This document outlines the Saudi Aramco Typical Inspection Plan for welding special corrosion-resistant materials, including duplex stainless steel. It details the inspection responsibilities, procedures, and quality control measures required throughout various project phases, including document review, material receiving, installation, and pre-commissioning. The plan emphasizes the need for compliance with standards and the roles of both Saudi Aramco and contractors in ensuring quality assurance during welding operations.

Uploaded by

erkishorekumar9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views12 pages

SATIP-W-016-01

This document outlines the Saudi Aramco Typical Inspection Plan for welding special corrosion-resistant materials, including duplex stainless steel. It details the inspection responsibilities, procedures, and quality control measures required throughout various project phases, including document review, material receiving, installation, and pre-commissioning. The plan emphasizes the need for compliance with standards and the roles of both Saudi Aramco and contractors in ensuring quality assurance during welding operations.

Uploaded by

erkishorekumar9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

SAUDI ARAMCO ID/PID - 29-Jun-2017 - REV. 2017.02.00 (Standards Cutoff - February 28, 2017) Rev. 2017.02.

00 28-Feb-17
APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.

Welding of Special Corrosion Resistant Matl's (Incl. Duplex SS) SATIP-W-016-01 29-Jun-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Review WPS, PQR (New/Existing)


1.1 SAIC-W-2001 SAIC-W-2001 RH RH

SAIC-W-2035 SAIC-W-2035
Welder/Welding Operator Certs Review
1.2 RH RH
and Issuance of JCC

Weld Repair Procedure & WPS to be


1.3 SAIC-W-2002 SAIC-W-2002 RH RH
used including specific instructions
Procedure & Weld Database for Weld
1.4 ID, Traceability, Tracking & Status SAIC-W-2008 SAIC-W-2008 RH RH Requirements of SAEP-1160 Sect 6 are incorporated.
Reporting (SAEP-1160*)
Post Weld Heat Treatment (PWHT)
1.5
Procedure (If required)
SAIC-W-2003 SAIC-W-2003 RH RH

1.6 Production Weld Hardness Testing SAIC-W-2012 SAIC-W-2012 RH RH


Gap Control Procedure & Inspection of SAIC-W-2037 SAIC-W-2037
1.7 RH RH
Welded Socket & Threaded Joints
Positive Material Identification
1.8
Procedure (Alloy Verification)
SAIC-L-2004 SAIC-L-2004 RH RH

Refer to respective SATIP for NDE. (SATIP-NDE-UT-01,


1.9 Non-Destructive Testing Procedure See Remarks See Remarks
LPT-01 MPT-01, RT-01)

Procedure for Control of Welding


1.10
Consumables
SAIC-W-2009 SAIC-W-2009 RH R

1.11 Ferrite Content Testing Procedure SAIC-W-2029 SAIC-W-2029 RH RH


2.0 MATERIAL RECEIVING

Receiving Inspection and Verification of SA shall verify and inspect first delivered batch of
SAIC-W-2010
2.1 Welding Consumables-(Properties, SAIC-W-2010 H W consumables & check for compliance to approved control
SATR-W-2009
Type, approve source, storage, etc.) procedures with random checks thereafter

Saudi Aramco: Company General Use


APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.

Welding of Special Corrosion Resistant Matl's (Incl. Duplex SS) SATIP-W-016-01 29-Jun-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

SAIC-W-2010
Welding Equipment Calibration Random witnessing by S. Aramco at each calibration
2.2 SAIC-W-2011 SATR-W-2009 H W
Verification cycle.
SATR-W-2011

SAIC-L-2010 Refer to Note 1 of General Notes for SA Inspection


Positive Material Identification of SS
2.3 SAIC-L-2010 SATR-A-2012 H W responsibility, after which pre-arranged witness is agreed
Pipe & fitting Materials.
SATR-A-2013 upon.

3.0 INSTALLATION

Control of Welding Consumables- SAIC-W-2032


3.1 SAIC-W-2032 W S
Storage, Handling, Issue, Condition SATR-W-2010

SA inspection responsibility varies from H1 to W1:


a) "W" -for build-up thickness not exceeding 1/3 of
SAIC-W-2033
3.2 Buttering or Weld Build-Up of Joints SAIC-W-2033 H W/H the metal thickness or 10mm whicever is less.
SATR-W-2006
b) "H" - for build-up thickness exceeding the above
and requiring CSD's approval.

SA Inspection
W/H responsibilities varies as follows:
See a) "W" - for Welding on normal services at normal
SAIC-W-2005
3.3 Pre-Welding Inspection SAIC-W-2005 H remarks conditions, refer to Note 1 of the General Notes.
SATR-W-2006
& See b) "H" - for critical welds, ie.; Tie-Ins, buttering, Hot
NOTICE Taps, NDE-In-Lieu of Hydro & others as determined
by project requirements.

SAIC-W-2006 SA inspects and verifies Heat Input at random or on


3.4 In-Process Weld Inspection SAIC-W-2006 W W
SATR-W-2007 routine basis on SS welding.

SAIC-W-2007
3.5 Post-Welding Visual Inspection SAIC-W-2007 H W
SATR-W-2007
Inspect Welding of Socket Joint and
3.6 SAIC-W-2037 SAIC-W-2037 H W
Seal Welding Threaded Jts.
Repair of Weld Joints or Base Metal by
3.7 SAIC-W-2013 SAIC-W-2013 W S
Welding (Prior to Weld Accept)

SA Participates in selection Process daily. SA


Selection of Weld Joints for NDE*
Responsibility: "W" -PID Inspectors shall participate in
3.8 (Follow NDE Process SAIC-W-2015 SAIC-W-2015 H W
the selection of weld to be radiographed.
Control Proc.)

Saudi Aramco: Company General Use


APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.

Welding of Special Corrosion Resistant Matl's (Incl. Duplex SS) SATIP-W-016-01 29-Jun-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

SAIC-W-2030
3.9 Ferrite Content Testing (As-Welded) SAIC-W-2030 H W
SATR-W-2016

Refer to Note 1, General Notes for SA Inspection


Post Weld Heat Treatment Inspection (If SAIC-W-2004
3.10 SAIC-W-2004 H W/R responsibility, after which pre-arranged witnessing shall be
Required) SATR-W-2005
agreed upon.

Refer to Note 1, General Notes for SA Inspection


Verification of Hardness Testing SAIC-W-2014
3.11 SAIC-W-2014 H W&R responsibility, after which pre-arranged witnessing shall be
Application and Results (If Req'd) SATR-W-2012
agreed upon.

Positive Material Identification (PMI) of SAIC-L-2010 Refer to Note 1 General Notes for SA Inspection
3.12 Deposited Weld for alloyed mat'ls within SAIC-L-2010 SATR-A-2012 H W/ R responsibility, after which pre-arranged witnessing shall be
the scope of SAES-A-206. SATR-A-2013 agreed upon

Verify NDE Method Application and


*Refer to the respective NDE SATIP
3.13 Evaluation, Documentation & Reporting See Remarks See Remarks W/RH* W/R*
(SATIP-NDE-UT-01, LPT-01, MPT-01, RT-01, etc.):
of Results*

Database Reporting (SAEP-1160)


a) Production Weld Status, SAIC-W-2016
b) Welder & Project Repair Rate SATR-W-2013,
Data tracking system(s) shall be maintained & kept
3.14 c) Welder's Individual Repair Rate SAIC-W-2016 SATR-W-2018, H R
current & available for SA review at all times.
d) NDE & backlog of SATR-W-2019
welds & status
e) Special Process* status per weld

Liquid Penetrant Test on removal of


3.15 SATR-NDE-2002 SATR-NDE-2002 H W
Temporary attachment welds

Modification or Re-Work After Weld SAIC-W-2036 SAIC-W-2036 Use SAIC-W-2008 & SAIC-W-2013
3.16 H H
Acceptance

4.0 PRE-COMMISSIONING

Final Welding Insp & Documentation Refer to Applicable SATIP for Pressure Testing. Test Pkg
SAIC-W-2008
4.1 (Database Report, Welding Summary/ SAIC-W-2008 H R Documentation (per weld) shall contain final welding &
SATR-W-2008
Record & Weld Map) per SAEP-1160 special process acceptance docs.

GENERAL NOTES

Saudi Aramco: Company General Use


APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.

Welding of Special Corrosion Resistant Matl's (Incl. Duplex SS) SATIP-W-016-01 29-Jun-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of
1 Saudi Aramco participation based upon the Contractor’s performance.

2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is
3 not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 29-Jun-2017 - REV. 2017.02.00 (Standards Cutoff - February 28, 2017)

Saudi Aramco: Company General Use


Rev. 2017.02.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


29-Jun-17 29-Jun-17

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 29-Jun-2017 - REV. 2017.02.00 (Standards Cutoff - February 28, 2017)

Saudi Aramco: Company General Use


Rev. 2017.02.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


29-Jun-17 29-Jun-17

Saudi Aramco: Company General Use