817 r3 Design calculations
817 r3 Design calculations
Index
Topic Page
1.0 Design Report 1-2
2.1 Dimensions of Box 3-3
2.2 Basic Parameters 4-4
2.3 Idealised Structure for Staad Analysis 4-4
3.1 Earth Pressure and Live Load Calculation 4-9
3.2 Temperature load calculation 10 - 11
3.3 Staad input file 12 - 25
3.4 Summary of factored moments 26 - 26
4.0 Partial Safety Factors 27 - 31
5.1.1 Verification of structural strength for top slab 32 - 35
5.1.2 Verification for serviceability limit state for top slab 36 - 38
5.2.1 Verification of structural strength for bottom slab 39 - 42
5.2.2 Verification for serviceability limit state for bottom slab 43 - 45
5.3.1 Verification of structural strength for outer wall 46 - 49
5.3.2 Verification for serviceability limit state for outer wall 50 - 52
8.0 Base Pressure #REF!
1.0 Design Report
1.1 Introduction:-
Design is presented consistently in SI units; the following apply unless mentioned specifically otherwise:
Length m
Force kN
Stress MPa
Bearing Pressure kN/m2
Hog Mom/Com Str -ve
Sag Mom/Ten Str +ve
1.2 Reference documents :-
1 IRC codes /guidelines/special publications
2 MORTH specification
3 Specialised literature as relevant
1.3 Assumptions:-
The following assumptions have been taken while designing the Box.
1 Structure is designed for per metre width.
2 On top slab 75mm thick wearing coat is assumed for SIDL. while 65mm for dispersion effect.
3 Deck width taken-8.45 m
4 Carriageway width-7.5 m
5 Modulus of subgrade reaction - 13000 KN/m3
6 Shear value is taken at dist. Of deff from the face of the slab.
In load dispersion wearing coat thickness, fill thickness and top slab thickness is considered wherever
7
applicable.
8 In design sheet under summary of moments, only magnitude of force has been considered.
In case of earth pressure and LL surcharge governing case out of Normal earth pressure and Fluid pressure
9
is taken.
10 Structure is designed for standard earth pressure without weep holes.
1.4 Loads:-
The different types of loads used as per IRC 6 : 2017 are.
1 Dead load.
2 In SIDL fill, crash barrier, and wearing coat load is considered.
3 Saturated Earth pressure without drainage arrangment
4 Live load -Class AA Track, 40 T Boggie, 70R Wheel load in case of top slab.
5 Live load surcharge.
6 Braking load is taken as 20% of the live load on top slab.
7 Temperature loading for uniform rise and temperature gradient is considered.
8 The Earth pressure coefficient at rest 0.5 is considered.
tb
B
tw
10.686 m
2
2.36 kN/m 0.493 m
2
53.65 kN/m 11.178 m
1) c Earth Pressure (HFL) Without Drainage arrangement
DIRECTION OF TRAFFIC
0.85 m
2.125 m 2.05 m
a = 4.15 m
b1 = 1.00 m
b/lo = 1.02
a = 2.25
beff = 5.66 m
2.05<5.66 Therefore overlapping due to load dispersion occurs
a = 1.80 m
b1 = 1.00 m
b/lo = 1.02
a = 2.25
beff = 4.17 m
2.05<4.17 Therefore overlapping due to load dispersion occurs
a = 0.90 m
b1 = 1.00 m
b/lo = 1.02
a = 2.25
beff = 2.80 m
0<2.8 Therefore overlapping due to load dispersion occurs
DIRECTION OF TRAFFIC
0.81 m
0.23
m
100 100
100 100 1.22 m 8.30m
2.13 m
1.93 m
a = 3.54 m
b1 = 0.96 m
b/lo = 1.02
a = 2.25
beff = 5.52 m
1.93<5.52 Therefore overlapping due to load dispersion occurs
a = 0.61 m
b1 = 0.96 m
b/lo = 1.02
a = 2.25
beff = 2.23 m
1.93<2.23 Therefore overlapping due to load dispersion occurs
a = 0.31 m
b1 = 0.96 m
b/lo = 1.53
a = 2.25
beff = 1.63 m
1.93>1.63 No over lapping
12 12 17 17 17 17
4.15m
Width along span = 2.090m
Impact factor = 1.25
S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 166.77 1.05m 2.25 3.01m Yes 4.94m 16.1 kN/sqm 20 kN/sqm
2 166.77 2.42m 2.25 4.81m Yes 6.39m 12.5 kN/sqm 16 kN/sqm
3 166.77 2.84m 2.25 5.15m Yes 6.56m 12.2 kN/sqm 15 kN/sqm
4 166.77 1.47m 2.25 3.67m Yes 5.60m 14.2 kN/sqm 18 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
H) 70R Wheel Case 2 (at mid span)
12 12 17 17 17 17
16.60m
Width along span = 2.090m
Impact factor = 1.25
S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 166.77 1.255 2.25 3.35m Yes 5.28m 15.1 kN/sqm 19 kN/sqm
2 166.77 2.625 2.25 4.99m Yes 6.48m 12.3 kN/sqm 15 kN/sqm
3 166.77 2.625 2.25 4.99m Yes 6.48m 12.3 kN/sqm 15 kN/sqm
4 166.77 1.255 2.25 3.35m Yes 5.28m 15.1 kN/sqm 19 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
I) 70R Wheel Case 3 (Int wall)
12 12 17 17 17 17
16.60m
Width along span = 2.070m
S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 166.77 3.176 2.25 5.37m Yes 6.67m 12.0 kN/sqm 15 kN/sqm
2 166.77 3.754 2.25 5.58m Yes 6.78m 11.8 kN/sqm 15 kN/sqm
3 166.77 0.704 2.25 2.41m Yes 4.34m 18.4 kN/sqm 23 kN/sqm
4 166.77 0.666 2.25 2.34m Yes 4.27m 18.7 kN/sqm 23 kN/sqm
5 117.72 2.796 2.25 5.13m Yes 6.55m 9 kN/sqm 11 kN/sqm
6 117.72 3.984 2.25 5.62m Yes 6.79m 8.3 kN/sqm 10 kN/sqm
7 78.48 0.024 2.25 1.01m No 1.01m 18.5 kN/sqm 23 kN/sqm
J ) SPECIAL VEHICLE
Tyre Sizes
w = 0.274 m
B = 1.2 m
C/C distance between tyre = 1.8 m
Effective width ( longitudinal direction) = 2.134 > 1.5 overlap
final beff = 1.5
Effective width (transverse direction) = 1.35 m
Impact factor = 1
18 18 18 18 18 18
16.60m
Width along span = 2.134m
S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
2 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
3 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
4 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
5 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
6 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
7 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
8 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
9 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
10 0 0.000 2.25 1.35m No 1.35m 0.0 kN/sqm 0.00 kN/sqm
F = Ec aDt A
0.250 3
0.150
4
2.1
Sr. Eccentricity
Dt b t A=bxt F (force) Acting at
No. e*
0.075m
1 4.0 1.0 0.150 0.150 22.77 0.353
from top
13.8 0.050m
2 1.0 0.150 0.150 39.27 0.378
2 from top
4.0 0.233m
3 1.0 0.250 0.250 18.97 0.194
2 from top
2.1 0.050m
4 1.0 0.150 0.150 5.98 -0.378
2 from bottom
SF = 86.99 M= 24.278
EFFECT OF TEMPERATURE FALL
9.90 0.70
2 1
0.171
3
0.2138
6 0.2138
4 5 0.171
5.80 0.80
Sr. Eccentricity
Dt b t A=bxt F (force) Acting at
No. e*
0.086m
1 0.70 1.0 0.171 0.171 4.54 0.342
from top
9.90 0.057m
2 1.0 0.171 0.171 32.12 0.371
2 from top
0.70 0.242m
3 1.0 0.2138 0.2138 2.84 0.185
2 from top
5.80 0.057m
4 1.0 0.171 0.171 18.82 -0.371
2 from bottom
0.086
m
5 0.80 1.0 0.171 0.171 5.19 -0.342
from bottom
0.80 0.242m
6 1.0 0.2138 0.2138 3.24 -0.185
2 from bottom
SF = 66.75 M= 4.631
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 010-July-23
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 8.3 0 0; 3 16.6 0 0; 4 24.9 0 0; 5 33.2 0 0; 6 0 -10.683 0;
7 8.3 -10.683 0; 8 16.6 -10.683 0; 9 24.9 -10.683 0; 10 33.2 -10.683 0;
11 4.15 -10.683 0; 12 12.45 -10.683 0; 13 20.75 -10.683 0; 14 29.05 -10.683 0;
15 32.85 -10.683 0;
MEMBER INCIDENCES
1 6 1; 2 1 2; 3 2 3; 4 3 4; 5 10 5; 6 7 2; 7 8 3; 8 9 4; 9 4 5; 10 6 11;
11 11 7; 12 7 12; 13 12 8; 14 8 13; 15 13 9; 16 9 14; 17 14 15; 18 15 10;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
2 TO 4 9 PRIS YD 0.85 ZD 1
1 5 TO 8 PRIS YD 0.8 ZD 1
10 TO 18 PRIS YD 1.8 ZD 1
CONSTANTS
MATERIAL CONCRETE MEMB 1 TO 18
SUPPORTS
6 TO 9 FIXED
11 TO 15 FIXED
***DL***
LOAD 1 DL
SELFWEIGHT Y -1
***DL HFL CASE***
LOAD 2 DL HFL
SELFWEIGHT Y -1 LIST 2 TO 4 9
SELFWEIGHT Y -0.85 LIST 1 5 TO 8
***SIDL+ Earth Fill****
LOAD 3 SIDL+ EARTH FILL
MEMBER LOAD
2 TO 4 9 UNI GY -8
**Surfacing (wearing coat)
LOAD 4 SURFACING (WEARING COAT)
MEMBER LOAD
2 TO 4 9 UNI GY -2
****EARTH PRESSURE ****
LOAD 5 EARTH PRESSURE FROM RIGHT SIDE
MEMBER LOAD
5 TRAP GX -61.325 -4.15
LOAD 6 EARTH PRESSURE FROM LEFT SIDE
MEMBER LOAD
1 TRAP GX 61.325 4.15
*****LL SURCHARGE *****
LOAD 7 LL SURCHARGE RIGHT SIDE
MEMBER LOAD
5 UNI GX -12
LOAD 8 LL SURCHARGE LEFT SIDE
MEMBER LOAD
1 UNI GX 12
****EARTH PRESSURE HFL ****
LOAD 9 HFL EARTH PRESSURE FROM RIGHT SIDE
MEMBER LOAD
5 TRAP GX -78.4375 -2.075
LOAD 10 HFL EARTH PRESSURE FROM LEFT SIDE
MEMBER LOAD
1 TRAP GX 78.4375 2.075
*****HFL LL SURCHARGE *****
LOAD 11 HFL LL SURCHARGE RIGHT SIDE
MEMBER LOAD
5 UNI GX -12
LOAD 12 HFL LL SURCHARGE LEFT SIDE
MEMBER LOAD
1 UNI GX 12
****CLASS Class AA Tracked (TOP SLAB AT MID SPAN)*******
LOAD 13 CLASS AA TRACKED (TOP SLAB AT MID SPAN)
JOINT LOAD
1 FX 3.86
2 FX 3.86
3 FX 3.86
4 FX 3.86
5 FX 3.86
MEMBER LOAD
2 UNI GY -21.3 1.725 6.875
****CLASS 70R Tracked (TOP SLAB AT MID WALL)*******
LOAD 14 CLASS AA TRACKED (TOP SLAB AT INT. WALL)
JOINT LOAD
1 FX 3.86
2 FX 3.86
3 FX 3.86
4 FX 3.86
5 FX 3.86
MEMBER LOAD
2 UNI GY -44.2 6.8 8.6
3 UNI GY -44.2 0 1.8
******CLASS 70R Tracked (TOP SLAB AT SUPP.)*****
LOAD 15 CLASS AA TRACKED (TOP SLAB OUTER WALL)
JOINT LOAD
1 FX 3.86
2 FX 3.86
3 FX 3.86
4 FX 3.86
5 FX 3.86
MEMBER LOAD
2 UNI GY -28.3 0 4.375
******CLASS 40T (TOP SLAB AT MID SPAN)*********
LOAD 16 CLASS 40T (TOP SLAB AT MID SPAN)
JOINT LOAD
1 FX 19.28
MEMBER LOAD
2 UNI GY -21.6 2.8 5.8
*****
LOAD 17 CLASS 40T AT SUPPORT (TOP SLAB AT OUTER SUPP.)
JOINT LOAD
1 FX 19.28
MEMBER LOAD
2 UNI GY -48.1 0 2.225
*******
LOAD 18 CLASS 40T AT MID WALL (TOP SLAB AT INNER SUPPORTS)
JOINT LOAD
1 FX 19.28
MEMBER LOAD
2 UNI GY -45.4 2.19 5.19
**
LOAD 19 CLASS 70R WHEEL (TOP SLAB AT INT. WALL)
JOINT LOAD
1 FX 4.46
2 FX 4.46
3 FX 4.46
4 FX 4.46
5 FX 4.46
MEMBER LOAD
2 UNI GY -17.23 2.586 4.366
2 UNI GY -17.11 2.864 4.644
2 UNI GY -27.05 7.006 8.6
3 UNI GY -27.51 -0.224 1.556
3 UNI GY -12.54 1.906 3.686
3 UNI GY -12.01 3.426 5.206
3 UNI GY -16.66 7.386 8.6
****CLASS 70R Wheel (TOP SLAB AT OUTER WALL)*******
LOAD 20 CLASS 70R WHEEL (TOP SLAB AT OUTER WALL)
JOINT LOAD
1 FX 4.46
2 FX 4.46
3 FX 4.46
4 FX 4.46
5 FX 4.46
MEMBER LOAD
2 UNI GY -22.29 0 1.78
2 UNI GY -16.39 1.37 3.15
2 UNI GY -15.4 4.42 6.2
2 UNI GY -16.91 5.79 7.57
**
**
**
****CLASS 70R Wheel (TOP SLAB AT MID SPAN)*******
LOAD 21 CLASS 70R WHEEL (TOP SLAB AT MID SPAN)
JOINT LOAD
1 FX 4.46
2 FX 4.46
3 FX 4.46
4 FX 4.46
5 FX 4.46
MEMBER LOAD
2 UNI GY -18.89 0.515 2.295
2 UNI GY -15.8 1.885 3.665
2 UNI GY -15.8 4.935 6.715
2 UNI GY -18.89 6.305 8.085
**
**
**
****CLASS SV Loading*******
LOAD 22 CLASS SV LOADING
MEMBER LOAD
2 UNI GY -23.69 0.022 1.802
2 UNI GY -16.77 1.522 3.302
2 UNI GY -14.89 3.022 4.802
2 UNI GY -15.44 4.522 6.302
2 UNI GY -19.06 6.022 7.802
2 UNI GY -33.42 7.522 8.6
3 UNI GY -20.91 0.422 2.202
3 UNI GY -15.97 1.922 3.702
3 UNI GY -14.82 3.422 5.202
3 UNI GY -16.01 4.922 6.702
*******************Temperature Loading*********
*********Uniform increase****
LOAD 23 TEMPERATURE LOADING (RISE)
TEMPERATURE LOAD
2 TO 4 9 TEMP 31.85
*********Uniform decrease****
LOAD 24 TEMPERATURE LOADING (FALL)
TEMPERATURE LOAD
2 TO 4 9 TEMP 11.85
***********Temperature gradient****
LOAD 25 TEMPERATURE GRADIENT (RISE)
JOINT LOAD
1 FX -796.99
5 FX 796.99
1 MZ 173.93
5 MZ -173.93
LOAD 26 TEMPERATURE GRADIENT (FALL)
JOINT LOAD
1 FX 518.81
5 FX -518.81
1 MZ -29.47
5 MZ 29.47
*Partial Safety for Verification of Structural Strength (Basic Combination)
*** ULS COMBINATION
***LWL Live load leading & Temperature rise accompanying.
LOAD COMB 30 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 13 1.5 23 0.9 25 0.9
LOAD COMB 31 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 14 1.5 23 0.9 25 0.9
LOAD COMB 32 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 15 1.5 23 0.9 25 0.9
LOAD COMB 33 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 16 1.5 23 0.9 25 0.9
LOAD COMB 34 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 17 1.5 23 0.9 25 0.9
LOAD COMB 35 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 18 1.5 23 0.9 25 0.9
LOAD COMB 36 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 19 1.5 23 0.9 25 0.9
LOAD COMB 37 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 20 1.5 23 0.9 25 0.9
LOAD COMB 38 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 21 1.5 23 0.9 25 0.9
*** HFL Live load leading & Temperature rise accompanying.
LOAD COMB 39 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 13 1.5 23 0.9 25 0.9
LOAD COMB 40 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 14 1.5 23 0.9 25 0.9
LOAD COMB 41 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 15 1.5 23 0.9 25 0.9
LOAD COMB 42 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 16 1.5 23 0.9 25 0.9
LOAD COMB 43 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 17 1.5 23 0.9 25 0.9
LOAD COMB 44 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 18 1.5 23 0.9 25 0.9
LOAD COMB 45 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 19 1.5 23 0.9 25 0.9
LOAD COMB 46 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 20 1.5 23 0.9 25 0.9
LOAD COMB 47 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 21 1.5 23 0.9 25 0.9
*** LWL Live load leading & Temperature fall accompanying.
LOAD COMB 48 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 13 1.5 24 0.9 26 0.9
LOAD COMB 49 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 14 1.5 24 0.9 26 0.9
LOAD COMB 50 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 15 1.5 24 0.9 26 0.9
LOAD COMB 51 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 16 1.5 24 0.9 26 0.9
LOAD COMB 52 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 17 1.5 24 0.9 26 0.9
LOAD COMB 53 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 18 1.5 24 0.9 26 0.9
LOAD COMB 54 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 19 1.5 24 0.9 26 0.9
LOAD COMB 55 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 20 1.5 24 0.9 26 0.9
LOAD COMB 56 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 21 1.5 24 0.9 26 0.9
*** HFL Live load leading & Temperature fall accompanying.
LOAD COMB 57 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 13 1.5 24 0.9 26 0.9
LOAD COMB 58 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 14 1.5 24 0.9 26 0.9
LOAD COMB 59 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 15 1.5 24 0.9 26 0.9
LOAD COMB 60 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 16 1.5 24 0.9 26 0.9
LOAD COMB 61 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 17 1.5 24 0.9 26 0.9
LOAD COMB 62 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 18 1.5 24 0.9 26 0.9
LOAD COMB 63 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 19 1.5 24 0.9 26 0.9
LOAD COMB 64 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 20 1.5 24 0.9 26 0.9
LOAD COMB 65 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 21 1.5 24 0.9 26 0.9
*** LWL Live load accompanying & Temperature rise leading.
LOAD COMB 66 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 13 1.15 23 1.5 25 1.5
LOAD COMB 67 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 14 1.15 23 1.5 25 1.5
LOAD COMB 68 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 15 1.15 23 1.5 25 1.5
LOAD COMB 69 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 16 1.15 23 1.5 25 1.5
LOAD COMB 70 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 17 1.15 23 1.5 25 1.5
LOAD COMB 71 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 18 1.15 23 1.5 25 1.5
LOAD COMB 72 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 19 1.15 23 1.5 25 1.5
LOAD COMB 73 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 20 1.15 23 1.5 25 1.5
LOAD COMB 74 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 21 1.15 23 1.5 25 1.5
*** HFL Live load accompanying & Temperature rise leading.
LOAD COMB 75 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 13 1.15 23 1.5 25 1.5
LOAD COMB 76 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 14 1.15 23 1.5 25 1.5
LOAD COMB 77 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 15 1.15 23 1.5 25 1.5
LOAD COMB 78 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 16 1.15 23 1.5 25 1.5
LOAD COMB 79 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 17 1.15 23 1.5 25 1.5
LOAD COMB 80 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 18 1.15 23 1.5 25 1.5
LOAD COMB 81 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 19 1.15 23 1.5 25 1.5
LOAD COMB 82 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 20 1.15 23 1.5 25 1.5
LOAD COMB 83 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 21 1.15 23 1.5 25 1.5
*** LWL Live load accompanying & Temperature fall leading.
LOAD COMB 84 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 13 1.5 24 0.9 26 0.9
LOAD COMB 85 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 14 1.5 24 0.9 26 0.9
LOAD COMB 86 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 15 1.5 24 0.9 26 0.9
LOAD COMB 87 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 16 1.5 24 0.9 26 0.9
LOAD COMB 88 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 17 1.5 24 0.9 26 0.9
LOAD COMB 89 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 18 1.5 24 0.9 26 0.9
LOAD COMB 90 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 19 1.5 24 0.9 26 0.9
LOAD COMB 91 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 20 1.5 24 0.9 26 0.9
LOAD COMB 92 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 21 1.5 24 0.9 26 0.9
*** HFL Live load accompanying & Temperature fall leading.
LOAD COMB 93 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 13 1.5 24 0.9 26 0.9
LOAD COMB 94 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 14 1.5 24 0.9 26 0.9
LOAD COMB 95 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 15 1.5 24 0.9 26 0.9
LOAD COMB 96 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 16 1.5 24 0.9 26 0.9
LOAD COMB 97 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 17 1.5 24 0.9 26 0.9
LOAD COMB 98 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 18 1.5 24 0.9 26 0.9
LOAD COMB 99 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 19 1.5 24 0.9 26 0.9
LOAD COMB 100 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 20 1.5 24 0.9 26 0.9
LOAD COMB 101 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 21 1.5 24 0.9 26 0.9
** Special Vehicle Loading
LOAD COMB 102 BASIC COMBINATION
1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 22 1.0
LOAD COMB 103 BASIC COMBINATION
2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 22 1.0
***RARE COMBINATION
****LWL Live load leading & Temperature rise accompanying.
*LOAD COMB 104 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 13 1.0 23 0.6 25 0.6
*LOAD COMB 105 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 14 1.0 23 0.6 25 0.6
*LOAD COMB 106 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 15 1.0 23 0.6 25 0.6
*LOAD COMB 107 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 16 1.0 23 0.6 25 0.6
*LOAD COMB 108 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 17 1.0 23 0.6 25 0.6
*LOAD COMB 109 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 18 1.0 23 0.6 25 0.6
*LOAD COMB 110 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 19 1.0 23 0.6 25 0.6
*LOAD COMB 111 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 20 1.0 23 0.6 25 0.6
*LOAD COMB 112 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 21 1.0 23 0.6 25 0.6
**** HFL Live load leading & Temperature rise accompanying.
*LOAD COMB 113 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 13 1.0 23 0.6 25 0.6
*LOAD COMB 114 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 14 1.0 23 0.6 25 0.6
*LOAD COMB 115 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 15 1.0 23 0.6 25 0.6
*LOAD COMB 116 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 16 1.0 23 0.6 25 0.6
*LOAD COMB 117 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 17 1.0 23 0.6 25 0.6
*LOAD COMB 118 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 18 1.0 23 0.6 25 0.6
*LOAD COMB 119 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 19 1.0 23 0.6 25 0.6
*LOAD COMB 120 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 20 1.0 23 0.6 25 0.6
*LOAD COMB 121 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 21 1.0 23 0.6 25 0.6
**** LWL Live load leading & Temperature fall accompanying.
*LOAD COMB 122 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 13 1.0 24 0.6 26 0.6
*LOAD COMB 123 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 14 1.0 24 0.6 26 0.6
*LOAD COMB 124 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 15 1.0 24 0.6 26 0.6
*LOAD COMB 125 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 16 1.0 24 0.6 26 0.6
*LOAD COMB 126 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 17 1.0 24 0.6 26 0.6
*LOAD COMB 127 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 18 1.0 24 0.6 26 0.6
*LOAD COMB 128 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 19 1.0 24 0.6 26 0.6
*LOAD COMB 129 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 20 1.0 24 0.6 26 0.6
*LOAD COMB 130 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 21 1.0 24 0.6 26 0.6
**** HFL Live load leading & Temperature fall accompanying.
*LOAD COMB 131 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 13 1.0 24 0.6 26 0.6
*LOAD COMB 132 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 14 1.0 24 0.6 26 0.6
*LOAD COMB 133 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 15 1.0 24 0.6 26 0.6
*LOAD COMB 134 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 16 1.0 24 0.6 26 0.6
*LOAD COMB 135 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 17 1.0 24 0.6 26 0.6
*LOAD COMB 136 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 18 1.0 24 0.6 26 0.6
*LOAD COMB 137 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 19 1.0 24 0.6 26 0.6
*LOAD COMB 138 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 20 1.0 24 0.6 26 0.6
*LOAD COMB 139 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 21 1.0 24 0.6 26 0.6
**** LWL Live load accompanying & Temperature rise leading.
*LOAD COMB 140 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 13 0.75 23 1.0 25 1.0
*LOAD COMB 141 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 14 0.75 23 1.0 25 1.0
*LOAD COMB 142 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 15 0.75 23 1.0 25 1.0
*LOAD COMB 143 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 16 0.75 23 1.0 25 1.0
*LOAD COMB 144 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 17 0.75 23 1.0 25 1.0
*LOAD COMB 145 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 18 0.75 23 1.0 25 1.0
*LOAD COMB 146 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 19 0.75 23 1.0 25 1.0
*LOAD COMB 147 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 20 0.75 23 1.0 25 1.0
*LOAD COMB 148 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 21 0.75 23 1.0 25 1.0
*LOAD COMB 149 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 22
**** HFL Live load accompanying & Temperature rise leading.
*LOAD COMB 150 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 13 0.75 23 1.0 25 1.0
*LOAD COMB 151 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 14 0.75 23 1.0 25 1.0
*LOAD COMB 152 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 15 0.75 23 1.0 25 1.0
*LOAD COMB 153 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 16 0.75 23 1.0 25 1.0
*LOAD COMB 154 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 17 0.75 23 1.0 25 1.0
*LOAD COMB 155 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 18 0.75 23 1.0 25 1.0
*LOAD COMB 156 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 19 0.75 23 1.0 25 1.0
*LOAD COMB 157 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 20 0.75 23 1.0 25 1.0
*LOAD COMB 158 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 21 0.75 23 1.0 25 1.0
**** LWL Live load accompanying & Temperature fall leading.
*LOAD COMB 159 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 13 1.0 24 0.6 26 0.6
*LOAD COMB 160 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 14 1.0 24 0.6 26 0.6
*LOAD COMB 161 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 15 1.0 24 0.6 26 0.6
*LOAD COMB 162 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 16 1.0 24 0.6 26 0.6
*LOAD COMB 163 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 17 1.0 24 0.6 26 0.6
*LOAD COMB 164 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 18 1.0 24 0.6 26 0.6
*LOAD COMB 165 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 19 1.0 24 0.6 26 0.6
*LOAD COMB 166 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 20 1.0 24 0.6 26 0.6
*LOAD COMB 167 BASIC COMBINATION
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 21 1.0 24 0.6 26 0.6
**** HFL Live load accompanying & Temperature fall leading.
*LOAD COMB 168 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 13 1.0 24 0.6 26 0.6
*LOAD COMB 169 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 14 1.0 24 0.6 26 0.6
*LOAD COMB 170 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 15 1.0 24 0.6 26 0.6
*LOAD COMB 171 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 16 1.0 24 0.6 26 0.6
*LOAD COMB 172 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 17 1.0 24 0.6 26 0.6
*LOAD COMB 173 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 18 1.0 24 0.6 26 0.6
*LOAD COMB 174 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 19 1.0 24 0.6 26 0.6
*LOAD COMB 175 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 20 1.0 24 0.6 26 0.6
*LOAD COMB 176 BASIC COMBINATION
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 21 1.0 24 0.6 26 0.6
**** Special Vehicle Loading.
*LOAD COMB 177 THERMAL LOAD AS LEADING LOAD
*1 1.0 3 1.0 4 1.2 5 1.0 6 1.0 7 0.8 8 0.8 22 1.0
*LOAD COMB 178 THERMAL LOAD AS LEADING LOAD
*2 1.0 3 1.0 4 1.2 9 1.0 10 1.0 11 0.8 12 0.8 22 1.0
*LWL Partial Safety for Verification of Serviceability Limit State (Quasi-permanent Combination)
****Temperature Rise
*LOAD COMBINATION 179
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 23 0.5 25 0.5
*LOAD COMBINATION 180
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 23 0.5 25 0.5
****Temperature Fall
*LOAD COMBINATION 181
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 24 0.5 26 0.5
*LOAD COMBINATION 182
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 24 0.5 26 0.5
** HFL Partial Safety for Verification of Serviceability Limit State (Quasi-permanent Combination)
****Temperature Rise
*LOAD COMBINATION 183
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 23 0.5 25 0.5
*LOAD COMBINATION 184
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 23 0.5 25 0.5
****Temperature Fall
*LOAD COMBINATION 185
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 24 0.5 26 0.5
*LOAD COMBINATION 186
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 24 0.5 26 0.5
*Dry Combination for Design of Foundation (Combination 1 )
*** Live load leading & Temperature rise accompanying.
*LOAD COMB 187 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 13 1.5 23 0.9 25 0.9
*LOAD COMB 188 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 14 1.5 23 0.9 25 0.9
*LOAD COMB 189 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 15 1.5 23 0.9 25 0.9
*LOAD COMB 190 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 16 1.5 23 0.9 25 0.9
*LOAD COMB 191 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 17 1.5 23 0.9 25 0.9
*LOAD COMB 192 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 18 1.5 23 0.9 25 0.9
*LOAD COMB 193 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 19 1.5 23 0.9 25 0.9
*LOAD COMB 194 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 20 1.5 23 0.9 25 0.9
*LOAD COMB 195 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 21 1.5 23 0.9 25 0.9
*** Live load leading & Temperature fall accompanying.
*LOAD COMB 196 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 13 1.5 24 0.9 26 0.9
*LOAD COMB 197 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 14 1.5 24 0.9 26 0.9
*LOAD COMB 198 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 15 1.5 24 0.9 26 0.9
*LOAD COMB 199 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 16 1.5 24 0.9 26 0.9
*LOAD COMB 200 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 17 1.5 24 0.9 26 0.9
*LOAD COMB 201 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 18 1.5 24 0.9 26 0.9
*LOAD COMB 202 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 19 1.5 24 0.9 26 0.9
*LOAD COMB 203 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 20 1.5 24 0.9 26 0.9
*LOAD COMB 204 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 21 1.5 24 0.9 26 0.9
* HFL Combination for Design of Foundation (Combination 1 )
*** Live load leading & Temperature rise accompanying.
*LOAD COMB 205 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 13 1.5 23 0.9 25 0.9
*LOAD COMB 206 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 14 1.5 23 0.9 25 0.9
*LOAD COMB 207 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 15 1.5 23 0.9 25 0.9
*LOAD COMB 208 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 16 1.5 23 0.9 25 0.9
*LOAD COMB 209 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 17 1.5 23 0.9 25 0.9
*LOAD COMB 210 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 18 1.5 23 0.9 25 0.9
*LOAD COMB 211 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 19 1.5 23 0.9 25 0.9
*LOAD COMB 212 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 20 1.5 23 0.9 25 0.9
*LOAD COMB 213 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 21 1.5 23 0.9 25 0.9
*** Live load leading & Temperature fall accompanying.
*LOAD COMB 214 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 13 1.5 24 0.9 26 0.9
*LOAD COMB 215 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 14 1.5 24 0.9 26 0.9
*LOAD COMB 216 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 15 1.5 24 0.9 26 0.9
*LOAD COMB 217 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 16 1.5 24 0.9 26 0.9
*LOAD COMB 218 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 17 1.5 24 0.9 26 0.9
*LOAD COMB 219 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 18 1.5 24 0.9 26 0.9
*LOAD COMB 220 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 19 1.5 24 0.9 26 0.9
*LOAD COMB 221 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 20 1.5 24 0.9 26 0.9
*LOAD COMB 222 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 21 1.5 24 0.9 26 0.9
*** Special Vehicle Loading
*LOAD COMB 223 LIVE LOAD AS LEADING LOAD
*1 1.35 3 1.35 4 1.75 5 1.5 6 1.5 7 1.2 8 1.2 22 1.0
*LOAD COMB 224 LIVE LOAD AS LEADING LOAD
*2 1.35 3 1.35 4 1.75 9 1.5 10 1.5 11 1.2 12 1.2 22 1.0
**Dry Combination for Base Pressure (Combination 2 )
*LOAD COMBINATION 225
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 13 1.0 23 1.0 25 1.0
*LOAD COMBINATION 226
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 14 1.0 23 1.0 25 1.0
*LOAD COMBINATION 227
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 15 1.0 23 1.0 25 1.0
*LOAD COMBINATION 228
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 16 1.0 23 1.0 25 1.0
*LOAD COMBINATION 229
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 17 1.0 23 1.0 25 1.0
*LOAD COMBINATION 230
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 18 1.0 23 1.0 25 1.0
*LOAD COMBINATION 231
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 19 1.0 23 1.0 25 1.0
*LOAD COMBINATION 232
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 20 1.0 23 1.0 25 1.0
*LOAD COMBINATION 233
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 21 1.0 23 1.0 25 1.0
*LOAD COMBINATION 234
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 13 1.0 24 1.0 26 1.0
*LOAD COMBINATION 235
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 14 1.0 24 1.0 26 1.0
*LOAD COMBINATION 236
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 15 1.0 24 1.0 26 1.0
*LOAD COMBINATION 237
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 16 1.0 24 1.0 26 1.0
*LOAD COMBINATION 238
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 17 1.0 24 1.0 26 1.0
*LOAD COMBINATION 239
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 18 1.0 24 1.0 26 1.0
*LOAD COMBINATION 240
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 19 1.0 24 1.0 26 1.0
*LOAD COMBINATION 241
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 20 1.0 24 1.0 26 1.0
*LOAD COMBINATION 242
*1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0 21 1.0 24 1.0 26 1.0
** HFL Combination for Base Pressure (Combination 2 )
*LOAD COMBINATION 243
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 13 1.0 23 1.0 25 1.0
*LOAD COMBINATION 244
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 14 1.0 23 1.0 25 1.0
*LOAD COMBINATION 245
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 15 1.0 23 1.0 25 1.0
*LOAD COMBINATION 246
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 16 1.0 23 1.0 25 1.0
*LOAD COMBINATION 247
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 23 1.0 25 1.0
*LOAD COMBINATION 248
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 18 1.0 23 1.0 25 1.0
*LOAD COMBINATION 249
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 19 1.0 23 1.0 25 1.0
*LOAD COMBINATION 250
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 20 1.0 23 1.0 25 1.0
*LOAD COMBINATION 251
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 21 1.0 23 1.0 25 1.0
*LOAD COMBINATION 252
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 13 1.0 24 1.0 26 1.0
*LOAD COMBINATION 253
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 14 1.0 24 1.0 26 1.0
*LOAD COMBINATION 254
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 15 1.0 24 1.0 26 1.0
*LOAD COMBINATION 255
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 16 1.0 24 1.0 26 1.0
*LOAD COMBINATION 256
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 24 1.0 26 1.0
*LOAD COMBINATION 257
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 18 1.0 24 1.0 26 1.0
*LOAD COMBINATION 258
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 19 1.0 24 1.0 26 1.0
*LOAD COMBINATION 259
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 20 1.0 24 1.0 26 1.0
*LOAD COMBINATION 260
*2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 21 1.0 24 1.0 26 1.0
PERFORM ANALYSIS
FINISH
2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 15 1.0 24 1.0 26 1.0
LOAD COMBINATION 255
2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 16 1.0 24 1.0 26 1.0
LOAD COMBINATION 256
2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 24 1.0 26 1.0
LOAD COMBINATION 257
2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 18 1.0 24 1.0 26 1.0
LOAD COMBINATION 258
2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 19 1.0 24 1.0 26 1.0
LOAD COMBINATION 259
2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 20 1.0 24 1.0 26 1.0
LOAD COMBINATION 260
2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 12 1.0 21 1.0 24 1.0 26 1.0
PERFORM ANALYSIS
FINISH
4.0 Partial Safety Factors
Material Parameters
Concrete Refer Table 6.5, IRC:112-2011
Grade = M30
Cube strength of concrete at 28 days fck = 30 MPa
Design value of concrete compressive strength fcd = α fck / γm
Refer cl. 6.4.2.8 of IRC:112-2011 a= 0.67
fctm = 2.5 MPa
For Basic Combination fcd = 13.40 MPa
For Accidental Combination fcd = 16.75 MPa
For Seismic Combination fcd = 13.40 MPa
*For Verification of
Structural Strength 281 923 355 390 - - - 879 662 469 538 131 215 38.6
(Basic Combination)
LC 30 TO 103
*For Verification of
Stress (Rare 199 622 289 271 64.6 64.6 32.3 - - 650 448 312 - - 181 143 22.3
Combination) LC 104
TO 178
*For Verification of
Crack Width (Quasi 146 303 153 64.6 64.6 32.3 - - 650 306 234 - - 181 130 22.3
Permanent
Combination) LC 179
TO 186
*For Verification of
Structural Strength - - - 43.6 87.2 87.2 126 - - - - - - - -
(Basic Combination)
LC 187 TO 224
5.1.1 Verification of structural strength for top slab
0.0035 fcd
Tu = (fyk/γm)*Ast
(fyk/γm)/Es
Ast Strain Diagram Stress Diagram
0.0035 fcd
Tu = (fyk/γm)*Ast
(fyk/γm)/Es
Ast Strain Diagram Stress Diagram
fcd
0.0035 Cu
0.416xu,lim
xu,lim
deff 0.002
Neutral Axis
Tu =
(fyk/γm)*
Ast (fyk/γm)/Es Strain Diagram Ast
Stress Diagram
ULTIMATE LIMIT STATE
Grade of Concrete fck = 30 N/mm2
As per clause 6.4.2.8, IRC:112-2011
fcd = 13.40 N/mm2 Combination (1)
fcd = 16.75 N/mm2 Accidental Combi.
fcd = 13.40 N/mm2 Combination (2)
Ec = 31000 MPa
Grade of steel fY = 500 N/mm2
fYd = 435 N/mm2 Combination (1)
fYd = 500 N/mm2 Accidental Combi.
fYd = 435 N/mm2 Combination (2)
Refer Fig. 6.2 of IRC:112-2011
For steel reinforcement, simplified bilinear diagram is used
Minimum strain in steel reinforcement = 0.87 fy / Es
Es = 2.0E+05 MPa Ec = 31000 MPa
Cu = fcd*b*(3/7xu,lim + 2/3*4/7xu,lim)
= 17/21*fcd*b*xu
= 0.8095 *fcd*b*xu
cg of compression block from top = 0.416 xu
Tu = fyd*Ast
Rlim = Mu,Lim/bd2 = 0.8095fcd*(xu lim/d)*(1-0.416*xu lim/d)
Basic Accidental
Comb Comb Seismic Comb
xu,lim/d 0.62 0.58 0.62
Rlim = Mu,Lim/bd2 4.97 5.99 4.97 Here Rlim is in MPa
Calculation of Reinforcement
Width of section b = 1000 mm
Depth of section D = 1800 mm
Clear cover at bott. = 75 Clear cover at top = 50
Moment on the section Bottom End support Top Mid Span
Combin
Mid Combinati Mid ation
End Support Support on (2) Mid Span Support (2)
Actual moment (KNm) 87.2 87.2 #REF! 43.6 #REF! #REF!
b 1000 1000 1000 1000 1000 1000
D 1800 1800 1800 1800 1800 1800
c 75 75 75 50 50 50
d 1715.0 1705.0 1705.0 1727.5 1727.5 1727.5
fcd 13.40 16.75 13.40 13.40 16.75 13.40
fYd 435 500 435 435 500 435
xu,lim/d 0.62 0.58 0.62 0.62 0.58 0.62
Rsls = Mu,sls/bd2 4.97 5.99 4.97 4.97 5.99 4.97
Mu,Lim (KNm) 14630 17413 14460 14844 17876 14844
OK OK #REF! OK #REF! #REF!
Ast Req. 117 205 #REF! 58 #REF! #REF!
Dia of bar (main tension) (mm) 20 20 20 25 25 25
Spacing (mm) 150 150 150 150 150 150
+ dia of bar (main tension) (mm) 20 20 20 0 0 0
Spacing (mm) 150 150 150 170 170 170
Ast provided (sq mm) 4189 4189 4189 3272 3272 3272
% Steel 0.24 0.19
Dia of bar (main compresion) (mm) 25 25 25 20 20 20
Spacing (mm) 150 150 150 150 150 150
Area of main compresion (mm2) 3272 3272 3272 2094 2094 2094
fctm 2.5 2.5 2.5 2.5 2.5 2.5
fyk 500 500 435 500 500 500
cl. 16.6.1 (2) of IRC :112-2011
AS.min = 0.26 fctm bt d / fyk >= 0.0013 bt d 2230 2217 2549 2246 2246 2246
Act 1632104 1645536 1632104 1668832 1679325 ####
fct,eff 2.9 2.9 2.9 2.9 2.9 2.9
*
kc = 0.4 { 1 - sc / ( k1 fct,eff h/h ) } <= 1 0.4 0.4 0.4 0.4 0.4 0.4
For Bending or bending combined with axial force
k 0.6500 0.6500 0.6500 0.6500 0.6500 0.6500
ss 500 500 435 500 500 500
cl. 12.3.6 (4) of IRC :112-2011
AS.min = kc k fct,eff Act / ss 2461 2481 2830 1762 2532 2517
OK OK OK OK OK OK
As.max = 0.025 Ac (main tension) 45000 45000 45000 45000 45000 45000
cl. 16.5.1.1 (2) of IRC :112-2011 OK OK OK OK OK OK
As.max = 0.04 Ac (tension + compresion) 72000 72000 72000 72000 72000 72000
x (mm) 168 154 168 131 121 131
x/d 0.098 0.091 0.098 0.076 0.070 0.076
OK OK OK OK OK OK
z (mm) 1645 1641 1635 1673 1677 1673
MR (KNm) 2996 3436 2978 2380 2744 2380
OK OK #REF! OK #REF! #REF!
Calculation of Transverse Steel as per Clause 16.6.1.1
AST min = 20% of main reinforcement 492.2 449.2
Dia of bar (Horizontal Bar) (mm) 20 20
Spacing (mm) 150 150
Area of distribution bar (mm2) 2094.4 2094.4
OK OK
Shear on the section Bottom End support
Actual shear VEd (KN) 36.0 #REF! #REF!
Actual shear stress (N/mm2) 0.023 #REF!
Max shear capacity, 0.135 fck(1-fck/310) 3.7 3.7
OK. #REF!
Min shear capacity, 0.0924 fck(1-fck/310) 2.5 2.5
Ɵ = 0.5 x sin-1 (Applied shear stress /
0.135/fck/(1-fck/310))
Min angle of inclination, Ɵ (deg) 21.8 #REF!
cl. 10.3.2(2) Eq. 10.2 of IRC :112-2010
K = 1+Sqrt(200/d) <= 2.0 1.341 1.342 1.342
cl. 10.3.2(2) Eq. 10.3 of IRC :112-2010
nmin = 0.031 K3/2 fck1/2 0.264 0.264 0.264
cl. 10.3.1 of IRC :112-2011
r1 = Asl/(bw d) <= 0.02 0.002 0.002 0.002
OK OK OK
0.12 K (80 r1 fck)0.33 0.289 0.289 0.289
Axial compressive force NEd (KN) 0 0 0
scp = NEd / Ac <= 0.2 fcd 0.0 0.0 0.0
cl. 10.3.2(2) Eq. 10.1 of IRC :112-2010
0.0035 fcd
Tu = (fyk/γm)*Ast
(fyk/γm)/Es
Ast Strain Diagram Stress Diagram
0.0035 fcd
Tu = (fyk/γm)*Ast
(fyk/γm)/Es
Ast Strain Diagram Stress Diagram
0.0035 fcd
Tu = (fyk/γm)*Ast
(fyk/γm)/Es
Ast Strain Diagram Stress Diagram
0.0035 fcd
Tu = (fyk/γm)*Ast
(fyk/γm)/Es
Ast Strain Diagram Stress Diagram
0.0035 fcd
Tu = (fyk/γm)*Ast
(fyk/γm)/Es
Ast Strain Diagram Stress Diagram
RECTANGULAR PART
a = 1.000
ka = 0.297
g = 1.8 t/m3
b = 10.708
(SHt)
Q1=ka*g*SHt Q2=ka*g*b
Dia of links 16 16
Spacing of links 300 300
z = 0.9*d mm 645 645
cotθ 2.50 2.50
Shear Capacity of steel reinf= Asw/s*z*fywd*cotθ VRd.s t 54.06 54.06
Check No Shear Reinf. No Shear Reinf.
d
Diameter of bars provided = 25 mm
No. of bars provided = 24 Nos.
Percentage of stee, p = 1.042
So, p/fck = 0.030
d'/D = 0.073
Now for case 1, Pile No. 1
Pu/fck.D2 = 0.039
The depth of fixity of pile is determined using plots given IS:2911 2014
Where
T = (E I / K 1 ) 1/5
E = Young's modulus of the pile in kg/m2
I = Moment of inertia of the pile in cm4
K1 are the constants given in table 2 & 3 of IS:2911
T= 351 cm
L1 = 0 m
L1/T = 0.00
For Fixed Head Piles in Preloaded Clays, from Fig.2 of Append.C
Lf/T = 2.2
Lf = 5.14 m
The fixed end moment of the eq. Cantilever = Q(L1+Lf)*0.5*m for fixed head pile