2022 UNLIMITED
2022 UNLIMITED
67L
Q2) The distance between the center of gravity of compression and center of gravity of tension of the
steel beams is called ______
Q4) Horizontal stiffeners are used in girders to prevent web buckling due to ____
Q5) Vertical stiffeners are used in plate girders to prevent web buckling due to ___
Q7) The maximum allowable lateral displacement of the shoring system is ___
Q8) The maximum deflection of shoring if the road is away more than 5m is ___
Q9) The Maximum deflection of shoring system if the road is adjacent or less than 5m ___
A: 1m B: 3m C: 1.5m D: 1.2m.
A: 3m B: 5m C: 7m D: 10m.
Q12) The minimum depth of unplanned excavation for shoring system as per DM is ____
A: 1m B: 2m C: 3m D: 0.5m.
Q13) If the soil type is less firm and need water to retain than ____ piles are used in shoring.
A: Contiguous piles B: sheet C: secant D: any one
Q14) The correct statement about secant piles and contiguous piles is that____
D: None of above
Q15) If all the piles of the building foundations are of 75cm diameter than static load test is required
for _____ percent of the piles.
A: 2% B: 3% C: 5% D: 1%.
Q16) dynamic load test is required for _____ % of the piles in the foundation.
A: 1% B: 2% C: 100% D: 5%.
A: 1% B: 2% C: 5% D: 10%.
Q18) Integrity test is required for at least _____% of all the piles.
Q19) The minimum steel bars required in pile design to achieve the ductility As per DM is _____
A: 5% B: 3% C: 1% D: 0.5%
Q20) The minimum steel bars diameter for main steel and stirrups for piles are____
A: 1.5D B: 2D C: 3D D: 2.5D
Q23) The Maximum limit for crack width due to tension load for tension piles is ____
Q24) Cross hole sonic logging test is usually done if the diameter and length of piles is ___
Q25) Which of the following is not the grade of bolt used?(mostly repeated question)
Q27) the limit for inter storey lateral drift due to wind force is _____
Q28) wind tunnel testing is required for the buildings as per DM rule with height more than____
Q29) In all cases, the designed wind pressure shall not be less than____ KN/m2
A: 2 B: 0.5 C: 1.5 D: 1
Q30) grouting of the PT slab tendons shall be done at least ____ days before removing shuttering.
A: 10 B: 5 C: 3 days D: 14
Q34) solid blocks and blocks for load bearing wall shall have compressive strength not less than___
Q35) Hollow blocks and blocks for non-load bearing wall shall have strength not less than ____ N/mm2
A: 7.5 B: 7 C: 5 D: 6
Q36) the minimum yield strength fy of the Angles used in steel structure as per British standards is
____N/mm2
Q38) the jacking force to stress the cables shall not exceed ____% of the total tendons tensile strength.
A: 50% B: 60 C: 70 D: 80%
Q39) the wall thickness of the metal duct used in PT slab tendons shall not be less than___
Q40) grouts in tendons shall have a strength not less than strength of the concrete at ___ days
A: 3 days B: 7 days C: 14 D: 28 days
Q41) the minimum concrete clear cover for substructure if it has direct contact with soil is ___
Q42) The concrete used for structural elements shall have compressive strength f’c not less than___
Q43) plate girders are considered as shallow if the depth of the plate girder is less than ____
Q44) the web plate is provided with stiffeners when the ratio of the clear depth to thickness of the web
is greater than _____
A: 58 B: 75 C: 68 D: 85
Q45) web buckling due to shear will not happen ie no need of stiffeners when d/tw<85
Q46) When building is completed than shoring beams are cut at level of ____ in case of adjacent plot.
A: 1m B: 2m C: 3m D: 5m.
Q47) The most common type of shoring system used in UAE is____
A: 20 B: 25 C: 35 D: 40
Q50) Minimum distance from the edge of plate to the center of bolt is ____
A: 2.5D B: 2D C: 1D D: 1.5D
Q51) The hydrogeological model for dewatering must be prepared for at least ____ below the bottom of
the excavation.