0% found this document useful (0 votes)
10 views

Str. LV4P

The document outlines the structural reinforcement details for various columns, slabs, beams, and footings, including specifications for reinforcement types, sizes, and spacing. It provides average reinforcement and concrete ratios, bearing capacities, and notes on camber requirements for beams. Additionally, it includes schedules for slabs and footings with specific dimensions and reinforcement details for construction purposes.

Uploaded by

mhanafy17988
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Str. LV4P

The document outlines the structural reinforcement details for various columns, slabs, beams, and footings, including specifications for reinforcement types, sizes, and spacing. It provides average reinforcement and concrete ratios, bearing capacities, and notes on camber requirements for beams. Additionally, it includes schedules for slabs and footings with specific dimensions and reinforcement details for construction purposes.

Uploaded by

mhanafy17988
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

1 2 3 4 5

NOTES:
SCHEDULE OF COLUMNS DETAILS AVERAGE RFT./CONC. RATIO = 250 KG/m3
COLUMN
TYPE C1 C2 C3 C4 C5 C6 C7 C8 C9 P1 SLAB RFT SLAB RFT 500 500

SLAB RFT
FLOOR Ø10@200
500 2Ø10
100

D 200
D

600
2Ø10@200
Ø10@200
TO UPPER ROOF

Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 1/SET ]


FROM ROOF

Ø8@150 TIES [ 2/SET ]


200
400 400 250
2Ø10
250

250
250

TYPICAL DETAIL FOR R.C DOWNSTAND


8 Ø 16 VERT. BARS 8 Ø 16 VERT. BARS 4 Ø 16 VERT. BARS 2 AS PER ARCH. DWGS
1 SECTION VA-S201 1:20
VA-S201 1:20
FROM FIRST FLOOR

Ø8@150 TIES [ 1/SET ]


Ø8@150 TIES [ 1/SET ] Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 2/SET ]
TO ROOF

250
300 400 500 400 500
250

250

250

250

250
250

EL. 99.90 SLAB ON GRADE


4 Ø 18 VERT. BARS SLAB ON GRADE BRICK WORK
8 Ø 16 VERT. BARS 8 Ø 16 VERT. BARS 10 Ø 16 VERT. BARS 8 Ø 16 VERT. BARS 10 Ø 16 VERT. BARS
EL. 99.90 REFER TO AR
3Ø10
SEALANT
2Ø10

350
JOINT FILLER
EL. 99.20 COMPRESSIBLE MATERIAL F.G.L
3Ø10
FROM FOUNDATION

T.O.GRADE BEAM
TO FIRST FLOOR

100
Ø8@150 TIES [ 1/SET ] Ø8@150 TIES [ 1/SET ] Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 2/SET ] Ø8@150 TIES [ 1/SET ]
Ø8@150 TIES [ 1/SET ] Ø8@150 TIES [ 1/SET ] 100 200 100
Ø10@150
250 300 400 500 400 500 300
Ø250 Ø250

150
2Ø10
250

250

250

250

250

250

250

2Ø10
150
4 Ø 18 VERT. BARS 8 Ø 16 VERT. BARS 10 Ø 16 VERT. BARS 10 Ø 16 VERT. BARS 8 Ø 16 VERT. BARS

800
8 Ø 12 VERT. BARS 8 Ø 12 VERT. BARS 8 Ø 16 VERT. BARS 8 Ø 16 VERT. BARS
GB (SEE PLAN)
C * FOR CLOSER SPACING OF COLUMN TIES ABOVE OR BELOW BEAMS, REFER TO DETAILS (E , F) DWG. No S003

300

300
150 250 150
150 250 150
AVERAGE RFT./CONC. RATIO = 65 KG/m3 AVERAGE RFT./CONC. RATIO = 65 KG/m3
SCHEDULE OF FOOTINGS BEARING CAPACITY = 1.75 KG/cm2
SCHEDULE OF FOOTINGS BEARING CAPACITY = 1.50 KG/cm2 3 SECTION
VC-S201
PLAIN CONCRETE REINFORCED CONCRETE PLAIN CONCRETE REINFORCED CONCRETE
1:20 4 SECTION
MARK REINFORCEMENT REMARKS MARK REINFORCEMENT REMARKS VA-S201 1:20
A B T A B T A B T A B T
F1 1600 1600 300 1000 1000 400 Ø12 @200 E.W. F1 1600 1600 300 1000 1000 400 Ø12 @200 E.W.
F2 1750 1600 300 1150 1000 400 Ø12 @200 E.W. F2 1900 1900 300 1300 1300 400 Ø12 @200 E.W.
F3 1950 1700 300 1350 1100 400 Ø12 @200 E.W. F3 2100 1850 300 1500 1250 400 Ø12 @200 E.W.
F4 2150 1900 300 1550 1300 500 Ø12 @150 E.W. F4 2300 2050 300 1700 1450 500 Ø12 @150 E.W.
F5 1600 1100 300 1000 800 400 Ø12 @200 E.W. F5 1600 1100 300 1000 800 400 Ø12 @200 E.W.
F6 1750 1400 300 1150 1100 400 Ø12 @200 E.W. F6 2000 1400 300 1400 1100 400 Ø12 @200 E.W.
F7 1750 1600 300 1300 1150 500 Ø12 @150 E.W. F7 2050 1600 300 1450 1300 500 Ø12 @150 E.W.
SPAN
SPAN/4 ALLOWED LOCATION FOR SLEEVES SPAN/4
SCHEDULE OF SLABS AVERAGE RFT./CONC. RATIO =90 KG/m3
MINIMUM 500 mm
REINFORCEMENT
MAX. DIAMETER
THICK- SHORT SPAN LONG SPAN =70 mm

MIN. 250
125 125
MARK NESS TOP BARS TOP BARS REMARKS
(t) BOTTOM BARS BOTTOM BARS
CONT. EDGE DISC. EDGE CONT. EDGE DISC. EDGE
SIZE SPACING SIZE SPACING SIZE SPACING SIZE SPACING SIZE SPACING SIZE SPACING
S1 120 Ø10 200 Ø10 200 Ø10 200 Ø10 200 Ø10 200 Ø10 200 ONE WAY SLAB
B S2 120 Ø10 150 Ø10 200 Ø10 200 Ø10 200 Ø10 200 Ø10 200 TWO WAY SLAB
TYPICAL DETAIL OF SLEEVES
S3 150 Ø10 150 Ø10 200 Ø10 200 Ø10 200 Ø10 200 Ø10 200 ONE WAY SLAB 5 IN BEAMS
CS1 100 Ø10 150 Ø10 200 Ø10 200 Ø10 200 Ø10 200 Ø10 200 CANTILEVER SLAB
VA-S201 1:20 FOR REINFORCEMENT REFER TO GENERAL DWG NO. S003 DETAIL NO. A-06 B
NOTES:
* IF THE TOP REINFORCEMENT OF TWO ADJACENT PANELS IS DIFFERENT THE HIGHER
VALUE OF REINFORCEMENT IS ADOPTED OF THE TWO PANELS ( E.G Ø10 @ 150 (520 MM2/M) ADJACENT
TO Ø12 @ 200 (565 MM2/M) USE Ø12 @ 200 FOR BOTH)
* FOR SLABS WITH THICKNESS MORE THAN 150MM INTERMEDIATE AREAS NOT COVERD WITH TOP
00 ISSUED FOR TENDER MAY 2024
REINFORCEMENT SHALL BE REINFORCED WITH TOP SHRINKAGE REINFORCEMENT Ø10@200 E.W.
SLAB ON GRADE REV DESCRIPTION DATE
BRICK WORK
INCLUDING STONE CLADDING DEVELOPER:
EL. 99.90
REFER TO AR
SCHEDULE OF BEAMS AVERAGE RFT./CONC. RATIO =150 KG/m3
SEALANT
SIZE BOTTOM BARS TOP BARS STIRRUPS
Nation Of Sky - N.O.S.
MARK
W H A B C D E SIZE @SUPPORT @MIDSPAN
REMARKS
SLAB RFT
JOINT FILLER
&
B1 200 600 3Ø12 -- 2Ø12 -- 2Ø12 Ø8 100 (1/SET) 200 (1/SET)
COMPRESSIBLE MATERIAL F.G.L
Mountain View
B2 200 600 3Ø16 -- 2Ø12 -- 2Ø12 Ø8 100 (1/SET) 200 (1/SET) Ø10@150 PROJECT NAME:

600
B3 200 600 3Ø16 -- 3Ø12 2Ø16 -- Ø8 100 (1/SET) 200 (1/SET) B3A (CLOSED STIRRUPS) 2Ø10@200

150
B4 100 600 1Ø16 - 1Ø12 -- -- Ø8 100 (1/SET) 200 (1/SET)
Ø10@200 2Ø10
ECO RIVIERA
VAR.
B5 200 800 3Ø16 -- 3Ø12 2Ø16 -- Ø8 100 (1/SET) 200 (1/SET)
PROJECT MANAGEMENT:

800
2Ø10
CB1 100 600 2Ø12 - 2Ø12 -- -- Ø8 100 (1/SET) 200 (1/SET)
100
GB (SEE PLAN)
2 Al lmam Abou Hanifa st, 9th Floor- 7th Sector
CB2 200 600 2Ø12 - 2Ø12 2Ø16 -- Ø8 100 (1/SET) 200 (1/SET) NASR CITY, Cairo , Egypt
CB3 200 800 2Ø12 - 2Ø12 2Ø16 -- Ø8 100 (1/SET) 200 (1/SET) TYPICAL DETAIL OF MIRROR WWW.ecb-consulting.com
6 BEAM 10cm WIDTH

300
CAMBER NOTES: VA-S201 1:20
1. UNLESS OTHERWISE INDICATED, PROVIDE MINIMUM CAMBER FOR BEAMS WITH SPAN IN EXCEEDING 6.00 M. AS FOLLOWS:
150 250 150 BUILDING NAME:
CONTINUOUS BEAM - 1.5 MM. PER M. OF SPAN (i.e. A 10 M. SPAN BEAM WILL HAVE 15 MM. CAMBER AT MIDSPAN).
SIMPLE BEAM - 2.0 MM. PER M. OF SPAN AT MIDSPAN. LV4P
2. CANTILEVER BEAM OF ANY SPAN SHALL BE PROVIDED WITH 5.0 MM. CAMBER PER METER OF SPAN AT THE FREE END.
3. THE ANTICIPATED SHORTENING AND SETTLEMENT OF FORM SUPPORTS WHILE CARRYING CONCRETE, MUST BE ADDED TO THE TYPICAL SECTION FOR GB UNDER VILLA -LV4P
A ABOVE VALUES OF CAMBER. 7 STONE CLADDING WHERE REQUIRED A MAIN CONSULTANT:
4. IF THE " C " OR " D " BARS OF TWO ADJACENT BEAMS ARE DIFFERENT THE HIGHER VALUE OF REINFORCEMENT SHALL BE VA-S201 1:20
ADOPTED FOR THE TWO BEAMS.
SCHEDULE OF GRADE BEAMS AVERAGE RFT./CONC. RATIO = 150 KG/m3
SIZE BOTTOM BARS TOP BARS STIRRUPS
MARK REMARKS
SPACING FROM FACE OF
W H A B C D E SIZE
SUPPORT TO MIDSPAN
TITLE:
GB1 250 800 6Ø16 - 6Ø16 - - Ø8 1 @ 50 , REST @ 150 (1/SET) GB1A "W"=200
2Ø16 GB2A "W"=200
GB2 250 800 6Ø16 - 4Ø16 2Ø16 Ø8 1 @ 50 , REST @ 150 (1/SET)
4Ø16 ADJ GB3 0 500 1000 2000
GB3 250 800 6Ø16 - 4Ø16 4Ø16 - Ø8 1 @ 50 , REST @ 125 (1/SET) SCHEDULES , SECTIONS & DETAILS
SCALE 1:20 MILLIMETERS
SCALE: SHEET NO.: SHEET REVISION:
AS SHOWEN VA-S201 A
1 2 3 4 5 240908
1 2 3 4 5
NOTES:
D D
C
B
B
00 ISSUED FOR TENDER MAY 2024
REV DESCRIPTION DATE
DEVELOPER:
Nation Of Sky - N.O.S.
&
Mountain View
PROJECT NAME:
ECO RIVIERA
PROJECT MANAGEMENT:
2 Al lmam Abou Hanifa st, 9th Floor- 7th Sector
NASR CITY, Cairo , Egypt
WWW.ecb-consulting.com
BUILDING NAME:
LV4P
VILLA -LV4P
A A MAIN CONSULTANT:
TITLE:
GENERAL NOTES
SCALE: SHEET NO.: SHEET REVISION:
N.T.S. VB-S001 A
1 2 3 4 5 240908
1 2 3 4 5
NOTES:
D DOWELS SHALL BE
SAME AS COL RFT
DOWELS SHALL BE
SAME AS COL RFT
D
SHORT RFT LONG RFT

Ld
COLUMN STIRRUPS SHOULD BE

LO

(TYP)
EXTENDED THROUGH THE RC BEAMS

So
PC FOOTING PC FOOTING
T

(TYP)
H
H

LONG RFT SHORT RFT

(TYP)
LONG RFT SHORT RFT

LO

So
ELEVATION SOIL REPLACEMENT WITH ELEVATION SOIL REPLACEMENT WITH
DEPTH AND PROJECTION

COLUMN FREE HIGHT (H)


DEPTH AND PROJECTION ACCORDING TO ACCORDING TO SOIL REPORT
SOIL REPORT RECOMMENDATIONS

(TYP)
200
So = SMALLEST OF :
SHORT SIDE

SHORT SIDE

BOTTOM
SHORT RFT
SHORT RFT
TOP

TOP LONG RFT M


PC FOOTING 2- 24 x STIRRUP DIAMTER
3- HALF OF SMALLEST SIDE OF COLUMN
RC FOOTING 4- 150 mm
Y

BOTTOM LONG RFT S RC FOOTING


LONG RFT
PC FOOTING
LO = GREATEST OF :

Ld
Lo
1- H/6

(TYP)
2- LONGEST SIDE OF COLUMN

So
3- 500 mm
LONG SIDE LONG SIDE
PLAN PLAN
C FOOTING REINFORCEMENT
IS NOT SHOWN
A TYPICAL ISOLATED FOOTING DETAILS B TYPICAL COMBINED FOOTING DETAIL
S002 S002 N.T.S.
N.T.S.
C TYPICAL ARRANGEMENT OF STIRRUPS IN COLUMNS
S002 N.T.S.
B
Ø10 NOSING BAR TIES @ 150 (FOR SIZE & NO.
B
(TYPICAL) COLUMN (SEE SCHED. COLUMN (SEE SCHED.
PER SET, SEE COLUMN SCHEDULE)
FOR SIZE & REINF.) FOR SIZE & REINF.)
TOP OF ROOF BEAM
CONTROL JOINT CONTROL JOINT W/ SEALANT STD. 90° BEND
6mm OR GIRDER
WITH SEALANT WHERE REQUIRED (SEE GEN. NOTES)
Ø10 @300 Ø12 x 600
DOWELS @ 300 SLAB REINF. FOR TOP OF SLAB EL. AND
CHAIR BAR (SEE PLAN)

(SEE TABULATION)

(SEE TABULATION)
VERIFY REINFORCEMENT, SEE PLAN

TENSION SPLICE

TENSION SPLICE
OF BARS ABOVE

OF BARS ABOVE
BASED ON SIZE

BASED ON SIZE
00 ISSUED FOR TENDER MAY 2024
T (SEE PLAN)

W/ AR

T/4

EMBEDMENT LENCTH
T/2

(SEE TABULATION)
T
REV DESCRIPTION DATE
VERIFY
W/ AR

8@100

8@100

150
DEVELOPER:
VAPOR
VAPOR BARRIER BARRIER

50
Nation Of Sky - N.O.S.

8@100
50

50

CLASS B SPLICE
(SEE TABLES)
(MIN)
300

Ø10 @300 EW
CONSTRUCTION JOINT
1 (MAX)
1
6 (MAX) &
6
Mountain View

EMBEDMENT LENGTH

EMBEDMENT LENGTH
200 & CONTROL JOINT AT CONTROL JOINT

(SEE TABULATION)

(SEE TABULATION)
1 Ø12 POLYETHYLENE SHEET CONFINEMENT TIES (SEE
(MIN)
CONT. BAR COLUMN SCHEDULE FOR SIZE
& NO. PER SET) PROJECT NAME:
DETAIL OF JOINTS

50

50
BEAM/GIRDER-COLUMN BEAM/GIRDER-COLUMN
D TYP. EXTERIOR STAIR SECTION E IN SLAB ON GRADE JOINT TIES@150 (SEE COLUMN JOINT TIES@150 (SEE COLUMN
DOWELS TO MATCH SIZE
ECO RIVIERA
N.T.S. N.T.S. COLUMN (SEE SCHEDULE AND NO. OF COLUMN BARS

8@100

8@100
SCHEDULE FOR SIZE & NUMBER SCHEDULE FOR SIZE & NUMBER
PER SET) PER SET) FOR SIZE & REINF.) (SEE COLUMN SCHEDULE)
PROJECT MANAGEMENT:
CONFINEMENT TIES (SEE CONFINEMENT TIES (SEE 2 Al lmam Abou Hanifa st, 9th Floor- 7th Sector
COLUMN SCHEDULE FOR SIZE COLUMN SCHEDULE FOR SIZE NASR CITY, Cairo , Egypt
& NO. PER SET) & NO. PER SET) TYP. ROOF/GIRDER/ SLAB WWW.ecb-consulting.com
H COLUMN JOINT DETAIL
N.T.S.
BUILDING NAME:
4 Ø12 CONT.
FOR REINF.
(SEE PLAN) BRICK WORK FOR REINF.
LV4P
Ø10@150 SEALANT
REFER TO AR (SEE PLAN)
CHANGE IN VILLA -LV4P
A SLAB ELEV.
A MAIN CONSULTANT:
F.G.L.
VAPOR
BARRIER
JOINT FILLER VAPOR G TYPICAL COLUMN LAP SPLICE DETAIL
200 COMPRESSIBLE MATERIAL BARRIER
N.T.S.
(MIN.)
AT CHANGE IN LEVEL
AT FREE EDGE
TITLE:
F DETAIL OF SLAB ON GRADE STANDARD DETAILS (1/4)
N.T.S.
SCALE: SHEET NO.: SHEET REVISION:
N.T.S. VB-S002 A
1 2 3 4 5 240908
1 2 3 4 5
NOTES:
A-BEAMS DETAILS
0.33 L2 GREATER OF GREATER OF
70 Ø OR 1.00 L1 0.33 (L2 OR L3) 0.33 (L2 OR L3) 0.25 L3 40MM. CLEAR COVER FIRST LAYER OF TOP BARS
(CONTINUOUS CORNER BARS;
GREATEST SCHEDULE OF BEAMS & GIRDERS (TYP.)
REMAINING BARS CONTINUOUS
D BAR D BAR E BAR OR EXTRA BARS
SYMMETRICALLY PLACED) BEAM WIDTH "W" MM
C BAR C BAR C BAR SLAB (WHERE BAR DIA.MM
SIZE BOTTOM BARS TOP BARS STIRRUPS
OCCURS) 200 250 300 350 400 450 500 550 600 650 700 750
MARK REMARKS
W H A B C D E @ SUPPORT @ MIDSPAN 12 3 4 5 6 7 8 10 11 12 13 15 16
0.125 L2 0.125 L2 0.125 L3 0.10 L3
SECOND LAYER TOP BARS 14 3 4 5 6 7 8 10 11 12 13 15 16
B1
(REMAINING EXTRA BARS 16 3 4 5 6 7 8 10 11 12 13 15 16
B2 SYMMETRICALLY PLACED)
18 2 3 4 6 7 8 9 10 11 12 14 15
Ø12 WEB BARS
B3 EF @ 300 VERT. SECOND LAYER OF BOTTOM BARS 20 2 3 4 6 7 8 9 10 11 12 14 15
D A BAR
A BAR
B BAR EMBEDMENT LENGTH
A BAR
B BAR
SPACING (CLASS
B SPLICE)
(REMAINING EXTRA BARS
SYMMETRICALLY PLACED) 22 2 3 4 5 6 7 8 9 10 11 12 13
D
(SEE GENERAL NOTES)
25 2 3 4 5 6 7 8 9 10 11 12 13
L1 L2 L3
CAMBER NOTES: FIRST LAYER OF BOTTOM BARS
(CONTINUOUS CORNER BARS;
28 1 2 3 4 5 6 7 8 9 9 10 11
1. UNLESS OTHERWISE INDICATED, FOR BEAMS WITH SPAN EQUAL TO OR EXCEEDING 8.00 M PROVIDE MINIMUM CAMBER REMAINING BARS CONTINUOUS
CANTILEVER CLEAR SPAN INTERIOR CLEAR SPAN EXTERIOR CLEAR SPAN Ø25 SPACER OR EXTRA BARS
OF 1/500 OF THE SPAN, AT THE MID SPAN OF BEAM. 32 1 2 3 4 5 6 6 7 8 9 10 10
@ 1000 (TYP.) SYMMETRICALLY PLACED)
2. CANTILEVER BEAM OF ANY SPAN SHALL BE PROVIDED WITH CAMBER OF 1/150 OF SPAN AT THE FREE END.
TYP.BEAM ELEVATION 3. THE ANTICIPATED SHORTENING AND SETTLEMENT OF FORM SUPPORTS WHILE CARRYING CONCRETE, MUST BE ADDED TO THE TYP.CROSS - SECTION FOR
A-1 (CONTINOUSLY SUPPORTED) ABOVE VALUES OF CAMBER.
A-2 A TWO ROWS BAR PLACING IN A BEAM
N.T.S. N.T.S.
OPENING
NOT LESS THAN 0.25 CLEAR SPAN ADDITIONAL T20 TOP & BOTTOM MAX. SIZE
0.15 L3 600 MIN. OF HOLE (MIN. 2 BARS T & B) 300 dia.
AND NOT LESS THAN 2 TIMES BEAM DEPTH ADDITIONAL ADDITIONAL T20 TOP & BOTTOM
ADDED SUPPORT BARS (SAME AS BEAM REINF.) BUT NOT LESS
TIES SAME AS BEAM TIES OF HOLE (MIN. 2 BARS T & B)
E BAR NOT LESS THAN BEAM DEPTH THE SUPPORT BARS ARE NOT REQ'D WHEN THAN DEPTH
BEAM WIDTH IS NOT LARGER THAN 150mm OF BEAM CONCRETE COLUMN
600 600 OR WHEN BEAM REINF. CAN PROVIDE SUPPORT MAX. SIZE
C BAR TIES EACH SIDE OF SLEEVE. 300x600

BEAM DEPTH (D)


BEAM WIDTH
COPENING
L
KEY SHALL BE FULL WIDTH 0.10 L3
MAIN REINF.
OF BEAM OR GIRDER (FOR
(SEE DESIGN DWG.) SLEEVE OR BOX OPENING
LOCATION SEE GENERAL 100 MIN OR D/3 300
NOTES ON A BAR T&B
ELEVATION MAIN BEAM
B BAR
50
COLUMN
D = BAR DIAMETER
D = 6d FOR Ø10 THROUGH Ø25 75mm
ADDITIONAL 1-Ø12
AROUND OPENING
Ld Ld
(TYP.)
600 MIN.
100 MIN. OR D/3
T&B
TYP. EACH FACE OF BEAM ADDITIONAL COLUMN BUT NOT LESS
D = 8d FOR Ø28, Ø32, Ø36 HALF SPACING
. OF
2Ø16 E.F. 0.50 SUPPORTED T10 TIES THAN D
BEAM TIES
NOTES
BEAM DEPTH
BEAM OR GIRDER L3
BEAM
1. NO HOLES LARGER THAN 100 DIA.
SHALL BE PERMITTED IN BEAMS,
A-3 CONSTRUCTION JOINT DETAIL EXTERIOR CLEAR SPAN
Ø75mm
2. UNLESS SPECIFICALLY INDICATED
N.T.S. ON STRUCTURAL DRAWINGS.
TYP.BEAM ELEVATION A-5 STANDARD HOOK DETAIL A-6 TYP. VERTICAL SLEEVE IN A BEAM A-7 DETAIS OF OPENING IN CONCRETE BEAM
3. ALL BEAM REINFORCEMENTS TO
RUN THRU UNDISTURBED.
NTS
A-4 .(SIMPLY SUPPORTED) S003 NTS
N.T.S.
C B- SUSPENDED SLABS DETAILS
REINFORCEMENT
THICK- SHORT SPAN LONG SPAN
MARK NESS TOP BARS TOP BARS REMARKS
(t) BOTTOM BARS BOTTOM BARS 100 (MAX)
CONT. EDGE DISC. EDGE CONT. EDGE DISC. EDGE
0.10 L1 OR 45 Ø 0.25 (L1OR L2) 0.25 (L1OR L2) SIZE SPACING SIZE SPACING SIZE SPACING SIZE SPACING SIZE SPACING SIZE SPACING INTERRUPTED
600

(MIN)
GREATER GREATER BARS

600
GREATER
(MIN) MINIMUM CLEARANCE
S1
EXTRA TOP AND BOTTOM BETWEEN SLEEVES
TOP BARS (SEE SCHED.) BARS BE EQUAL TO THE 100"D" < 155
S2

600
NUMBER AND SIZE OF 155"D" > 155
OPEN EXTRA TOP AND BOTTOM
BARS INTERRUPTED BY
BARS BE EQUAL TO THE
OPENINGS. PLACE ONE
NUMBER AND SIZE OF TWO DIAGONAL
T

HALF EACH SIDE. USE


BARS INTERRUPTED BY BARS (SAME
* IF THE TOP REINFORCEMENT OF TWO ADJACENT PANELS IS DIFFERENT THE HIGHER 2 Ø16 MIN. FOR TOP
150 (MIN) OPENINGS. PLACE ONE SIZE AS MAIN
VALUE OF REINFORCEMENT IS ADOPTED OF THE TWO PANELS ( E.G Ø10 @ 150 (520 MM2/M) ADJACEMNT L/5 60 AND BOTTOM BARS.
BOTTOM BARS (SEE SCHED.) 0 TWO DIAGONAL HALF EACH SIDE. USE REINFORCEMENT)
0 EXTEND BOTTOM BARS
TO Ø12 @ 200 (565 MM2/M) USE Ø12 @ 200 FOR BOTH) 60 BARS X 1200 LONG 2 Ø16 MIN. FOR TOP
(SAME SIZE AS MAIN 600 600 150mm INTO BEAM, GIRDER
AND BOTTOM BARS. INTERRUPTED
* FOR SLABS WITH THICKNESS MORE THAN 150MM INTERMEDIATE AREAS NOT COVERD WITH TOP REINFORCEMENT) (MIN) (MAX) OR SHEAR WALL SUPPORT.
EXTEND BOTTOM BARS BARS
L1 L2
REINFORCEMENT SHALL BE REINFORCED WITH TOP SHRINKAGE REINFORCEMENT Ø10@200 E.W. BOTTOM BARS 150mm INTO BEAM, GIRDER
TOP BARS OR SHEAR WALL SUPPORT.

L/5
RECTANGULAR OPENING CIRCULAR OPENING
ROUGHEN SURFACE
FIRST POUR
B-1 TYPICAL SLAB ON BEAM DETAIL SLAB REINF. NOTES
SUSPENDED CONCRETE
1. WHERE L IS THE LONGER SPAN OF THE CORNER PANNEL.
N.T.S.
2. TOP AND BOTTOM BARS ARE OF THE SAME ORDER AND
B-4 SLAB OPENING
SPACING AS OF THE MAXIMUM MAIN BOTTOM BARS IN N.T.S.
THE PANNEL.
B-2 TYP.CONSTRUCTION JOINT B-3 SUSPENDED SLAB CORNER DETAILS
(ADDITIONAL REINFORCEMENT)
N.T.S.
B
B
00 ISSUED FOR TENDER MAY 2024
REV DESCRIPTION DATE
DEVELOPER:
Nation Of Sky - N.O.S.
&
Mountain View
PROJECT NAME:
ECO RIVIERA
PROJECT MANAGEMENT:
2 Al lmam Abou Hanifa st, 9th Floor- 7th Sector
NASR CITY, Cairo , Egypt
WWW.ecb-consulting.com
BUILDING NAME:
LV4P
VILLA -LV4P
A A MAIN CONSULTANT:
TITLE:
STANDARD DETAILS (2/4)
SCALE: SHEET NO.: SHEET REVISION:
N.T.S. VB-S003 A
1 2 3 4 5 240908
1 2 3 4 5
NOTES:
EL. 1 EL. 1
T.O.S.S. T.O.S.S.
R.C. FRAME R.C. FRAME
R.C COLUMN
R.C COLUMN
VERTICAL SIDES OF
h

EL.
2 DOORS AND WINDOWS T.O.S.S.
TO BE GROUTED WITH C15 CONCRETE. OVER A MIN.
BEAM/ SLAB
h<3500 MAX.>

2 OF HALF BLOCK
EXPANDING WALL TIE AT R.C. WALL
30mm. x 1.5mm. THK. GALVANIZED STEEL TIE
1200mm c/c. SHOT FIXED TO WALL AT ALTERNATE COURSES
D (MIN. 2 FIXINGS) 150
TYP. D
EL.
h

T.O.S.S.
METAL LATH TO COVER ALL
EL.
T.O.S.S. JOINTS.
ALTERNATE BLOCK WALL JUNCTION OF
EL.
BED JOINT REINFORCEMENT 15mm SEISMIC T.O.S.S. C HEAD RESTRAINT DETAIL D BLOCKWALL TO RC WALL
3 S004 N.T.S. S004 N.T.S.
IN LOWER TWO COURSES ISOLATION JOINT
BED JOINT REINFORCEMENT 15mm SEISMIC
R.C. RESTRAINT POST
3
IN LOWER TWO COURSES ISOLATION JOINT
DETAILS AT WINDOW / DOOR OPENINGS IN WALLS
FOR BLOCKWORK
R.C. RESTRAINT POST
WALL PANEL ELEVATION FOR BLOCKWORK
TYPICAL NON-LOAD
A1 (WALL MAX. HEIGHT 3500 MM)
S004 N.T.S.
B BEARING BLOCKWALL DETAILS
A2 WALL PANEL ELEVATION (HIEGHT >3500) S004 N.T.S.
S004 N.T.S.
EL.
12mm. JOINT
T.O.S.S.
R.C. COLUMN / POST
R.C. BEAM
12mm. COMPRESSIBLE FILLER
2 NOS M12 BOLTS
EL. RC POST
T.O.S.S. 1-Ø20 DE-BONDED RESIN FIXED DOWEL 1-T20 RESIN FIXED DOWEL BAR
BAR
EL. 15mm JOINT
10mm THK PLATE T.O.S.S. TYP. DETAIL OF RC
(EXTERNAL FACE ONLY) RSA 125x75x8 LENGTH TO MATCH WITH
PRE FABRICATED GALVANIZED STRAP AT 1200
c/c. 2.5mm THICK REFER DETAIL -`5'. POST SIZE
E TYP. DETAIL OF WALL TIES J COLUMN-BEAM CONNECTION
RC POST S004 N.T.S. S004 N.T.S.
(APPLICABLE TO EXTERNAL WALLS ONLY)
C
1 DETAIL 2 DETAIL 3 DETAIL
S004 N.T.S. S004 N.T.S. S004 N.T.S.
EL. AT ALTERNATE COURSE. 30mmX1.5mm
T.O.S.S. THK. GALVANIZED HOOP IRON FLAT SHOT
DOVE TAIL SLOT FIXED TO RESTRAIN POST OR WALL TIES
BEAM
15mm JOINT R.C. COLUMN 1200mm c/c. SCHEDULE OF RC POST/ BEAM FOR BLOCK WORK SUPPORT
15mm JOINT
WALL PANEL
12mm. COMPRESSIBLE GALVANIZED WALL TIES WITH DE-BONDED 150 W 150 R.C POST R.C BEAM
WALL THICKNESS DIMENSIONS (MAX.)
JOINT FILLER SLEEVE HOLLOW BLOCKS TO BE FILLED TYP. TYP.
WITH GROUT (mm) WIDTH (W) DEPTH (D) VERTICAL TIES WIDTH (W) DEPTH (D) TOP BAR BOTT. BAR TIES
NOTE:- JOINT TO BE PROVIDED L (mm) H (mm)
(mm) (mm) BARS (mm) (mm)
THROUGH PLASTER & FINISH
WHERE APPLICABLE
100 3000 3000 300 200 6-Ø12 Ø8-200 (1/SET) 100 300 2-Ø12 2-Ø16 Ø8-200 (1/SET)
BRICK WALL
METAL LATH TO COVER ALL POST BRICK WALL
JOINTS. 200 3000 3000 300 200 6-Ø12 Ø8-200 (1/SET) 200 300 2-Ø12 2-Ø16 Ø8-200 (1/SET)
1 SECTION 2 SECTION 3 SECTION 4 SECTION 250 4000 4000 250 250 8-Ø12 Ø8-200 (1/SET) 250 300 2-Ø12 2-Ø16 Ø8-200 (1/SET)
S004 N.T.S. S004 N.T.S. S004 N.T.S. S004 N.T.S.
GALVANIZED STEEL
B FLAT 300 x 50 x 2.5mm THK. DEBONDED ON
ONE SIDE
DEBONDED GALVANIZED MILD STEEL FLAT
300x50x2.5 SHOT-FIXED TO POST ALTERNATE
B
COURSES PLASTER STOP ON BOTH
SIDES OF JOINT (TYP.)
10 10 B
Ld h 100 MIN.
TIES
A
CLEAR SPAN
00 ISSUED FOR TENDER MAY 2024
CORNER PIECES AND REINFORCING STRIP DETAIL OF WATERPROOFING MEMBRANE REV DESCRIPTION DATE
DEVELOPER:
TIES
Nation Of Sky - N.O.S.
CORNER CUT
K DOWELED CONTROL JOINT Ld h
EDGE CUT
GUSSET WITH
25 MIN. LAPS &
S004 N.T.S. LEGEND :
NOTE: MAXIMUM SPACING 6m CONTRACTOR TO
SUBMIT LOCATIONS FOR ENGINEER'S APPROVAL Ld h LTB
1 EDGE CUT Mountain View
CORNER PIECE
PROJECT NAME:
CLEAR SPAN TOP
CONCRETE FACE
CONTRACTOR TO ENSURE CORRECT STARTER BARS INTERNAL CORNER DETAILS 1 GUSSET ECO RIVIERA
ARE CAST INTO CONC. ELEMENTS AS NECESSARY.
GUSSET WITH
PROJECT MANAGEMENT:
CORNER CUT 25 MIN. LAPS EDGE CUT
1 CORNER CUT
2 Al lmam Abou Hanifa st, 9th Floor- 7th Sector
CORNER PIECE
NASR CITY, Cairo , Egypt
SCHEDULE OF LINTELS REINFORCEMENT WWW.ecb-consulting.com
L TYPICAL LINTEL DETAILS BOTTOM
LINTEL b=200mm or S004 N.T.S.
b=100mm (NON LOAD BEARING BLOCK WALLS)
WIDTH 250mm DEPTH=
CLEAR =b d
SPAN
(mm)
TOP
REINF.
BOTTOM
REINF.
TOP
REINF.
BOTTOM
REINF.
(mm) STAGE 1 STAGE 2 STAGE 3 STAGE 4 BUILDING NAME:
LV4P
< 2000 1Ø10 1Ø14 2Ø10 2Ø12 200
VILLA -LV4P
A 2000-3000 1Ø10 1Ø16 2Ø10 2Ø16 250
TOP
A MAIN CONSULTANT:
3010-4000 1Ø10 1Ø20 2Ø10 2Ø18 300 CORNER CUT
EDGE CUT
GUSSET WITH
4010-5000 1Ø10 1Ø20 2Ø10 2Ø18 400 25 MIN. LAPS
5010-6000 1Ø10 1Ø20 2Ø10 2Ø18 500
EXTERNAL CORNER DETAILS
6010-7000 1Ø12 1Ø25 2Ø12 2Ø25 600
BOTTOM TITLE:
NOTES:
CORNER CUT EDGE CUT
2. BEARING ON BLOCK WALL ON EITHER SIDE OF OPENING SHALL BE AT LEAST EQUAL TO THE OVERALL DEPTH OF GUSSET WITH
THE LINTEL 25 MIN. LAPS
2. OVERALL LINTEL DEPTHS COULD BE INCREASED TO SUIT BLOCK- WORK COURSING. STANDARD DETAILS (3/4)
STAGE 1 STAGE 2 STAGE 3 STAGE 4
3. GRADE OF CONCRETE SHALL BE C25
SCALE: SHEET NO.: SHEET REVISION:
N.T.S. VB-S004 A
1 2 3 4 5 240908
1 2 3 4 5
NOTES:
GRID GRID GRID GRID
0.15L
L1 L2 L3
2000
Ln1 Ln2 Ln3
0.22 Ln1 OR Ln2 0.22 Ln1 OR Ln2 0.22 Ln2 OR Ln3 0.22 Ln2 OR Ln3
WHICH GREATER WHICH GREATER WHICH GREATER WHICH GREATER
0.22Ln1 0.22Ln1
MIN. 30Ø MIN. 30Ø MIN. 30Ø MIN. 30Ø
D D
3
4 Asx/m'
1/2 M.S.

0.125L1 0.125L2 0.125L2 0.125L3


L/4

75mm 75mm
4-Ø16
BOTTOM BARS

0.15L
75mm 75mm
2000

0.30Ln1 MIN. 30Ø 0.30 Ln1 OR Ln2 0.30 Ln1 OR Ln2 MIN. 30Ø 0.30 Ln2 OR Ln3 0.30 Ln2 OR Ln3 MIN. 30Ø 0.30Ln3
WHICH GREATER WHICH GREATER WHICH GREATER WHICH GREATER
6-Ø16
500(Typ.)

TOP BARS
500(Typ.)

0.125L2 0.125L3 0.125L2 0.125L3


L=1600
1/4 C.S

1/4 C.S

1/4 C.S
1/4 C.S

GRID
C.S.

L./2
1/4 C.S

1/4 C.S

1/4 C.S

1/4 C.S
500(Typ.)

500(Typ.)

MIN. 30Ø Ld MIN. 30Ø MIN. 30Ø Ld MIN. 30Ø


1/2 M.S.

0.125L1 0.125L2 0.125L2 0.125L3


L/4

75mm 75mm
75mm 75mm
1/2 C.S. M.S. C.S. M.S. C.S. M.S. 1/2 C.S.
TOP BARS
BOTTOM BARS
C A TYPICAL FLAT SLAB REINF. DETAIL C SLAB CORNER REINFORCEMENT DETAILS
N.T.S. * REINF. SHOWN ARE TYPICAL MAIN BARS APPLIED IN X DIRECTION FOR N.T.S.
CLARITY , THE SAME DETAILS SHALL BE APPLIED FOR Y DIRECTION
* FOR ANY ADD. REINF. BARS REF. TO FRAMING PLANS.
GRID GRID GRID
L1 L2 L3
Ln1 Ln2 Ln3

T ( SEE PLAN )
0.30Ln1 0.30 GREATER OF Ln1 OR Ln2 0.30 GREATER OF Ln1 OR Ln2 MIN. 30Ø 0.30 GREATER OF Ln3 OR Ln2 0.30 GREATER OF Ln3 OR Ln2
Ld Ld
BEAM (SEE
PLAN & SCHED.)
W
B TYP. COLUMN STRIP ( C.S )
S005 N.T.S.
B
B
00 ISSUED FOR TENDER MAY 2024
REV DESCRIPTION DATE
DEVELOPER:
Nation Of Sky - N.O.S.
&
Mountain View
PROJECT NAME:
ECO RIVIERA
PROJECT MANAGEMENT:
2 Al lmam Abou Hanifa st, 9th Floor- 7th Sector
NASR CITY, Cairo , Egypt
WWW.ecb-consulting.com
BUILDING NAME:
LV4P
VILLA -LV4P
A A MAIN CONSULTANT:
TITLE:
STANDARD DETAILS (4/4)
SCALE: SHEET NO.: SHEET REVISION:
N.T.S. VB-S005 A
1 2 3 4 5 240908
1 2 3 4 5
01 02 03 NOTES:
VA VA VA - ALL DIMENSIONS SHOWN ARE IN MILLIMETERS AND LEVELS ARE IN METERS.
01 02 03 01 02 03 - DON'T SCALE DRAWINGS, DIMENSION GIVEN SHALL GOVERN.
VA VA VA VA VA VA - MAXIMUM FOUNDATION DEPTH (B.O.PC) @ -1.50 m BELOW F.G.L.
7600
7600 3700 3900 7600
3700 3900 3700 3900
GB2

F5 F1 F1
F

GB2
100 GB2 GB2
100 100 VA F5
DN DN F1 F1
F
100

F
25

25

GB2 GB2
VA C3
GB2

GB2

C2 C3 VA
GB2
1700

DN DN
DN

GB2

GB2
F6
1700

GB2
F3

1700
F1
D E
GB2 GB2
F6 F3 F2
DN D
100 100 100 VA
GB2 GB2
E
100

100

100

E
VA C4 VA
C6 C4
GB2

150 mm THK
SLAB ON GRADE

GB2
4350

GB2

GB2

W/RFT. Ø10@200 E.W.


EL 99.900 150 mm THK
4350

F2 SLAB ON GRADE

4350

GB2

GB2
T.O.SOG
W/RFT. Ø10@200 E.W.
F3
100 EL 99.900
T.O.SOG
G B1
F4
C5 F7
GB1 G B1
D
1050

F7 F4
100 100
VA DN GB1
D
150

150

D
GB2

VA C7 C8 VA DN
14450

GB2
2600

GB3
GB2

GB1A
14450

14450
GB1A
2600

2600

GB3
GB2
F4 F2 GB1A
F7

GB1A
GB2 GB2 F3
100 C F7 F4
100 100 VA
GB2 GB2
C
100

100

C
1150
150

VA C5 VA
C7 C8
GB1
GB1
GB2A
150 mm THK
3850

GB2

GB2

GB1

GB2
SLAB ON GRADE 1100
W/RFT. Ø10@200 E.W. GB1

GB2A
3850

150 mm THK

3850

GB2

GB2

GB1

GB2
EL 99.900
1600 SLAB ON GRADE
T.O.SOG
C W/RFT. Ø10@200 E.W.
EL 99.900
GB1

1250
F2 T.O.SOG
F6
F3
GB2 GB2 F3
100 B F6 F3
100 100 VA
GB2 GB2

750
600 600
B
150

B
100

100

VA VA

GB2A
C4 C6 C5 GB1A

GB2
1950

4 600 600
GB2

GB2
VA-S201

GB2A
GB1A
1950

GB2
1950
F1 F1 4

675
F5 3

GB2

GB2
DN
VA-S201
100 A VA-S201
GB2
100 VA F1 F1

675
25 GB2 F5 3 DN
A A
GB2

VA-S201
25

25
100

GB2
VA C9 C1 C1 VA GB2

GB2
01 02 03
A COLUMNS & AXES LAYOUT VA VA VA
VA-S101 1:50 B FOUNDATION & GROUND FLOOR FRAMING PLAN(B.C=1.75 Kg/cm2)
VA-S101 1:50 01 02 03
7600
VA VA VA B FOUNDATION & GROUND FLOOR FRAMING PLAN(B.C=1.50 Kg/cm2)
VA-S101 1:50
3700 3900
7600
300 3700 3900
200

F
VA 200 B3 B3

300

250
S1

F
1700

B3

B3

VA B2
2000 250
E

1700

Ø12@200 ADD TOP

B3
B1
VA
Ø10@200 ADD TOP

B3 B3
200 01 02 03
L=2000

L=2500
VA VA VA
E
VA B2
200
B
Ø10@200 ADD BOTT.

180 mm THK. Ø10@200 ADD TOP


7600
FLAT SLAB W/RFT. L=2500
1

B3
L=3000

Ø10@200 E.W. TOP 2000


1 200
VA-S201 3700 3900
4350

Ø10@200 E.W. BOTT. VA-S201


B3

EL. +103.10
1350

B3
T.O.S.S. 180 mm THK.
3000 FLAT SLAB W/RFT.

4350
Ø10@200 E.W. TOP

B3
2000
Ø10@200 E.W. BOTT.
00 ISSUED FOR TENDER MAY 2024
Ø16@200 ADD TOP EL. +106.30
L=2000 T.O.S.S. REV DESCRIPTION DATE
Ø12@200 ADD TOP
B1 DEVELOPER:
D 2000
VA Ø16@200 ADD TOP

L=2500
Nation Of Sky - N.O.S.

2000
L=2500

Ø12@200 ADD TOP


B3A
B1 P1

L=2500
Ø10@200 ADD BOTT.
Ø16@125
L=3000 D &

200
VA
14450

2000
D Mountain View
2600

B1 W/STAIR

180mm CB1

6000
B3

Ø10@200 ADD BOTT. VA Ø10@400 ADD TOP Ø10@400 ADD TOP


Ø16@125

450

B3A
L=1500 L=1500

1000

1000
B4
Ø12@200 ADD TOP
CB1
L=3000 PROJECT NAME:

B1 W/STAIR
14450
Ø16@125

2600

B3
400 CB1

6000
180mm 160 mm THK.

L=2500
280
C 600 400
ECO RIVIERA

2000

2600
EL. +109.30 FLAT SLAB W/RFT.

450
B4
VA B1 Ø16@125
CB1 T.O.S.S. Ø10@200 E.W. TOP
Ø10@200 E.W. BOTT.
Ø16@200 ADD TOP P1 PROJECT MANAGEMENT:

1500
L=2500 C

2000
Ø10@400 ADD TOP Ø10@400 ADD TOP

Ø10@400 ADD BOTT.


1 VA L=1500 L=1500

1000

1000
2000 B1 2 Al lmam Abou Hanifa st, 9th Floor- 7th Sector
VA-S201
Ø16@200 ADD TOP
C NASR CITY, Cairo , Egypt

L=2000
VA

CS1

200
L=2500

1500
1 WWW.ecb-consulting.com

B3
850 2000
3850

VA-S201

B3
2000
S2
BUILDING NAME:

B3

B3
3850

B3
EL. +106.30
Ø12@200 ADD TOP T.O.S.S.
LV4P
EL. +103.10 200
L=2500
T.O.S.S.
VILLA -LV4P
200
A B
250
A

2000
MAIN CONSULTANT:
VA 2
VA-S201 Ø10@200 ADD TOP
2000 B2
L=2500
B

B3
1950

B3

1500
VA

200
CS

CB2
CB2
B3 B3

1950
A B2
VA

200
250 E UPPER ROOF FRAMING PLAN

250
300
VA-S101 TITLE:
1:50
A 750 750
VA
COLUMN & AXES , FOUNDATIONS
0 1 2 3 4 5
& FLOORS FRAMING PLANS
C FIRST FLOOR FRAMING PLAN
VA-S101 1:50
D ROOF FRAMING PLAN SCALE 1:50 METERS SCALE: SHEET NO.: SHEET REVISION:
VA-S101 1:50 1:50 VA-S101 A
1 2 3 4 5 240908