The document is an estimate prepared by GESCOM for the shifting of an existing 11kV line and replacement with an 11KV UG cable in Hospet. The total estimated cost for the project is Rs. 352,159.66, which includes material and labor costs, as well as additional charges like GST. The estimate has been certified by the inspecting officer, confirming its adherence to current schedules and safety standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

EstimationReport (4)

The document is an estimate prepared by GESCOM for the shifting of an existing 11kV line and replacement with an 11KV UG cable in Hospet. The total estimated cost for the project is Rs. 352,159.66, which includes material and labor costs, as well as additional charges like GST. The estimate has been certified by the inspecting officer, confirming its adherence to current schedules and safety standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Gulbarga Electricity Supply Company Limited (GESCOM)

Estimated Location: HOSPET CSC-3

This estimate is prepared for shifting of existing 11kV line of F5-Amaravathi Feeder passing over sharana basaveshwara colony and replacing the existing
11Kv conductor by 11KV UG cable in UNIT-1, USD-1, GESCOM, Hospet under S.E.W.
Estimate No: 390646 Report Taken Date: 22/03/2025 12:12PM
Estimated by: madival nagaraj
Estimated Date: 30/11/2024
Work Type : Self Excution Works for Arranging of power supply/others
Work CategorySELF EXECUTION
Execution Type : SELF EXECUTION
Work Nature : Shifting & Existing 11KV Line

Part-A
Sl.No. Particulars Unit Material Cost Labour Cost
Qty Rate Amt Labour Desc Qty Rate Amt
1 27901205-11 kV Horizontal cross arm wit Nos. 1.00 762.28 762.28 Fixing of V- 1.0000 257.0000 257.0000
Shape/Horizontal cross
arm including single top
support Braces and
Insulators fixing.
2 2791002-DP Structure with 9 Mtrs RCC P Set 1.00 24695.04 24695.04 Ordinary Soil 4.0000 629.0000 2516.0000
3 Releasing Of Ordinary 2.0000 566.1000 1132.2000
Soil
4 Releasing Of Same as 1.0000 3720.6000 3720.6000
above using RCC poles 9
mtr to 10 mtr long
5 Same as above using 2.0000 4134.0000 8268.0000
RCC poles 9 mtr to 10 mtr
long
6 279149-11kV G.O.S.Mounting H-Frame se Set 1.00 5111.76 5111.76 Errection of H Frame. 1.0000 323.0000 323.0000
7 281683-Spiral Earth Electrode Nos. 2.00 282.02 564.04 providing spiral earth 2.0000 93.0000 186.0000
electrode type earthing
along with pole (without
charcoal, salt etc.,)
8 283040-DISC Insulators 45kN Nos. 6.00 601.80 3610.80
9 287400-11kV 3 Core XLPE UG Cable-95Sq Km 0.22 1049805.88 230957.29 i) Normal soil 5' bore size 0.2200 949.0000 208.7800
10 Laying of cable for HT 0.2200 61322.0000 13490.8400
Cable 3x95 to 150 sq.mm
11 288302-3X95 Sq.mm (Heat Shrinkable ou Set 2.00 4799.06 9598.12 3x95 to 3x150 sq.mm 2.0000 2658.0000 5316.0000

Page No. : 1 of 3
12 302021-11 kV D.O.L.O Cutouts REC Spe Set/3 1.00 5004.38 5004.38 Fixing DOLO cutouts / 3.0000 237.0000 711.0000
nos. Horn Gap Fuses including
fixing of cross arms and
wiring
13 304212-11kV G.O.S 200A Single break Set 1.00 11151.00 11151.00 Fixing of GOS including 1.0000 1104.0000 1104.0000
wiring (11kV SB 200A)
Total 291454.71 37233.4200

Part-D(Return Materials)
Sl.No. Particulars Unit Material Cost Labour Cost
Qty Rate Amt Labour Desc Qty Rate Amt
14 791000-Scrap Released Conductor Kg 15.00 18.00 270.00
15 795501-Scrap ABC Cable Kg 0.09 40.00 3.60
Total 273.60

Sl.No. Material Labour


1 Part A in Rs. : 291454.71 37233.42
Total 291454.71 37233.42

Sl.No. Other Charges Details


1 Area Specific - Kalyana Karnataka 14211.45
2 Area Specific - GST 2558.06
3 GST 18% For Labour 6702.02
Total Estimate cost 352159.66

Certificate : Certified that I have personally inspected the spot and prepared this estimate as per the current Schedule of rates for most economical and safe way of
execution of works.

Report:This estimate is costing of Rs.352159.66 is prepared This estimate is prepared for shifting of existing 11kV line of F5-Amaravathi Feeder passing over sharana
basaveshwara colony and replacing the existing 11Kv conductor by 11KV UG cable in UNIT-1, USD-1, GESCOM, Hospet under S.E.W.HOSPET CSC-3.
This estimate is prepared for shifting of existing 11kV line of F5-Amaravathi Feeder passing over sharana basaveshwara colony and
replacing the existing 11Kv conductor by 11KV UG cable in UNIT-1, USD-1, GESCOM, Hospet under S.E.W.

Note: As existing 8 metre PCC poles are released so they are not shown in DE-COM estimate. Kindly, approve

Section Officer

HOSPET CSC-3

Certificate : Certified that I have personally inspected the spot and got prepared this estimate to execute the works using current Schedule of rates in safe way and
economically.

SubDivision Office
HOSPET URBAN-1

Page No. : 2 of 3
Page No. : 3 of 3