Relay Protection Calculation of Power Transformer ETAP
Relay Protection Calculation of Power Transformer ETAP
Jinguo Wei*
Datang Guanyinyan Hydropower Development co., Ltd., Panzhihua Sichuan 617000,
China
*[email protected]
Abstract. The conventional relay protection setting calculation method considers the internal
interference of the transformer and obtains the setting value quickly, which leads to large
harmonic interference of the transformer and affects the secondary setting calculation results.
Therefore, the setting calculation method of the power transformer relay protection based on
the Electrical Transient Analysis Program (ETAP) is designed. The harmonic transfer
characteristics of the power transformer are extracted, and the harmonic interference of the
power transformer is proposed. Then the ETAP software is adopted to establish the calculation
principle of the power transformer relay protection setting and improve the calculation
accuracy of the secondary setting. Through comparative experiments, it is verified that the
second fixed value of the algorithm is close to the actual fixed value and can be applied to real
life.
1. Introduction
In the process of power system operation, abnormal faults often occur. When a fault occurs in the
power system, if it cannot be maintained in time, it will affect its stable operation effect. To solve this
problem, relay protection has appeared in the power system, which can handle every element in the
line and eliminate the fault of the power transformer in a short time. Transformer relay protection can
cut off the faulty element and switch it to another transformer to ensure a stable supply of electric
energy. At the same time, relay protection can also send out early warning information in time before
the fault occurs, and provide better fault solutions for the power system. Since there are many of data
on relay protection, the setting calculation is needed. Therefore, researchers have designed a variety of
calculation methods. The Firefly-based calculation method and the distribution network automation
system-based calculation method are widely used.
The Firefly-based calculation method mainly uses the Factor Analysis (FA) algorithm to optimize
the calculation process of relay protection setting value, which improves the effectiveness of relay
protection set-up calculation by suppressing internal interference and shortening the time of manual
calculation to obtain set-up values quickly. The calculation method based on the distribution network
automation system mainly applies the distribution network automation system to analyze the relay
protection and submit it to the operation and maintenance for setting, which is to improve the effect of
relay protection setting calculation [2]. ETAP is software for electrical analysis and management,
which can make targeted calculations according to the operation of the power system and provide
relevant solutions [3]. Therefore, this paper applies ETAP to design the setting calculation method for
the power transformer relay protection.
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
ECCST-2022 IOP Publishing
Journal of Physics: Conference Series 2480 (2023) 012018 doi:10.1088/1742-6596/2480/1/012018
2. Design of ETAP method for relay protection setting calculation of power transformer
1
Rs 2 m
c
X 1
a
2 m c
(1)
R
Where s is the resistance per unit length of the conductor in the transformer, a is the
X
inductance per unit length of the conductor in the transformer, m is the radius of the conductor, is
the conductivity, c is the transmission depth, and is the angular frequency. At different harmonic
frequencies, the impedance value of the copper conductor of the transformer is different. The
harmonic resistance value is about k times the fundamental resistance value, and the harmonic
reactance value is about k times the fundamental reactance value [8]. Therefore, the equivalent
harmonic resistance and reactance of the transformer are as follows.
Rm k Rs
X t k X a (2)
R X
Where m is the equivalent harmonic resistance value of the transformer, t is the equivalent
harmonic reactance value of the transformer, and k is a constant. Therefore, the harmonic impedance
value of the power transformer under the action of the kth harmonic is as follows.
Z k k Rs lkX a
(3)
Where
Z k is the harmonic impedance value of the power transformer under the action of kth
harmonic and l is the number of fundamental waves [9]. When the harmonic order of the transformer
is not high, the capacitance effect of the transformer is not obvious. At this time, the equivalent circuit
of harmonic transmission is displayed in Figure 1.
2
ECCST-2022 IOP Publishing
Journal of Physics: Conference Series 2480 (2023) 012018 doi:10.1088/1742-6596/2480/1/012018
transformer, the values of Rm and Xt should be considered to ensure that the calculation results are
consistent with the actual results.
2.2. Setting principle of the power transformer relay protection based on ETAP
To verify whether the calculation method designed in this paper has the use value, the harmonic
transmission data of the power transformer is packaged into files and imported into ETAP, and the
relay protection is calculated [10]. The setting calculation principle of the zero sequence current in
ETAP software is as follows.
I 0 Rk Rt 3I 0 max
(4)
Where
I 0 is the fixed value of zero-sequence current. Rk and Rt are the resistance values of
I 0 max
current k and t sections. is the maximum zero-sequence current at the end. When the above relay
I
protection short circuit fault occurs, the fault point is 0 max , and the second fixed value of the current
of the inter-phase short circuit of the transformer bus is set as follows.
I z Rk Rt Z k I d max
(5)
I I
Where z is the secondary current constant value and d max is the maximum unbalanced current
value of the end line. The setting principles of inter-phase distance protection and differential
protection in ETAP software are as follows.
Gz Rk Z k
K z Rk Z k Rt Zt (6)
Gz
Where is the phase-to-phase fault impedance value of the transformer relay protection line
module,
K z is the over current impedance value of the transformer relay protection differential
Z I G K
protection, and t is the overload signal. The set z , z , and z are imported into the ETAP
software again. Compared with the target database, if the data is consistent, the corresponding
protection scheme is proposed for zero-sequence current fault, inter-phase distance protection, and
differential protection. If the data is inconsistent, the ETAP analysis is carried out again until it is
consistent with the target database, which provides a guarantee for the stable operation of the power
system.
3. Experiment
r makes an experimental analysis of the above method. The final experimental results are presented in
the form of a comparison between the calculation method based on Firefly in Reference [1], the
calculation method based on the distribution network automation system in Reference [2], and the
ETAP-based calculation method designed in this paper. The specific experimental process and results
are shown in the following section.
3
ECCST-2022 IOP Publishing
Journal of Physics: Conference Series 2480 (2023) 012018 doi:10.1088/1742-6596/2480/1/012018
circuits according to the file structure, select to receive the import results or give up the import
operation to ensure the accuracy of the setting calculation results. The process of importing data on
ETAP software in this experiment is shown in Figure 2.
Start
End
Figure 2. ETAP software import data flow charts.
In Figure 2, when the ETAP software is used and the lines, components, and parameters in the
import file are completely consistent with the target database, the report can be spliced directly. When
the import file is inconsistent with the target database, the process of line reservation, deletion,
comparison, and splicing can be carried out to ensure that the data input into ETAP is more accurate.
The power transformer single loop network connection in the target area is shown in Figure 3.
A Transformer B Transformer
Outgoing line Interconnection Outgoing line
switch switch switch
500 kV busbar
4
ECCST-2022 IOP Publishing
Journal of Physics: Conference Series 2480 (2023) 012018 doi:10.1088/1742-6596/2480/1/012018
4. Conclusion
In recent years, the operating range of power systems has been expanded to higher living conditions
for people. During the long-term operation of the power system, abnormal faults often occur, such as
transformer faults, relay faults, and so on, which can lead to the paralysis of the whole system.
Therefore, this paper adopts the ETAP to design the setting calculation method of power transformer
relay protection. The calculation is carried out from the aspects of zero-sequence protection, phase-to-
phase distance protection, and differential protection so that the setting calculation value of relay
protection is closer to the actual value, which is more conducive to improving the operation stability of
the power system.
5
ECCST-2022 IOP Publishing
Journal of Physics: Conference Series 2480 (2023) 012018 doi:10.1088/1742-6596/2480/1/012018
References
[1] Xi, L., Liang, Q. (2022) Firefly algorithm-based relay setting calculation method for the multi-
loop distribution network. Mechanics and Electronics, 40 (05): 17-20 + 24.
[2] Han, M. (2021) Relay protection setting calculation of 10 kV transmission line based on
distribution network automation system. Modern Industrial Economy and Informatization,
11 (10): 116-117 + 120.
[3] Li, B., Zhou, Y., Li, M. (2021) Combination of operation modes in setting calculation of power
system relay protection. Power Equipment Management, (03): 144-145 + 198.
[4] Chen, Q., Nan, D., Feng, X. (2020) Study on setting calculation of distance protection in regional
power network with traction power supply. Electrical Appliance and Energy Efficiency
Management Technology, (12): 105-108 + 113.
[5] Xu, Y., Ma, H., Xu, P. (2022) Research on automatic configuration technology of intelligent
operation and maintenance system for relay protection in a smart substation. Power System
Protection and Control, 50 (11): 160-168.
[6] Ma, S., Rong, Z., Lin, X. (2022) Mechanism analysis and countermeasure research on the false
operation of relay protection under the influence of DC magnetic bias. Power System
Protection and Control, 50 (08): 86-98.
[7] Zhao, K., Sha, J., Chen, G. (2022) Development of 10kV switch gear relay protection verification
simulation tool based on Unity3D. Instrumentation and Analytical Monitoring, (01):
25-29.
[8] Li, K., Liu, Z., Niu, J. (2022) Adaptability simulation analysis of AC relay protection
performance in multi-infeed HVDC system. Shandong Electric Power Technology, 49 (02):
23-28 + 53.
[9] Zhao, Y., Li, S., Li, Y. (2022) Reform and practice of power system analysis course based on
ETAP power system simulation analysis software. Journal of Chongqing Electric Power
College, 27 (04): 36-39.
[10] Sun, X., Shen, J., Chen, Q. (2022) Analysis of factors affecting the starting of 16500 K W high-
power electric feed pump motor in thermal power unit based on ETAP simulation. China
Survey and Design, (S2): 94-97.