. 71
PCC TOP LEVEL M/S S. K. C. P. L. 72
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 153
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 154
PCC BOTTOM LEVEL BY BOOM TCC BUILDERS PRIVATE LIMITED 352
PCC BOTTOM LEVEL BY BOOM TCC BUILDERS PRIVATE LIMITED 353
PCC BOTTOM LEVEL BY BOOM TCC BUILDERS PRIVATE LIMITED 355
PCC TOP LEVEL M/S SOPAL MAGNA GUJAR
BRICK WALL TOP LEVEL M/S SOPAL MAGNA GUJAR
BRICK WALL TOP LEVEL M/S SOPAL MAGNA GUJAR
BRICK WALL TOP LEVEL M/S SOPAL MAGNA GUJAR
BRICK WALL TOP LEVEL M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 868
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 264
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 674
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 869
PCC BOTTOM LEVEL OF NALA M/S SHREE DEVNARAYAN CONSTRUCTION 60
TOP LEVEL OF BRICK WALL M/S SHREE DEVNARAYAN CONSTRUCTION 63
TOP OF PCCC JAI SHREE INFRASTRUCTURE 267
BOTTOM LEVEL OF FLOOR FOUNDATION GOEL CONSTRUCTION CO. PVT LTD 839
PCC TOP LEVEL M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 870
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 873
PAINT WORK M/S CHETAN PRAKASH
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 163
TOP LEVEL OF FLOOR FOUNDATION GOEL CONSTRUCTION CO. PVT LTD 840
BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 841
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 874
FOUNDATION PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 878
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 164
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 165
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 881
FLOORING BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 368
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJAR
SHEETING WORK SHREE SATGURU ENTERPRISES
RRM - PCC TOP LEVEL M/S SOPAL MAGNA GUJAR
RRM - PCC TOP LEVEL M/S SOPAL MAGNA GUJAR
FOR PLUM BOTTOM TCC BUILDERS PRIVATE LIMITED 501
FOR PLUM TOP TCC BUILDERS PRIVATE LIMITED 502
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 503

PCC OF BOTTOM JAI SHREE INFRASTRUCTURE 166

PCC OF BOTTOM JAI SHREE INFRASTRUCTURE 167

PCC OF BOTTOM JAI SHREE INFRASTRUCTURE 169

PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 370

PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 886

PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 598

PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 887

PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 599

PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 579


PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 883
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 885
RAFT TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2184
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2185
RAFT TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2186
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 173
BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 172
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 372
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 373
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 374
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 375
TEMPLE WORK AT TOWNSHIP S N SOMPURA & SONS

TOP OF PCC JAI SHREE INFRASTRUCTURE 175


BOTTOM OF PCC JAI SHREE INFRASTRUCTURE 176
TOP OF PCC JAI SHREE INFRASTRUCTURE 177
TOP OF PCC JAI SHREE INFRASTRUCTURE 178
TOP OF PCC JAI SHREE INFRASTRUCTURE 179
HANDRAILING WORK AT RAS XI PITRAKRIPA ENTERPRISES
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 279
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 282
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 819
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 820
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 821
BOTTOM LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 825
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 879
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 883
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 885
TOP LEVEL OF PCC GOEL CONSTRUCTION CO. PVT LTD 842
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 889
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 890
TEMPLE WORK AT TOWNSHIP S N SOMPURA & SONS RA 08
PCC BOTTOM LEVEL M/S S. K. C. P. L. 77
ELECTRIC WORK VEDRAJ ELECTRICALS
BOTTOM LEVEL OF FLOORING TCC BUILDERS PRIVATE LIMITED 22
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 24
PCC TOP LEVEL M/S S. K. C. P. L. 78
PCC TOP LEVEL M/S S. K. C. P. L. 79
PCC TOP LEVEL M/S S. K. C. P. L. 80
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 89
PCC TOP LEVEL GOEL CONSTRUCTION CO. PVT LTD 893
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 378
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 26
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 510
TEMPLE WORK AT TOWNSHIP S N SOMPURA & SONS RA 09
PCC/PLUM TOP LEVEL TCC BUILDERS PRIVATE LIMITED 511
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 379
BOTTOM LEVEL OF FLOORING TCC BUILDERS PRIVATE LIMITED 513
BOTTOM LEVEL OF FLOORING TCC BUILDERS PRIVATE LIMITED 381
BOTTOM LEVEL OF FLOORING TCC BUILDERS PRIVATE LIMITED 382
PCC BOTTOM LEVEL M/S TCC BUILDERS PVT LTD 32
PCC PLUMB OF CENTER WALL M/S TCC BUILDERS PVT LTD 33
TOP LEVEL OF PCC PLUMB M/S TCC BUILDERS PVT LTD 34
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO. PVT LTD 616
LABOUR CAMP , TOILET , WATER TANK SHREE ADITYA POWER -
FLOORING TOP LAVEL TCC BUILDERS PRIVATE LIMITED 384
FLOORING TOP LAVEL TCC BUILDERS PRIVATE LIMITED 386
FLOORING TOP LAVEL TCC BUILDERS PRIVATE LIMITED 387
PCC TOP LAVEL GOEL CONSTRUCTION CO PVT LTD 617
PCC BOTTOM REDING TCC BUILDERS PRIVATE LIMITED 753
PCC TOP REDING TCC BUILDERS PRIVATE LIMITED 754
PCC BOTTOM REDING Goel construcation co. pvt ltd 613
TOP OF FLOORING TCC BUILDERS PRIVATE LIMITED 525
PCC TOP LAVEL Goel construcation co. pvt ltd 619
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 35
POND M/S SOPAL MAGNA GUJAR -
HARPUL JI HOUSE M/S SOPAL MAGNA GUJAR -
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
FABRICATION AND ERETION JAI SAVARIYA SAITH ENGINEERING
PCC BOTTOM LAVEL GOYAL CONSTRUCTION COM.
PCC TOP LAVEL GOYAL CONSTRUCTION COM. 624
BOUNDARY WALL - OUT SIND SOPAL MAGNA GUJJAR
BOUNDARY WALL - OUT SIND SOPAL MAGNA GUJJAR
TOP LAVEL OF PCC TCC BUILDERS PRIVATE LIMITED 528
BOTTOM LAVEL OF PCC TCC BUILDERS PRIVATE LIMITED 529
HRB FAN BOTTOM TCC BUILDERS PRIVATE LIMITED 392
FLOURING BOTOM LAVEL TCC BUILDERS PRIVATE LIMITED 391
FLOURING TOP LAVEL TCC BUILDERS PRIVATE LIMITED 393
FLOURING TOP LAVEL TCC BUILDERS PRIVATE LIMITED 394
HANDRAILING WORK AT RAS XI PITRAKRIPA ENTERPRISES -
JMR FOR ELECTRICAL WORK VEDRAJ ELECTRICALS
FOUNDATION WORK HITECH RENEWALBLE ENERGY PVT LTD
FOUNDATION WORK HITECH RENEWALBLE ENERGY PVT LTD
BOTTOM LAVEL OF PCC GOEL CONSTRUCTION COMPANY
BOTTOM LAVEL OF PCC GOEL CONSTRUCTION COMPANY
SOILNI BOUTOM GOEL CONSTRUCTION COMPANY 845
SOILNI BOUTOM GOEL CONSTRUCTION COMPANY 843
BOTTOM LAVEL OF PCC GOEL CONSTRUCTION COMPANY 630
TOP LAVEL OF FLOURING TCC BUILDERS PRIVATE LIMITED 532
PCC BOTTOM REDING TCC BUILDERS PRIVATE LIMITED 758
PCC TOP REDING TCC BUILDERS PRIVATE LIMITED 759
BOTTOM LAVEL OF RCC FLOORING TCC BUILDERS PRIVATE LIMITED 535
TOP LAVEL OF RCC FLOORING TCC BUILDERS PRIVATE LIMITED 533
FLOORING PCC BOTTOM LAVES TCC BUILDERS PRIVATE LIMITED 101
PCC TOP LAVEL SOPAL MAGNA GUJJAR 1
AIR CONDITIONER INSTALLLATION WORK GOODLUCK ENTERPRISE 1
GROUND FLOOR LAVEL S.L.C.P.L 89
GROUND FLOOR LAVEL S.L.C.P.L 90
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 632
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 1
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 2
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 35
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 633
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 286
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 287
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 37
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 766
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 42
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 41
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 766
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 895
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 896
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 103
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 288
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 290
OUT SIDER BOUNDARY WALL M/S SOPAL MAGNA GUJJAR -
OUT SIDER BOUNDARY WALL M/S SOPAL MAGNA GUJJAR -
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 289
RAFT TOP LEVEL SHARDE CONSTRUCTION 16
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 12
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 13
PCC TOP LAVEL SHARDE CONSTRUCTION 11
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 8
PCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 1
POWE PLANT ELECTRICAL JOB WORK VEDRAJ ELECTRICALS -
RAFT TOP LEVEL SHARDE CONSTRUCTION 14
RAFT TOP LEVEL SHARDE CONSTRUCTION 15
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 291
PCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 5
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 44
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 644
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 642
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 640
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 641
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 634
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 6
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 544
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 545
FABRICATION WORK JAI SAVARIYA SAITH ENGINEERING -
FABRICATION WORK JAI SAVARIYA SAITH ENGINEERING -
PCC BOTTOM LAVEL JAI SHREE INFRACTURUCTURE 203
PCC BOTTOM LAVEL JAI SHREE INFRACTURUCTURE 204
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 7
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 65
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 45
PCC TOP LAVEL JAI SHREE INFRASTRUCTURE 205
PCC TOP LAVEL JAI SHREE INFRASTRUCTURE 206
PCC TOP LAVEL JAI SHREE INFRASTRUCTURE 66
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 18
RCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 6
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 67
RCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 7
PCC TOP LAVEL SHARDE CONSTRUCTION 17
PCC BOTTOM LAVEL JAI SHREE INFRASTRUCTURE 274
PCC BOTTOM LAVEL JAI SHREE INFRASTRUCTURE 269
PCC BOTTOM LAVEL JAI SHREE INFRASTRUCTURE 276
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 68
PCC TOP LAVEL JAI SHREE INFRASTRUCTURE 275
PCC TOP LAVEL JAI SHREE INFRASTRUCTURE 277
PCC TOP LAVEL JAI SHREE INFRASTRUCTURE 270
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 420
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 413
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 647
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 648
FOUNDATION WORK HITECH RENEWALBLE ENERGY PVT LTD -
FOUNDATION WORK HITECH RENEWALBLE ENERGY PVT LTD
FOUNDATION WORK HITECH RENEWALBLE ENERGY PVT LTD
FOUNDATION WORK HITECH RENEWALBLE ENERGY PVT LTD
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 413
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 76
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 74
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 72
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 153
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 421
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 303
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 20
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 426
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 425
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 424
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 22
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 24
PCC TOP LAVEL SHARDE CONSTRUCTION 21
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 19
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 778
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 78
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 304
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 73
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 75
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 77
RAILING WORK MEASURMENT PITRAKRIPA ENTERPRISES -
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 431
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 1704
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 1703
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 1702
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 1701
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 432
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 434
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 432
FLOORING TOP LAVEL GOEL CONSTRUCTION COMPANY 849
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 108
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 158
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 156
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 154
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 109
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 435
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 437
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 116
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 161
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 159
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 157
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 155
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 781
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 79
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 48
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 115
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 436
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 438
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 162
FLOORING TOP LAVEL TCC BUILDERS PRIVATE LIMITED 165
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 49
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 439
FLOORING TOP LAVEL GOEL CONSTRUCTION COMPANY 440
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 441
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 902
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 901
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 1705
PCC BOTTOM LAVEL JAI SHREE INFRACTURUCTURE 207
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 1706
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 903
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 904
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 113
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 104
PCC TOP LAVEL SHARDE CONSTRUCTION 25
PCC TOP LAVEL SHARDE CONSTRUCTION 26
PCC TOP LAVEL SHARDE CONSTRUCTION 27
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 28
PCC BOTTOM LAVEL TCC BUILDERS PRIVATE LIMITED 80
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 441
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 445
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 701
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 114
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 906
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 907
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 903
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 905
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 105
PCC TOP LAVEL TCC BUILDERS PRIVATE LIMITED 81
RCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 3
JMR OF PILLARS SN SOMPURA & SONS -
PCC TOP LAVEL SHARDE CONSTRUCTION 31
PCC TOP LAVEL JAI SHREE INFRACTURE 208
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 446
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 465
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 767
PCC BOTTOM LAVEL SHARDE CONSTRUCTION 33
PCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 9
PCC TOP LAVEL SHARDE CONSTRUCTION 32
PCC TOP LAVEL SHARDE CONSTRUCTION 29
PCC TOP LAVEL SHARDE CONSTRUCTION 34
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 468
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 466
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 1709
PCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 10
PCC BOTTOM LAVEL GOEL CONSTRUCTION COMPANY 469
PCC TOP LAVEL GOEL CONSTRUCTION COMPANY 1710
PCC BOTTOM LAVEL SOPAL MAGNA GUJJAR 11
PCC TOP LEVEL GOEL CONSTRUCTION COMPANY 702
PCC TOP LEVEL GOEL CONSTRUCTION COMPANY 476
PCC BOTTOM LEVEL GOEL CONSTRUCTION COMPANY 451
PCC TOP LEVEL GOEL CONSTRUCTION COMPANY 912
PCC TOP LEVEL GOEL CONSTRUCTION COMPANY 913
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 12
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 42
PCC TOP LEVEL GOEL CONSTRUCTION COMPANY 477
PCC TOP LEVEL GOEL CONSTRUCTION COMPANY 473
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 914
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 479
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 480
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 481
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1711
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 13
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 170
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 483
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 43
ELECTRIC WORK VEDRAJ ELECTRICALS
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 172
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 482
RAFT TOP LEVEL SHARDE CONSTRUCTION 44
RAFT TOP LEVEL SHARDE CONSTRUCTION 45
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 46
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 484
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 485
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 916
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 917
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 918
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 486
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 487
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 782
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 14
BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 919
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 920
BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 922
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 923
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 703
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 491
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 492
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 493
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 494
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 495
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 785
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 787
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 280
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 923
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 925
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 924
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 926
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 705
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 85
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 83
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 48
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 86
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 87
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 306
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 174
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 676
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 496
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 677
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 929
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 789
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 307
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 790
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 450
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 930
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 931
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 932
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 498
PCC TOP LEVEL SHARDE CONSTRUCTION 49
PCC TOP LEVEL SHARDE CONSTRUCTION 50
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 51
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 499
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 933
RCC TOP LEVEL S.K.C.P.L. 99
RCC TOP LEVEL S.K.C.P.L. 100
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 177
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 934
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 935
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 936
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 50
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 308
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 309
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 792
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 179
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 180
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2601
PCC BOTTOM LEVEL SHARDE CONSTRUCTIONS 56
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 937
PCC TOP LEVEL SHARDE CONSTRUCTIONS 53
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 2602
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 679
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 678
SHEETING MEASUREMENT & SCAFFFOLDING
ROOPRAJAT ENGINEERING -
MEASUREMENT
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 501
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 502
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 93
PCC TOP LEVEL SHARDE CONSTRUCTIONS 57
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 310
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 794
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 795
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 706
PCC BOTTOM LEVEL KUBER ENGINEERING -
PCC TOP LEVEL KUBER ENGINEERING -
RAFT TOP LEVEL SHARDE CONSTRUCTIONS 54
PCC BOTTOM LEVEL SHARDE CONSTRUCTIONS 58
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 181
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 94
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2603
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 2604
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2605
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 60
RAFT TOP LEVEL SHARDE CONSTRUCTIONS 59
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 797
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 708
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 709
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 13
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 95
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 796
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 117
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 119
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 710
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 938
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 939
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 940
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 15
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 101
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 182
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 96
PCC BOTTOM LEVEL SOPAL MAGNA GUJJAR NOV/24/CIVIL/01
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 63
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 798
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 120
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 122
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 503
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 126
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 97
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 711
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 680
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 127
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 504
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 505
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 507
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 17
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 102
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 98
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 90
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 89
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 944
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 508
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 509
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 510
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 183
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 511
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 512
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 513
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 514
PCC BOTTOM LEVEL M/s S.K.C.P.L. 101
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 715
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 717
PCC BOTTOM LEVEL M/s S.K.C.P.L. 102
ELECTRIC WORK VEDRAJ ELECTRICALS JMR/01/2024
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 91
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 92
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 945
PCC TOP LEVEL KUBER ENGINEERING
PCC TOP LEVEL SHARDE CONSTUCTIONS 64
PCC BOTTOM LEVEL SHARDE CONSTUCTIONS 66
PCC BOTTOM LEVEL SHARDE CONSTUCTIONS 65
PCC BOTTOM LEVEL GOEL CONSTRUCTIONS 685
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 686
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 19
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 513
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 515
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 516
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 517
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 718
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 719
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 406
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 405
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 799
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 451
PCC BOTTOM LEVEL R.K UTILITY GROUP -
PCC BOTTOM LEVEL SOPAL MAGNA GUJJAR -
PCC TOP LEVEL SOPAL MAGNA GUJJAR -
PCC BOTTOM LEVEL KUBER ENGINEERING -
PCC BOTTOM LEVEL KUBER ENGINEERING -
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 519
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 407
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 716
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 454
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 453
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 70
PCC TOP LEVEL KUBER ENGINEERING
PCC TOP LEVEL KUBER ENGINEERING
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 408
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 409
PCC TOP LEVEL SHARDE CONSTRUCTION 71
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 312
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 80
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 78
PCC TOP LEVEL SHARDE CONSTRUCTION 76
RAFT TOP LEVEL SHARDE CONSTRUCTION 74
RAFT TOP LEVEL SHARDE CONSTRUCTION 72
SIZE MEASUREMENT SHARDE CONSTRUCTION 68
SIZE MEASUREMENT SHARDE CONSTRUCTION 67
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 520
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 521
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 20
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 688
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 313
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 184
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 455
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 410
PCC TOP LEVEL SHARDE CONSTRUCTION 81
PCC BOTTOM LEVEL S.K.C.P.L. 103
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 82
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 689
PCC TOP LEVEL S.K.C.P.L. 104
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 83
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 522
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 21
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 413
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 412
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 85
PCC TOP LEVEL S.K.C.P.L. 105
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 15
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 523
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 690
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 691
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 86
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 87
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 88
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 946
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 947
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 524
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 525
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 948
RAFT TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 91
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 949
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 526
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 103
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 456
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 457
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 459
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 104
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 128
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 129
SIDE CLADDING 2SIDE AND ROOF 2 SIDE V&R FABRICATORS AND ECRECTORS
-
(15MTR ABOVE SHEETING SHEETING JMR) ENGINERING
SIDE CLADDING 2SIDE AND ROOF 2 SIDE (0- V&R FABRICATORS AND ECRECTORS
-
15MTR SHEETING JMR) ENGINERING

ELECTRIC WORK VEDRAJ ELECTRICALS -


PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 460
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 461
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 105
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 527
V&R FABRICATORS AND ECRECTORS
RIDGE SHEETING -
ENGINERING
SIDE CLADDING 2SIDE AND ROOF 2 SIDE (0- V&R FABRICATORS AND ECRECTORS
-
15MTR SHEETING JMR) ENGINERING
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 19
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 20
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 107
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 108
PCC BOTTOM LEVEL KUBER ENGINEERING -
PCC TOP LEVEL KUBER ENGINEERING -
TOP OF GP2 GROUTING JAI SHREE INFRASTRUCTURE 282
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 523
PCC BOTTOM LEVEL SHARDE CONSTRUCTIONS 93
PCC TOP LEVEL SHARDE CONSTRUCTIONS 94
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 722
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 529
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 723
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 213
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 21
PCC TOP LEVEL KUBER ENGINEERING -
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 186
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 462
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 695
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 187
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 414
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 532
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 22
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 23
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 24
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 726
PCC BOTTOM LEVEL SHARDE CONSTRUCTIONS 95
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 727
PCC TOP LEVEL SHARDE CONSTRUCTIONS 97
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 316
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 416
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 533
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 534
Y ANGLE FIXING SOPAL MAGNA GUJJAR -
PCC TOP LEVEL SOPAL MAGNA GUJJAR -
PCC BOTTOM LEVEL KUBER ENGINEERING -
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 535
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 418
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 419
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 463
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 415
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 465
ELECTRIC WORK VEDRAJ ELECTRICALS -
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 317
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 318
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 536
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 189
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 292
PCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 22
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 25
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 27
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 298
PCC BOTON REDING TCC BUILDERS PRIVATE LIMITED 469
PCC BOTON REDING TCC BUILDERS PRIVATE LIMITED 467
PCC TOP REDING TCC BUILDERS PRIVATE LIMITED 466
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 422
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 421
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 420
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 537
FOOTING PCC BOTOM LAVEL GOEL CONSTRUCTION CO PVT LTD 533
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 540
FOOTING PCC TOP LAVEL GOEL CONSTRUCTION CO PVT LTD 541
SOILING TOP LAVEL GOEL CONSTRUCTION CO PVT LTD 542
FOOTING TOP LAVEL PCC GOEL CONSTRUCTION CO PVT LTD 539
PCC BOTTOM LEVEL KUBER ENGINEERING 101
PCC TOP LEVEL KUBER ENGINEERING -
FOOTING BOTOM LAVEL TCC BUILDERS PRIVATE LIMITED 111
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 110
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 321
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 320
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 319
PCC TOP LEVEL KUBER ENGINEERING 102
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 729
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 730
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 473
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 601
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 470
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 471
PCC TOP LEVEL SHARDE CONSTRUCTION 99
PCC TOP LEVEL SHARDE CONSTRUCTION 108
PCC TOP LEVEL SHARDE CONSTRUCTION 107
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 106
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 109
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 470
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 602
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 423
PCC TOP LEVEL SHARDE CONSTRUCTION 111
PCC TOP LEVEL SHARDE CONSTRUCTION 105
PCC TOP LEVEL SHARDE CONSTRUCTION 104
HANDRAILING WORK AT RAS XI
PITRAKRIPA ENTERPRISES
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 112
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 113
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 114
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 115
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 211
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 213
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 214
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 215
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 216
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 217
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 428
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 426
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 474
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 475
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 25
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 322
PCC BOTTOM LEVEL S.K.C.P.L. 110
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 323
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 324
PCC TOP LEVEL S.K.C.P.L. 115
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 543
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 545
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 325
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 731
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 732
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 733
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 734
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 429
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 431
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 476
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 477
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 478
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 432
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 433
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 434
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 119
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 430
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 116
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 118
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 120
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 191
ELECTRIC WORK
VEDRAJ ELECTRICALS -
ELECTRIC WORK
VEDRAJ ELECTRICALS -
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 479
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 297
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 121
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 546
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 547
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 122
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 123
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 127
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 128
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 131
PCC BOTTOM LEVEL SHARDE CONSTRUCTIONS 113
PCC TOP LEVEL SHARDE CONSTRUCTIONS 114
PCC BOTTOM LEVEL SHARDE CONSTRUCTIONS 116
PCC TOP LEVEL SHARDE CONSTRUCTIONS 117
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 548
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 549
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 550
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 101
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 480
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 481
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 482
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 132
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 133
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 134
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 135
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 102
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 103
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 136
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 137
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 138
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 484
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 485
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 486
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 298
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 299
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 104
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2607
PCC TOP LEVEL HIMTARAM BHATI 68
RRM TOP LEVEL SOPAL MAGNA GUJJAR 27
PCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 28
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 139
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 326
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 735
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 736
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 737
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 738
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 105
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 106
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 107
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 2609
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 327
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 487
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 488
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 108
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 109
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 141
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 142
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 328
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1903
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 607
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 608
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 489
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 23
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 898
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 143
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 145
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 603
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 605
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 130
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 131
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2610
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 697
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 698
PCC TOP LEVEL S.K.C.P.L. 118
PCC BOTTOM LEVEL S.K.C.P.L. 117
PCC BOTTOM LEVEL S.K.C.P.L. 116
PCC BOTTOM LEVEL KUBER ENGINEERING 103
PCC TOP LEVEL KUBER ENGINEERING 104
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 739
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 329
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 330
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 331
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 741
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 2611
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 110
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 111
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 112
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 561
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 562

PAINTING WORK JUGANU ASSOCIATES -


PAINTING WORK PITRAKRIPA ENTERPRISES -
PCC TOP LEVEL SOPAL MAGNA GUJJAR 29
PLUM BOTTOM LEVEL SOPAL MAGNA GUJJAR 31
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 699
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 700
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1904
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 118
PCC TOP LEVEL SHARDE CONSTRUCTION 119
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 220
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 221
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 490
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 332
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 333
PCC BOTTOM LEVEL HIMTARAM BHATI 69
PCC BOTTOM LEVEL HIMTARAM BHATI 70
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 222
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 113
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 114
PCC BOTTOM LEVEL KUBER ENGINEERING 105
PCC TOP LEVEL KUBER ENGINEERING 106
PCC BOTTOM LEVEL KUBER ENGINEERING 107
PCC TOP LEVEL KUBER ENGINEERING 108
PCC BOTTOM LEVEL KUBER ENGINEERING 109
PCC TOP LEVEL KUBER ENGINEERING 110
RR WALL TOP LEVEL KUBER ENGINEERING 111
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 851
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 852
PCC BOTTOM LEVEL S.K.C.P.L. 119
PCC BOTTOM LEVEL S.K.C.P.L. 120
PCC TOP LEVEL S.K.C.P.L. 121
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 612
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 613
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 853
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 854
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1905
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1906
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 614
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 615
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 855
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 856
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 742
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 618
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 616
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 617
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 223
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 224
PCC TOP LEVEL JAI SHREE INFRASTRUCTURE 225
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 121
PCC BOTTOM LEVEL KUBER ENGINEERING 112
PCC TOP LEVEL KUBER ENGINEERING 113
PCC BOTTOM LEVEL KUBER ENGINEERING 114
PCC TOP LEVEL KUBER ENGINEERING 115
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 619
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 620
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 621
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 622
PCC BOTTOM LEVEL M/s S.K.C.P.L. 122
PCC BOTTOM LEVEL M/s S.K.C.P.L. 123
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 623
PCC TOP LEVEL SHARDE CONSTRUCTION 124
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 859
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 624
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 334
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 335
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 336
PCC TOP LEVEL SOPAL MAGNA GUJJAR 32
PCC TOP LEVEL SOPAL MAGNA GUJJAR 33
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1907
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 198
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 199
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 743
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 745
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 563
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 492
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 493
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 496
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 499
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 115
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 116
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 133
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 134
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 135
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 564
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 565
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 118
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 119
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1908
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 746
PCC TOP LEVEL HIMTA RAM BHATI 71
BRICWORK AND PLASTER MEASUREMENT OF STAIR HIMTA RAM BHATI 72
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 337
PCC BOTTOM LEVEL KUBER ENGINEERING 116
RRM TOP LEVEL SOPAL MAGNA GUJJAR 34
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 626
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 627
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 629
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 437
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 436
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 625
PCC BOTTOM LEVEL M/s S.K.C.P.L. 124
PCC BOTTOM LEVEL M/s S.K.C.P.L. 125
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 126
PCC BOTTOM LEVEL M/s S.K.C.P.L. 126
PCC BOTTOM LEVEL M/s S.K.C.P.L. 127
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 747
PCC TOP LEVEL SHARDE CONSTRUCTION 127
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 128
PCC TOP LEVEL SHARDE CONSTRUCTION 129
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 338
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 630
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 631
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 120
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 749
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 339
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2614
PCC BOTTOM LEVEL KUBER ENGINEERING 118
PCC TOP LEVEL KUBER ENGINEERING 119
PCC BOTTOM LEVEL KUBER ENGINEERING 120
PCC BOTTOM LEVEL M/s S.K.C.P.L. 128
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 750
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 566
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 567
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3301
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3302
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 125
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 126
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 127
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 865
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 633
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 637
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 128
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 129
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1911
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 341
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 866
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 130
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 132
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 2615
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 133
PCC TOP LEVEL SHARDE CONSTRUCTION 134
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 135
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 638
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 639
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 665
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 868
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1912
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 136
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 137
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 138
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 139
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2151
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 136
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 138
PCC TOP LEVEL SHARDE CONSTRUCTION 139
PCC TOP LEVEL SHARDE CONSTRUCTION 140
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 2616
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 342
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 343
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 346
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2152
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2153
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 130
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 131
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 132
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 133
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 134
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 344
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 345
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 861
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 347
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 348
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 143
PCC TOP LEVEL SHARDE CONSTRUCTION 145
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 641
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 642
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 643
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 644
PCC TOP LEVEL KUBER ENGINEERING 121
PCC TOP LEVEL KUBER ENGINEERING 122
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 135
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 138
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 139
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 140
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 141
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1913
PCC TOP LEVEL SHARDE CONSTRUCTION 144
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 645
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 646
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 350
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1915
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1917
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 140
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 141
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 35
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 142
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 143
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 144
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 146
PCC BOTTOM LEVEL BUDHA RAM GUJJAR -
PCC TOP LEVEL BUDHA RAM GUJJAR -
PCC BOTTOM LEVEL BUDHA RAM GUJJAR -
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 147
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 148
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3305
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3306
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 647
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 648
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2352
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2353
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2354
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 149
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 150
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 151
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2355
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2356
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3311
INSULATION WORK UNICAME ENGINEEERING -
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2156
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2158
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 146
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3307
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3308
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3312
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 152
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1918
PCC BOTTOM LEVEL M/S SOPAL MAGNA GUJJAR 37
PCC TOP LEVEL M/S SOPAL MAGNA GUJJAR 38
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2358
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2357
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2251
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 147
PCC TOP LEVEL SHARDE CONSTRUCTION 148
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2157
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2159
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2160
PCC TOP LEVEL SHARDE CONSTRUCTION 151
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 150
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3314
RRM TOP M/S SOPAL MAGNA GUJJAR 39
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 153
RCC FLOORING BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 873
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2252
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2253
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2360
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2359
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2361
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2362
INSULATION WORK OF COOLER ESP M M INSULATION -
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 155
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3320
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3321
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3322
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2363
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1919
PCC TOP LEVEL BUDHARAM GURJAR -
BRICK WORK TOP BUDHARAM GURJAR -
PCC BOTTOM LEVEL JAI SHREE INFRASTRUCTURE 184
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1920
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 153
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1921
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1922
BRICK WORK WITH PLASTER M/S SOPAL MAGNA GUJJAR 40
PCC TOP LEVEL BUDHARAM GURJAR -
PCC BOTTOM LEVEL BUDHARAM GURJAR -
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 145
PILLAR MEASUREMENT S N SOMPURA % SONS -
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 164
PCC TOP LEVEL SHARDE CONSTRUCTION 149
PCC TOP LEVEL SHARDE CONSTRUCTION 152
PCC TOP LEVEL SHARDE CONSTRUCTION 155
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 146
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 147
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2254
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2255
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2161
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2163
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 438
PCC BOTTOM LEVEL KUBER ENGINEERING 123
PCC BOTTOM LEVEL KUBER ENGINEERING 125
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 165
PCC TOP LEVEL BUDHARAM GURJAR -
PCC TOP LEVEL BUDHARAM GURJAR -
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2257
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 439
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 3323
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 3324
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2258
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1924
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1925
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 802
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 149
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 151
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 803
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 29
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 28
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 167
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2364
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2365
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3327
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2366
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 159
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1923
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3326
SUREMENT FOR THE FALSE FLOORING ON FLOOR 3RD 5TH; AND 7TH FLOOR)
SWASTIK GLAZETECH -

MEASUREMENT FOR THE FALSE FLOORING ON


IT ROOM AND CONTROL ROOM;INSTRUMNT
ROOM ;SERVER ROOM) SWASTIK GLAZETECH -
WBM SOILING LEVEL MEASUREMENT GOEL CONSTRUCTION CO PVT LTD 153
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3329
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3334
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2368
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 572
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 573
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 574
RCC FLOOR TOP TCC BUILDERS PRIVATE LIMITED 878
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2260
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2263
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2264
PCC TOP LEVEL M/S KUBER ENGINEERING 126
PCC BOTTOM LEVEL M/S KUBER ENGINEERING 127
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3335
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3337
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1927
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1929
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2265
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2266
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2267
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2268
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1930
PCC TOP LEVEL SHARDE CONSTRUCTION 157
PCC TOP LEVEL SHARDE CONSTRUCTION 160
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 158
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 159
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2369
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2371
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1931
HUME PIPE LAYING BUDHA RAM GUJJAR -
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2270
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2269
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2166
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2167
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2168
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2169
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 168
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 169
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2170
PCC TOP LEVEL BUDHA RAM GUJJAR -
RCC FOOTING TOP TCC BUILDERS PRIVATE LIMITED 879
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1933
CEMENT MILL FEEDING GOEL CONSTRUCTION CO PVT LTD 3333
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1934
RCC BOTTOM LEVEL M/s SOPAL MAGNA GUJJAR 42
RCC BOTTOM LEVEL M/s SOPAL MAGNA GUJJAR 43
ELECTRCIAL WORK M/s VEDRAJ ELECTRICCALS -
MS ROLLING SHUTTTER TCC BUILDERS PRIVATE LIMITED 2273
DIFFERENT SIZE OF THE MS VENTILIATION TCC BUILDERS PRIVATE LIMITED 2274
PCC TOP LEVEL M/s KUBER ENGINEEERING 128
PCC BOTTOM LEVEL M/s KUBER ENGINEEERING 129
PCC TOP LEVEL BUDHA RAM GUJJAR -
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3340
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3342
PCC BOTTOM LEVEL HIMATRAM BHATI CONTRACTOR -
ELECTRICAL CHMABBER MEASUREMENT BUDHA RAM GUJJAR -
300mm HUME PIPE LINE LAYING AND THE HOUCHING WORK BUDHA RAM GUJJAR -
PCC BOTTOM LEVEL BUDHA RAM GUJJAR -
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 162
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2372
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 804
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 810
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 811
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 812
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 44
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 813
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 814
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 815
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 816
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2373
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2374
INSULATION WORK M.M INSULATION -
RCC BOTTOM LEVEL M/S SOPAL MAGNA GUJJAR 46
RCC BOTTOM LEVEL M/S SOPAL MAGNA GUJJAR 47
PCC TOP LEVEL M/S SOPAL MAGNA GUJJAR 48
PCC TOP LEVEL SHARDE CONSTRUCTION 166
PCC TOP LEVEL SHARDE CONSTRUCTION 167
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2278
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2279
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2280
LAYING OF THE HUME PIPE BUDHA RAM GURJAR -
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2375
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2376
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2378

HAND RAILING WORK PITRAKRIPA ENTERPRISES -


PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2171
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2172
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2173
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 168
PCC BOTTOM LEVEL
BUDHA RAM GURHJAR -
PCC TOP LEVEL
BUDHA RAM GURHJAR -
PRIMARY CRUSHER SLAB TCC BUILDERS PRIVATE LIMITED 2174
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2175
BRICK WORK TOP LEVEL BUDHA RAM GURJAR -
PCC BOTTOM LEVEL BUDHA RAM GURJAR -
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 49
PCC TOP LEVEL SHARDE CONSTRUCTION 170
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2381
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2382
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2383
FLOORING BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 170
FLOORING TOP GOEL CONSTRUCTION CO PVT LTD 3403
HIGH MAST AT THE MAHARAJA YARD & LABOU JBR CONSTRUCTION -
TOP OF FLOORING TCC BUILDERS PRIVATE LIMITED 2384
TOP OF FLOORING GOEL CONSTRUCTION CO PVT LTD 3404
RCC TOP LEVEL SOPAL MAGNA GUJJAR 52
RCC TOP LEVEL SOPAL MAGNA GUJJAR 51
RCC TOP LEVEL SOPAL MAGNA GUJJAR 50
HUME PIPE CROSSING AND PCC MEASUREMENT BUDHA RAM GURJAR -
PCC TOP LEVEL BUDHA RAM GURJAR -
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2176
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 171
PCC TOP LEVEL SHARDE CONSTRUCTION 172
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 172
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1935
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1936
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3343
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3344
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3345
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2281
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2282
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3346
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3347
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3348
RCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 53
FOOTING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 884
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2180
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2183
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2283
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2284
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2285
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2286
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2177
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2181
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2182
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 885
RCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 54
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2386
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2385
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2387
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2388
ELECTRCIAL WORK THE POWER DEPARTMENT KATHAT ENTERPRISES -
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2184
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 173
PCC TOP LEVEL SHARDE CONSTRUCTION 174
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 177
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 178
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2288
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2289
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2389
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2390
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1937
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1938
FLOORIMG TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 2290
PVC LINE MEASUREMENT HORIZONTAL AND INSIDE of TOILET
Mastan Plumbing works & Company 1
PVC LINE MEASUREMENT HORIZONTAL for PANTRY Mastan Plumbing works & Company 2
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2291
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2292
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 440
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 441
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3350
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2185
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2391
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2392
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2393
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2394
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2295
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2296
PCC TOP LEVEL M/S SOPAL MAGNA GUJJAR 55
BRICKWORK AND PLASTER FOR ELECTRICAL
WORK BUDHA RAM GURJAR -
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2297
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2293
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2396
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 185
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 186
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2186
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 190
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2398
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2399
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2397
RR WALL TOP LEVEL KUBER ENGINEERING 130
RCC TOP LEVEL KUBER ENGINEERING 131
RR WALL TOP LEVEL KUBER ENGINEERING 132
PCC BOTTOM LEVEL KUBER ENGINEERING 133
PCC BOTTOM LEVEL KUBER ENGINEERING 134
PILLAR MEASUREMENT S N SOMPURA % SONS -
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 189
SOILING BOTTOM LEVCEL GOEL CONSTRUCTION CO PVT LTD 192
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1939
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1940
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2187
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3407
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3408
RR WALL TOP LEVEL KUBER ENGINEERING 135
RR MASSONARY MEASUREMENT WORK KUBER ENGINEERING 136
RCC CABLE TRUNCH TOP LEVEL KUBER ENGINEERING 137
PCC BOTTOM LEVEL KUBER ENGINEERING 194
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2189
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2190
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2191
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 886
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 887
ELECTRIAL WORK T&D ELECTRICALS -
PCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 56
FLOORING BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 195
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 57
PCC TOP LEVEL KUBER ENGINEERING 138
PCC TOP LEVEL KUBER ENGINEERING 139
ELECTRIAL & INSTRUMENTATION WORK T&D ELECTRICALS -
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 175
PCC TOP LEVEL SHARDE CONSTRUCTION 176
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2051
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2052
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2298
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2299

HAND RAILING WORK PITRAKRIPA ENTERPRISES -


FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 196
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 197
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1941
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1943

ELECTRICAL WORK VAIDRAJ ELECTRICALS -


PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3410
FLOORING BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3103
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3104
PCC BOTTOM LEVEL SS & COMPANY 1101
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 161
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 162
FLOORING BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2203
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2051
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3053
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 2201
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2202
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2055
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3108
PCC BOTTOM LEVEL M/s S.K.C.P.L. 143
PCC BOTTOM LEVEL M/s S.K.C.P.L. 144
PCC TOP LEVEL M/s S.K.C.P.L. 145
PCC TOP LEVEL M/s S.K.C.P.L. 146
PVC LINE MEASUREMNT AT TERRACE AND VERTICAL MASTAN
LINE PLUMBING WORKS & CO. 3
PVC MEASUREMENT OF AIRVENT & VERTICAL LINE
MASTAN PLUMBING WORKS & CO. 4
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 58
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3109
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3110
PCC TOP LEVEL KUBER ENGINEERING 140
PCC TOP LEVEL KUBER ENGINEERING 141
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2204
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2205
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2206
HUME PIPE CROSSING AND PCC MEASUREMENT SOPAL MAGNA GUJJAR 59
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1944
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1945
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 61
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 177
PCC TOP LEVEL SHARDE CONSTRUCTION 178
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3113
PCC TOP LEVEL SS & COMPANY 1102
PCC BOTTOM LEVEL SS & COMPANY 1103
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2056
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2057
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2058
PCC TOP LEVEL SOPAL MAGNA GUJJAR 63
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2401
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2207
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2209
BOX CULVERT MEASUREMENT SOPAL MAGNA GUJJAR 64
RCC COLUMN TOP LEVEL KUBER ENGINEERING 143
RCC COLUMN TOP LEVEL KUBER ENGINEERING 144
RCC COLUMN TOP LEVEL KUBER ENGINEERING 145
FLOORING TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2210
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2212
ELECTRIC WORK VEDRAJ ELECTRICALS -
FLOORING BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3111
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3112
PCC TOP LEVEL SS & COMPANY 1104
RCC TOP LEVEL SOPAL MAGNA GUJJAR 66
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3419
PCC MEASUREMENT O FSOIL PIPE SOPAL MAGNA GUJJAR 65
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 817
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 818
HDPE POLYTHENE SHEET GHEVRI DEVI -
SEPTIC TANK STONE MASONARY & PLASTER IN
LABOUR COLONY OUTSIDE ROAD SOPAL MAGNA GUJJAR -
PCC BOTTOM LEVEL SS & COMPANY 1105
PCC TOP LEVEL SS & COMPANY 1106
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 165
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 166
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2402
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2059
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2060
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3114
FLOORING BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3115
FLOORING TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3116
RCC TOP LEVEL SOPAL MAGNA GUJJAR 67
HUME PIPE CROSSING AND PCC MEASUREMENT SOPAL MAGNA GUJJAR 68
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 69
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 179
PCC BOTTOM LEVEL SS & COMPANY 1107
PCC TOP LEVEL SS & COMPANY 1109
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3054
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3055
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2213
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2215
PCC TOP LEVEL SHARDE CONSTRUCTION 180
FLOORING BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3119
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2102
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2103
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2106
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2107
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2109
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2111
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 181
PCC BOTTOM LEVEL SS & COMPANY 1110
PCC BOTTOM LEVEL SS & COMPANY 1111
PCC BOTTOM LEVEL SS & COMPANY 1112
PCC BOTTOM LEVEL SS & COMPANY 1113
PCC TOP LEVEL SHARDE CONSTRUCTION 182
FLOORING BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2217
PCC BOTTOM LEVEL SS & COMPANY 1114
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 183
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1949
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1950
PCC BOTTOM LEVEL SS & COMPANY 1115
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 70
RCC BOTTOM LEVEL SOPAL MAGNA GUJJAR 72
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2123
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2124
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2062
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2219
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2220
PCC TOP LEVEL SHARDE CONSTRUCTION 184
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2407
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2408
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2409
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2410
RCC TOP LEVEL & MEASUREMENT SOPAL MAGNA GUJJAR 73
RCC TOP LEVEL & MEASUREMENT SOPAL MAGNA GUJJAR 74
RCC WALL TOP LEVEL & MEASUREMENT SOPAL MAGNA GUJJAR 75
PCC TOP LEVEL SS & COMPANY 1119
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2063
FLOORING BOTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2221
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2223
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 146
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 147
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 148
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 149
PCC BOTTOM LEVEL SHARDE CONSTRUCTION 185
PCC TOP LEVEL SHARDE CONSTRUCTION 186
PCC BOTTOM LEVEL SS & COMPANY 1116
PCC TOP LEVEL SS & COMPANY 1121
PCC TOP LEVEL SS & COMPANY 1120
RCC RETAINING WALL SS & COMPANY 1122
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1953
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1954
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 3072
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 3075
FLOORING BOTTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2224
PCC BOTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2225
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1958
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1959
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1956
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1957
MEASUREMENT OF FLOORING & SKIRTING GURUKRIPA ENTERPRISES -
MEASUREMENT OF FLOORING & SKIRTING GURUKRIPA ENTERPRISES -
MEASUREMENT OF PAINTING WORK SUNIL ENTERPRISES -
MEASUREMENT OF FALSE CEILING WORK FATMA ENTERPRISES -
PCC TOP LEVEL SHARDE CONSTRUCTION 187
PCC BOTTOM LEVEL GOEL CONSTRUCTION CO PVT LTD 1960
PCC TOP LEVEL GOEL CONSTRUCTION CO PVT LTD 1961
FLOORING BOTTTOM LEVEL TCC BUILDERS PRIVATE LIMITED 2226
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2227
PCC TOP LEVEL TCC BUILDERS PRIVATE LIMITED 2228
PCC TOP LEVEL SS & COMPANY 1123
PCC BOTTOM LEVEL SS & COMPANY 1124
ACCOUNT
Site Engineer EIC PERSON/REMARKS JMR TAKEN TIME REMARKS
ON JMR BYENGINEER
TUSHAR
KOTHARI/HEMANT 2:00 TO 5:30
CHOUDHARY
TUSHAR
KOTHARI/HEMANT 2:00 TO 5:30
CHOUDHARY
TUSHAR KOTHARI 2:00 TO 5:30
TUSHAR KOTHARI 2:00 TO 5:30
TUSHAR KOTHARI 2:00 TO 5:30
ACCOUNT PERSON
NOT AVAILABLE
TUSHAR KOTHARI 2:00 TO 5:30
TUSHAR KOTHARI 2:00 TO 5:30
TUSHAR KOTHARI 2:00 TO 5:30
TUSHAR KOTHARI 2:00 TO 5:30
TUSHAR KOTHARI 2:00 TO 5:30
TUSHAR KOTHARI 2:00 TO 5:30
lokesh khatri , hemand
2:00 TO 5:30
choudhary
lokesh khatri , hemand
2:00 TO 5:30
choudhary
lokesh khatri 3:00 TO 4:00
lokesh khatri, GAUTAM
3:00 TO 5:00
SHARMA
lokesh khatri, GAUTAM
3:00 TO 5:00
SHARMA
lokesh khatri 3:30 to 4:45
Gautam sharma 11 :00 to 1:30

Gautam sharma 11 :00 to 1:30

Gautam sharma 11 :00 to 1:30

Gautam sharma 11 :00 to 1:30

Gautam sharma 11 :00 to 1:30

lokesh khatri 2:30 to 5:00

lokesh khatri 2:30 to 5:00

lokesh khatri 2:30 to 5:00

lokesh khatri 2:30 to 5:00

lokesh khatri 2:30 to 5:00


lokesh khatri 2:30 to 5:00
LOKESH KHATRI, ATUL
2:30 to 5:00
GARG
LOKESH KHATRI 2:30 to 5:00
LOKESH KHATRI, ATUL
2:30 to 5:00
GARG
LOKESH KHATRI 2:30 to 5:10
LOKESH KHATRI 2:30 to 5:10
Gautam sharma 2:30 to 5:10
Gautam sharma 2:30 to 5:10
Gautam sharma 2:30 to 5:10
Gautam sharma 2:30 to 5:10
Gautam sharma 2:30 to 5:10
LOKESH KHATRI VIJAY
2:30 to 5:10
KUMAR
LOKESH KHATRI VIJAY
2:30 to 5:10
KUMAR
LOKESH KHATRI VIJAY
2:30 to 5:10
KUMAR
LOKESH KHATRI VIJAY
2:30 to 5:10
KUMAR
LOKESH KHATRI VIJAY
2:30 to 4:30
KUMAR
LOKESH KHATRI VIJAY
10:00 TO 11:00
KUMAR
Gautam sharma -

Gautam sharma -

Gautam sharma -

Gautam sharma -
lokesh khatri, vijay
10:15 to 12.30
kumar
lokesh khatri, vijay
2:30 to 5:10
kumar
lokesh khatri, vijay
2:30 to 5:10
kumar
lokesh khatri, vijay
2:30 to 5:10
kumar

Gautam sharma 12:00 to 1:00

Gautam sharma 3:00 TO 4:00


lokesh khatri 10:00 to 12:00
lokesh khatri 10:00 to 12:00
lokesh khatri 2:30 to 4:30
lokesh khatri 2:30 to 5:00
lokesh khatri 2:30 to 5:00
Gautam sharma 2:30 to 5:00
Gautam sharma 2:30 to 5:00
Gautam sharma 2:30 to 5:00
Gautam sharma 2:30 to 5:00
Gautam sharma 2:30 to 5:00
LOKESH KHATRI 10:30 TO 12:00
LOKESH KHATRI 3:30 TO 5:10
LOKESH KHATRI 3:30 TO 5:10
gautam sharma 3:40 to 5:15
gautam sharma 3:40 to 5:15
lokesh khatri 3:40 to 5:15
lokesh khatri 9:45 TO 1:00
lokesh khatri 9:45 TO 1:00
lokesh khatri 9:45 TO 1:00
lokesh khatri 9:45 TO 1:00
lokesh khatri 3:30 to 5:10
lokesh khatri 3:30 to 5:10
Gautam sharma 3:30 to 5:10
LOKESH KHATRI 10:30 TO 12:30
Gautam sharma 10:30 to 12:30
Gautam sharma 10:30 to 12:30
lokesh khatri 10:30 to 12:30
lokesh khatri 10:30 to 12:30
lokesh khatri 3:30 TO 5:10
lokesh khatri 3:30 TO 5:10
lokesh khatri 3:30 TO 5:10
lokesh khatri 3:30 TO 5:10
Gautam sharma 3:30 TO 5:00
lokesh khatri 3:30 TO 5:00
lokesh khatri 10:00 to 12:00
lokesh khatri 10:00 to 12:00
lokesh khatri 10:00 to 12:30
Gautam sharma 10:00 to 12:30
Gautam sharma 10:00 to 12:30
Gautam sharma 10:00 to 12:30
Gautam sharma 10:00 to 12:30
Gautam sharma 10:00 to 12:30
Gautam sharma 10:00 to 12:30
LOKESH KHATRI 10:30 TO 11:00
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 3:00 TO 5:10
Gautam sharma 10:00 TO 12:00
Gautam sharma 10:00 TO 12:00
LOKESH KHATRI 3:30 TO 5:10
LOKESH KHATRI 3:30 TO 5:10
LOKESH KHATRI 3:30 TO 5:10
Gautam sharma 3:30 TO 5:10
Gautam sharma 10:15 to 12.30
LOKESH KHATRI 10:15 to 01:00
LOKESH KHATRI 10:15 to 01:00
LOKESH KHATRI 10:15 to 01:00
LOKESH KHATRI 10:15 to 01:00
LOKESH KHATRI 3:30 TO 5:00
LOKESH KHATRI 3:30 TO 5:00
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 01:00
GAUTAM SHARMA 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 01:00
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
GAUTAM SHARMA 2:30 TO 5:10
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
GAUTAM SHARMA 2:30 to 4:30
LOKESH KHATRI 2:30 to 4:30
GAUTAM SHARMA 10:00 TO 11:30
GAUTAM SHARMA 10:00 TO 11:30
GAUTAM SHARMA 10:00 TO 11:30
LOKESH KHATRI 9:45 TO 12:30
LOKESH KHATRI 9:45 TO 12:30
GAUTAM SHARMA 9:45 TO 12:30
GAUTAM SHARMA 9:45 TO 12:30
LOKESH KHATRI
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 04:00 TO 5:00
LOKESH KHATRI 10:00 TO 12:50
LOKESH KHATRI 10:00 TO 12:50
LOKESH KHATRI 10:00 TO 12:50
LOKESH KHATRI 10:00 TO 12:50
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 10:00 TO 12:45
LOKESH KHATRI 10:00 TO 12:45
LOKESH KHATRI 10:00 TO 12:45
LOKESH KHATRI 10:00 TO 12:45
LOKESH KHATRI 10:00 TO 12:45
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 10:00 TO 10:45
LOKESH KHATRI 10:00 TO 11:00
LOKESH KHATRI 3:00 to 5:00
LOKESH KHATRI 3:00 to 5:00
LOKESH KHATRI 4:30 to 5:15
LOKESH KHATRI 2.30 TO 4.00
LOKESH KHATRI 10:30 TO 12:00
LOKESH KHATRI 10:30 TO 12:00
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 3:00 TO 5:10
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
GAUTAM SHARMA 10:00 TO 1:00
GAUTAM SHARMA 10:00 TO 1:00
GAUTAM SHARMA 10:00 TO 1:00
GAUTAM SHARMA 3.00 TO 5.00
ACCOUNT PERSON NOT AVAILABLE
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:00
LOKESH KHATRI 2.30 TO 5.00
LOKESH KHATRI 2.30 TO 5.00
LOKESH KHATRI 2.30 TO 5.00
LOKESH KHATRI 2.30 TO 5.00
LOKESH KHATRI 2.30 TO 5.00
LOKESH KHATRI 10:00 TO 11:30
LOKESH KHATRI 2.30 TO 5:15
LOKESH KHATRI 2.30 TO 5:15
LOKESH KHATRI 2.30 TO 5:15
LOKESH KHATRI 2.30 TO 5:15
LOKESH KHATRI 2.30 TO 5:15
LOKESH KHATRI 2.30 TO 5:15
LOKESH KHATRI 2:30 TO 3:30
LOKESH KHATRI 3:00 TO 4:45
LOKESH KHATRI 3:00 TO 4:45
LOKESH KHATRI 2:30 TO 3:30
LOKESH KHATRI 2:30 TO 3:30
LOKESH KHATRI 10:30 TO 12:00
LOKESH KHATRI 10:30 TO 12:00

LOKESH KHATRI 3:00 TO 5:00


LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 10:30 TO 12:00
LOKESH KHATRI 03:00 TO 5:00
LOKESH KHATRI 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 01:00
GAUTAM SHARMA 10:00 TO 01:00
GAUTAM SHARMA 10:00 TO 01:00
LOKESH KHATRI 10:00 TO 12:50
GAUTAM SHARMA 10:00 TO 11:00
LOKESH KHATRI 10:00 TO 12:50
LOKESH KHATRI 2:30 to 4:30
LOKESH KHATRI 11:00 TO 12:00
LOKESH KHATRI 3:00 to 4:30
LOKESH KHATRI 3:00 to 4:30
LOKESH KHATRI 10:00 TO 12;15
LOKESH KHATRI 10:00 TO 12;15
LOKESH KHATRI 10:00 TO 12;15
LOKESH KHATRI 3:30 TO 4:45
LOKESH KHATRI 3:30 TO 4:45
LOKESH KHATRI 10:30 to 12:00
LOKESH KHATRI 10:30 to 12:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 TO 11:00
LOKESH KHATRI 2:30 TO 3:30
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 2:30 TO 5:10
LOKESH KHATRI 11:00 TO 12:00
LOKESH KHATRI 10:00 TO 12:30
LOKESH KHATRI 2:30 TO 3:30
LOKESH KHATRI 10:30 to 11:30
LOKESH KHATRI 04:00 to 05:10
LOKESH KHATRI 04:00 to 05:10
LOKESH KHATRI 12:00 to 1:00
LOKESH KHATRI 3:00 to 04:30
LOKESH KHATRI 3:00 to 04:30
LOKESH KHATRI 10:30 TO 12:00
LOKESH KHATRI 3:30 TO 5:00
LOKESH KHATRI 3:00 TO 4:30
LOKESH KHATRI 10:00 TO 11:00
LOKESH KHATRI 2:30 TO 4:30
LOKESH KHATRI 2:30 TO 4:30
LOKESH KHATRI 2:30 TO 4:30
LOKESH KHATRI 4:30 to 5:15
LOKESH KHATRI 09:45 to 12:50
LOKESH KHATRI 09:45 to 12:50
LOKESH KHATRI 09:45 to 12:50
LOKESH KHATRI 09:45 to 12:50
LOKESH KHATRI 09:45 to 12:50
LOKESH KHATRI 09:45 to 12:50
LOKESH KHATRI 09:45 to 12:50
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 to 5:15
LOKESH KHATRI 3:00 to 5:15
LOKESH KHATRI 3:00 to 5:15
LOKESH KHATRI 10:15 TO 11:00
LOKESH KHATRI 10:30 TO 01:00
LOKESH KHATRI 10:30 TO 01:00
LOKESH KHATRI 10:30 TO 01:00
LOKESH KHATRI 10:00 to 11:30
LOKESH KHATRI 10:00 to 11:30
LOKESH KHATRI 3:30 to 5:15
LOKESH KHATRI 3:30 to 5:15
LOKESH KHATRI 3:30 to 5:15
LOKESH KHATRI 11:30 TO 12:30
LOKESH KHATRI 10:15 to 12:15
LOKESH KHATRI 10:15 to 12:15
LOKESH KHATRI 10:15 to 12:15
LOKESH KHATRI 2:30 TO 4:00
LOKESH KHATRI 2:30 TO 4:00
LOKESH KHATRI 2:30 TO 4:00
LOKESH KHATRI 4:00 TO 5:15
LOKESH KHATRI 4:00 TO 5:15
LOKESH KHATRI 10:00 TO 12:15
LOKESH KHATRI 10:00 TO 12:15
LOKESH KHATRI 10:00 TO 12:15
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 11:00 to 12:45
LOKESH KHATRI 11:00 to 12:45
LOKESH KHATRI 11:00 to 12:45
LOKESH KHATRI 3:00 to 5:15
LOKESH KHATRI 3:00 to 5:15
LOKESH KHATRI 3:00 to 5:15
LOKESH KHATRI 3:00 to 5:15
LOKESH KHATRI 2:30 TO 3:30
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 10:00 to 12:45
LOKESH KHATRI 11:00 to 12:00
LOKESH KHATRI 3:00 to 4:45
LOKESH KHATRI 11:00 TO 12:15
LOKESH KHATRI 9:30 TO 11:00
LOKESH KHATRI 9:30 TO 11:00
LOKESH KHATRI 11:30 TO 1:15
LOKESH KHATRI 11:30 TO 1:15
LOKESH KHATRI 11:30 TO 1:15
LOKESH KHATRI 10:30 to 1:00
LOKESH KHATRI 10:30 to 1:00
LOKESH KHATRI 10:30 to 1:00
LOKESH KHATRI 10:30 to 1:00
LOKESH KHATRI 10:30 to 1:00
LOKESH KHATRI 10:30 to 1:00
LOKESH KHATRI 3:00 to 5:00
LOKESH KHATRI 3:00 to 5:00
LOKESH KHATRI 3:00 to 5:00
LOKESH KHATRI 3:00 to 5:00
LOKESH KHATRI 3:00 to 4:00
LOKESH KHATRI 10:00 to 12:00
LOKESH KHATRI 10:00 to 12:00
LOKESH KHATRI 3:30 to 5:20
LOKESH KHATRI 3:30 to 5:20
LOKESH KHATRI 3:45 to 5:15
LOKESH KHATRI 3:45 to 5:15
LOKESH KHATRI 3:00 TO 4:30
LOKESH KHATRI 10:00 TO 11:00
LOKESH KHATRI 4:00 TO 5:15
LOKESH KHATRI 4:00 TO 5:15
LOKESH KHATRI 10:00 to 12:30
LOKESH KHATRI 10:00 to 12:30
LOKESH KHATRI 10:00 to 12:30
LOKESH KHATRI 4:15 to 5:15
LOKESH KHATRI 9:45 to 11:00
LOKESH KHATRI 9:45 to 11:00
LOKESH KHATRI 3:15 TO 5:15
LOKESH KHATRI 3:15 TO 5:15
LOKESH KHATRI 3:15 TO 5:15
LOKESH KHATRI 11:00 to 1:00
LOKESH KHATRI 11:00 to 1:00
LOKESH KHATRI 11:00 to 1:00
LOKESH KHATRI 2:15 TO 5:10
LOKESH KHATRI 2:15 TO 5:10
LOKESH KHATRI 2:15 TO 5:10

LOKESH KHATRI 2:15 TO 5:10


LOKESH KHATRI 2:15 TO 5:10
LOKESH KHATRI 10:00 11:45
LOKESH KHATRI 10:00 11:45
LOKESH KHATRI 4:15 TO 5:10
LOKESH KHATRI 11:00 TO 12:45
LOKESH KHATRI 11:00 TO 12:45
LOKESH KHATRI 2:30 to 5:15
LOKESH KHATRI 2:30 to 5:15
LOKESH KHATRI 09:45 TO 1:00
LOKESH KHATRI 09:45 TO 1:00
LOKESH KHATRI 09:45 TO 1:00
LOKESH KHATRI 10:30 to 12:50
LOKESH KHATRI 2:15 to 5:15
LOKESH KHATRI 2:15 to 5:15

LOKESH KHATRI 11:30 TO 12:30

LOKESH KHATRI 10:00 TO 12:30


LOKESH KHATRI 10:00 TO 12:30
LOKESH KHATRI 10:00 TO 12:30
LOKESH KHATRI 4:00 TO 5:15
LOKESH KHATRI 09:45 to 11:30
LOKESH KHATRI 09:45 to 11:30
LOKESH KHATRI 3:30 TO 5:00
LOKESH KHATRI 3:30 TO 5:00
LOKESH KHATRI 10:00 to 12:30
LOKESH KHATRI 10:00 to 12:30
LOKESH KHATRI 9:30 to 10:30
LOKESH KHATRI 3:30 to 5:20
LOKESH KHATRI 3:30 to 5:20
LOKESH KHATRI 3:30 to 5:20
LOKESH KHATRI 12:00 to 1:30
LOKESH KHATRI 12:00 to 1:30
LOKESH KHATRI 9:45 TO 1:00
LOKESH KHATRI 9:45 TO 1:00
LOKESH KHATRI 2:15 TO 5:15
LOKESH KHATRI 2:15 TO 5:15
LOKESH KHATRI 2:15 TO 5:15
LOKESH KHATRI 9:30 TO 1:00
LOKESH KHATRI 9:30 TO 1:00
LOKESH KHATRI 9:30 TO 1:00
LOKESH KHATRI 9:30 TO 1:00
LOKESH KHATRI 9:30 TO 1:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 10:00 TO 1:00
LOKESH KHATRI 10:00 TO 1:00
LOKESH KHATRI 10:00 TO 1:00
LOKESH KHATRI 10:00 TO 1:00
LOKESH KHATRI 10:00 TO 1:00
LOKESH KHATRI 02:30 TO 3:45
LOKESH KHATRI 02:30 TO 3:45
LOKESH KHATRI 10:00 TO 12:30

LOKESH KHATRI 10:00 TO 12:30

LOKESH KHATRI 10:00 TO 12:30


LOKESH KHATRI 10:00 TO 12:30
LOKESH KHATRI 02:30 TO 5:10
LOKESH KHATRI 02:30 TO 5:10
LOKESH KHATRI 02:30 TO 5:10
LOKESH KHATRI 02:30 TO 5:10
LOKESH KHATRI 10:30 TO 12:45
LOKESH KHATRI 10:00 TO 11:30
LOKESH KHATRI 10:00 TO 11:30
LOKESH KHATRI 3:00 TO 4:00
LOKESH KHATRI 10:00 to 11:30
LOKESH KHATRI 10:00 to 11:30
LOKESH KHATRI 3:00 TO 4:00
LOKESH KHATRI 4:10 TO 5:15
LOKESH KHATRI 4:10 TO 5:15
LOKESH KHATRI 2:45 TO 3:30
3:30 TO 5:10
LOKESH KHATRI
11:00 TO 12:45
LOKESH KHATRI 10:00 TO 11:00
LOKESH KHATRI 3:00 TO 5:15
LOKESH KHATRI 3:00 TO 5:15
LOKESH KHATRI 3:00 TO 5:15
LOKESH KHATRI 9:45 TO 10:45
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 10:00 TO 11:00
LOKESH KHATRI 10:30 TO 11:45
LOKESH KHATRI 10:30 TO 12:15
LOKESH KHATRI 10:30 TO 12:15
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 10:00 to 1:00
LOKESH KHATRI 3:00 TO5:00
LOKESH KHATRI 3:00 TO5:00
LOKESH KHATRI 3:00 TO5:00
LOKESH KHATRI 3:00 TO5:00
LOKESH KHATRI 9:30 to 10:30
LOKESH KHATRI 3:00 TO 5:15
LOKESH KHATRI 3:00 TO 5:15
LOKESH KHATRI 3:00 TO 5:15
LOKESH KHATRI 10:30 TO 12:30
LOKESH KHATRI 10:30 TO 12:30
LOKESH KHATRI 3:30 TO 4:30
LOKESH KHATRI 3:00 TO 4:00
LOKESH KHATRI 2:15 TO 3:00
LOKESH KHATRI 9:45 TO 12:30
LOKESH KHATRI 9:45 TO 12:30
LOKESH KHATRI 9:45 TO 12:30
LOKESH KHATRI 3:00 TO 5:35
LOKESH KHATRI 3:00 TO 5:35
LOKESH KHATRI 3:00 TO 5:35
LOKESH KHATRI 3:00 TO 5:35
LOKESH KHATRI 3:00 TO 5:35
LOKESH KHATRI 11:45 TO 1:15
LOKESH KHATRI 11:45 TO 1:15
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 10:00 to 01:00
LOKESH KHATRI 10:00 to 01:00
LOKESH KHATRI 10:00 to 01:00
LOKESH KHATRI 3:00 to 4:30
LOKESH KHATRI 3:00 to 4:30
LOKESH KHATRI 3:00 to 4:30
LOKESH KHATRI
9:45 TO 12:45
RANJAN SAHOO
LOKESH KHATRI
9:45 TO 12:45
RANJAN SAHOO
LOKESH KHATRI
9:45 TO 12:45
RANJAN SAHOO
LOKESH KHATRI
4:30 TO 5:35
RANJAN SAHOO
LOKESH KHATRI
10:00 TO 12:45
RANJAN SAHOO
LOKESH KHATRI
10:00 TO 12:45
RANJAN SAHOO
LOKESH KHATRI
3:00 TO 5:00
RANJAN SAHOO
LOKESH KHATRI
3:00 TO 5:00
RANJAN SAHOO
ACCOUNT PERSON NOT AVAILABLE
ACCOUNT PERSON NOT AVAILABLE
ACCOUNT PERSON NOT AVAILABLE
LOKESH KHATRI 10:50 TO 12:45
LOKESH KHATRI 10:50 TO 12:45
LOKESH KHATRI 10:50 TO 12:45
LOKESH KHATRI 2:45 TO 5:15
LOKESH KHATRI 2:45 TO 5:15
LOKESH KHATRI 2:45 TO 5:15
LOKESH KHATRI 2:45 TO 5:15
LOKESH KHATRI 2:45 TO 5:15
LOKESH KHATRI 2:45 TO 5:15
LOKESH KHATRI 10:20 TO 1:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:30 TO 5:00
LOKESH KHATRI 2:15 TO 5:15
ACCOUNT PERSON NOT AVAILABLE
ACCOUNT PERSON NOT AVAILABLE
ACCOUNT PERSON NOT AVAILABLE

ACCOUNT PERSON NOT AVAILABLE


ACCOUNT PERSON NOT AVAILABLE
ACCOUNT PERSON NOT AVAILABLE
ACCOUNT PERSON NOT AVAILABLE
ACCOUNT PERSON NOT AVAILABLE
LOKESH KHATRI 11:45 TO 1:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 9:00 TO 12:00
LOKESH KHATRI 3:00 TO 5:20
LOKESH KHATRI 3:00 TO 5:20
LOKESH KHATRI 10:00 TO 11:00
LOKESH KHATRI 10:30 TO 1:00
LOKESH KHATRI 10:30 TO 1:00
LOKESH KHATRI 10:30 TO 1:00
LOKESH KHATRI 10:30 TO 1:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:30
LOKESH KHATRI 3:00 TO 5:30
LOKESH KHATRI 3:00 TO 5:30
LOKESH KHATRI 9:00 TO 12:45
LOKESH KHATRI 3:30 to 5:15
LOKESH KHATRI 3:30 to 5:15
LOKESH KHATRI 4:00 TO 5:15
LOKESH KHATRI 3:00 TO 5:00
LOKESH KHATRI 3:00 TO 5:00
GAUTAM SHARMA 11:00 to 1:00
GAUTAM SHARMA 11:00 to 1:00
GAUTAM SHARMA 11:00 to 1:00
GAUTAM SHARMA 10:30:00 TO 1:00
GAUTAM SHARMA 10:30:00 TO 1:00
GAUTAM SHARMA 11:30 to 1:00
GAUTAM SHARMA 11:30 to 1:00
GAUTAM SHARMA 11:30 to 1:00
GAUTAM SHARMA 1:00 TO 5:00
GAUTAM SHARMA 1:00 TO 5:00
GAUTAM SHARMA 4:30 to 5:30
GAUTAM SHARMA 12:00 to 1:00
GAUTAM SHARMA 12:00 to 1:00
GAUTAM SHARMA 12:00 To 1:00
GAUTAM SHARMA 3:00 To 4:00
Mr.Ram sing GAUTAM SHARMA 12:00 To 1:00
Mr.Ram sing GAUTAM SHARMA 12:00 To 1:00
Mr. Jaswant sing GAUTAM SHARMA 10:00 to 1:00
Mr. Jaswant sing GAUTAM SHARMA 10:00 to 1:00
Mr. Jaswant sing GAUTAM SHARMA 3:00 to 5:00
Mr. Jaswant sing GAUTAM SHARMA 3:00 to 5:00
Mr. Jaswant sing GAUTAM SHARMA 2:00 TO 5:30
Mr. Jaswant sing GAUTAM SHARMA 2:00 TO 5:30
Mr. Jaswant sing GAUTAM SHARMA 2:00 TO 5:30
Mr. Jaswant sing GAUTAM SHARMA 2:00 TO 5:30
Mr. Jaswant sing GAUTAM SHARMA 2:00 TO 5:30
Mr. Jaswant sing GAUTAM SHARMA 2:00 TO 5:30
Mr. Jaswant sing GAUTAM SHARMA 2:00 TO 5:30
Mr.abhishek jain GAUTAM SHARMA 12;00 to 1:00
Mr.abhishek jain GAUTAM SHARMA 12;00 to 1:00
Mr. ram sing GAUTAM SHARMA 12;00 to 1:00
Mr. ram sing GAUTAM SHARMA 12;00 to 1:00
Mr.abhishek jain GAUTAM SHARMA 3:00 TO 4:00
Mr.abhishek jain GAUTAM SHARMA 3:00 TO 4:00
Mr.abhishek jain GAUTAM SHARMA 3:00 TO 4:00
Mr.abhishek jain GAUTAM SHARMA 3:00 TO 4:00
Mr.abhishek jain GAUTAM SHARMA 11:00 TO 12:00
Mr.abhishek jain GAUTAM SHARMA 11:00 TO 12:00
Mr. Arun GAUTAM SHARMA 2:00 to 5:00
Shabir khan GAUTAM SHARMA 2:00 to 5:00
MR.MUKESH GAUTAM SHARMA 10 :00 TO 11:00
MR.MUKESH GAUTAM SHARMA 10 :00 TO 11:00
MR.SANJEEV GAUTAM SHARMA 11:00 to 1:00
MR.SANJEEV GAUTAM SHARMA 11:00 to 1:00
MR ARPIT GAUTAM SHARMA 11:00 to 1:00
MR ARPIT GAUTAM SHARMA 11:00 to 1:00
MR ARPIT GAUTAM SHARMA 10:00 TO 11:00
Mr.abhishek jain GAUTAM SHARMA 3:00 TO 4:00
Mr.abhishek jain GAUTAM SHARMA 3:00 TO 4:00
Mr.abhishek jain GAUTAM SHARMA 11:00 TO 1:00
Mr.abhishek jain GAUTAM SHARMA 11:00 TO 1:00
Mr.abhishek jain GAUTAM SHARMA 11:00 TO 1:00
MR. MANISH GAUTAM SHARMA 4:00 5:00
MR.RAMAN BHATI GAUTAM SHARMA 11:00 TO 1:00
MR. MANOJ GAUTAM SHARMA 11:00 TO 1:00
MR.MANIKANDAN GAUTAM SHARMA 3:00 -5:00
MR.MANIKANDAN GAUTAM SHARMA 3:00 -5:00
MR. MANISH GAUTAM SHARMA 3:00 -5:00
MR. PAWAN GAUTAM SHARMA 11:00 -1:00
MR. PAWAN GAUTAM SHARMA 11:00 -1:00
MR.AMIR GAUTAM SHARMA 11:00 -1:00
MR. MANISH GAUTAM SHARMA 11:00 -1:00
MR.JASWANT GAUTAM SHARMA 4:00-5:00
MR.JASWANT GAUTAM SHARMA 4:00- 5:30
MR.AMIR GAUTAM SHARMA 4:00- 5:30
MR.AMIR GAUTAM SHARMA 4:00- 5:30
MR.AMIR GAUTAM SHARMA 10 :00 - 12:00
MR.AMIR GAUTAM SHARMA 10 :00 - 12:00
MR.AMIR GAUTAM SHARMA 4:00- 5:00
MR.MANISH GAUTAM SHARMA 10 :00 - 12:00
MR.MANISH GAUTAM SHARMA 10 :00 - 12:00
MR.MANISH GAUTAM SHARMA 10 :00 - 12:00
Mr. Jaswant sing GAUTAM SHARMA 4:00- 5:00
Mr. Jaswant sing GAUTAM SHARMA 4:00- 5:00
MR.RAMSING GAUTAM SHARMA 4:00- 5:00
MR.RAMSING GAUTAM SHARMA 4:00- 5:00
Mr. Jaswant sing GAUTAM SHARMA 4:00- 5:00
MR.PAWAN GAUTAM SHARMA 10:00 - 1:00
MR.PAWAN GAUTAM SHARMA 10:00 - 1:00
MR.PAWAN GAUTAM SHARMA 10:00 - 1:00
MR.PAWAN GAUTAM SHARMA 10:00 - 1:00
MR.PAWAN GAUTAM SHARMA 10:00 - 1:00
MR. SUMANTO DAS GAUTAM SHARMA 10:00 - 1:00
MR. SABIR GAUTAM SHARMA 4:00-5:00
MR.PAWAN GAUTAM SHARMA 11:00-12:30
MR.PAWAN GAUTAM SHARMA 11:00-12:30
Mr. Jaswant sing GAUTAM SHARMA 11:00-12:30
MR. SUMANTO DAS GAUTAM SHARMA 10:00-12:00
MR. AMIR GAUTAM SHARMA 10:00-12:30
MR.PAWAN GAUTAM SHARMA 10:00-12:30
MR.PAWAN GAUTAM SHARMA 10:00-12:30
MR.PAWAN GAUTAM SHARMA 10:00-12:30
Mr. Jaswant sing GAUTAM SHARMA 11:00-1:00
Mr.abhishek jain GAUTAM SHARMA 11:00-1:00
MR.MANISH GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 4:00 - 5:30
Mr. Jaswant sing GAUTAM SHARMA 4:00 - 5:30
Mr. Jaswant sing GAUTAM SHARMA 4:00 - 5:30
MR.PAWAN GAUTAM SHARMA 11:00-1:00
MR.PAWAN GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 4;00-5:00
MR.AMIR GAUTAM SHARMA 4;00-5:00
MR.PAWAN GAUTAM SHARMA 11:00-12:00
MR.PAWAN GAUTAM SHARMA 11:00-12:00
MR.PAWAN GAUTAM SHARMA 11:00-12:00
MR.PAWAN GAUTAM SHARMA 4:00-5:00
MR. SUMANTO DAS GAUTAM SHARMA 4:00-5:00
MR.AMIR GAUTAM SHARMA 10:00-12:30
MR. SUMANTO DAS GAUTAM SHARMA 10:00-12:30
MR.PAWAN GAUTAM SHARMA 10:00-12:30
MR . JASWANT SING GAUTAM SHARMA 4:00 - 5:30
MR . JASWANT SING GAUTAM SHARMA 4:00 - 5:30
MR . JASWANT SING GAUTAM SHARMA 4:00 - 5:30
MR.AMIR GAUTAM SHARMA 4:00 - 5:30
MR . JASWANT SING GAUTAM SHARMA 10:00- 12:30
MR . JASWANT SING GAUTAM SHARMA 10:00- 12:30
MR . JASWANT SING GAUTAM SHARMA 10:00- 12:30
MR. SOURABH GAUTAM SHARMA 10:00- 12:30
MR. SANJEEV GAUTAM SHARMA 10:00- 12:30
MR. SANJEEV GAUTAM SHARMA 10:00- 12:30
MR. SANJEEV GAUTAM SHARMA 10:00- 12:30
MR. MUKESH GAUTAM SHARMA 4:00-5:30
MR. MUKESH GAUTAM SHARMA 4:00-5:30
MR. MUKESH GAUTAM SHARMA 4:00-5:30
MR. MUKESH GAUTAM SHARMA 4:00-5:30
MR. ABHISHEK GAUTAM SHARMA 4:00-5:30
MR. ABHISHEK GAUTAM SHARMA 10:00 - 11:30
MR. ABHISHEK GAUTAM SHARMA 10:00 - 11:30
MR. ABHISHEK GAUTAM SHARMA 10:00 - 11:30
MR. ABHISHEK GAUTAM SHARMA 10:00 - 11:30
MR. SANJEEV GAUTAM SHARMA 4:00-5:30
MR. SANJEEV GAUTAM SHARMA 4:00-5:30
MR. ABHISHEK GAUTAM SHARMA 4:00-5:30
MR. SANJEEV GAUTAM SHARMA 10:00 -12:00
MR. SANJEEV GAUTAM SHARMA 10:00 -12:00
MR. SANJEEV GAUTAM SHARMA 10:00 -12:00
MR.PAWAN GAUTAM SHARMA 10:00 -12:00
MR.PAWAN GAUTAM SHARMA 10:00 -12:00
MR. ABHISHEK GAUTAM SHARMA 10:00 -12:00
MR.PAWAN GAUTAM SHARMA 10:00 -12:00
MR. SANJEEV GAUTAM SHARMA 3:00 - 5:300
MR. SANJEEV GAUTAM SHARMA 3:00 - 5:300
MR. SANJEEV GAUTAM SHARMA 3:00 - 5:300
MR. SANJEEV GAUTAM SHARMA 3:00 - 5:300
MR. SANJEEV GAUTAM SHARMA 3:00 - 5:300
MR. SANJEEV GAUTAM SHARMA 3:00 - 5:300
- GAUTAM SHARMA 9:30- 1:00
MR. SANJEEV GAUTAM SHARMA 9:30- 1:00
MR. SANJEEV GAUTAM SHARMA 9:30- 1:00
MR. SANJEEV GAUTAM SHARMA 9:30- 1:00
MR. SANJEEV GAUTAM SHARMA 9:30- 1:00
MR. SANJEEV GAUTAM SHARMA 9:30- 1:00
MR. SANJEEV GAUTAM SHARMA 9:30- 1:00
MR. SANJEEV GAUTAM SHARMA 4:00 -5:00
MR. SANJEEV GAUTAM SHARMA 4:00 -5:00
MR ARPIT GAUTAM SHARMA 10:00- 11:00
MR ARPIT GAUTAM SHARMA 10:00- 11:00
MR. MANISH GAUTAM SHARMA 4:00-5:30
MR. MANISH GAUTAM SHARMA 4:00-5:30
MR. MANISH GAUTAM SHARMA 4:00-5:30
MR. MANISH GAUTAM SHARMA 4:00-5:30
MR. SANJEEV GAUTAM SHARMA 4:00-5:30
MR. SANJEEV GAUTAM SHARMA 4:00-5:30
MR ARPIT GAUTAM SHARMA 10:00 - 12:00
MR.AMIR GAUTAM SHARMA 10:00 - 12:00
MR.AMIR GAUTAM SHARMA 10:00 - 12:00
MR.AMIR GAUTAM SHARMA 10:00 - 12:00
MR.AMIR GAUTAM SHARMA 10:00 - 12:00
MR. SANJEEV GAUTAM SHARMA 10:00 - 12:00
MR. SANJEEV GAUTAM SHARMA 4:00 - 5:30
MR ARPIT GAUTAM SHARMA 4:00 - 5:30
MR ARPIT GAUTAM SHARMA 4:00 - 5:30
MR. ABHISHEK GAUTAM SHARMA 4:00 - 5:30
MR. ABHISHEK GAUTAM SHARMA 4:00 - 5:30
MR. AMIR GAUTAM SHARMA 10:00- 12:30
MR. AMIR GAUTAM SHARMA 10:00- 12:30
MR. AMIR GAUTAM SHARMA 10:00- 12:30
MR. ABHISHEK GAUTAM SHARMA 10:00- 12:30
MR. ABHISHEK GAUTAM SHARMA 10:00- 12:30
MR. ABHISHEK GAUTAM SHARMA 10:00- 12:30
MR.AMIR GAUTAM SHARMA 10:00- 12:30
MR.AMIR GAUTAM SHARMA 10:00- 12:30
MR. ABHISHEK GAUTAM SHARMA 10:00- 12:30
MR.PAWAN GAUTAM SHARMA 10:00-1:00
MR. ABHISHEK GAUTAM SHARMA 10:00-1:00
MR ARPIT GAUTAM SHARMA 10:00-1:00
MR ARPIT GAUTAM SHARMA 10:00-1:00
MR.MANISH GAUTAM SHARMA 10:00-1:00
MR.SANJEEV GAUTAM SHARMA 10:00-1:00
MR.PAWAN GAUTAM SHARMA 4:00- 5:00
MR.PAWAN GAUTAM SHARMA 4:00- 5:00
MR.PAWAN GAUTAM SHARMA 4:00- 5:00
MR.PAWAN GAUTAM SHARMA 4:00- 5:00
MR ARPIT GAUTAM SHARMA 4:00- 5:00
MR. ABHISHEK GAUTAM SHARMA 10:00- 12:00
MR. ABHISHEK GAUTAM SHARMA 10:00- 12:00
MR.MANISH GAUTAM SHARMA 10:00- 12:00
MR.MANISH GAUTAM SHARMA 10:00- 12:00
MR ARPIT GAUTAM SHARMA 10:00- 12:00
MR ARPIT GAUTAM SHARMA 10:00- 12:00
MR ARPIT GAUTAM SHARMA 10:00- 12:00
MR ARPIT GAUTAM SHARMA 10:00- 12:00
Mr.abhishek jain GAUTAM SHARMA 4:00-5:00
MR.AMIR GAUTAM SHARMA 4:00-5:00
MR.RAMSING GAUTAM SHARMA 4:00-5:00
MR.VAIBHAV GAUTAM SHARMA 10:00 -11:00
Mr.abhishek GAUTAM SHARMA 4:00- 5:30
MR.PAWAN GAUTAM SHARMA 4:00- 5:30
Mr.abhishek GAUTAM SHARMA 4:00- 5:30
Mr.abhishek GAUTAM SHARMA 4:00- 5:30
Mr.abhishek GAUTAM SHARMA 4:00- 5:30
MR.PAWAN GAUTAM SHARMA 4:00- 5:30
MR.RAM SING GAUTAM SHARMA 4:00- 5:30
Mr.abhishek GAUTAM SHARMA 10:00-12:30
MR.PAWAN GAUTAM SHARMA 10:00-12:30
MR.PAWAN GAUTAM SHARMA 10:00-12:30
Mr.abhishek GAUTAM SHARMA 10:00-12:30
Mr.abhishek GAUTAM SHARMA 10:00-12:30
MR.MANISH GAUTAM SHARMA 4:00-5:00
MR.RAM SING GAUTAM SHARMA 4:00-5:00
Mr.abhishek MR.RAHUL/GAUTAM 10:00-12:00
MR.MANISH MR.RAHUL/GAUTAM 3:00-5:30
MR.RAM SING MR.RAHUL/GAUTAM 3:00-5:30
MR.MANISH RAHUL SURANA 10:00-12:00
Mr.ABHIHSHEK RAHUL SURANA 10:00-12:00
MR.MANISH RAHUL SURANA 10:00-12:00
Mr ARPIT RAHUL SURANA 2:00-4:00
Mr ARPIT RAHUL SURANA 2:00-4:00
MR.RAM SINGH RAHUL SURANA 4:00-5:00
Mr.ABHIHSHEK RAHUL SURANA 5:00-9:00
Mr.ABHIHSHEK RAHUL SURANA 5:00-9:00
Mr SANJEEV RAHUL SURANA 5:00-9:00
Mr ARPIT RAHUL SURANA 10:00-1:00
Mr.ABHIHSHEK RAHUL SURANA 10:00-1:00
Mr.ABHIHSHEK RAHUL SURANA 10:00-1:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-5:00
MR.MANISH RAHUL SURANA 2:00-5:00
MR.RAM SINGH RAHUL SURANA 2:00-5:00
Mr AMAR GERMANWAL RAHUL SURANA 6:00-9:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-5:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-5:00
MR RAKESH RAHUL SURANA 2:00-5:00
Mr AMAR GERMANWAL RAHUL SURANA 6:00-9:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-5:00
Mr.PAWAN RAHUL SURANA 10:00-1:00
Mr.PAWAN RAHUL SURANA 10:00-1:00
Mr.PAWAN RAHUL SURANA 10:00-1:00
Mr.ABHIHSHEK RAHUL SURANA 10:00-1:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
MR.RAM SINGH RAHUL SURANA 2:00-6:00
Mr ARPIT ATUL GARG 2:00-6:00
Mr ARPIT ATUL GARG 2:00-6:00
Mr ARPIT ATUL GARG 2:00-6:00
Mr ARPIT ATUL GARG 2:00-6:00
MR. MANISH ATUL GARG 2:00-6:00
MR. MANISH ATUL GARG
MR. MANISH ATUL GARG 2:00-6:00
MR. MANISH ATUL GARG 2:00-6:00
MR. MANISH ATUL GARG 2:00-6:00
MR. MANISH ATUL GARG 10:00-01:00
Mr. Amir ATUL GARG 2:00-6:00
Mr. Amir ATUL GARG 10:00-01:00
Mr. Jaswant sing ATUL GARG 10:00-01:00
Mr ARPIT GAUTAM SHARMA 10:00-4:00
Mr ARPIT GAUTAM SHARMA 10:00-4:00
Mr MANISH GAUTAM SHARMA 10:00-4:00
Mr ARPIT GAUTAM SHARMA 10:00-4:00
Mr MANISH GAUTAM SHARMA 10:00-4:00
Mr AMIR GERMANWAL GAUTAM SHARMA 10:00-4:00
Mr AMIR GERMANWAL GAUTAM SHARMA 10:00-4:00
Mr Sanjiv RAHUL SURANA 4:00-7:00
Mr AMIR GERMANWAL RAHUL SURANA 4:00-7:00
Mr AMIR GERMANWAL RAHUL SURANA 4:00-7:00
Mr AMIR GERMANWAL RAHUL SURANA 4:00-7:00
Mr AMIR GERMANWAL RAHUL SURANA 4:00-7:00
Mr SAURABH T RAHUL SURANA 4:00-7:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr.ABHIHSHEK RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 10:00-1:00
Mr MANIKANDAN RAHUL SURANA 2:00-6:00
Mr MANIKANDAN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 10:00-1:00
Mr ARPIT RAHUL SURANA 10:00-1:00
Mr ARPIT RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Sanjiv RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr Sanjiv RAHUL SURANA 10:00-2:00
Mr Sanjiv RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 2:00-6:00

Mr Jaswant RAHUL SURANA 10:00-2:00

Mr ARPIT RAHUL SURANA 2:00-6:00


Mr ARPIT RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Sanjiv RAHUL SURANA 2:00-6:00
Mr Sanjiv RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Sanjiv RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 2:00-6:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Sanjiv RAHUL SURANA 2:00-6:00
Mr MANISH RAHUL SURANA 10:00-2:00
Mr MANISH RAHUL SURANA 10:00-2:00
Mr Sanjiv RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr Sanjiv RAHUL SURANA 10:00-2:00
Mr Sanjiv RAHUL SURANA 10:00-2:00
Mr Sanjiv RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Sanjiv RAHUL SURANA 2:00-6:00
Mr MANISH RAHUL SURANA 10:00-2:00
Mr MANISH RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr MANISH RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr MANISH RAHUL SURANA 2:00-6:00
Mr MANISH RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr MANISH RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr ARPIT RAHUL SURANA 10:00-2:00
Mr MANIKANDAN RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr MANIKANDAN RAHUL SURANA 2:00-6:00
Mr VINOD DHADHICH RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr Sumunto Das RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr PAWAN SUTHAR RAHUL SURANA 2:00-6:00
Mr PAWAN SUTHAR RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SAHU RAHUL SURANA 2:00-6:00
Mr Ram Singh RAHUL SURANA 2:00-6:00
Mr Ram Singh RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr MANIKANDAN RAHUL SURANA 2:00-6:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr MANIKANDAN RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 2:00-6:00
Mr PAWAN SUTHAR RAHUL SURANA 2:00-6:00
Mr MANIKANDAN RAHUL SURANA 10:00-2:00
Mr Vaibhav Jain RAHUL SURANA 10:00-2:00
Mr Arpit GAUTAM SHARMA 2:00-6:00
Mr Arpit GAUTAM SHARMA 2:00-6:00
Mr Arpit GAUTAM SHARMA 2:00-6:00
Mr PAWAN SUTHAR GAUTAM SHARMA 2:00-6:00
Mr PAWAN SUTHAR GAUTAM SHARMA 2:00-6:00
Mr Abhishek GAUTAM SHARMA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-2:00
Mr SAURABH T RAHUL SURANA 10:00-2:00

Mr ABHINAV RAHUL SURANA 10:00-2:00

Mr JAIPAL RAHUL SURANA 10:00-2:00

Mr RAKESH RAHUL SURANA 2:00-6:00


Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-2:00

Mr ABHINAV RAHUL SURANA 10:00-2:00

Mr ABHINAV RAHUL SURANA 10:00-2:00

Mr VAIBHAV JAIN RAHUL SURANA 2:00-6:00


Mr VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr Jaswant RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr PAWAN SUTHAR RAHUL SURANA 2:00-10:00
Mr VAIBHAV JAIN RAHUL SURANA 10:00-2:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Manish RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 2:00-6:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr Abhishek RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Ram Singh RAHUL SURANA 2:00-6:00
Mr Ram Singh RAHUL SURANA 2:00-6:00
Mr Sumunto Das RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr RAKESH RAHUL SURANA 10:00-2:00
Mr SANJIV RAHUL SURANA 10:00-2:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr VAIBHAV JAIN RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
MR.JASWANT GAUTAM SHARMA 4:30-5:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.ARPIT GAUTAM SHARMA 3:30-5:00
MR.ARPIT GAUTAM SHARMA 3:30-5:00
MR.ARPIT GAUTAM SHARMA 3:30-5:00
MR.ARPIT GAUTAM SHARMA 3:30-5:00
MR.ARPIT GAUTAM SHARMA 3:30-5:00
MR.ARPIT GAUTAM SHARMA 3:30-5:00
MR.SUMONTO DAS GAUTAM SHARMA 3:30-5:00
MR.SUMONTO DAS GAUTAM SHARMA 3:30-5:00
MR.RAM SING GAUTAM SHARMA 11:00-12:30
MR.ABHISHKE GAUTAM SHARMA 11:00-12:30
MR.ABHISHKE GAUTAM SHARMA 11:00-12:30
MR.ABHISHKE GAUTAM SHARMA 11:00-12:30
MR.ABHISHKE GAUTAM SHARMA 11:00-12:30
MR.JASWANT GAUTAM SHARMA 4:00-5:30
MR.MANISH GAUTAM SHARMA 4:00-5:30
MR.MANISH GAUTAM SHARMA 4:00-5:30
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 11:00-1:00
Mr.PAWAN GAUTAM SHARMA 11:00-1:00
Mr.PAWAN GAUTAM SHARMA 11:00-1:00
Mr.PAWAN GAUTAM SHARMA 11:00-1:00
Mr.PAWAN GAUTAM SHARMA 11:00-1:00
Mr.PAWAN GAUTAM SHARMA 11:00-1:00
MR.AMIR GAUTAM SHARMA 4:00-5:30
MR.AMIR GAUTAM SHARMA 4:00-5:30
MR.AMIR GAUTAM SHARMA 4:00-5:30
Mr.PAWAN GAUTAM SHARMA 4:00-5:30
Mr.PAWAN GAUTAM SHARMA 4:00-5:30
Mr.PAWAN GAUTAM SHARMA 4:00-5:30
GAUTAM SHARMA
10:00-1:00
MR.MANISH GAUTAM SHARMA 10:00-1:00
MR.MANISH GAUTAM SHARMA 10:00-1:00
MR.MANISH GAUTAM SHARMA 10:00-1:00
MR.MANISH GAUTAM SHARMA 10:00-1:00
Mr.PAWAN GAUTAM SHARMA 02:00-6:00
Mr.PAWAN GAUTAM SHARMA 02:00-6:00
Mr.PAWAN GAUTAM SHARMA 02:00-6:00
Mr.PAWAN GAUTAM SHARMA 02:00-6:00
Mr.PAWAN GAUTAM SHARMA 02:00-6:00
Mr.PAWAN GAUTAM SHARMA 02:00-6:00
MR.AMIR GERMANWALA GAUTAM SHARMA 02:00-6:00
MR.AMIR GERMANWALA GAUTAM SHARMA 02:00-6:00
MR.AMIR GERMANWALA GAUTAM SHARMA 02:00-6:00
MR.AMIR GERMANWALA GAUTAM SHARMA 02:00-6:00
Mr VAIBHAV JAIN RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr Sunil Golani RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
MR.AMIR GERMANWALA RAHUL SURANA 02:00-6:00
Mr Sunil Golani RAHUL SURANA 02:00-6:00
Mr Ankit RAHUL SURANA 02:00-6:00
Mr Ankit RAHUL SURANA 02:00-6:00
MR.AMIR GERMANWALA RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.AMIR GERMANWALA RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.VISHWANTH RAHUL SURANA 02:00-6:00
RAHUL SURANA
MR DEEPAK 10:00-1:00
RAHUL SURANA
MR DEEPAK 10:00-1:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.MANISH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
MR VIABHAV JAIN RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
MR.MANISH RAHUL SURANA 02:00-6:00
MR.MANISH RAHUL SURANA 02:00-6:00
MR.MANISH RAHUL SURANA 02:00-6:00
MR.MANISH RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 02:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.RAM SINGH RAHUL SURANA 02:00-6:00
MR.SANJEEV RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 02:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
MR MANISH RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 10:00-1:00
MR.RAM SINGH RAHUL SURANA 10:00-1:00
MR VISHWARAJ RAHUL SURANA 02:00-6:00
MR VISHWARAJ RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
Mr SAURABH T RAHUL SURANA 02:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr MANIKANDAN RAHUL SURANA 10:00-1:00
Mr MANIKANDAN RAHUL SURANA 10:00-1:00
Mr MANIKANDAN RAHUL SURANA 10:00-1:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
MR.SANJEEV RAHUL SURANA 02:00-6:00
MR.SANJEEV RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
Mr Manish RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
Mr Arpit RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
MR.ABHISHEK JAIN RAHUL SURANA 02:00-6:00
RAHUL SURANA
10:00-2:00
RAHUL SURANA
10:00-2:00
MR.RAM SINGH RAHUL SURANA 10:00-2:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Manish RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr SANJEEV RAHUL SURANA 10:00-2:00
Mr SANJEEV RAHUL SURANA 10:00-2:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-2:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr SUMANTO DAS RAHUL SURANA 10:00-2:00
Mr SUMANTO DAS RAHUL SURANA 10:00-2:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr MANIKANDAN RAHUL SURANA 10:00-2:00
Mr MANIKANDAN RAHUL SURANA 10:00-2:00
Mr MANIKANDAN RAHUL SURANA 10:00-2:00
MR VISHWARAJ RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr PAWAN SUTHAR RAHUL SURANA 10:00-2:00
Mr SANJEEV RAHUL SURANA 2:00-6:00
Mr SUMNATO DAS RAHUL SURANA 2:00-6:00
Mr SUMNATO DAS RAHUL SURANA 2:00-6:00
Mr SUMNATO DAS RAHUL SURANA 2:00-6:00
Mr SUMNATO DAS RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Manikandan RAHUL SURANA 2:00-6:00
Mr Manikandan RAHUL SURANA 2:00-6:00
Mr SANJEEV RAHUL SURANA 10:00-2:00
Mr SANJEEV RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
MR.RAM SINGH RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJEEV RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-2:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-2:00
MR.ABHISHEK JAIN RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr Manish RAHUL SURANA 10:00-2:00
Mr Manish RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr Arpit RAHUL SURANA 10:00-2:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-2:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-2:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
MR.RAM SINGH RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr MANIKANDAN RAHUL SURANA 10:00-2:00
Mr MANIKANDAN RAHUL SURANA 10:00-2:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-2:00
Mr Manikandan RAHUL SURANA 10:00-2:00
Mr Manikandan RAHUL SURANA 10:00-2:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Manikandan RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Sanjeev RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJEEV RAHUL SURANA 10:00-1:00
Mr SANJEEV RAHUL SURANA 10:00-1:00
Mr SANJEEV RAHUL SURANA 10:00-1:00
Mr SANJEEV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SUMNATO DAS RAHUL SURANA 2:00-6:00
Mr SUMNATO DAS RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr SANJEEV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJEEV RAHUL SURANA 2:00-6:00
Mr SANJEEV RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr HITESH MAHESHWARI RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJIV GAUTAM SHARMA 10:00-6:00
Mr SANJIV GAUTAM SHARMA 10:00-6:00
Mr Manish GAUTAM SHARMA 10:00-6:00
Mr Manish GAUTAM SHARMA 10:00-6:00
Mr Manish GAUTAM SHARMA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr HITESH MAHESHWARI RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr PARAKRAM SINGH RAHUL SURANA
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00

MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00


Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr Rajesh RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr SUMANTO DAS RAHUL SURANA 10:00-1:00
Mr SUMANTO DAS RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr MANIKANDAN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr HITESH NMAHESHWARI RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
RAHUL SURANA
Mr HUKUM SINGH AND ORS 2:00-6:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 2:00-6:00
RAHUL SURANA
Mr SANJIV 2:00-6:00
RAHUL SURANA
Mr Manish 2:00-6:00
Mr Manish RAHUL SURANA 10:00-6:00
Mr Manish RAHUL SURANA 10:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-6:00
Mr Arpit RAHUL SURANA 10:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-6:00
Mr SAURABH T RAHUL SURANA 10:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-6:00
Mr Manish RAHUL SURANA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr Manish GAUTAM SHARMA 10:00-6:00
Mr Manish GAUTAM SHARMA 10:00-6:00
Mr Manish GAUTAM SHARMA 10:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr VINOD DHADHICH RAHUL SURANA 10:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
RAHUL SURANA
MR VAIBHAV JAIN 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr ABHISHEK JAIN RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr JASWANT RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAJENDRA DARAT RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr SUMNATO DAS RAHUL SURANA 10:00-1:00
Mr SUMNATO DAS RAHUL SURANA 2:00-6:00
Mr MANOJ RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
VARIOUS SITE RAHUL SURANA
ENGINEERS 2:00-6:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
RAHUL SURANA
Mr JAYANT 10:00-1:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr MNAIKANDAN RAHUL SURANA 2:00-6:00
Mr MNAIKANDAN RAHUL SURANA 2:00-6:00
Mr MNAIKANDAN RAHUL SURANA 2:00-6:00
Mr MNAIKANDAN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr SUMNATO DAS RAHUL SURANA 10:00-1:00
Mr SUMNATO DAS RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR SUMANTO DAS RAHUL SURANA 2:00-6:00
MR SUMANTO DAS RAHUL SURANA 2:00-6:00
MR SUMANTO DAS RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr DEEPAK/ Mr RAHUL SURANA
JAYANT 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr PARAKRAM SINGH RAHUL SURANA 2:00-6:00

RAHUL SURANA
Mr RAM SINGH 2:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr PARAKRAM SINGH RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr Arpit RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr Jaswant RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 10:00-1:00
Mr Manish RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr Jaswant RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr RAM SINGH RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr SAURABH T RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
MR VAIBHAV JAIN RAHUL SURANA 2:00-6:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr SANJIV RAHUL SURANA 10:00-1:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00
Mr AMIR GERMANWAL RAHUL SURANA 2:00-6:00