0% found this document useful (0 votes)
129 views84 pages

Advanced Production Integration (SAP PP-EWM INTEGRATION)-TTEW

The document outlines the integration of SAP Production Planning (PP) with SAP Extended Warehouse Management (EWM), detailing three manufacturing processes: Discrete, Process, and Repetitive Industries. It explains the concepts of single order staging and cross order staging, highlighting their differences in order specificity and efficiency. Additionally, it provides a comprehensive list of configuration steps necessary for successful integration within SAP S/4 HANA 2023.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views84 pages

Advanced Production Integration (SAP PP-EWM INTEGRATION)-TTEW

The document outlines the integration of SAP Production Planning (PP) with SAP Extended Warehouse Management (EWM), detailing three manufacturing processes: Discrete, Process, and Repetitive Industries. It explains the concepts of single order staging and cross order staging, highlighting their differences in order specificity and efficiency. Additionally, it provides a comprehensive list of configuration steps necessary for successful integration within SAP S/4 HANA 2023.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 84

Advanced Production Integration

(SAP PP-EWM INTEGRATION)

ROHELA KHAN
SAP EWM SOLUTION ARCHITECT, TRAINER,
MENTOR, STORY TELLER AND BLOGGER.

ROHELA TECH IT SOLUTIONS

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
There are 3 types of manufacturing process followed in SAP Production Planning:

1) Discrete Industry
2) Process Industry
3)Repetitive Industry
Discrete Industry Manufacturing Process

In discrete scenario, the manufacturing process is based on production orders. Discrete


manufacturing is characterized by requirements that occur on an irregular basis and a workshop-
oriented process. Basically, the demand and supply varies time to time in this scenario.

Discrete manufacturing forms an industry type where in the products which are manufactured can be
easily assembled and dis-assembled. They can be reworked upon easily to a large extent. You can say
making pumps, engines, cars, airplanes.
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more
Process Industry Manufacturing Process

The component Production Planning for Process Industries (PP-PI) provides an integrated planning
tool for batch-oriented process manufacturing. It is primarily designed for the chemical,
pharmaceutical, food and beverage industries as well as the batch-oriented electronics industry.
Industry Type: Chemical, Pharma, Poultry, Dairy and many more.
Repetitive manufacturing Process

Company manufactures product in large numbers and production is quantity based and period based
not order based. You can use repetitive manufacturing as either make-to-stock REM or make-to-order
REM such as in the automotive industry.

Repetitive manufacturing form an industry type where in the products manufactured can be discrete
manufactured or process industry type, produced repetitively or continuously in production lines. This
forms the continuous production scenario.
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more
SINGLE ORDER STAGING:
"single order staging" refers to preparing materials specifically for one production order at a time,
while "cross order staging" means grouping materials from multiple production orders together to
stage them simultaneously, allowing the staged stock to be used by any of the active orders at that
time, not just one specific order; essentially, single order is dedicated to a single order while cross
order is more flexible and can be used by multiple orders.

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
Key points about the difference:
Order specificity:
In single order staging, each warehouse task is linked to a specific production order, meaning the
staged materials are only meant for that order. In cross order staging, there's no direct link between the
staged materials and a particular production order, allowing flexibility in usage.

Efficiency:
Cross order staging can be more efficient when multiple production orders require similar materials,
as the system can stage them together in one operation, reducing handling time.

Production Material Request (PMR):


Both methods use PMRs to communicate material requirements, but in single order staging, each
PMR is processed individually, while in cross order staging, multiple PMRs can contribute to a single
staging process.
When to use each method:
Single order staging:
When strict order-specific requirements are needed, ensuring each production order receives exactly
the materials it needs.
Cross order staging:
When there's a high degree of component overlap between multiple production orders, allowing for
optimized warehouse operations by staging materials once for all relevant orders.

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
In the below document we are going to explain how the SAP Production Planning integrates with SAP
EWM Advanced Production Integration in SAP S/4 HANA 2023

CONFIGURATION STEPS:

1) Maintain BC Sets:
/SCWM/PMR_SINGLE_ORDER
/SCWM/PMR_CROSS_ORDER
/SCWM/DLV_INBOUND_PROD

2) Create a storage location which is EWM Managed storage location


3) Assign Plant and Storage location to warehouse in Enterprise Structure

4) Define availability group--003


5) Configure stock type -p2
6) Define storage type for PSA

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
7)Map storage location from ERP to EWM
8) Maintain stock determination group
9) Configure stock determination
10) Define Product group types
11) Define Product group
12) Maintain product group type for PSA
13) Maintain warehouse parameters for production
14) Map SAP ERP order type (PP01) to SAP EWM Document type
15) Map SAP ERP Order Type (PP01) To Sap EWM Item Type
16) Define WPT for Single Order and Cross Order
17) Determination of WPT
18) Stock Removal Strategies
18.1) Define STSS
18.2) Assign Storage Type to STSS
18.3) Define SRCI
18.4) Determine STSS for Stock Removal
19) Create Storage type for production supply area in S/4 HANA -1005
20) Create Storage Bin for Storage Type - 1005 (PSA-001) - /N/SCWM/LS01
21) Generate Activity Area for 1005 - /N/SCWM/GENA
22) Do Bin Sorting --/N/SCWM/SBST
23) Define EWM Doc Type/Item Type/ Doc Category/Item Category
24) Define Warehouse Process Type: 1100
25) Determine Warehouse Process Type
26) Define Storage Type for Staging Area (9015)
27) Create a Storage bin for Storage Type – (9015)
28) Define Work Center – PRWC
29) Assign Work Center Bin to Work Center - /N/SCWM/TWORKST
30) Create Storage type TT50
31) Generate AA for TT50 - /N/SCWM/GENA
32) Do Bin Sorting

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
33). Put Away Strategies
33.1 Define Storage Type Search Sequence
33.2 Assign Storage Type to Storage Type Search Sequence
33.3 Define Putaway Control Indicator
33.4 Specify Storage Type Search Sequence for Putaway
34) Create 2 raw materials with MRP View Mandatory
(Assign Product Group Type and Product Group to Material Master in Basic Data 2 Tab)
35) Create 1 Finished material with MRP view & work Scheduling view Mandatory
36) Maintain Product Master for 2 Raw Materials and Finished product ---- /N/SCWM/MAT1
37) Create Routing for Finished product —CA01
38) Define Production supply Area in (S4) ----PK05
39) Create work centre(S4): PRWC ------ CR01
40) Create a BOM for Finished Product ------------- CS01
41) Create a Control Cycle for Raw Materials ----- LPK1
42) Define PSA (EWM) ----------------- /N/SCWM/PSA
43) Replicate PSA -------------------- /N/SCWM/PSA_REPLICATE
44) Map PSA ------------------------- /N/SCWM/PSAMAP
45) Assign PSA Bin to PSA ----------------------- /N/SCWM/PSASTAGE
46) Add Production Version and Routing Group to Finished Product under Work Scheduling
Tab - MM02

Testing Process: Single order


1.Create a Manufacturing Order - CO01
2.Release the Manufacturing Order - CO02
3.WM Staging - CO02
4.PMR Doc --- /N/SCWM/PMR (Staging material, PSA Bin, WPT)
5.Staging Task - /N/SCWM/STAGE
6.WT for Components - /N/SCWM/MON or /N/SCWM/RFUI
7.Goods Consumption - /N/SCWM/RFUI
8.Post Goods Issue.

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
Testing Process: Cross order
1. Putaway Final Product - /N/SCWM/RFUI
CONFIGURATION STEPS:
1) Maintain BC Sets
BC Sets: /SCWM/PMR_SINGLE_ORDER

BC Sets: /SCWM/PMR_CROSS_ORDER

BC Sets: /SCWM/DLV_INBOUND_PROD

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
2) Create a storage location which is EWM Managed storage location

Path: Spro➔ Ref Img→ Enterprise Structure→ Definition→ Materials Management→ Maintain
storage location

3) Assign Plant and Storage location to warehouse in Enterprise Structure

Path: Spro➔ Ref Img→ Enterprise Structure→ Assignment→ Logistics Execution→ Assign
Warehouse Number to Plant and Storage Location.

4) Define availability group--003

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→ Goods Receipt Process→


Configure Availability Group for Putaway→ Define Availability Group

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
5) Configure stock type -p2

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→ Goods Receipt Process→


Configure Availability Group for Putaway→ Configure stock type

6)Map storage location from ERP to EWM

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→Interfaces→ ERP


Integration→ Goods Movements → Map Storage Locations from ERP System to EWM

7) Maintain stock determination group

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→Cross-Process Settings→


Stock Determination→ Maintain Stock Determination Groups

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
8) Configure stock determination

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→Cross-Process Settings→


Stock Determination→ Configure stock determination

9) Define Product group types

Path: Spro→IMG→SCM EWM→SCM Basis→Master Data→Product →Product Groups→


Define Product Group Types

10) Define Product group

Path: Spro->IMG-->SCM EWM-->SCM Basis-->master data-->product --->product groups-->define


product group

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
11) Maintain product group type for PSA

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→Master Data→ Production


Supply→ Maintain Product Group Type for PSA Assignment

12) Maintain warehouse parameters for production

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→Master Data→ Production


Supply→ Maintain Warehouse Parameters for Production

13) Map SAP ERP order type (PP01) to SAP EWM Document type

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→ Interfaces→ ERP


Integration→ Production → Map SAP ERP Order Type to SAP EWM Document Type

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
14) Map SAP ERP Order Type (PP01) To Sap EWM Item Type

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→ Interfaces→ ERP


Integration→ Production → Map SAP ERP Order Type to SAP EWM Item Type

15) Define WPT for Single Order and Cross Order

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→Cross-Process Settings→


Warehouse Task → Define Warehouse Process Type

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
16) Determination of WPT

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→Cross-Process Settings→


Warehouse Task → Determine Warehouse Process Type

17) Stock Removal Strategies


17.1) Define STSS

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→ Goods Issue Process→


Strategies→ Specify Storage Type Search Sequence

17.2) Assign Storage Type to STSS

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

17.3) Define SRCI

17.4) Determine STSS for Stock Removal

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
18) Create Storage type for production supply area in S/4 HANA -1005

Path: Spro→IMG→SCM EWM→ Extended Warehouse Management→ Master Data→ Define


Storage Types

19) Create Storage Bin for PSA Storage Type - 1005 (PSA-001) - /N/SCWM/LS01

20) Generate Activity Area for 1005 - /N/SCWM/GENA

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

21) Do Bin Sorting --/N/SCWM/SBST

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
22.Define EWM Doc Type/Item Type/ Doc Category/Item Category

SPRO→ REF IMG→ SCM EWM→ EWM→ GOODS RECEIPT PROCESS→ INBOUND
DELIVERY→ DEFINE DOCUMENT TYPES FOR INBOUND DELIVERY PROCESS

23.Define Warehouse Process Type: 1100

SPRO→ REF IMG→ SCM EWM→ EWM→ CROSS-PROCESS SETTINGS→ DEFINE


WAREHOUSE PROCESS TYPE

24.Determine Warehouse Process Type

SPRO→ REF IMG→ SCM EWM→ EWM→ CROSS-PROCESS SETTINGS→ DETERMINE


WAREHOUSE PROCESS TYPE

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
25.Define Storage Type for Staging Area (9015)

SPRO→ REF IMG→ SCM EWM→ EWM→ MASTER DATA → DEFINE STORAGE TYPES

26.Create a Storage bin for Storage Type – (9015)

27.Define Work Center – PRWC


SPRO→ REF IMG→ SCM EWM→ EWM→ MASTER DATA → WORK CENTER → DEFINE
WORK CENTER

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
28.Assign Work Center Bin to Work Center - /N/SCWM/TWORKST

29. Create Storage type TT50---(CHECK)

30.Generate AA for TT50 - /N/SCWM/GENA-----(IF NOT DONE)

31. Do Bin Sorting --/N/SCWM/SBST

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
32.Put Away Strategies:
32.1 Define Storage Type Search Sequence

Path → SPRO→REF IMG → SCM EWM→ EWM→ GOODS RECEIPT PROCESS→


STRATEGIES→ STORAGE TYPE SEARCH→ DEFINE STORAGE TYPE SEARCH SEQUENCE
FOR PUTAWAY

32.2 Assign Storage Type to Storage Type Search Sequence

Path → SPRO→REF IMG → SCM EWM→ EWM→ GOODS RECEIPT PROCESS→


STRATEGIES→ STORAGE TYPE SEARCH→ ASSIGN STORAGE TYPES TO STORAGE TYPE
SEARCH SEQUENCE

32.3 Define Putaway Control Indicator

Path → SPRO→REF IMG → SCM EWM→ EWM→ GOODS RECEIPT PROCESS→


STRATEGIES→ STORAGE TYPE SEARCH→ DEFINE PUTAWAY CONTROL INDICATOR

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
32.4 Specify Storage Type Search Sequence for Putaway

Path → SPRO→REF IMG → SCM EWM→ EWM→ GOODS RECEIPT PROCESS→


STRATEGIES→ STORAGE TYPE SEARCH→ SPECIFY STORAGE TYPE SEARCH
SEQUENCE FOR PUTAWAY

========================================================================
========================================================================
(ERROR: Hierarchy area not found) – IF YOU MISS THIS ENTRY
IN T-CODE: OKKP --- (CHECK)

(ERROR: NO PROFIT CENTER GROUP) ----IF YOU MISS THIS ENTRY

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
PATH: Financial Accounting => General Ledger Accounting => Master Data => Profit Center =>
Define Profit Center Standard Hierarchy in Controlling Area

**CREATE YOUR OWN AS GIVEN IN CONTROLLING AREA.

PATH: Financial Accounting => General Ledger Accounting => Master Data => Profit Center =>
Activate Profit Center Accounting in Controlling Area

IN T-CODE: OKKP --- (CHECK)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

33. CREATE PROFIT CENTER IN T-CODE: KE51

Click on Activate.

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
PATH: Financial Accounting => General Ledger Accounting => Master Data => Profit Center =>
Define Standard Hierarchy

========================================================================
34. CREATE COST CENTER IN T-CODE: KS01

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

COST CENTER CREATED.

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
35) Create 2 raw materials with MRP View Mandatory:
Material 1:

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
Material 2:

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
36) Create Finished material with MRP view & work Scheduling view Mandatory

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

In work scheduling tab, we will activate production version in step 47.

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
37) Maintain Product Master for 2 Raw Materials and Finished product ---- /N/SCWM/MAT1

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
** CHECK IN T-CODE: OMS2 --- (FOR FINAL PRODUCT)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
38) Define Production supply Area in (S4)----PK05

39) Create work center(S4): PRWC------ CR01

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
DOUBLE CLICK ON CAPACITIES TAB

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

40) Create Routing for Finished product—CA01


Routing Group: 50000028

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

GO TO T-CODE: CA02

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

SAVE

41) Create a BOM for Finished Product------------- CS01

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
42) Create a Control Cycle for Raw Materials ----- LPK1

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
43) Define PSA (EWM)- ---------------- /N/SCWM/PSA

44) Replicate PSA -------------------- /N/SCWM/PSA_REPLICATE

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

45) Map PSA ------------------------- /N/SCWM/PSAMAP

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
46) Assign PSA Bin to PSA ----------------------- /N/SCWM/PSASTAGE

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
47) Add Production Version and Routing Group to Finished Product under Work Scheduling
Tab - MM02

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

SAVE

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
TESTING PROCESS: Single Order

1.Create a Manufacturing Order - CO01

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

IF ERROR RELATED TO COST CENTER, THEN GO TO

IF ERROR CK48 WITH 400000 AND 895000 APPEARS IN LOG

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
GO TO T-CODE: FS00

SAVE

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

SAVE

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
2.Release the Manufacturing Order - CO02

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
3. WM Staging - CO02

PRESS BACK BUTTON

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

SAVE

4.PMR Doc --- /N/SCWM/PMR (Staging material, PSA Bin, WPT)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

COPY THE MANUFACTURING ORDER

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
5. Create Staging Task - /N/SCWM/STAGE

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
6. WT for Components - /N/SCWM/MON

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

7.Goods Consumption - /N/SCWM/RFUI

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

PRESS ENTER

PRESS ENTER

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
IN MONITOR

Check whether the goods issue has been happened in MB51

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
IN T-Code: CO02

IN MONITOR

8. Post Goods Issue----Completed

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)
Testing Process: Cross Order
1. Putaway Final Product - /N/SCWM/RFUI

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

GO TO MONITOR

CLICK ON DELIVERY NUMBER

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
Advanced Production Integration
(SAP PP-EWM INTEGRATION)

ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)

You might also like