Assign 1_G11_Contractor_06-June-2024
Assign 1_G11_Contractor_06-June-2024
Group 11
Centennial College
1|Page
Contents
Role and Approach ..................................................................................................................... 3
2|Page
Role: Contractor (Civil Engineer)
Project Objective
Project Stakeholders
• Major Deliverables:
• Recreation Center
• Pool
• Multipurpose Room
• Arena
• Gymnasium
• Preschool and Youth Spaces
• Silver Harbor Seniors’ Activity Centre
• Indoor/Outdoor Fitness and Play Spaces
• Skate Park
3|Page
Work Breakdown Structure (WBS):
Harry Jerome
Community
Recreation Centre
Utility
Permits
Activity list:
4|Page
1.1.2.1 Breaking down the project Phases
1.1.2.2 Identifying and sequencing tasks
1.1.2.3 Allocating resources
1.2 Permits and Approvals
1.2.1 Environmental Permits
1.2.1.1 Assessing environmental Impact
1.2.1.2 Preparing required documents
1.2.2 Building Permit
1.2.2.1 Gathering necessary architectural and engineering
drawings
1.2.2.2 Submitting to local building authority
1.2.3 Utility Permits
1.2.3.1 Identifying utility requirements
1.2.3.2 Preparing and submitting applications
1.3 Mobilization
1.3.1 Site Survey
1.3.1.1 Hiring surveyors
1.3.1.2 Performing topographical and geotechnical survey
1.3.2 Equipment Mobilization
1.3.2.1 Arranging transportation for heavy equipment
1.3.2.2 Setting up staging areas for equipment
1.4 Site Setup
1.4.1 fencing
1.4.1.1 Determining fencing requirements
1.4.1.2 Erecting temporary fencing around the site perimeter
1.4.2 Site office
1.4.2.1 Setting up communication systems
1.4.2.2 Installing office furniture and equipment
1.4.3 Temporary Facilities
1.4.3.1 Installing a temporary water supply
1.4.3.2 Installing a temporary power supply
1.4.3.3 Installing sanitary facilities
2 Procurement
2.1 Vendor Selection
2.1.1 Prequalification
2.1.1.1 Developing prequalification criteria
2.1.1.2 Inviting vendors to submit prequalification documents
2.1.1.3 Evaluating and selecting vendor submissions
2.1.2 Bid and Contract Negotiation
2.1.2.1 Inviting bids from prequalified vendors
5|Page
2.2.2.1 Creating purchase orders
Sending purchase orders to vendors
2.3 Subcontractors
2.3.1 Identification
2.3.1.1 Assessing project requirements
2.3.1.2 Identifying necessary subcontractors
2.3.2 Procurement
2.3.2.1 Prequalifying subcontractors
2.3.2.2 Bidding and negotiating with contractors
3 Construction
3.1 Substructure
3.1.1 Excavation
3.1.1.1 Marking excavation areas
3.1.1.2 Excavating to the required depth
3.1.1.3 Transporting excavated soil
3.1.2 Footing, foundation walls, and slab
3.1.2.1 Soil leveling
3.1.2.2 Placing Rebars
3.1.2.3 Erecting formwork
3.1.2.4 Pouring Concrete
3.1.2.5 Compacting and leveling concrete
3.1.3 Dampproof and Drainage
3.1.3.1 Applying tar
3.1.3.2 Installing waterproof membrane
3.1.3.3 Laying weeping tiles
3.1.3.4 Pouring gravel
3.2 Superstructure
3.2.1 floor
3.2.1.1 Installing floor joists
3.2.1.2 Laying subflooring
3.2.1.3 Installing finished flooring materials
3.2.2 Exterior walls
3.2.2.1 Erecting wall framing
3.2.2.2 Installing exterior sheathing
3.2.2.3 Installing roof sheathing
3.2.3 Roof
3.2.3.1 Constructing roof framing
3.2.3.2 Installing roof sheathing
3.2.3.3 Laying roofing materials
4 Interior Finishing
4.1 Mechanical
4.1.1 plumbing
4.1.1.1 Installing pipes
4.1.1.2 Connecting fixtures
4.1.1.3 Pressure testing
4.1.2 HVAC
4.1.2.1 Installing ductwork
4.1.2.2 Installing HVAC units
6|Page
4.1.2.3 Doing Final inspection
4.1.3 Fire protection
4.1.3.1 Installing sprinklers
4.1.3.2 Placing Alarms
4.2 Electrical
4.2.1 Lighting
4.2.1.1 Running electrical wires
4.2.1.2 Installing light fixtures
4.2.1.3 Connecting switches and outlets
4.2.1.4 Final inspection
4.3 Wall
4.3.1 Drywall
4.3.1.1 Installing drywall
4.3.1.2 Taping and mudding joints
4.3.1.3 Sanding and finishing
4.4 Floor
4.4.1 Hardwood
4.4.1.1 Installing hardwood boards
4.4.1.2 Sanding hardwood
4.4.1.3 Finishing and sealing
4.4.2 Tile
4.4.2.1 Laying tile
4.4.2.2 Grouting joints
4.4.2.3 Sealing tiles
7|Page
5.3.2.1 Measuring and marking lines
5.3.2.2 Painting lines
5.3.2.3 Installing parking signs
6 Project closeout
6.1 Final Inspection
6.1.1 Conducting final inspections
6.1.2 Compiling inspection reports
6.1.3 Rectifying any deficiencies
6.2 Documentation
6.2.1 Assembling project documentation
6.2.2 Compiling operation and maintenance manuals
6.2.3 Submitting documentation to client
8|Page