0% found this document useful (0 votes)
6 views

Deconsolidation Process

Uploaded by

rrnambreamit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Deconsolidation Process

Uploaded by

rrnambreamit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Deconsolidation Process

Process Flow: -
Step 1: create purchase order

Step 2: Create Inbound delivery: Perform packing during inbound delivery creation
and delivery will be distributed to EWM.

Step 3: Access Inbound delivery in EWM and perform unloading.


Tcode: /n/SCWM/PRDI

Step 4: Perform UNLOADING using Unloading button

Step 5: System will create the Warehouse task to move the Stock/Hu from Doors to
Goods receipt /Inbound (GR) area and another WT will be created that will move the
HU from GR Area to Deconsolidation Area -DEKO work centre.

Go to Monitor using T-code : /n/SCWM/MON

Warehouse Order

Warehouse Task: The HU will be place in DECON.B bin after confirmation


Confirm the Warehouse task to move the material from Source BIN -123A to
DECON.B bin. As of now the 2nd & 3rd line item of Warehouse task is set as ‘B’ → on
hold, Once the DECON activity is done we can see the status changes from ‘B’ to
‘active’ for moving Decon HU to Final put away.

Step 6: Go to Deconsolidation Work centre

Tcode /n/SCWM/DCONS

In selection screen enter the warehouse no and Work centre ‘DEKO’ and execute or
further filter it will possible options available on screen

In Deconsolidation Screen , select the possible destination HU tab , enter the


packing material and enter the qty of HU that we want to be created to
place/distribute the material and click on create button.

Generate the HU and place material from Big pallet to separate HU with required qty
(for both material).

Step 7:Perform Complete HU process so that system will generate the Warehouse
task to put away the HU’s to destination bin.

In Warehouse Monitor /n/SCWM/MON we can see that system has created the
Warehouse task each for HU’s and the Status has been changed from ‘B-hold’ to
Active.

Before HU step completion → The Warehouse task status will be open

After HU step completion

Confirm the open warehouse task to move the material to final Destination bin.
CONFIG:

1. Define Process Oriented Storage Control


Path: SPRO→ IMG→ SCM EWM → EWM → Cross Process Settings → Warehouse
Task → Define Process Oriented Storage Control
2. Define Warehouse Process type
Path: SPRO→ IMG→ SCM EWM → EWM → Cross Process Settings → Warehouse
Task → Define Warehouse Process type
3. Define control Indicators for Determining Warehouse Process Types
Path: SPRO→ IMG→ SCM EWM → EWM → Cross Process Settings → Warehouse
Task → Define control Indicators for Determining Warehouse Process Types

4. Define Storage type for Work Centre


Path: SPRO→ IMG→ SCM EWM → EWM → Master Data → Define Storage type
5. Specify work Centre Layout
Path: SPRO→ IMG → SCM EWM → EWM → Master Data →Work Centre→ Specify
work Centre Layout
6. Define Work Centre
Path: SPRO→ IMG → SCM EWM → EWM → Master Data →Work Centre→ Define
work Centre
7. Create Storage bin for Work Center
Path: SAP Easy Access → Logistics → SCM EWM → EWM → Master Data→
Storage Bin → Create Storage bin
T-code: /SCWM/LS01
8. Define Master Data Attributes for Work Centre
Path: SAP Easy Access → Logistics → SCM EWM → EWM → Master Data→ Work
Centre → Define Master Data Attributes
T-code: /SCWM/TWORKST
9. Specify Deconsolidation Station
Path: SPRO→ IMG → SCM EWM → EWM → Goods Receipt Process →
Deconsolidation → Specify Deconsolidation Station

You might also like