Annexure D

The document provides a detailed estimate for the renewal of improved SEJ work with sleeper without rails, including various components and their associated costs. The total estimated cost amounts to 430,691.44 Rs, broken down into specific items such as SEJ sets, rubber pads, and transportation charges. Additional charges for D&G and contingency are also included in the overall estimate.

Uploaded by

ambar.rvnl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

Annexure D

The document provides a detailed estimate for the renewal of improved SEJ work with sleeper without rails, including various components and their associated costs. The total estimated cost amounts to 430,691.44 Rs, broken down into specific items such as SEJ sets, rubber pads, and transportation charges. Additional charges for D&G and contingency are also included in the overall estimate.

Uploaded by

ambar.rvnl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Firefox https://ircep.gov.in/IRPSM/PopUpItemListRateRef.jsp?prmworkid=...

Reference - D
Unit Rate

Complete estimate for the unit rate should be entered, so that there is no need to separately attach abstract estimate.
Work Type Ref Code Ref Desc
Others 27 Renewal of Improved SEJ work with sleeper without rails
PRINT
(Fig. in Thousands )
Department Value View/Edit

Civil 431 Details

Total 4,31

Estimates for CIVIL

(Fig. in Rupees )
Applicability
Sr. Store Delete/
Description (Max. 50 words) Quantity Unit Rate Allocation Cash Total of
No. Add (?)
Purchase Stock D&G CG

SEJ's (Improvrd 60 KG )
1. 1 Set 341138 RRSK 0 341138 0 341138

ERC, Rubber pad and GFN liners for 6


2. 1 Set 3122 RRSK 0 3122 0 3122
sleepers

SEJ GRSP
3. 1 Set 1629.58 RRSK 0 1629.58 0 1629.58

PSC Sleepers for SEJ, 60 Kg


4. 1 Set 20473 RRSK 0 20473 0 20473

"Renewal of existing SEJ with improved


5. 1 Set 8758.16 RRSK 8758.16 0 0 8758.16
SEJ with PSC sleepers under
traffic block conditions as per approved
Loading & Unloading Charges
6. 1 MT 2733.1 RRSK 2733.1 0 0 2733.1

Welding of rail joints


7. 4 Nos. 4229.37 RRSK 16917.48 0 0 16917.48

Joggled fish plate with clamp


8. 4 Pairs 4010.82 RRSK 0 16043.28 0 16043.28

Transportation charges for


9. 1 per set 4151.32 RRSK 4151.32 0 0 4151.32
Rails,SEJ,Sleepers, fittings,etc

Any other Items which is incidental to


10. 0.01 per set 414965.9 RRSK 4149.66 0 0 4149.66
this work is to be taken in the Detailed
Estimate depending on site conditions
Contingency Charges (CG)
11. 0.01 Each 419116 RRSK 4191.16 0 0 4191.16

D & G charges on CRRM


12. 0.0153 Each 59353.5 RRSK 908.11 0 0 908.11

13. [Select One]

Total 424214.85

Additional Charges Rate % Amount

D&G Charges 1.53 6476.59

Contingency Charges (CG) 0 0

Allocation Amount

RRSK 430691.44 Rs.

REV 0 Rs.

SF 0 Rs.

Grand Total 4,30,691.44 Rs.

4,31 (In thousands of Rs.)