April 29, 2023package 10 Graphical
April 29, 2023package 10 Graphical
AS OF APRIL 29, 20
Name Of Project : BUENAVISTA-BOLONG BYPASS ROAD, PACKAGE 10
Project I.D. : 23JO0134
Location Of Project : Brgy. Quinput-Dita, Zamboanga City
PLANNED
BOQ Program
DESCRIPTION
ITEM NO. Percent
ACTUAL
Prepared By:
SHADIMAR M. SALAHUDDIN
Project Engineer
Approved By:
SHARIF MAD
Genera
ACCOMPLISHMENT
S OF APRIL 29, 2023
Start Date : April 11, 2023
Duration : 273 C.D.
Epiry Date : January 9, 2024
UNIT
AMOUNT QUANTITY UNIT % ITEM ACCOMPLISHMENT TO DATE
PRICE
₱136,207,132.78
Actual Accomplishment :
Planned :
₱ 136,207,132.78 Slippage :
Checked By:
DAN T. RUIZ
Project Manager
By:
SHARIF MADZMIR A. HASIM
General Manager
0.6333333333 0.06923076923
0.089%
0.089%
0.210%
-+ 0.121%
Name Of Project : BUENAVISTA-BOLONG BYPASS ROAD, PACKAGE 10
Project I.D. : 23JO0133
Location Of Project : Brgy. Quinput-Dita, Zamboanga City
PROGRAM
PAY ITEM
NO.
DESCRIPTION WEIGHT AMOUNT
PERCENTAGE
OTHER GENERAL
B 0.878% ₱ 1,195,834.49
REQUIREMENTS
SHADIMAR M. SALAHUDDIN
Project Engineer
SHADIMAR M. SALAHUDDIN
Project Engineer
GRAPHICAL REPORT (SUMM
AS OF APRIL 29, 2023
PACKAGE 10
ACCOMPLISHMENT
CONTRACT ACCOMPLISHMENT
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
Checked by:
ALHAZEN S. SAPIE
Project Manager
ALHAZEN S. SAPIE
Project Manager
L REPORT (SUMMARY)
OF APRIL 29, 2023
PLISHMENT
WEIGHT PERCENTAGE
SCHEDULED
TO DATE
PREV. THIS WEEK TO THIS DATE
Approved by:
SUBBASE AND 0.0071 0.0106 0.0106 0.0106 0.0141 0.0141 0.0141 0.0141 0.0141 0.0141 0.0141 0.0141 0.0141 0.0106 60%
D BASE COURSE
24,074,529.59 0.1767 - - 0.000
50%
0.0248 0.0248 0.0248 0.0248 0.0330 0.0330 0.0330 0.0330 0.0330 0.0330 0.0330 0.0248 0.0330 0.0248
E SURFACE COURSE 56,254,499.31 0.4130 - - 0.000
40%
BRIDGE 0.0015 0.0015 0.0022 0.0022 0.0030 0.0037 0.0037 0.0037 0.0030 0.0037 0.0030 0.0030 0.0030
F CONTRUCTION
5,054,327.51 0.0371 - - 0.000
30%
DRAINAGE AND
0.0006 0.0006 0.0006 0.0008 0.0008 0.0008 0.0010 0.0010 0.0010 0.0010 0.0010 0.0008
G SLOPE 1,342,597.10 0.0099 - - 0.000 20%
PROTECTION
MISCELLANEOUS 0.0057 0.0057 10%
H STRUCTURES
1,541,393.24 0.0113 - - 0.000
Prepared by:
Checked by:
SHADIMAR M. SALAHUDDIN
Project Engineer ALHAZEN S. SAPIE
Approved by: Project Manager
Resumption Date :
Revised Project Duration :
Revised Completion Date :
Revised Contract Amount : PhP. 136,207,132.784
Reporting Date : April 11, 2023 To April 29, 2023
Contract Time Elapsed : 19 Days
Percent Time Elapsed : 6.909 %
Contract Time Remaining : 256 Days
Percent Time Remaining : 93.091 %
Scheduled Monthly
: 0.060% %
Accomplishment
Actual Monthly Accomplishment : 0.020% %
Slippage : -0.040% %
Scheduled Accomplishment
: 0.210% %
to Date
Actual Accomplishment to Date : 0.089% %
Slippage this Month : -0.121% %
###
###