The Standard Procurement Document (SPD) outlines the Initial Selection Document for the procurement of Plant (Design, Supply, and Installation) as prepared by the World Bank. It includes instructions for applicants, selection criteria, and requirements for submitting applications, as well as details on the eligibility of applicants and the scope of the employer's requirements. This document is intended for use with a Request for Proposals selection method and reflects the World Bank's Procurement Regulations for IPF Borrowers.

Uploaded by

esmaelay.97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views69 pages

SPDInitialSelectionDocumentPLANTJanuary2017

The Standard Procurement Document (SPD) outlines the Initial Selection Document for the procurement of Plant (Design, Supply, and Installation) as prepared by the World Bank. It includes instructions for applicants, selection criteria, and requirements for submitting applications, as well as details on the eligibility of applicants and the scope of the employer's requirements. This document is intended for use with a Request for Proposals selection method and reflects the World Bank's Procurement Regulations for IPF Borrowers.

Uploaded by

esmaelay.97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 69

STANDARD PROCUREMENT

DOCUMENT

Initial Selection Document


Plant
Design, Supply and Installation
(For use with a Request for Proposals selection method)

JANUARY, 2017
i

This document is subject to copyright.

This document may be used and reproduced for non-commercial purposes only. Any commercial
use, including without limitation reselling, charging to access, redistribute, or for derivative
works such as unofficial translations based on this document is not allowed.
ii

Revisions

January 2017

This revision dated January, 2017 includes a few editorial enhancements.


iii

Foreword

This Standard Procurement Document (SPD) has been prepared by the World Bank for Initial
Selection of Applicants for the Request for Proposals (RFP) for procurement of Plant (Design,
Supply, and Installation).
The Initial Selection Document (ISD) shall be used by the Borrower with minimum changes as
may be necessary, and acceptable to the Bank, when an Initial Selection process takes place prior
to issuing request for proposals.
iv

Preface
This SPD reflects the World Bank’s Procurement Regulations for IPF Borrowers (“Procurement
Regulations”), July, 2016. This SPD is applicable to the procurement of Plant (Design, Supply,
and Installation) funded by IBRD or IDA-financed projects whose Legal Agreement makes
reference to the Procurement Regulations.

To obtain further information on procurement under World Bank financed projects or for
question regarding the use of this SPD, contact:

Chief Procurement Officer


Standards, Procurement and Financial Management Department
The World Bank
1818 H Street, N.W.
Washington, D.C. 20433 U.S.A.
http://www.worldbank.org/
v

Standard Procurement Document


Summary

Specific Procurement Notice - Invitation for Initial Selection


The template attached is the Invitation for Initial Selection. This is the template to be used by the
Employer.

Initial Selection Document: Procurement of Plant (Design, Supply


and Installation)

PART 1 – INITIAL SELECTION PROCEDURES

Section I - Instructions to Applicants (ITA)

This Section provides information to help the Applicants in preparing and


submitting their Applications for Initial Selection (“Applications”). Information is
also provided on opening and evaluation of Applications. Section I contains
provisions that are to be used without modification.

Section II - Initial Selection Data Sheet (ISDS)

This Section includes provisions that are specific to each contract and supplement
Section I, Instructions to Applicants.

Section III - Initial Selection Criteria and Requirements

This Section specifies the methods, criteria, and requirements to be used to


determine how Applicants shall be initially selected and later invited to submit
Proposals.

Section IV - Application Forms

This Section includes the Application Submission Letter and other forms required to
be submitted with the Application.

Section V - Eligible Countries


vi

This Section contains information regarding eligible countries.

Section VI - Fraud and Corruption

This Section provides the Applicants with the reference to the Bank’s policy in
regard to Fraud and Corruption applicable to the Initial Selection process.

PART 2 – EMPLOYER’S REQUIREMENTS

Section VII - Scope of Employer’s Requirements

This Section includes a summary description, Implementation schedule, and Site


and other Data of the Plant Design, Supply and Installation subject of this Initial
Selection.
vii

Specific Procurement Notice – Initial Selection Document (ISD)


Template

Invitation for Initial Selection


Plant
(Design, Supply, and Installation)

Employer: [insert the name of the Employer’s agency]


Project: [insert name of project]
Contract title: [insert the name of the contract]
Country: [insert country where ISD is issued]
Loan No. /Credit No. / Grant No.: [insert reference number for loan/credit/grant]
ISD No: [insert ISD reference number from Procurement Plan]
Issued on: [insert date when ISD is issued to the market]

1. The [insert name of Borrower/Beneficiary/Recipient] [has received/has applied for/intends


to apply for] financing from the World Bank toward the cost of the [insert name of project
or grant], and intends to apply part of the proceeds toward payments under the contract 1for
[insert title of contract]2.

2. The [insert name of implementing agency] intends to initially select Applicants for [insert
contract number and/or name, a brief description of the type(s) of Plant Design, Supply and
Installation to be provided, including key performance/functional requirements, location,
key qualification requirements and other information necessary to enable Applicants to
decide whether or not to respond to this invitation for Initial Selection.] It is expected that
the Request for Proposals will be made in [insert month and year].

3. Initial Selection will be conducted through the procedures as specified in the World Bank’s
Procurement Regulations for IPF Borrowers [insert date of applicable Procurement
Regulations edition as per legal agreement] (“Procurement Regulations”), and is open to all
eligible Applicants as defined in the Procurement Regulations.

4. Interested eligible Applicants may obtain further information from the [insert name of
agency] at the address below [insert address at end of document] during office hours [insert
1
Substitute “contracts” where Proposals are called concurrently for multiple contracts. Add a new para. 3 and
renumber paras 3 - 8 as follows: “Initially selected Applicants may submit Proposals for one or several contracts, as
further defined in the RFP Document.”
2
Insert if applicable: “This contract will be jointly financed by [insert name of cofinancing agency]. Procurement
process will be governed by the World Bank’s Procurement Regulations.”
viii

office hours if applicable, i.e. 0900 to 1700 hours]. A complete set of Initial Selection
documents in [insert name of language] may be purchased by interested Applicants on the
submission of a written application to the address below and upon payment of a
nonrefundable fee of [insert amount in local currency] or [insert amount in specified
convertible currency, i.e. US$]. The method of payment will be [insert method of payment].
The document will be sent by [insert delivery procedure].3

5. Applications for Initial Selection should be submitted in clearly marked envelopes and
delivered to the address below by [insert time] on [insert date]. Late applications may be
rejected.

[Insert name of office]


[Insert name of officer and title]
[Insert postal address and/or street address, postal code, city and country]
[Insert telephone number, country and city codes]
[Insert facsimile number, country and city codes]
[Insert email address]
[Insert web site address]

3
The delivery procedure is usually airmail for overseas delivery and surface mail or courier for local delivery. If
urgency or security dictates, courier services may be required for overseas delivery. With the agreement of the
World Bank, documents may be distributed by e-mail, downloading from authorized web site(s) or electronic
procurement system. Initial Selection Document (in Read Only form) should to be posted on the Employer’s web
page, if available, for inspection by prospective Applicants.
Invitation for
Initial Selection
Plant
(Design, Supply, and Installation)

Procurement of:
[insert identification of the Plant - Design, Supply
and Installation]

Employer: [insert the name of the Employer’s agency]


Project: [insert name of project]
Contract title: [insert the name of the contract]
Country: [insert country where ISD is issued]
Loan No. /Credit No. / Grant No.: [insert reference number for loan/credit/grant]
ISD No: [insert ISD reference number from Procurement Plan]
Issued on: [insert date when ISD is issued to the market]

(This Initial Selection Document is for use with a Request for Proposals process)
Standard Procurement Document

Table of Contents

PART 1 – Initial Selection Procedures..........................................1


Section I - Instructions to Applicants...................................................................................2
Section II - Initial Selection Data Sheet (ISDS)................................................................19
Section III - Initial Selection Criteria and Requirements...................................................24
Section IV - Application Forms.........................................................................................35
Section V - Eligible Countries...........................................................................................51
Section VI - Fraud and Corruption....................................................................................53
PART 2 – Employer’s Requirements...........................................55
Section VII - Scope of Employer’s Requirements.............................................................57
Part 1 – Initial Selection Procedures 1

PART 1 – Initial Selection Procedures


Part 1 – Initial Selection Procedures 2

Section I - Instructions to Applicants


Contents
A. General........................................................................................................................3
1. Scope of Application........................................................................................................3
2. Source of Funds.................................................................................................................3
3. Fraud and Corruption........................................................................................................4
4. Eligible Applicants............................................................................................................4
5. Eligibility..........................................................................................................................6
B. Contents of the Initial Selection Document................................................................7
6. Sections of Initial Selection Document..............................................................................7
7. Clarification of Initial Selection Document and Pre-Application Meeting........................8
8. Amendment of Initial Selection Document.......................................................................9
C. Preparation of Applications........................................................................................9
9. Cost of Applications..........................................................................................................9
10. Language of Application................................................................................................9
11. Documents Comprising the Application........................................................................9
12. Application Submission Letter....................................................................................10
13. Documents Establishing the Eligibility of the Applicant............................................10
14. Documents Establishing the Qualifications of the Applicant.....................................10
15. Signing of the Application and Number of Copies.....................................................10
D. Submission of Applications......................................................................................11
16. Sealing and Marking of Applications..........................................................................11
17. Deadline for Submission of Applications...................................................................11
18. Late Applications........................................................................................................12
19. Opening of Applications.............................................................................................12
E. Procedures for Evaluation of Applications...............................................................12
20. Confidentiality.............................................................................................................12
21. Clarification of Applications.......................................................................................12
22. Responsiveness of Applications..................................................................................13
23. Margin of Preference...................................................................................................13
24. Subcontractors.............................................................................................................13
F. Evaluation of Applications and Initial Selection of Applicants................................13
25. Evaluation of Applications..........................................................................................13
26. Employer’s Right to Accept or Reject Applicants......................................................14
27. Initial Selection of Applicants.....................................................................................14
28. Notification of Initial Selection...................................................................................16
29. Request for Proposals..................................................................................................16
30. Changes in Qualifications of Applicants.....................................................................16
31. Procurement Related Complaint.................................................................................17
Section I – Instructions to Applicants (ITA) 3

Section I - Instructions to Applicants

A.General
1. Scope of Application 1.1 In connection with the invitation for Initial Selection
indicated in Section II, Initial Selection Data Sheet
(ISDS), the Employer, as defined in the ISDS, issues
this Initial Selection Document (“Initial Selection
Document”) to prospective applicants (“Applicants”)
interested in submitting applications (“Applications”)
for Initial Selection to submit Proposals for the Plant
Design, Supply and Installation described in Section
VII, Scope of Employer’s Requirement. In case
proposals for the Plant Design, Supply and Installation
are to be invited as individual contracts (i.e., the slice
and package procedure), these are listed in the ISDS.
The Request for Proposals (RFP) number corresponding
to this Initial Selection is also provided in the ISDS.
2. Source of Funds 2.1 The Borrower or Recipient (hereinafter called
“Borrower”) indicated in the ISDS has applied for or
received financing (hereinafter called “funds”) from the
International Bank for Reconstruction and Development
or the International Development Association
(hereinafter called “the Bank”) in an amount specified
in the ISDS, towards the cost of the project named in
the ISDS. The Borrower intends to apply a portion of
the funds to eligible payments under the contract(s)
resulting from the Request for Proposals (RFP) process
for which this Initial Selection is conducted.
2.2 Payment by the Bank will be made only at the request of
the Borrower and upon approval by the Bank, and will
be subject, in all respects, to the terms and conditions of
the Loan (or other financing) Agreement. The Loan (or
other financing) Agreement prohibits a withdrawal from
the loan (or credit) account for the purpose of any
payment to persons or entities, or for any import of
goods, equipment, plant or materials, or services if such
payment or import, to the knowledge of the Bank, is
prohibited by a decision of the United Nations Security
Council taken under Chapter VII of the Charter of the
United Nations. No party other than the Borrower shall
derive any rights from the Loan (or other financing)
Agreement or have any claim to the proceeds of the loan
Section I – Instructions to Applicants (ITA) 4

(or credit).
3. Fraud and Corruption 3.1 The Bank requires compliance with the Bank’s Anti-
Corruption Guidelines and its prevailing sanctions
policies and procedures as set forth in the WBG’s
Sanctions Framework, as set forth in Section VI, Fraud
and Corruption.
3.2 In further pursuance of this policy, Applicants shall
permit and shall cause their agents (where declared or
not), subcontractors, subconsultants, service providers,
suppliers, and their personnel, to permit the Bank to
inspect all accounts, records and other documents
relating to any Prequalification process, Initial Selection
process, Bid submission (in case prequalified), Proposal
submission (in case initially selected), and contract
performance (in the case of award), and to have them
audited by auditors appointed by the Bank.
4. Eligible Applicants 4.1 Applicants shall meet the eligibility criteria as per this
Instruction and ITA 5.1.
4.2 An Applicant may be a firm that is a private entity, a state-
owned enterprise or institution subject to ITA 4.9 - or any
combination of such entities in the form of a joint venture
(“JV”) under an existing agreement or with the intent to
enter into such an agreement supported by a letter of
intent. In the case of a joint venture, all members shall
be jointly and severally liable for the execution of the
entire Contract in accordance with the Contract terms.
The JV shall nominate an authorized representative who
shall have the authority to conduct all business for and
on behalf of any and all the members of the JV during
the Initial Selection process, RFP process (in the event
the JV submits a Proposal) and during contract
execution (in the event the JV is awarded the Contract).
Unless specified in the ISDS, there is no limit on the
number of members in a JV.
4.3 A firm is not permitted to participate for initial selection
for the same contract both as an individual firm and as a
part of a joint venture or as a subcontractor. However, a
firm may participate as a subcontractor in more than one
Application but only in the capacity of a subcontractor.
Applications submitted in violation of this procedure
will be rejected.
Section I – Instructions to Applicants (ITA) 5

4.4 A firm and any of its affiliates (that directly or indirectly


control, are controlled by or are under common control
with that firm) are not permitted to submit more than
one application for initial selection for the same contract,
either individually, as joint venture or as a subcontractor
among them. Applications submitted in violation of this
procedure will be rejected.
4.5 An Applicant may have the nationality of any country,
subject to the restrictions pursuant to ITA 5.1. An
Applicant shall be deemed to have the nationality of a
country if the Applicant is constituted, incorporated or
registered in and operates in conformity with the
provisions of the laws of that country, as evidenced by its
articles of incorporation (or equivalent documents of
constitution or association) and its registration documents,
as the case may be. This criterion also shall apply to the
determination of the nationality of proposed specialized
sub-contractors or suppliers for any part of the Contract
including related Services.
4.6 Applicants and proposed specialized sub-contractors or
suppliers for any part of the Contract including related
services (for the purpose of this ITA 4.6 referred to as
“Applicants”) shall not have a conflict of interest.
Applicants shall be considered to have a conflict of
interest, if they, or any of their affiliates, participated as
a consultant in the preparation of the Employer’s
Requirement (other than design to be carried out as part
of this Plant Design, Supply and Installation contract) or
have been hired or proposed to be hired by the
Employer or Borrower as Project Manager for contract
implementation of the Plant Design, Supply and
Installation that are the subject of this Initial Selection.
In addition, Applicants may be considered to have a
conflict of interest if they have a close business or
family relationship with a professional staff of the
Borrower (or of the project implementing agency, or of
a recipient of a part of the loan) who: (i) are directly or
indirectly involved in the preparation of the Initial
Selection Document or Request for Proposals (RFP)
Document or specifications of the Contract, and/or the
Proposal evaluation process of such Contract; or (ii)
would be involved in the implementation or supervision
of such Contract, unless the conflict stemming from
such relationship has been resolved in a manner
acceptable to the Bank throughout the procurement
Section I – Instructions to Applicants (ITA) 6

process and execution of the Contract.


4.7 An Applicant that has been sanctioned by the Bank,
pursuant to the Bank’s Anti-Corruption Guidelines, and
in accordance with its prevailing sanctions policies and
procedures as set forth in the WBG’s Sanctions
Framework, as described in Section VI, paragraph 2.2 d.
shall be ineligible to be prequalified for, initially
selected for, bid for, propose for or be awarded a Bank-
financed contract or benefit from a Bank-financed
contract, financially or otherwise, during such period of
time as the Bank shall have determined.
4.8 The list of debarred firms and individuals is available as
specified in the ISDS.
4.9 Applicants that are state-owned enterprise or institutions
in the Employer’s Country may be eligible to be initially
selected, compete and be awarded a Contract(s) only if
they can establish, in a manner acceptable to the Bank,
that they (i) are legally and financially autonomous (ii)
operate under commercial law, and (iii) are not under
supervision of the Employer.
4.10 An Applicant shall not be under suspension from bidding
or submitting proposals by the Employer as the result of
the execution of a Bid or Proposal–Securing Declaration.
4.11 An Applicant shall provide such documentary evidence
of eligibility satisfactory to the Employer, as the
Employer shall reasonably request.
4.12 A firm that is under a sanction of debarment by the
Borrower from being awarded a contract is eligible to
participate in this procurement, unless the Bank, at the
Borrower’s request, is satisfied that the debarment:
(a) relates to fraud or corruption; and
(b) followed a judicial or administrative proceeding
that afforded the firm adequate due process.
5. Eligibility 5.1 Firms and individuals may be ineligible if they are
nationals of ineligible countries as indicated in Section
V. The countries, persons or entities are ineligible if (a)
as a matter of law or official regulations, the Borrower’s
country prohibits commercial relations with that
country, provided that the Bank is satisfied that such
exclusion does not preclude effective competition for
Section I – Instructions to Applicants (ITA) 7

the supply of goods or the contracting of works or


services required; or (b) by an act of compliance with a
decision of the United Nations Security Council taken
under Chapter VII of the Charter of the United Nations,
the Borrower’s country prohibits any import of goods or
contracting of works or services from that country, or
any payments to any country, person, or entity in that
country. When the Plant Design, Supply and Installation
is implemented across jurisdictional boundaries (and
more than one country is a Borrower, and is involved in
the procurement), then exclusion of a firm or individual
on the basis of ITA 5.1(a) above by any country may be
applied to that procurement across other countries
involved, if the Bank and the Borrowers involved in the
procurement agree.

B. Contents of the Initial Selection Document


6. Sections of Initial Selection 6.1 This Initial Selection Document consists of parts 1 and
Document 2 which comprise all the sections indicated below, and
which should be read in conjunction with any Addendum
issued in accordance with ITA 8.
PART 1 Initial Selection Procedures
 Section I - Instructions to Applicants (ITA)
 Section II - Initial Selection Data Sheet (ISDS)
 Section III - Initial Selection Criteria and
Requirements
 Section IV - Application Forms
 Section V – Eligible Countries
 Section VI – Fraud and Corruption
PART 2 Employer’s Requirements
 Section VII - Scope of Employer’s Requirement
6.2 Unless obtained directly from the Employer, the
Employer accepts no responsibility for the
completeness of the document, responses to requests
for clarification, the minutes of the pre-Application
meeting (if any), or Addenda to the Initial Selection
Document in accordance with ITA 8. In case of any
discrepancies, documents issued directly by the
Section I – Instructions to Applicants (ITA) 8

Employer shall prevail.


6.3 The Applicant is expected to examine all instructions,
forms, and terms in the Initial Selection Document and
to furnish with its Application all information or
documentation as is required by the Initial Selection
Document.
7. Clarification of Initial 7.1 An Applicant requiring any clarification of the Initial
Selection Document and Pre- Selection Document shall contact the Employer in
Application Meeting writing at the Employer’s address indicated in the
ISDS. The Employer will respond in writing to any
request for clarification provided that such request is
received no later than fourteen (14) days prior to the
deadline for submission of the applications. The
Employer shall forward a copy of its response to all
prospective Applicants who have obtained the Initial
Selection Document directly from the Employer,
including a description of the inquiry but without
identifying its source. If so indicated in the ISDS, the
Employer shall also promptly publish its response at
the web page identified in the ISDS. Should the
Employer deem it necessary to amend the Initial
Selection Document as a result of a clarification, it shall
do so following the procedure under ITA 8 and in
accordance with the provisions of ITA 17.2.
7.2 If indicated in the ISDS, the Applicant’s designated
representative is invited at the Applicant’s cost to
attend a pre-Application meeting at the place, date and
time mentioned in the ISDS. During this pre-
Application meeting, prospective Applicants may
request clarification of the project requirement, the
criteria for qualifications or any other aspects of the
Initial Selection Document.
7.3 Minutes of the pre-Application meeting, if applicable,
including the text of the questions asked by Applicants,
including those during the meeting (without identifying
the source) and the responses given, together with any
responses prepared after the meeting will be
transmitted promptly to all prospective Applicants who
have obtained the Initial Selection Document. Any
modification to the Initial Selection Document that
may become necessary as a result of the pre-
Application meeting shall be made by the Employer
exclusively through the use of an Addendum pursuant
to ITA 8. Non-attendance at the pre-Application
Section I – Instructions to Applicants (ITA) 9

meeting will not be a cause for disqualification of an


Applicant.
8. Amendment of Initial 8.1 At any time prior to the deadline for submission of
Selection Document Applications, the Employer may amend the Initial
Selection Document by issuing an Addendum.
8.2 Any Addendum issued shall be part of the Initial
Selection Document and shall be communicated in
writing to all Applicants who have obtained the Initial
Selection Document from the Employer. The Employer
shall promptly publish the Addendum at the
Employer’s web page identified in the ISDS.
8.3 To give Applicants reasonable time to take an
Addendum into account in preparing their
Applications, the Employer may, at its discretion,
extend the deadline for the submission of Applications
in accordance with ITA 17.2.

C. Preparation of Applications
9. Cost of Applications 9.1 The Applicant shall bear all costs associated with the
preparation and submission of its Application. The
Employer will in no case be responsible or liable for
those costs, regardless of the conduct or outcome of the
Initial Selection process.
10. Language of Application 10.1 The Application as well as all correspondence and
documents relating to the Initial Selection exchanged
by the Applicant and the Employer, shall be written in
the language specified in the ISDS. Supporting
documents and printed literature that are part of the
Application may be in another language, provided they
are accompanied by an accurate translation of the
relevant passages in the language specified in the
ISDS, in which case, for purposes of interpretation of
the Application, the translation shall govern.
11. Documents Comprising the 11.1 The Application shall comprise the following:
Application
(a) Application Submission Letter, in accordance
with ITA 12.1;
(b) Eligibility: documentary evidence establishing
the Applicant’s eligibility, in accordance with ITA
13.1;
(c) Qualifications: documentary evidence
Section I – Instructions to Applicants (ITA) 10

establishing the Applicant’s qualifications, in


accordance with ITA 14; and
(d) any other document required as specified in the
ISDS.
11.2 The Applicant shall furnish information on
commissions and gratuities, if any, paid or to be paid to
agents or any other party relating to this Application
12. Application Submission 12.1 The Applicant shall complete an Application
Letter Submission Letter as provided in Section IV,
Application Forms. This Letter must be completed
without any alteration to its format.
13. Documents Establishing the 13.1 To establish its eligibility in accordance with ITA 4,
Eligibility of the Applicant the Applicant shall complete the eligibility declarations
in the Application Submission Letter and Forms ELI
(eligibility) 1.1 and 1.2, included in Section IV,
Application Forms.
14. Documents Establishing the 14.1 To establish its qualifications to perform the contract(s)
Qualifications of the in accordance with Section III - Initial Selection
Applicant Criteria and Requirements, the Applicant shall provide
the information requested in the corresponding
Information Sheets included in Section IV, Application
Forms.
14.2 Wherever an Application Form requires an Applicant
to state a monetary amount, Applicants should indicate
the USD equivalent using the rate of exchange
determined as follows:
(a) for turnover or financial data required for each
year - exchange rate prevailing on the last day of
the respective calendar year (in which the
amounts for that year are to be converted); and
(b) value of single contract - exchange rate
prevailing on the date of the contract.
Exchange rates shall be taken from the publicly
available source identified in the ISDS. Any error in
determining the exchange rates in the Application
may be corrected by the Employer.
15. Signing of the Application 15.1 The Applicant shall prepare one original of the
and Number of Copies documents comprising the Application as described in
ITA 11 and clearly mark it “ORIGINAL”. The original
Section I – Instructions to Applicants (ITA) 11

of the Application shall be typed or written in indelible


ink and shall be signed by a person duly authorized to
sign on behalf of the Applicant. In case the Applicant is a
JV, the Application shall be signed by an authorized
representative of the JV on behalf of the JV and so as to
be legally binding on all the members as evidenced by a
power of attorney signed by their legally authorized
signatories.
15.2 The Applicant shall submit copies of the signed
original Application, in the number specified in the
ISDS, and clearly mark them “COPY”. In the event of
any discrepancy between the original and the copies, the
original shall prevail.
D. Submission of Applications
16. Sealing and Marking of 16.1 The Applicant shall enclose the original and the copies of
Applications the Application in a sealed envelope that shall:
(a) bear the name and address of the Applicant;
(b) be addressed to the Employer, in accordance with
ITA 17.1; and
(c) bear the specific identification of this Initial
Selection process indicated in the ISDS 1.1.
16.2 The Employer will accept no responsibility for not
processing any envelope that was not identified as
required in ITA 16.1 above.
17. Deadline for Submission of 17.1 Applicants may either submit their Applications by
Applications mail or by hand. Applications shall be received by the
Employer at the address and no later than the deadline
indicated in the ISDS. When so specified in the ISDS,
Applicants have the option of submitting their
Applications electronically, in accordance with
electronic Application submission procedures specified
in the ISDS.
17.2 The Employer may, at its discretion, extend the
deadline for the submission of Applications by
amending the Initial Selection Document in accordance
with ITA 8, in which case all rights and obligations of the
Employer and the Applicants subject to the previous
deadline shall thereafter be subject to the deadline as
extended.
Section I – Instructions to Applicants (ITA) 12

18. Late Applications 18.1 The Employer reserves the right to accept applications
received after the deadline for submission of
applications, unless otherwise specified in the ISDS.
19. Opening of Applications 19.1 The Employer shall open all Applications at the date,
time and place specified in the ISDS. Late
Applications shall be treated in accordance with ITA
18.1.
19.2 Applications submitted electronically (if permitted
pursuant to ITA 17.1) shall be opened in accordance
with the procedures specified in the ISDS.
19.3 The Employer shall prepare a record of the opening of
Applications to include, as a minimum, the name of the
Applicants. A copy of the record shall be distributed to
all Applicants.

E. Procedures for Evaluation of Applications


20. Confidentiality 20.1 Information relating to the Applications, their
evaluation and results of the Initial Selection shall not
be disclosed to Applicants or any other persons not
officially concerned with the Initial Selection process
until the notification of Initial Selection results is made
to all Applicants in accordance with ITA 28.
20.2 From the deadline for submission of Applications to
the time of notification of the results of the Initial
Selection in accordance with ITA 28, any Applicant
that wishes to contact the Employer on any matter
related to the Initial Selection process may do so only
in writing.
21. Clarification of Applications 21.1 To assist in the evaluation of Applications, the
Employer may, at its discretion, ask an Applicant for a
clarification (including missing documents) of its
Application, to be submitted within a stated reasonable
period of time. Any request for clarification from the
Employer and all clarifications from the Applicant shall
be in writing.
21.2 If an Applicant does not provide clarifications and/or
documents requested by the date and time set in the
Employer’s request for clarification, its Application
shall be evaluated based on the information and
documents available at the time of evaluation of the
Application.
Section I – Instructions to Applicants (ITA) 13

22. Responsiveness of 22.1 The Employer may reject any Application which is not
Applications responsive to the requirements of the Initial Selection
Document. In case the information furnished by the
Applicant is incomplete or otherwise requires
clarification as per ITA 21.1, and the Applicant fails to
provide satisfactory clarification and/or missing
information, it may result in disqualification of the
Applicant.
23. Margin of Preference 23.1 Margin of preference for domestic Proposers shall not
apply in the RFP process resulting from this Initial
Selection.
24. Subcontractors 24.1 Unless otherwise stated in the ISDS, the Employer
does not intend to execute any specific elements of the
Plant Design, Supply and Installation by sub-
contractors selected in advance by the Employer (so-
called “Nominated Subcontractors”).
24.2 The Applicant shall not propose to subcontract the
whole of the contract. The Applicant may propose
subcontractors for certain specialized parts of the
contract. Applicants planning to use such specialized
subcontractors shall specify, in the Application
Submission Letter, the parts of the contract proposed to
be subcontracted along with details of the proposed
subcontractors including their qualification and
experience.

F. Evaluation of Applications and Initial Selection of


Applicants
25. Evaluation of Applications 25.1 The Employer shall use the factors, methods, criteria,
and requirements defined in Section III, Initial
Selection Criteria and Requirements and the ISDS, to
evaluate the qualifications of the Applicants, and no
other factors, methods, criteria, or requirements shall
be used. The Employer reserves the right to waive
minor deviations from the qualification criteria if they
do not materially affect the technical capability and
financial resources of an Applicant to perform the
Contract.
25.2 Subcontractors proposed by the Applicant shall be fully
qualified for their parts of the contract. The
subcontractor’s qualifications shall not be used by the
Applicant to qualify for the contract unless the
Section I – Instructions to Applicants (ITA) 14

applicant designates them as Specialized


Subcontractors, in which case, the qualifications of the
Specialized Subcontractor proposed by the Applicant
may be added to the qualifications of the Applicant for
the purpose of the evaluation, if specified in ISDS.

25.3 In case of multiple contracts, Applicants should


indicate in their Applications the individual contract or
combination of contracts in which they are interested.
The Employer shall initially select each Applicant for
the maximum combination of contracts for which the
Applicant has thereby indicated its interest and for
which the Applicant meets the appropriate aggregate
requirements specified in Section III - Initial Selection
Criteria and Requirements.
25.4 Only the qualifications of the Applicant shall be
considered. The qualifications of other firms, including
the Applicant’s subsidiaries, parent entities, affiliates,
subcontractors (other than specialized subcontractors in
accordance with ITA 25.2 above) or any other firm(s)
different from the Applicant shall not be considered.
26. Employer’s Right to Accept 26.1 The Employer reserves the right to accept or reject any
or Reject Applicants Application, and to annul the Initial Selection process
and reject all Applicants at any time, without thereby
incurring any liability to the Applicants.
27. Initial Selection of Applicants 27.1 The range of Applicants that the Employer may
Initially Select (x=minimum number, y = maximum
number) is specified in the ISDS.
27.2 Initial Selection of Applicants involves several steps, as
follows:
(a) Step 1 - Table 1 Evaluation: The first step of
Initial Selection involves evaluation against the
methods, criteria and requirements described in
Section III, Table 1: Qualification Criteria and
Requirements;
(b) Step 2 - Rejection: Applicants that do not
substantially meet the qualification criteria and
requirements in Table 1: Qualification Criteria
and Requirements will not be evaluated further,
and will be eliminated from the Initial Selection
Section I – Instructions to Applicants (ITA) 15

process;
(c) Step 3 - Long List: Applicants that
substantially meet the qualification criteria and
requirements in Table 1: Qualification Criteria
and Requirements will be long listed, and
evaluated further;
(d) Step 4 - Depending on the number of
Applicants that are long listed, one of the
following options will apply:
Option 1: All are Initially Selected: Where the
number of long listed Applicants is ≤x, all long
listed Applicants are Initially Selected. In this
scenario, there is no requirement to evaluate
these long listed Applicants against Table 2:
Rated Criteria and Requirements;
Option 2: Applicants are evaluated using
Table 2 Evaluation: Where the number of long
listed Applicants is ˃x, the Employer shall
evaluate all long listed Applicants against Table
2: Rated Criteria and Requirements. This
evaluation method involves scoring each
Application against rated criteria using the
scoring methodology described;
(e) Step 5 - Rank Applicants: The total scores,
from this step of the Initial Selection evaluation,
for each long listed Applicant are compared,
and the Applicants are ranked from the highest
to the lowest total score;
(f) Step 6 - Initial Selection up to x: In
accordance with the values selected by the
Employer for x and y, the Employer Initially
Selects the Applicants that are ranked from the
highest score, to the Application ranked as x;
(g) Step 7 - Reject y+1 Applicants: Where the
number of long listed Applicants is ˃y, the
Employer rejects all Applicants that are ranked
greater than y, i.e. ranked as y+1, y+2, y+3, etc.;
(h) Step 8 - Optional, at the Employer’s
Discretion: Ranked Applicants which are
greater than x, up to, and including y, are not
normally Initially Selected. However, the
Section I – Instructions to Applicants (ITA) 16

Employer may, at its sole discretion, if justified,


Initially Select one or more additional
Applicants(s) from those that are ranked x+1,
up to and including y. This Initial Selection will
follow the order of ranking (i.e. the Employer
cannot Initially Select x+2, without Initially
Selecting x+1).
28. Notification of Initial 28.1 The Employer shall notify all Initially Selected
Selection Applicants in writing that they have been Initially
Selected. In providing this notification the Employer
shall include the names of all Applicants that have been
Initially Selected.
28.2 The Employer shall separately notify all other
Applicants that they have not been Initially Selected,
and that they have been eliminated from the process.
Any Applicant that has been eliminated from the
process at this stage may request, in writing, the
grounds on which they were eliminated.
29. Request for Proposals 29.1 Promptly after the notification of the results of the
Initial Selection, the Employer shall invite Proposals
from all the Applicants that have been initially selected.
29.2 Proposers may be required to provide a Proposal
Security or a Proposal-Securing Declaration acceptable
to the Employer in the form and an amount to be
specified in the RFP Document, and the successful
Proposer shall be required to provide a Performance
Security as specified in the RFP Document.
30. Changes in Qualifications of 30.1 Any change in the structure or formation of an
Applicants Applicant after being initially selected in accordance
with ITA 27 and invited to submit Proposal (including,
in the case of a JV, any change in the structure or
formation of any member and also including any
change in any specialized subcontractor) shall be
subject to the written approval of the Employer prior to
the deadline for submission of Proposals. Such
approval shall be denied if (i) an initially selected
applicant proposes to associate with a disqualified
applicant or in case of a disqualified joint venture, any
of its members; (ii) as a consequence of the change, the
Applicant no longer substantially meets the
qualification criteria set forth in Section III - Initial
Selection Criteria and Requirements Table 1-
Qualification Criteria, and Requirements; or (iii) no
Section I – Instructions to Applicants (ITA) 17

longer continues to be in the list of Initially Selected


Applicants as a result of the Employer’s re-evaluation
of the Application in accordance with ITA 27; or (iv) in
the opinion of the Employer, the change may result in a
substantial reduction in competition. Any such change
should be submitted to the Employer not later than
fourteen (14) days after the date of the Request for
Proposals.
31. Procurement Related 31.1 The procedures for making a Procurement-related
Complaint Complaint are as specified in the ISDS.
Section II – Initial Selection Data Sheet (ISDS) 19

Section II - Initial Selection Data Sheet (ISDS)


A. General
ITA 1.1 The identification of the Invitation for Initial Selection is: [insert number]
The Employer is: : [ insert full name, including name of Project Officer, and address]
The list of contract/s is: [insert number, name/s and identification number/s.] RFP
name and number are: [insert name and identification number]

ITA 2.1 The Borrower is: [insert name of the Borrower and statement of relationship
with the Employer, if different from the Borrower. This insertion should
correspond to the information provided in the RFP]
Loan or Financing Agreement amount: [insert US$ equivalent]
____________________________
The name of the Project is: [insert name of Project]

ITA 4.2 Maximum number of members in the JV shall be: [insert a number or insert “not
limited”]

ITA 4.8 A list of debarred firms and individuals is available on the Bank’s external website:
http://www.worldbank.org/debarr.

B. Contents of the Initial Selection Document

ITA 7.1 For clarification purposes, the Employer's address is:


[insert information or state “same as in ITA1.1 above”]
Attention: [insert name and room number of Project Officer]
Address: [insert street name and number]
[insert floor and room number, if applicable]
City: [insert name of city or town]
ZIP Code: [insert postal (ZIP) code, if applicable]
Country: [insert name of country]]
Telephone: [insert telephone number including country and city codes]
Facsimile number: [insert fax number including country and city codes]
Electronic mail address: [insert e-mail address of Project Officer]

ITA 7.1 & 8.2Web page: [In case used, identify the widely used website or electronic portal of
free access where Initial Selection information is published]

ITA 7.2 Pre-Application Meeting will be held: [Yes/No]


Section II – Initial Selection Data Sheet (ISDS) 20

[If Yes, please add the address, date and time of the meeting]

C. Preparation of Applications
ITA 10.1 This Initial Selection document has been issued in the [Insert “English” or
“French” or “Spanish”] language.
Note: In addition to one of the above languages, and if agreed with the Bank, the
Borrower has the option to issue translated versions of the Initial Selection
document in another language which should either be: (a) the national
language of the Borrower; or (b) the language used nation-wide in the
Borrower’s country for commercial transactions. In such case, the following
text shall be added:]
“In addition, the Initial Selection document is translated into the [insert national or
nation-wide used] language [if there are more than one national or nation-
wide used language, add “and in the ____________” [insert the second
national or nation-wide language].
Applicants shall have the option to submit their Initial Selection Application in any
one of the languages stated above. Applicants shall not submit Applications in
more than one language.]”
All correspondence exchange shall be in ____________ language.
The Application as well as all correspondence shall be submitted in
_____________________. [Insert the language of the Initial Selection
document in case of one language]
Note: If the Initial Selection document is issued in more than one language, the
following text shall be inserted above: “in one of the above languages”]
Language for translation of supporting documents and printed literature is
_______________________. [Specify one language]

ITA 11.1 (d) The Applicant shall submit with its Application, the following additional documents:
[insert list of additional documents]

ITA 14.2 The source for determining exchange rates is [insert a publicly available source]

ITA 15.2 In addition to the original, the number of copies to be submitted with the Application
is: [insert number of copies]

D. Submission of Applications
ITA 17.1 The deadline for Application submission is:
Date: [insert date]
Time: [insert time]
[The time allowed for preparation and submission of the Initial Selection document
Section II – Initial Selection Data Sheet (ISDS) 21

should be sufficient for Applicants to gather all the information required—


preferably eight weeks, but in any case not less than six weeks after the date
when the documents are available for distribution or the date of the
advertisement, whichever is later. This period may be longer for very large
contracts, where time should be allowed for the formation of joint ventures and
assembly of the necessary resources.]
For Application submission purposes only, the Employer's address is:
[insert information requested below or insert “Employer’s address is the same as that
indicated in 1.1]
Attention: [insert name and room number of Project Officer]
Address: [insert street name and number]
[insert floor and room number, if applicable]
City: [insert name of city or town]
ZIP Code: [insert postal (ZIP) code, if applicable]
Country: [insert name of country]
Telephone: [insert telephone number including country and city codes]
Facsimile number: [insert fax number including country and city codes]
Email address: [insert e-mail address of Project Officer]
Applicants [insert “shall” or “shall not”] have the option of submitting their
Applications electronically.
The following provision should be included and the required corresponding
information inserted only if Applicants have the option of submitting their
Applications electronically. Otherwise omit.]
The electronic Application submission procedures shall be: [insert a
description of the electronic Application submission procedures.]

ITA 18.1 [Choose one of the two options below:]


Late Applications will be returned unopened to the Applicants.
[or]
The Employer reserves the right to accept or reject late Applications.

ITA 19.1 The opening of the Applications shall be at [Insert date, time and address]

ITA 19.2 The following provision should be included and the required corresponding
information inserted only if Applicants have the option of submitting their
Applications electronically. Otherwise omit.]
The electronic Application opening procedures shall be: [insert a description of
the electronic Application opening procedures.]
Section II – Initial Selection Data Sheet (ISDS) 22

E. Procedures for Evaluation of Applications


ITA 24.1 At this time the Employer [insert “intends” or “does not intend”] to execute certain
specific parts of the contract by sub-contractors selected in advance.
If the above states “intends” list the specific parts of the contract and the respective
sub-contractors]

F. Evaluation of Applications and Initial Selection of Applicants

ITA 25.2 The relevant qualifications of the proposed Specialized Subcontractors [‘will be’/
‘will not be’] added to the qualifications of the Applicant for the purpose of
evaluation as indicated in Section III - Initial Selection Criteria and
Requirements.

ITA 27.1 Initial Selection – minimum number (x)


The Employer intends to Initially Select the following number of long listed
Applications: [write number in text (insert numerical number)]. This number is
referred to as x, and is the minimum number to be Initially Selected.
Initial Selection – maximum number (y)
The Employer, may, at its sole discretion, Initially Select more than the minimum
number of long listed Applications. The maximum number that may be Initially
Selected is [write number in text (insert numerical number)]. This number is
referred to as y.
Select numbers for x and y based on the results of the market analysis and other
findings in the PPSD. However, for Competitive Dialogue selection method x is
normally not less than three (3) Applications and y is not exceeding six (6)
Applications.]

ITA 31.1 The procedures for making a Procurement-related Complaint are detailed in
the “Procurement Regulations for IPF Borrowers (Annex III).” If an Applicant
wishes to make a Procurement-related Complaint, the Applicant should submit
its complaint following these procedures, in writing (by the quickest means
available, that is either by email or fax), to:
For the attention: [insert full name of person receiving complaints]
Title/position: [insert title/position]
Employer : [insert name of Employer]
Email address: [insert email address]
Fax number: [insert fax number] delete if not used
In summary, at this stage, a Procurement-related Complaint may challenge any
of the following:
Section II – Initial Selection Data Sheet (ISDS) 23

1. the terms of the Prequalification Documents; and


2. the Employer’s decision not to initially select an Applicant.
Section III – Initial Selection Criteria and Requirements 24

Section III - Initial Selection Criteria and


Requirements
This section contains all the methods, criteria, and requirements that the Employer shall use to
evaluate Applications. The information to be provided in relation to each requirement and the
definitions of the corresponding terms are included in the respective Application Forms.

Contents
Table 1 – Qualification Criteria and Requirements......................25
1. Eligibility..................................................................................................................25
2. Historical Contract Non-Performance......................................................................26
3. Financial Situation and Performance........................................................................27
4. Experience.................................................................................................................29
Table 2 – Rated Criteria and Requirements................................30
1. Past Performance......................................................................................................31
2. Contract/Project Management Capability.................................................................32
3. Employer’s Requirements.........................................................................................33
4. Sustainable Procurement...........................................................................................34
Section III – Initial Selection Criteria and Requirements 25

Table 1 – Qualification Criteria and Requirements


[Note to Employer: Only applications that are substantially responsive to the qualification criteria and requirements in Table 1 are to be
assessed against Table 2, Rated Criteria and Requirements.]

1. Eligibility

Criteria Single Entity Joint Venture Requirements Documentation


Requirement
s All
Each One Submission
No. Subject Requirement Members
Member Member Requirements
Combined
1.1 Nationality Nationality in accordance with Must meet Forms ELI – 1.1 and 1.2, with
Must meet Must meet
ITA 4.5 requireme N/A attachments
requirement requirement
nt
1.2 Conflict of No conflicts of interest in Must meet Application Submission Letter
Must meet Must meet
Interest accordance with ITA 4.6 requireme N/A
requirement requirement
nt
1.3 Bank Not having been declared Must meet N/A Application Submission Letter
Must meet Must meet
Eligibility ineligible by the Bank, as requireme
requirement requirement
described in ITA 4.7 and 5.1 nt
1.4 United Not having been excluded as a Forms ELI – 1.1 and 1.2, with
Nations result of prohibition in the attachments
resolution Borrower’s country laws or
or official regulations against
Must meet N/A
Borrower’s commercial relations with the Must meet Must meet
requireme
country law Applicant’s country, or by an act requirement requirement
nt
of compliance with UN Security
Council resolution, both in
accordance with ITA 5.1 and
Section V.
Section III – Initial Selection Criteria and Requirements 26
Section III – Initial Selection Criteria and Requirements 27

Historical Contract Non-Performance


Criteria Joint Venture Documentation
Single Entity
Requirements All
Each One Submission
No. Subject Requirement Members
Member Member Requirements
Combined

2.1 History of Non- Non-performance of a contract4 did Form CON-2


Performing not occur as a result of contractor’s Must meet Must meet Must meet
N/A
Contracts default since 1st January [insert requirement requirements requirement5
year].
2.2 Suspension Based Not under suspension based on Application
on Execution of execution of Bid or Proposal Submission Letter
Bid or Proposal Securing Declaration pursuant to Must meet Must meet Must meet
N/A
Securing ITA 4.10. requirement requirement requirement
Declaration by the
Employer
2.3 Pending Litigation Applicant’s financial position and Form CON – 2
prospective long term profitability
still sound according to criteria
Must meet Must meet
established in 3.1 below and N/A N/A
requirement requirement
assuming that all pending litigation
will be resolved against the
Applicant
2.4 Litigation History No consistent history of Must meet Must meet Must meet N/A Form CON – 2
court/arbitral award decisions requirement requirement requirement
against the Applicant6 since 1st
January [insert year]
4
Nonperformance, as decided by the Employer, shall include all contracts where (a) nonperformance was not challenged by the contractor, including through referral to the dispute
resolution mechanism under the respective contract, and (b) contracts that were so challenged but fully settled against the contractor. Nonperformance shall not include contracts
where Employers decision was overruled by the dispute resolution mechanism. Nonperformance must be based on all information on fully settled disputes or litigation, i.e. dispute
or litigation that has been resolved in accordance with the dispute resolution mechanism under the respective contract and where all appeal instances available to the applicant have
been exhausted.
5
This requirement also applies to contracts executed by the Applicant as JV member.
6
The Applicant shall provide accurate information on the related Application Form about any litigation or arbitration resulting from contracts completed or ongoing under its
execution over the last five years. A consistent history of awards against the Applicant or any member of a joint venture may result in rejection of the Application.
Section III – Initial Selection Criteria and Requirements 28

2. Financial Situation and Performance

Criteria Joint Venture Requirements Documentation


Single Entity All
Requirements Each One Submission
No. Subject Requirement Members
Member Member Requirements
Combined

3.1 Financial (i) The Applicant shall demonstrate Must meet Must meet N/A N/A Form FIN – 3.1, with
Capabilities that it has access to, or has available, requirement requirement attachments
liquid assets, unencumbered real
assets, lines of credit, and other
financial means (independent of any
contractual advance payment)
sufficient to meet the cash flow
requirements estimated as USD $
[insert amount in US$] for the subject
contract(s) net of the Applicants other
commitments. [In case the contracts
are to be procured as individual
contracts under a slice and package
(multiple contracts) state the cash
flow requirement to qualify for
individual and multiple contracts.]

(ii) The Applicant shall also


Must meet Must meet N/A N/A
demonstrate, to the satisfaction of the
requirement requirement
Employer, that it has adequate sources
of finance to meet the cash flow
requirements on contracts currently in
progress and for future contract
commitments.

(iii) The audited balance sheets or, if


not required by the laws of the Must meet N/A Must meet N/A
Applicant’s country, other financial requirement requirement
Section III – Initial Selection Criteria and Requirements 29

Criteria Joint Venture Requirements Documentation


Single Entity All
Requirements Each One Submission
No. Subject Requirement Members
Member Member Requirements
Combined

statements acceptable to the


Employer, for the last [insert number]
years shall be submitted and must
demonstrate the current soundness of
the Applicant’s financial position and
indicate its prospective long-term
profitability.
3.2 Average Minimum average annual turnover in Must meet Must meet Must meet Must meet Form FIN – 3.2
Annual Plant Design, and/or Supply and/or requirement requirement [insert [insert
Turnover Installation of US$ [insert amount in number] %, number]
US$ equivalent in words and figures], [insert %, [insert
calculated as total certified payments percentage percentag
received for contracts in progress in words] of e in
and/or completed within the last the words] of
[insert number] years, divided by requirement the
[insert number of years in words] requireme
years. [In case the contracts are to be nt
procured as individual contracts under
a slice and package (multiple
contracts) state the average annual
turnover requirement to qualify for
individual and multiple contracts.]

3. Experience
Section III – Initial Selection Criteria and Requirements 30

Criteria Single Entity Joint Venture Requirements Documentation


Requirements

All
Each One Submission
No. Subject Requirement Members
Member Member Requirements
Combined
4.1 General Experience in Plant Design, and/or Must meet N/A Must meet N/A Form EXP – 4.1
Experience Supply and/or Installation contracts in requirement requirement
the role of prime contractor, JV
member, subcontractor, or
management contractor for at least the
last [insert number] years, starting 1st
January [insert year].
4.2 Specific A minimum number of [state the Must meet Must meet N/A N/A Form EXP 4.2
Experience number] similar contracts specified requirement requiremen
below that have been satisfactorily t10
and substantially7 completed as a
prime contractor, joint venture
member 8, management contractor or
subcontractor between 1st January
[insert year] and Application
submission deadline:

[In case the contracts are to be


procured as individual contracts
under a slice and package (multiple
contract) procedure, depending on the
functional and/or performance

7
Substantial completion shall be based on 80% or more of the contracts completed.
8
For contracts under which the Applicant participated as a joint venture member or sub-contractor, only the Applicant’s role and responsibilities shall be considered to meet this
requirement.
Section III – Initial Selection Criteria and Requirements 31

Criteria Single Entity Joint Venture Requirements Documentation


Requirements

All
Each One Submission
No. Subject Requirement Members
Member Member Requirements
Combined
requirements for each slice, state the
specific experience requirement to
qualify for individual and multiple
contracts.]9

[Each of the contracts required above


shall meet the following minimum key
requirements: [Based on Section VII,
Scope of Employer’s Requirement,
specify the minimum key requirements
in terms of functional characteristics,
performance, production capacity,
complexity, and/or other
characteristics]

[State that the above specific


experience requirements may be met
by specialized subcontractors, if
permitted in accordance with ITA
25.2]

Table 2 – Rated Criteria and Requirements


9
The minimum experience requirement for multiple contracts will be the sum of the minimum requirements for respective individual contracts, unless specified otherwise.
10
In the case of JV, the value of contracts completed by its members shall not be aggregated to determine whether the requirement of the minimum value of a single contract has been
met. Instead, each contract performed by each member shall satisfy the minimum value of a single contract as required for single entity. In determining whether the JV meets the
requirement of total number of contracts, only the number of contracts completed by all members each of value equal or more than the minimum value required shall be aggregated.
Section III – Initial Selection Criteria and Requirements 32

[Note to Employer: The criteria, requirements, maximum scores, weightings and scoring methodology contained in the tables below are
examples only and may be modified to suit the nature and complexity of the contract. Only applications that are substantially responsive
to the qualification criteria and requirements in Table 1 are to be assessed against Table 2, Rated Criteria and Requirements]

1. Past Performance

Scoring Documentation
Maximum Submission
Requirement Remark
score Requirement

1.1 Number of similar contracts [select a In case of JV, Form EXP 4.2
[Number of satisfactorily and substantially completed Plant Design, Supply and Installation maximum all members
contracts that exceed the number specified in Table 1, Sub-Factor 4.2(where this number is x)that score (out of combined will
are: 100) between be evaluated.
30 and 40]
1. similar to the Requirements (Reference Table 1, 4.2); and
2. completed during the past___ years. [insert number equal or more than the number of years
specified in Table 1, Sub-Factor 4.2] ]
Scoring methodology:

Number of contracts
[Number of satisfactorily and [>= x+4 [x+3 [x+2 [x+1 [x contracts]
substantially completed similar contracts] contracts] contracts] contracts]
contracts.]

Weighting [100] [70] [40] [10] [0]


Section III – Initial Selection Criteria and Requirements 33

2. Contract/Project Management Capability


Criteria Scoring Documentation
Maximum Submission
Requirement Remark
score Requirement

[Contract/project management capability demonstrated in the following key areas: [select a In case of JV, Table 2-PM
[Note to Employer: consider putting a page limit on each of the responses] maximum the capability
score (out of of the lead
1. Description of project management system/s and how they will be applied (including status 100) between member will
of accreditation with recognized international standards applicable to the industry) 20 and 30] be evaluated
2. Environmental, Social, Health, and Safety management practice, and
3. Use of value Engineering, innovation and continuous improvement.]
Scoring methodology:

Key areas: [Number and extent of key


[all 3] [2] [1] [0]
areas demonstrated.]

Initial score [67-100] [34-66] [1-33] [0]


Section III – Initial Selection Criteria and Requirements 34

3. Employer’s Requirements
Criteria Scoring Documentation
Maximum Submission
Requirement Remark
score Requirement

[Demonstrate an understanding of the Employer’s Requirements. [select a Table 2-ER


Key aspects to be addressed are: maximum
score (out of
1. approach to the contract 100) between
2. preliminary timeline/delivery schedule, and 20 and 30]
3. risk identification).]
Scoring methodology:

Key aspects: [Number and extent of


[all 3] [2] [1] [0]
key areas demonstrated.]

Initial score [67-100] [34-66] [1-33] [0]


Section III – Initial Selection Criteria and Requirements 35

4. Sustainable Procurement
Criteria Scoring Documentation
Maximum Submission
Requirement Remark
score Requirement

[Sustainable procurement (to be specified by the Employer) practices demonstrated in the following [select a In case of JV, at Table 2-SP
key areas: maximum least one
score (out of member will be
1. Sustainable procurement practice, and evaluated.
2. Track record of delivering sustainable procurement outcomes. 100) between
0 and 20]
Scoring methodology:

Key aspects: [Number and extent of


[all 2] [1] [0]
key areas demonstrated.]

Initial score [51-100] [1-50] [0]


Section IV – Application Forms 36

Section IV - Application Forms


Table of Forms

Application Submission Letter..................................................36


Applicant Information Form......................................................38
Applicant's JV Information Form...............................................39
Historical Contract Non-Performance, and Pending Litigation and
Litigation History.....................................................................40
Financial Situation and Performance........................................42
Average Annual Turnover in Plant Design and/or Supply and/or
Installation..............................................................................44
General Experience in Plant Design and/or Supply and/or Installation
...............................................................................................45
Specific Experience..................................................................46
Contract / Project Management Capability................................48
Understanding of the Employer’s Requirement.........................49
Sustainable Procurement.........................................................50
Section IV – Application Forms 37

Application Submission Letter


Date: [insert day, month, and year]
RFP No. and title: [insert RFP number and title]

To: [insert full name of Employer]

We, the undersigned, apply to be initially selected for the referenced Request for Proposal (RFP) and
declare that:

(a) No reservations: We have examined and have no reservations to the Initial Selection
Document, including Addendum(s) No(s). issued in accordance with ITA 8: [insert the
number and issuing date of each addendum].
(b) No conflict of interest: We have no conflict of interest in accordance with ITA 4.6;
(c) Eligibility: We (and our subcontractors) meet the eligibility requirements as stated in ITA 4, we
have not been suspended by the Employer based on execution of a Bid-Securing Declaration or
Proposal-Securing Declaration in accordance with ITA 4.10;
(d) Suspension and Debarment: We, along with any of our subcontractors, suppliers,
consultants, manufacturers, or service providers for any part of the contract, are not subject
to, and not controlled by any entity or individual that is subject to, a temporary suspension
or a debarment imposed by the World Bank Group or a debarment imposed by the World
Bank Group in accordance with the Agreement for Mutual Enforcement of Debarment
Decisions between the World Bank and other development banks. Further, we are not
ineligible under the Employer’s country laws or official regulations or pursuant to a decision
of the United Nations Security Council;

(e) State-owned enterprise or institution: [select the appropriate option and delete the other]
[We are not a state-owned enterprise or institution] / [We are a state-owned enterprise or
institution but meet the requirements of ITA 4.9];

(f) Subcontractors and Specialized Subcontractors: We, in accordance with ITA 24.2 and
25.2, plan to subcontract the following parts of the contract:
[Insert any part of the contract which the Applicant intends to subcontract along with
complete details of the Specialized Subcontractors, their qualification and experience]
(g) Commissions, gratuities, fees: We declare that the following commissions, gratuities, or
fees have been paid or are to be paid with respect to the Initial Selection process, the
corresponding RFP process or execution of the Contract:

Name of Recipient Address Reason Amount


Section IV – Application Forms 38

[insert full name for [insert street/ [indicate reason] [specify amount
each occurrence] number/city/country] currency, value,
exchange rate and
US$ equivalent]
________________ ________________ ________________ ________________
________________ ________________ ________________ ________________
________________ ________________ ________________ ________________
________________ ________________ ________________ ________________
[If no payments are made or promised, add the following statement: “No commissions or gratuities
have been or are to be paid by us to agents or any third party relating to this Application]

(h) Not bound to accept: We understand that you may cancel the Initial Selection process at any
time and that you are neither bound to accept any Application that you may receive nor to
invite the initially selected Applicants to Submit Proposal for the contract subject of this
Initial selection process, without incurring any liability to the Applicants, in accordance with
ITA 26.1.
(i) True and correct: All information, statements and description contained in the Application are
in all respect true, correct and complete to the best of our knowledge and belief.

Signed [insert signature(s) of an authorized representative(s) of the Applicant]

Name [insert full name of person signing the Application]


In the capacity of [insert capacity of person signing the Application]

Duly authorized to sign the Application for and on behalf of:

Applicant’s Name [insert full name of Applicant or the name of the JV]

Address [insert street number/town or city/country address]


Dated on [insert day number] day of [insert month], [insert year]

[For a joint venture, either all members shall sign or only the authorized representative, in
which case the power of attorney to sign on behalf of all members shall be attached]
Section IV – Application Forms 39

Form ELI -1.1


Applicant Information Form
Date: [insert day, month, year]
RFP No. and title: [insert RFP number and title]
Page [insert page number] of [insert total number] pages

Applicant's name
[insert full name]
In case of Joint Venture (JV), name of each member:
[insert full name of each member in JV]
Applicant's actual or intended country of registration:
[indicate country of Constitution]
Applicant's actual or intended year of incorporation:
[indicate year of Constitution]
Applicant's legal address [in country of registration]:
[insert street/ number/ town or city/ country]
Applicant's authorized representative information
Name: [insert full name]
Address: [insert street/ number/ town or city/ country]
Telephone/Fax numbers: [insert telephone/fax numbers, including country and city codes]
E-mail address: [indicate e-mail address]
1. Attached are copies of original documents of
 Articles of Incorporation (or equivalent documents of constitution or association), and/or
documents of registration of the legal entity named above, in accordance with ITA 4.5.
 In case of JV, letter of intent to form JV or JV agreement, in accordance with ITA 4.2.
 In case of state-owned enterprise or institution, in accordance with ITA 4.9 documents
establishing:
 Legal and financial autonomy
 Operation under commercial law
 Establishing that the Applicant is not under supervision of the Employer
2. Included are the organizational chart, a list of Board of Directors, and the beneficial
ownership.
Section IV – Application Forms 40

Form ELI -1.2


Applicant's JV Information Form
[The following form is additional to Form ELI – 1.1., and shall be completed to provide information
relating to each JV member (in case the Applicant is a JV) as well as any Specialized Subcontractor
proposed to be used by the Applicant for any part of the Contract resulting from this Initial Selection]

Date: [insert day, month, year]


RFP No. and title: [insert RFP number and title]
Page [insert page number] of [insert total number] pages

Applicant name:
[insert full name]
Applicant's JV Member’s name:
[insert full name of Applicant's JV Member]
Applicant's JV Member’s country of registration:
[indicate country of registration]
Applicant JV Member’s year of constitution:
[indicate year of constitution]
Applicant JV Member’s legal address in country of constitution:
[insert street/ number/ town or city/ country]
Applicant JV Member’s authorized representative information
Name: [insert full name]
Address: [insert street/ number/ town or city/ country]
Telephone/Fax numbers: [insert telephone/fax numbers, including country and city codes]
E-mail address: [indicate e-mail address]
1. Attached are copies of original documents of
 Articles of Incorporation (or equivalent documents of constitution or association), and/or registration
documents of the legal entity named above, in accordance with ITA 4.5.
 In case of a state-owned enterprise or institution, documents establishing legal and financial
autonomy, operation in accordance with commercial law, and they are not under the supervision of
the Employer, in accordance with ITA 4.9.
2. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership.
Section IV – Application Forms 41

Form CON – 2
Historical Contract Non-Performance, and Pending
Litigation and Litigation History
[The following table shall be filled in for the Applicant and for each member of a Joint Venture]

Applicant’s Name: [insert full name]


Date: [insert day, month, year]
Joint Venture Member’s Name:[insert full name]
RFP No. and title: [insert RFP number and title]
Page [insert page number] of [insert total number] pages

Non-Performed Contracts in accordance with Section III, Table 1 Qualification Criteria, and
Requirements
 Contract non-performance did not occur since 1st January [insert year] specified in Section III,–
Table 1 Qualification Criteria, and Requirements, Sub-Factor 2.1.
 Contract(s) not performed since 1st January [insert year] specified in Section III,– Table 1
Qualification Criteria, and Requirements, Sub-Factor 2.1.
Year Non- Contract Identification Total Contract
performed Amount (current
portion of value, currency,
contract exchange rate
and US$
equivalent)
[insert [insert amount Contract Identification: [indicate complete contract [insert amount]
year] and percentage] name/ number, and any other identification]
Name of Employer: [insert full name]
Address of Employer: [insert street/city/country]
Reason(s) for nonperformance: [indicate main
reason(s)]
Pending Litigation, in accordance with Section III, Table 1 Qualification Criteria, and Requirements
 No pending litigation in accordance with Section III, Table 1 Qualification Criteria, and
Requirements, Sub-Factor 2.3.
 Pending litigation in accordance with Section III, Table 1 Qualification Criteria, and
Requirements, Sub-Factor 2.3 as indicated below.
Section IV – Application Forms 42

Year of Amount in dispute Contract Identification Total Contract


dispute (currency) Amount
(currency), USD
Equivalent
(exchange rate)
[insert [insert amount] Contract Identification: [indicate [insert amount]
year] complete contract name, number, and
any other identification]
Name of Employer: [insert full name]
Address of Employer: [insert
street/city/country]
Matter in dispute: [indicate main issues
in dispute]
Party who initiated the dispute: [indicate
“Employer” or “Contractor”]
Status of dispute: [Indicate if it is being

treated by the Adjudicator, under

Arbitration or being dealt with by the

Judiciary]
Litigation History in accordance with Section III, Table 1 Qualification Criteria, and Requirements
 No Litigation History in accordance with Section III, Table 1 Qualification Criteria, and
Requirements, Sub-Factor 2.4.
 Litigation History in accordance with Section III, Table 1 Qualification Criteria, and
Requirements, Sub-Factor 2.4 as indicated below.
Year of Outcome as Contract Identification Total Contract
award percentage of Net Amount
Worth (currency), USD
Equivalent
(exchange rate)
[insert [insert Contract Identification: [indicate [insert amount]
year] percentage] complete contract name, number, and
any other identification]
Name of Employer: [insert full name]
Address of Employer: [insert
street/city/country]
Matter in dispute: [indicate main issues
in dispute]
Party who initiated the dispute: [indicate
“Employer” or “Contractor”]
Reason(s) for Litigation and award
decision [indicate main reason(s)]
Section IV – Application Forms 43

Form FIN – 3.1


Financial Situation and Performance
[ The following table shall be filled in for the Applicant and for each member of a Joint Venture]

Applicant’s Name: [insert full name]


Date: [insert day, month, year]
Joint Venture Member Name:[insert full name]
RFP No. and title: [insert RFP number and title]
Page [insert page number] of [insert total number] pages

1. Financial data
Type of Financial information Historic information for previous _[insert number] years,
in [insert in words]
(currency) (amount in currency, currency, exchange rate*, USD
equivalent)
Year 1 Year 2 Year 3 Year4 Year 5

Statement of Financial Position (Information from Balance Sheet)

Total Assets (TA)

Total Liabilities (TL)

Total Equity/Net Worth (NW)

Current Assets (CA)

Current Liabilities (CL)

Working Capital (WC)

Information from Income Statement


Total Revenue (TR)

Profits Before Taxes (PBT)

Cash Flow Information


Cash Flow from Operating
Activities
Section IV – Application Forms 44

* Refer ITA 14 for the exchange rate

2. Sources of Finance
[ The following table shall be filled in for the Applicant and all parties combined in case of a Joint
Venture]
Specify sources of finance to meet the cash flow requirements on contracts currently in
progress and for future contract commitments.

No. Source of finance Amount (US$ equivalent)

3. Financial documents

The Applicant and its parties shall provide copies of financial statements for [number] years pursuant
Section III, Table 1 –Qualification Criteria, and Requirements Sub-factor 3.1. The financial statements
shall:

(a) reflect the financial situation of the Applicant or in case of JV member , and not an
affiliated entity (such as parent company or group member).

(b) be independently audited or certified in accordance with local legislation.

(c) be complete, including all notes to the financial statements.

(d) correspond to accounting periods already completed and audited.

 Attached are copies of financial statements11 for the [number] years required above; and
complying with the requirements

11
If the most recent set of financial statements is for a period earlier than 12 months from the date of Application, the reason
for this should be justified.
Section IV – Application Forms 45

Form FIN - 3.2


Average Annual Turnover in Plant Design and/or Supply
and/or Installation
[The following table shall be filled in for the Applicant and for each member of a Joint Venture]

Applicant’s Name: [insert full name]


Date: [insert day, month, year]
Joint Venture Member Name:[insert full name]
RFP No. and title: [insert RFP number and title]
Page [insert page number] of [insert total number] pages

Annual turnover data


Year Amount Exchange rate* USD equivalent
Currency
[indicate [insert amount and indicate
calendar currency]
year]

Average Annual
Turnover **

* Refer ITA 14 for date and source of exchange rate.


** Total USD equivalent for all years divided by the total number of years. See Section III, Table
1 Qualification Criteria, and Requirements, 3.2.
Section IV – Application Forms 46

Form EXP - 4.1


General Experience in Plant Design and/or Supply and/or
Installation

[The following table shall be filled in for the Applicant and in the case of a JV Applicant, each
Member]

Applicant’s Name: [insert full name]


Date: [insert day, month, year]
Joint Venture Member Name:[insert full name]
RFP No. and title: [insert RFP number and title]
Page [insert page number] of [insert total number] pages

[As per Section III, Table 1 Qualification Criteria, and Requirements, Sub-Factor 4.1. list
contracts chronologically, according to their commencement (starting) dates.]

Starting Ending Contract Identification Role of


Year Year Applicant

[indicate [indicate Contract name: [insert full name] [insert "Prime


year] year] Brief Description of the Contracts performed by the Contractor” or
Applicant: [describe contracts performed briefly] “JV Member” or
Amount of contract: [insert amount in currency, "Sub-contractor”
mention currency used, exchange rate and US$ or "Management
equivalent*] Contractor”]
Name of Employer: [indicate full name]
Address: [indicate street/number/town or city/country]
Contract name: [insert full name] [insert "Prime
Brief Description of the Contracts performed by the Contractor” or
Applicant: [describe contracts performed briefly] “JV Member” or
Amount of contract: [insert amount in currency, "Sub-contractor”
mention currency used, exchange rate and US$ or "Management
equivalent*] Contractor”]
Name of Employer: [indicate full name]
Address: [indicate street/number/town or city/country]
Contract name: [insert full name] [insert "Prime
Brief Description of the Contracts performed by the Contractor” or
Applicant: [describe contracts performed briefly] “JV Member” or
Amount of contract: [insert amount in currency, "Sub-contractor”
mention currency used, exchange rate and US$ or "Management
equivalent*] Contractor”]
Name of Employer: [indicate full name]
Address: [indicate street/number/town or city/country]
* Refer ITA 14 for date and source of exchange rate.
Section IV – Application Forms 47

Form EXP - 4.2


Specific Experience
(Table 1, 4.2 and Table 2)

[The following table shall be filled in for contracts performed by the Applicant, each member
of a Joint Venture, and Specialized Sub-contractors]

Applicant’s Name: [insert full name]


Date: [insert day, month, year]
Joint Venture Member Name:[insert full name]
RFP No. and title: [insert RFP number and title]
Page [insert page number] of [insert total number] pages

Information
Similar Contract No.
[insert number] of [insert number
of similar contracts required]
Contract Identification [insert contract name and number, if applicable]
Award date [insert day, month, year, i.e., 15 June, 2015]
Completion date [insert day, month, year, i.e., 03 October, 2017]
Role in Contract Prime Member in Management
Sub-contractor
[check the appropriate box] Contractor JV Contractor 
  

Total Contract Amount [insert total contract amount US$ [insert


in local currency] Exchange rate and total
contract amount in US$
equivalent]*
[insert a [insert total [insert exchange rate and total
If member in a JV or sub-
percentage contract amount contract amount in US$
contractor, specify share in value in
amount] in local equivalent]*
total Contract amount and roles and
currency]
responsibilities
[insert roles and responsibilities]
Description of the similarity in
accordance with Section III Table 1,
4.2
Physical size of required contracts [insert physical size of items]
items
Complexity [insert description of complexity]
Methods/Technology [insert specific aspects of the methods/technology involved
in the contract]
Section IV – Application Forms 48

Other Characteristics [insert other characteristics as described in Section VII,


Scope of Employer’s Requirements]
Employer's Name: [insert full name]
Address: [indicate street / number / town or city / country]

Telephone/fax number [insert telephone/fax numbers, including country and


E-mail: city area codes]
[insert e-mail address, if available]
* Refer ITA 14 for date and source of exchange rate.
Section IV – Application Forms 49

Table 2-PM
Contract / Project Management Capability

The applicant shall demonstrate Contract / Project Management Capability in accordance with
Table 2
Section IV – Application Forms 50

Table 2-ER
Understanding of the Employer’s Requirement
The applicant shall demonstrate an Understanding of the Employer’s Requirement in
accordance with Table 2
Section IV – Application Forms 51

Table 2-SP
Sustainable Procurement
The applicant shall demonstrate capability in Sustainable Procurement in accordance with
Table 2
Section V – Eligible Countries 52

Section V - Eligible Countries


Eligibility for the Provision of Goods, Works and Services in Bank-Financed
Procurement

In reference to ITA 5.1, for the information of the Applicants, at the present time firms and
individuals, supply of goods, or contracting of works or services, from the following countries are
excluded from this Initial Selection process:
Under ITA 5.1 (a) [insert a list of the countries following approval by the Bank to apply the
restriction or state “none”]
Under ITA 5.1 (b) [list the countries or state “none”]
Section VI – Fraud and Corruption 53

Section VI - Fraud and Corruption


(Text in this Section VI shall not be modified)

1. Purpose
1.1 The Bank’s Anti-Corruption Guidelines and this annex apply with respect to procurement
under Bank Investment Project Financing operations.
2. Requirements
2.1 The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders
(applicants/proposers), consultants, contractors and suppliers; any sub-contractors, sub-
consultants, service providers or suppliers; any agents (whether declared or not); and any of
their personnel, observe the highest standard of ethics during the procurement process,
selection and contract execution of Bank-financed contracts, and refrain from Fraud and
Corruption.

2.2 To this end, the Bank:


a. Defines, for the purposes of this provision, the terms set forth below as follows:
i. “corrupt practice” is the offering, giving, receiving, or soliciting, directly or
indirectly, of anything of value to influence improperly the actions of another party;
ii. “fraudulent practice” is any act or omission, including misrepresentation, that
knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial
or other benefit or to avoid an obligation;
iii. “collusive practice” is an arrangement between two or more parties designed to
achieve an improper purpose, including to influence improperly the actions of another
party;
iv. “coercive practice” is impairing or harming, or threatening to impair or harm, directly
or indirectly, any party or the property of the party to influence improperly the actions
of a party;
v. “obstructive practice” is:
(a) deliberately destroying, falsifying, altering, or concealing of evidence
material to the investigation or making false statements to investigators in
order to materially impede a Bank investigation into allegations of a corrupt,
fraudulent, coercive, or collusive practice; and/or threatening, harassing, or
intimidating any party to prevent it from disclosing its knowledge of matters
relevant to the investigation or from pursuing the investigation; or
(b) acts intended to materially impede the exercise of the Bank’s inspection and
audit rights provided for under paragraph 2.2 e. below.
Section VI – Fraud and Corruption 54

b. Rejects a proposal for award if the Bank determines that the firm or individual
recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-
contractors, service providers, suppliers and/ or their employees, has, directly or
indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in
competing for the contract in question;
c. In addition to the legal remedies set out in the relevant Legal Agreement, may take other
appropriate actions, including declaring misprocurement, if the Bank determines at any
time that representatives of the Borrower or of a recipient of any part of the proceeds of
the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices
during the procurement process, selection and/or execution of the contract in question,
without the Borrower having taken timely and appropriate action satisfactory to the Bank
to address such practices when they occur, including by failing to inform the Bank in a
timely manner at the time they knew of the practices;
d. Pursuant to the Bank’s Anti-Corruption Guidelines, and in accordance with the Bank’s
prevailing sanctions policies and procedures, may sanction a firm or individual, either
indefinitely or for a stated period of time, including by publicly declaring such a firm or
individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed
contract, financially or in any other manner; 12 (ii) to be a nominated13 sub-contractor,
consultant, manufacturer or supplier, or service provider of an otherwise eligible firm
being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan
made by the Bank or otherwise to participate further in the preparation or implementation
of any Bank-financed project;
e. Requires that a clause be included in request for bid/request for proposals documents and
in contracts financed by a Bank loan, requiring (i) bidders (applicants/proposers),
consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service
providers, suppliers, agents personnel, permit the Bank to inspect14 all accounts, records
and other documents relating to the procurement process, selection and/or contract
execution, and to have them audited by auditors appointed by the Bank.

12
For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i)
applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-
contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such
contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract.
13
A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider
(different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in
its pre-qualification Application or bid because it brings specific and critical experience and know-how that allow the bidder
to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.
14
Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact-finding activities undertaken
by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating
the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes
but is not limited to: accessing and examining a firm's or individual's financial records and information, and making copies
thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic
format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other
relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.
Section VI – Fraud and Corruption 55

PART 2 – Employer’s Requirements


Section VII – Scope of Employer’s Requirements 57

Section VII - Scope of Employer’s Requirements


Contents

1. Description of the Plant Design, Supply and Installation........58


2. Implementation Period.........................................................59
3. Site and Other Data.............................................................60
Section VII – Scope of Employer’s Requirements 58

1. Description of the Plant Design, Supply and Installation


[Insert a summary of the technical requirements including:

1. Legal and Regulatory Requirements including on Environmental, Social, Health and


Safety aspects as appropriate
2. Productivity and/or Performance Requirements
3. Testing and Quality Assurance Requirement, and
4. Any requirement for Warranty or post Warranty services]
Section VII – Scope of Employer’s Requirements 59

2. Implementation Period

[Insert estimated implementation period]


Section VII – Scope of Employer’s Requirements 60