make the bricks and using them to construct building. Overall, there are
three main stages which are shaping, drying and heating & cooling to
complete the products.
At the start, first step of shaping is digging clay from underground, then
uses metal grid to filter the clays, once filter has completed, add sand and
water mix with clays, after that, either use wire cutter to shape to become
bricks or shaping them in mould. At this stage, shaping work has been
completed. Next step is putting these bricks into a drying oven, drying
needs about 24-48hours to complete.
Thereafter, the third main stage is to put these bricks to the klin in
moderate degree about 200-980, then to high degree around 870-1300,
following that these bricks should cooling down in the chamber for 48-
72hours. Finally, all the three main stages have been processed and
became full products, they are ready to pack and deliver.