The document outlines a series of practical surveying exercises for BCE II/II students at Kantipur Engineering College. Each exercise includes tasks such as centering and leveling, measuring horizontal distances, calculating reduced levels (RL), and producing sketches and computations. The practicals are designed to assess students' understanding of surveying techniques and their ability to document observations accurately.

Uploaded by

sandipbanskota8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

survey practical question II (2075)

The document outlines a series of practical surveying exercises for BCE II/II students at Kantipur Engineering College. Each exercise includes tasks such as centering and leveling, measuring horizontal distances, calculating reduced levels (RL), and producing sketches and computations. The practicals are designed to assess students' understanding of surveying techniques and their ability to document observations accurately.

Uploaded by

sandipbanskota8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

Kantipur Engineering College

Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

a) Carry out centering and levelling working of


the instrument on the given station.
b) RL of TBM is given as 1300 m.
Observe one set horizontal angle to given points
A, B, C sighting HCR 90°0'0" to point C and
compute the angles.
c) Find RL of 3 points A, B and C.
d) Show with clear sketch, observation field book
and computation

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

a)
b) Carry out centering and levelling working of
the instrument on the given station.
c) RL of TBM is given as 1300 m.
Find RL of top of given point and theodolite
station.
d) Show with clear sketch, observation field book
and computation

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

a)
b) Carry out centering and levelling
working of the instrument on the
given station.
c) Find the horizontal distance in between the stations
A and B.
Use tangential method for station B.
d) RL of TBM is 500 m. Find RL of station A and
B.
e) Show with clear sketch, observation field book
and computation

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

e)
a) Carry out centering and levelling
working of the instrument on the given
station.
b) Compute slope (gradient) in between staff station
A to B.
c) RL of TBM is 900m. Find RL of instrument
station and given staff station
A and B.
d) Show with clear sketch, observation field
book and computation

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

e)
a) Carry out centering and levelling working of
the instrument on the given station.
b) Find the horizontal distance in between station A to B.
Use tangential method for station B.
c) RL of TBM is 500m, find RL of station A and B.
d) Show with clear sketch, observation field book
and computation

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

f)
a) Carry out centering and levelling Total (25)=
working of the instrument on the given
station.
b) Sighting horizontal angle 60°30’0” at a starting
Point A. Complete 2 set horizontal angle
Observation at given points B and C.
c) Find the consecutive interior angle formed at
the instrument station. Check the
fundamental requirement, and adjust the
angles if error occurred.
d) Show with clear sketch, observation field
book and computation

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

e)
a) Carry out centering and levelling
working of the instrument on the given
station.
b) RL of TBM is given as 1000 m.
Find the RL and one set horizontal angle at given
points P and Q taking zero reference to point P.
Point Q is ranging rod, complete by tangential
method.
c) Show with clear sketch, observation field
book and computation.

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

e)
a) Carry out centering and levelling Total (25)=
working of the instrument on the given
station.
b) RL of instrument station 1500m. Find the
Horizontal distance and RL to staff point A by
Stadia method. Find the Horizontal distance and
RL to staff point B by Tangential method.
c) Show with clear sketch, observation field
book and computation

TempAdj (4)=
FB (4)=
Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

e)
a) Carry out centering and levelling
working of the instrument on the
given station.
b) Sighting horizontal circle 40°30’00’’ at
Starting point A. Observe horizontal angle TempAdj (4)=
and find distance for given points B and C. FB (4)=
c) Co ordinate of instrument station is given
Reading (5)=
:
E= 1800m ; N= 3600m Sketch (3)=
Magnetic bearing of line ______ = Computation(7)=
Find the co ordinate of station A, B and Time (2)=
C. Total (25)=
d) Show with clear sketch, observation field
book and computation
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

d)
a) Carry out centering and levelling Reading (5)=
working of the instrument on the Sketch (3)=
given station.
Computation(7)=
b) Measure horizontal distance to given 3
Points A,B and C. Time (2)=
Co ordinate of instrument sation is given Total (25)=
E=7500m; N=3400m
Bearing of line ____=
Find co ordinate of station A,B and C.
c) Show with clear sketch, observation
field book and computation

TempAdj (4)=
FB (4)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

d)
a) Carry out centering and levelling
working of the instrument on the
given station. TempAdj (4)=
b) Complete horizontal distance between FB (4)=
The points P to Q.
Reading (5)=
Station P- Leveling staff for stadia method.
Station Q-Ranging rod for tangential method. Sketch (3)=
c) RL of TBM =2000m, find RL of P and Computation(7)=
Q. Time (2)=
d) Show with clear sketch, observation field Total (25)=
book and computation
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

e)
a) Carry out centering and levelling working
of the instrument on the given station. TempAdj (4)=
b) RL of TBM is given as 2400 m. Find RL of staff station FB (4)=
A and B (B at top point )
Reading (5)=
c) Co ordinate of instrument station is
E=2400m; N= 4800m Sketch (3)=
Bearing from instrument station to Point __= Computation(7)=
Find the co ordinate of station A and B (B at Time (2)=
top point) Total (25)=
d) Show with clear sketch, observation field book
and computation
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

f)
a) Carry out centering and levelling working of
the instrument on the given station. TempAdj (4)=
FB (4)=
b) Observe 1 set horizontal angle at the given two
Reading (5)=
stations A and B.
c) Co ordinate of theodolite station is given as Sketch (3)=
E=2200m; N=4400m Computation(7)=
North Bearing of line __= Time (2)=
Find the coordinate of station A and B. Total (25)=
d) Show with clear sketch, observation field book
and computation
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

g)
a) Carry out centering and levelling working of
the instrument on the given station.
TempAdj (4)=
b) Observe 2 set horizontal angle at the given two FB (4)=
stations A and B.
Reading (5)=
c) Co ordinate of theodolite station is given as
E=2300m; N=4600m Sketch (3)=
North Bearing of line __= Computation(7)=
Find the coordinate of station A and B. Time (2)=
d) Show with clear sketch, observation field book Total (25)=
and computation
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

h)
a) Carry out centering and levelling working of TempAdj (4)=
the instrument on the given station. FB (4)=
Reading (5)=
b) RL of point A is given = 2600m. Find the RL of
instrument station and point B ( B at top) Co Sketch (3)=
ordinate of instrument station : Computation(7)=
E=2600m; N=5200m Time (2)=
North Bearing of line __= Total (25)=
Find the coordinate of station A and B. (B at
top)
c) Show with clear sketch, observation field book
and computation
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

i)
a) Carry out centering and levelling working of the instrument on the given
station.
b) Determine the RL of ground points X, & Y and gradient between TempAdj (4)=
X & Y. Given that RL of BM is 1200 m and distance between X FB (4)=
& Y is 20m.
Reading (5)=
c) Show with clear sketch, observation field book and computation
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

j)
a) Carry out centering and levelling working of the instrument on the given
station.
b) Find the Independent coordinate of the Instrument station A & TempAdj (4)=
point B. Given that Coordinate of BM is 1000m, 2000m and FB (4)=
bearing of A-BM is 20 degree
Reading (5)=
c) Show with clear sketch, observation field book and computation
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

k)
a) Carry out centering and levelling working of the instrument on the given
station.
b) Determine the RL of ground points X. Given that RL of BM is TempAdj (4)=
1200 m. Observe two vertical angle on the single ranging rod at FB (4)=
point X. Reading (5)=
c) Show with clear sketch, observation field book and computation Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

l)
a) Carry out centering and levelling working of the instrument on the given
station.
b) Determine the height of electric pole. Given that RL of BM TempAdj (4)=
is 1200 m. FB (4)=
c) Show with clear sketch, observation field book and Reading (5)=
computation
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

m)
a) Carry out centering and levelling working of
the instrument on the given station.
b) Find the Independent coordinate of the Instrument Station A. Given TempAdj (4)= that
Coordinate of points X, Y, & Z are (1000m, 2000m), (2000, 3000) FB (4)= and
(3000. 4000).
c) Show with clear sketch, observation field book and computation Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=
Kantipur Engineering College
Dhapakhel, Lalitpur

College Roll No.: Start Time:


End Time:

BCE II/II Surveying II Practical (Date: _______/___/___)


CE 554 [FM: 25, PM=10]
Time: 40 minutes

n)
a) Carry out centering and levelling working of the instrument on the given
station.
b) Find the Independent coordinate of the Instrument Station A. Given TempAdj (4)= that
Coordinate of points X, Y, & Z are (1000m, 2000m), (2000, 3000) FB (4)= and
(3000. 4000).
c) Show with clear sketch, observation field book and computation Reading (5)=
Sketch (3)=
Computation(7)=
Time (2)=
Total (25)=