26-8 Project QA Checklist at Initial Meeting -Anthony
26-8 Project QA Checklist at Initial Meeting -Anthony
Quality Consultant:
Assurance Team:
Record Matrix
Retention periods of the records clearly defined
Rooms, cabinets, and shelves labeled
Records identified and where they are supposed to be
Records within the agreed retention period
Clear record keeping system where records are safe
Easily accessible / retrievable by authorized personnel
Hand-over Records
Communication procedure
Record of internal communication
Record of external communication
Project Organization chart available (as per PQP)
- QA Manager/ other QA staff
Qualifications and Responsibilities of Key Personnel
Sufficient numbers of Qualified QA/QC staff
Project personnel onboard
Job descriptions documented and communicated to project
personnel
Resource Management
Training / Competency
Taking-over Certificate
Servicing of the Works (Defect Liability Period)
Measurement, Analysis and Improvement
Audit Schedule
Non-conformance & Corrective and Preventive Action
Control of Non-conforming Products
Standards
Personnel/Competency
- Methods and procedures for all tests for its intended use
- Handling of test and calibration methods including sampling
- List of all standard methods and non-standard methods
- Required machine/equipment, other tools availability and
equipment specifications relevant to the test
- Equipment calibrated or checked to meet laboratory’s
specification requirements and calibrations recorded
appropriately. Maintenance of it
- Identification of all measuring equipment which requires
calibration
Measurement Traceability
Sampling
- Completion of reports
- Submission
- Review and Approval
- Compliance
- Submission
- Review and Approval
- Compliance
- Frequency
- NCR (handling Of Nonconforming Product) documenting,
process
- Corrective/ preventive action
- Effectiveness
- Records well defined and updated
Progress Reports
Quality Improvement