Ad-19.1-Ac-650100-Sht-002-03 Ground Floor Chilled Water Layout
Ad-19.1-Ac-650100-Sht-002-03 Ground Floor Chilled Water Layout
M
A B B' B'' C C' D D' E F G H
Ø20 CHWS/R PIPES F/A Ø20 CHWS/R PIPES F/A
0.244 L/s 0.192 L/s
1
FCU-GR-41
FCU-GR-12 FCU-GR-13 FCU-GR-14 FCU-GR-15 FCU-GR-16 FCU-GR-17 FCU-GR-18 FCU-GR-19 BOU: 3200
FCU-GR-20 FCU-GR-21 Main Telecom Room
BOU: 3200 BOU: Dr.
3200
Office BOU: 3200 BOU: 3200 BOU: 3200 BOU: 3200 BOU: 3200 BOU: 3200
Ø20 CHWS/R
BOU: 3200 BOU: 3200 GFL.MEP.04 Medical Gas Cylinder
GFL.OUT.21
Consult Exam/ Cardiac Consult/ Family medicine Consult Exam/ Internal Medicine GFL.MEP.03
BOP:3300
Ø20 CHWS/R Consult Exam/ Occup Medicine
0.048 L/s
Opthalmology Office-1
VP
0.244 L/s GFL.OUT.22 GFL.OUT.23 GFL.OUT.05 Consult Exam/ General Surgery
BOP:3300
Dental Surgery
GFL.OUT.20 Ø20 CHWS/R
GFL.OUT.24 Consult Exam/ General Medicine
GFL.OUT.04 GFL.OUT.03
GFL.OUT.02 GFL.OUT.06
BMS/ Control
KEY PLAN
Toilet
Ø20 CHWS/R 0.048 L/s Ø20 CHWS/R Ø20 CHWS/R GFL.MEP.08
FCU-GR-11 0.048 L/s BOP:3400 0.048 L/s 0.045 L/s
GFL.OUT.25
VP BOP:3400 BOP:3400 BOP:3300
BOU: 3200 VP VP VP VP
VP VP VP VP VP Ø20 CHWS/R
Dental Surgery 0.048 L/s
GFL.OUT.19 Ø20 CHWS/R BOP:3300 Office Team Leader
Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R GFL.OUT.08 Medical Plant
Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R 0.144 L/s 0.096 L/s 0.048 L/s 0.048 L/s 0.048 L/s
0.129 L/s 0.115 L/s Ø20 CHWS/R GFL.MEP.01
0.048 L/s BOP:3300 BOP:3300 BOP:3300 BOP:3300 BOP:3300 FCU-GR-30 0.141 L/s
BOP:3300 BOP:3400 BOP:3400 Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R FCU-GR-22 Ø20 CHWS/R PIPES F/A
BOU: 3200 BOP:3200
0.205 L/s
N
0.048 L/s 0.048 L/s 0.096 L/s 0.144 L/s BOU: 3200
BOP:3300 BOP:3400 BOP:3300 BOP:3200
Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R
FCU-GR-28 PIPES F/A Files Toilet
FCU-GR-42
0.048 L/s 0.073 L/s BOU: 3200
BOP:3300 BOP:3300 BOU: 3200 0.144 L/s Ø20 CHWS/R Toilet GFL.OUT.13 GFL.OUT.31
Dental Plant VP
Store FCU-GR-32 0.048 L/s GFL.OUT.41
GFL.OUT.17
FCU-GR-10 GFL.OUT.28
VP BOU: 3200
ECHO
GFL.OUT.12
VP
Vision Test VP
Ø20 CHWS/R
0.288 L/s BOP:3300 VP VP
Bulk Store (Inpatient)
NOTES :
ECG Cubicle Ø20 CHWS/R
BOU: 3200 Stress ECG
GFL.OUT.32 BOP:3200 Pulmonary Test
GFL.INP.01
GFL.OUT.33
GFL.OUT.30 FCU-GR-33 FCU-GR-35 GFL.OUT.10 0.060 L/s Ø20 CHWS/R 22.8 m² FCU-GR-44 1. ALL DIMENSIONS ARE IN MM AND ALL LEVELS ARE IN MM
VP BOP:3300
2 VP BOU: 3200 FCU-GR-34
BOU: 3200
BOU: 3200
FCU-GR-39 Ø25
Toilet
CHWS/R
GFL.OUT.42
0.096 L/s
BOP:3200
Ø20 CHWS/R Ø20 CHWS/R
BOU: 3200
UNLESS OTHERWISE NOTED.
Ø20 CHWS/R VP Ø20 CHWS/R PIPES F/A PIPES F/A 0.048 L/s
Cold Store 0.157 L/s
Ø20 CHWS/R 0.121 L/s Ø25 CHWS/R PIPES F/A BOU: 3200 VP BOP:3300
Hand wash Bay
BOP:3300 VP GFL.INP.05
0.048 L/s Dental Sterile 0.048 L/s 0.544 L/s 0.297 L/s GFL.INP.04 2. DO NOT SCALE FROM THIS DRAWING.
BOP:3200
BOP:3300 GFL.OUT.29 Ø20 CHWS/R Ø25 CHWS/R ENT Ø20 CHWS/R
Office Ø20 CHWS/R 0.048 L/s Ø20 CHWS/R
FCU-GR-09 GFL.OUT.16 0.169 L/s Nurse Station
BOP:3400
FCU-GR-36 FCU-GR-37 0.544 L/s
FCU-GR-40 0.237 L/s GFL.OUT.01
FCU-GR-23
0.073 L/s 3. FOLLOW THE WRITTEN DIMENSIONS
GFL.OUT.35 BOU: 3200 BOU: 3200 BOP:3100 Audiology Test BOP:3300 Air Lock Mortuary
BOU: 3200 BOP:3200 BOP:3100
VP Vital Sign Vaccination Vital Sign Ø20 CHWS/R GFL.OUT.09 BOU: 3200 Dirty Utility BOU: 3200 GFL.MRG.02 GFL.MRG.01
Ø20 CHWS/R PIPES F/A GFL.OUT.11 GFL.OUT.39 GFL.OUT.34 0.256 L/s GFL.OUT.36 Office
0.29 L/s FCU-GR-31 VP Ø20 CHWS/R FCU-GR-38 VP Ø20 CHWS/R GFL.INP.03
VP BOP:3200 0.048 L/s
BOU: 3200 0.048 L/s BOU: 3200 VP
VP BOP:3400 BOP:3300 Goods Receiving
Ø20 CHWS/R GFL.INP.02
0.121 L/s VP Corridor
BOP:3300 Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R Ø20 CHWS/R GFL.RST.02
0.048 L/s 0.096 L/s 0.048 L/s 0.048 L/s 0.048 L/s 0.048 L/s
BOP:3300 BOP:3300 Ø20 CHWS/R BOP:3300 BOP:3300
Ø20 CHWS/R BOP:3200 Ø20 CHWS/R 0.048 L/s BOP:3200 Ø20 CHWS/R PIPES F/A
0.048 L/s Ø20 CHWS/R BOP:3300 Ø20 CHWS/R
0.073 L/s
Dental Treatment 0.048 L/s 0.115 L/s 0.188 L/s
GFL.OUT.18 BOP:3300 BOP:3400
BOP:3300 BOP:3200
Ø20 CHWS/R Cahier
FCU-GR-08 0.115 L/s Ø20 CHWS/R
Dispensing Counter
AS-BUILT
BOP:3300 VP
W.Chair Bay
GFL.ENT.15 FCU-GR-01
Ø20 CHWS/R ADA Toilet
BOU: 3200 0.057 L/s GFL.EME.46 FCU-GR-56 Aviation Coordinator Office
Clean Lift BOP:3400 BOU: 3200 Clean up GFL.EME.21
GFL.ELV.03 GFL.EME.29
VP
Main Lobby
Air Lock GFL.PUB.01
GFL.ENT.04 FCU-GR-45
Scrub-up Minor OR-1
Ø20 CHWS/R BOU: 3200 Recovery Nurse Station Corridor GFL.EME.28
Public Lift GFL.EME.30
0.032 L/s GFL.EME.19 GFL.EME.69 GFL.EME.67
BOP:3200 GFL.ELV.02
Ø200 U.G. CHWS/R HDPE PIPE
Sterile Lobby 59.97 L/s (BOP -1780mm FROM FFL)
Patient Lift GFL.EME.59 REFERENCE SHOP DRAWING : DISCIPANCY/ADJUST DRWGS :
GFL.ELV.01 Corridor IPS Sterile Store Mech. Riser
GFL.RST.03
CPR Bay
GFL.MEP.17 GFL.EME.20 GFL.MEP.23
AD-19.1-M-275121-SHT-003
FCU-GR-05 46.4 m²
BOU: 3200
GFL.EME.61 FOR CONTINUATION REFER TO
DRAWING NO : AD-19.1-AC-650000-SHT-001
4700016709-SD-A-00401
Office
GFL.ENT.18
ATM Prep / Holding Bay Anesth. Store Ø200 CARBON STEEL CHWS/R
GFL.ENT.19 GFL.EME.71 GFL.EME.65
REF. CONTRACT DRAWING :
Cashier PIPE 59.97 L/s T/A , F/B
VP Semi Restricted Corridor
Reception
GFL.ENT.08
GFL.EME.66 AD227-104-0-A-30018
GFL.ENT.03
AD227-104-0-AC-30101
5 IPS
GFL.MEP.27
Files Cabinet
ADA Toilet
GFL.IMG.15
GFL.EME.14
CONTRACTORS REPRESENTATIVES DATE INITIALS
Anesthesia Work Room
Staff Change(M) Staff Change (F)
GFL.EME.70
GFL.EME.55 GFL.EME.54
Reception
Major Cubicle-1 Major Cubicle-2 Procedure Room Dirty Utility PROJECT TECH. COORDINATOR
GFL.EME.11 GFL.EME.43 GFL.EME.13 GFL.EME.45
GFL.IMG.18 Clean Utility
Waiting (M)
GFL.IMG.17 GFL.EME.15
Ø20 CHWS/R PIPES F/A MEP COORDINATOR
Ante Room
ISO
0.160 L/s
GFL.EME.16
GFL.EME.10
General Store SR ARCH./ENGR.
Waiting GFL.EME.58 UP
Clean Service Lift
GFL.EME.09
GFL.ELV.05
Stair CIVIL/ST.ENGR.
GFL.STR.03
Clean Utility
GFL.IMG.14
PROJECT:
Waiting (F)
GFL.IMG.16
Corridor DAS ISLAND RESIDENTIAL DEVELOPMENT
GFL.EME.24 Ø20 CHWS/R
Minor Cubicle-2 0.160 L/s CONSTRUCTION OF DAS NEW HOSPITAL
GFL.EME.03 BOP:3300
Linen Bay
GFL.EME.68
Corridor REVIEW STATUS A B C D
CPR Bay
Nurse Station -1 Store GFL.RST.04
GFL.EME.32
ADA Toilet GFL.EME.08 GFL.EME.57
GFL.IMG.12
DATE REVIEWED
6 REVIEWED BY
Changing
Consult 1 Consult 2 Treatment Room GFL.DEC.05
Dirty Utility Minor Cubicle-1 Consult 3 / Psychiatry Clinic Meeting Room IN NO C AS E S HALL A P PR OV A L AC CEP TANC E BY THE C OM P ANY B E
GFL.EME.04 GFL.EME.49 GFL.EME.51 GFL.EME.27 VP Office
GFL.IMG.06 GFL.EME.50 GFL.EME.56 IDF Room
Minor Cubicle-3 GFL.EME.64
Office GFL.EME.05
Medication GFL.MEP.07 Contamination Suits INTERPRETED AS RELEASING CONTRACTOR FROM HIS RESPONSIBILITIES
GFL.EME.12 GFL.DEC.04
GFL.IMG.23
FCU-GR-46 TO FULFILL ALL REQUIREMENT OF THE CONTRACT DOCUMENT.
Toilet
BOU: 3200
Control Room Mobile EQ.
GFL.DEC.09
DTF NO. -- DATE : 06.03.2023
GFL.IMG.09 GFL.IMG.11
8 CABLE BRACE
VIBRATION ISOLATOR
HDP (OVERSEAS) Ltd. P.O.BOX:47037 ABU
HANGER ROD DHABI, UAE, Tel: +971 26420033
MEP CONSULTANT:
TO DRAIN
CONTRACTOR :
DRAINAGE PIPE WITH
INSULATION
FORCE 1O UAE L.L.C.
P.O. Box - 29998, Abu Dhabi,
Tel : 971 2 6762121 - Fax : 971 2 6762122
Web: www.force10.ae,Email: [email protected]
HOSE WITH CLAMP
GROUND FLOOR
CHILLED WATER LAYOUT
DRAWN BY : JOB NO: DATE:
GTJ 10332 08-12-2024
CHECKED BY: SCALE: SHEET SIZE:
MK 1:150 A1
PROJECT NO: PACKAGE NO: SHOP DRAWING NO: REV:
4700016709 AD-19.1-M-650100-SHT-002 00