AD-19.1-M-650002-SHT-002 - Rev 02 First Floor Storm Water Layout-First Floor Plan - Storm Water Layout
AD-19.1-M-650002-SHT-002 - Rev 02 First Floor Storm Water Layout-First Floor Plan - Storm Water Layout
Expansion
M
A B B' B'' C C' D D' E F G H
GATE
W-03
Eq. Bay
1
Waste L01.PAT.31
N
N
N
N
N
L01.QUA.14
N
N
Ensuite Dirty Utility
L01.QUA.02 L01.QUA.13 Ø110 RWP-FA/TB
ROOF Ensuite
L01.PAT.17
T.O.P 7.850 m RWP-TB
RWP-TB
Isolation-1
Eq. Bay L01.PAT.18
L01.QUA.15
Ante Room
L01.PAT.24
SLOPE 2.5% 9
Quarantine Isolation Room-1 Surgical Two Bed RM-1 RWO SLOPE 2.5% SLOPE 2.5% KEY PLAN
L01.QUA.04 L01.PAT.01 Surgical Two Bed RM-2 Surgical Two Bed RM-3 Medical Two Bed RM-5
RWO
Surgical Two Bed RM-4 Medical Two Bed RM-6 Medical Two Bed RM-7 HDU Two Bed RM-8
Ante Room L01.PAT.02 L01.PAT.03 L01.PAT.04 L01.PAT.05 L01.PAT.06 L01.PAT.07
L01.QUA.07 L01.PAT.08
SLO
PE 2
SLOPE 2.5%
.5%
10
%
Medical Single
RIDGE
2.5
Ante Room Clean Utility L01.PAT.19
Quarantine Isolation Room-2 L01.QUA.12
L01.QUA.08 Ensuite
N
E
L01.QUA.05
L01.PAT.25
OP
SLO
SL
Ensuite
PE 2
L01.PAT.09 Ensuite
Ensuite Ensuite
L01.PAT.33
Ensuite Ensuite Ensuite L01.PAT.12 Ensuite
2 NOTES :
.5%
L01.PAT.14 L01.PAT.37 L01.PAT.10 L01.PAT.11 L01.PAT.13
.5%
RIDGE
PE 2
RIDGE
Ensuite Med. 1. ALL DIMENSIONS ARE IN MM AND ALL LEVELS ARE IN MM
Corridor L01.QUA.11
L01.QUA.01 L01.QUA.16 Ensuite
SLO
Corridor
L01.PUB.06
L01.PAT.26
HDU Single
L01.PAT.20 Roof 11 2.
UNLESS OTHERWISE NOTED.
DO NOT SCALE FROM THIS DRAWING.
Pantry Ø110 RWP-FA/TB Corridor
L01.PAT.35 L01.PAT.38
Ø110 RWP-FA/TB 3. FOLLOW THE WRITTEN DIMENSIONS.
SLOPE 2.5%
RIDGE
RIDGE
SLOP
Ante Room Nurse Station Wheel CH Bay
2.5%
L01.QUA.09 L01.QUA.10 L01.QUA.17
PE
SLO
E
Wheel Chair / Eq. Bay CPR Bay Ante Room 5.750 m
Quarantine Isolation Room-3 Janitor Shaft L01.PAT.36 L01.PAT.34
2.5%
L01.PAT.32 L01.MEP.07 L01.PAT.23 Isolation-2
L01.QUA.06
L01.PAT.21
IDF
L01.MEP.01 Dirty Utility
ELEC.
L01.MEP.05 L01.PAT.16
Nurse Station Eq.Store
L01.PAT.15 Clean Utility/ MED. L01.PAT.29
D1
Ensuite
L01.QUA.03
Corridor
Trolley Bay
L01.PAT.27
L01.PAT.28 Ensuite
L01.PAT.22 12
%
DA14458
.5
Waste
L01.PAT.30 RWO SSL 5.550 m
SLOPE 2
File Cabinet
T.O.P 7.850 m T.O.P 7.850 m
CO L01.SUP.01
Bay.
L01.PAT.39
Toi.
3 13
SLOPE 2.5% L01.OCR.04 T.O.P 7.850 m
Ø110 RWP-TB
RWO SL Corridor
Corridor
L01.RST.06
OP Toi. L01.PUB.03 On Call T.O.P 7.850 m
RIDGE
L01.OCR.02 L01.OCR.03
E RWP-TB
Decontamination
RWO
L01.CSD.03
RWO
AS-BUILT
Dirty Service Lift
On Call
L01.OCR.01
L01.ELV.04 SLOPE 2.5%
Stair
RAIN WATER OUTLET PIPES Ø110 RWP-T/B
L01.STR.02
25.1 m² Chemical Store
L01.CSD.02
EQ. Store
L01.STO.01 14
(RWP) ARE TERMINATED AT CONCEALED T.O.P 7.850 m
RWP-TB
CANOPY 150mm ABOVE FLOOR LEVEL INSIDE WALL Corridor
Staff CH.
L01.CSD.04 RWP-TB T.O.P 7.850 m
SL Reception
L01.CSD.21
H.K Store
O
SLOPE 2.5%
PE L01.VSP.05 L01.HOK.02
2.5
%
Shaft
L01.MEP.08
Office
L01.CSD.05
Dish Wash
L01.CAT.05
Cart Wash
L01.CAT.06
J K L M N P Q R
Store
L01.STO.02
Ø110 RWP-FA
Janitor
L01.CSD.22
H.K Staff Room
L01.HOK.01
Corridor
L01.CAT.09 General Store
L01.CAT.08
4 Roof Floor Plan - Ancillary Building - Storm Water Layout
Clean Lift
L01.ELV.03
Corridor
L01.RST.01 Assembly Packing Area
Trolley Wash
L01.CSD.06
1A 1 : 150
L01.CSD.13 Staff. CH. Linen Soiled Holding
Lift Lobby L01.CSD.14 L01.LIN.01
L01.PUB.01 Supervisor office
L01.CAT.10
Air Lock
L01.PUB.04
Server Room
L01.CSD.07 L01.CSD.01
L01.LIN.02
Receiving/ Dispatch STONE BALLAST
L01.MEP.02
Sterile Store
L01.CSD.09
L01.CAT.04
RWO RAIN WATER OUTLET AD227-104-0-SW-30503
.5%
Dispatch
E2
L01.CSD.08
ROOF FINISHES TO H/L HIGH LEVEL
OP INSULATION
SL
UPS Room CONTRACTORS REPRESENTATIVES DATE INITIALS
L01.MEP.04 ARCHITECT'S DETAILS
Waiting (F) L/L LOW LEVEL
L01.VSP.04
PROJECT TECH. COORDINATOR
Supervisor Office
DN
MEMBRANE TA TO ABOVE
L01.LIN.04
Elec.
Store
MEP COORDINATOR
L01.MEP.06 Clean Service Lift Stair
L01.STO.04 L01.ELV.05 L01.STR.03
8.8 m² 22.2 m² FA FROM ABOVE SR ARCH./ENGR.
DRAIN BODY GROUTED
PE
Cafe Store
L01.VSP.02 L01.STO.03
110∅ RWP TB TO BELOW CIVIL/ST.ENGR.
LO IN ROOF SLAB
S ADA Toilet
PROJECT:
L01.VSP.06 TA TO ABOVE
Staff Change (F) Corridor Corridor
DAS ISLAND RESIDENTIAL DEVELOPMENT
Ø110 RWP-TB RWO L01.SUP.02 L01.RST.04 L01.RST.03 CO CLEAN OUT CONSTRUCTION OF DAS NEW HOSPITAL
SLOPE 2.5% 11O∅RWP
Toilet (F)
L01.VSP.07
6 GROUND FLOOR
REVIEW STATUS A B C D
DATE REVIEWED
IDF Room TO BE CONNECT TO THE
Clean Utitlity L01.MEP.10
N
Dirty Utility
L01.PHS.03
L01.PHS.04 Pantry
L01.SUP.04
General Workshop
STORM WATER NETWORK REVIEWED BY
Consult / Exam
Cubicles-1 L01.PHS.02 L01.WRK.03 Biomedical Workshop
L01.PHS.01 L01.WRK.02 IN NO C AS E S HALL A P PR OV A L AC CEP TANC E BY THE C OM P ANY B E
Toilet (M)
Medical Record L01.VSP.08
L01.REC.01 LECTURE ROOM INTERPRETED AS RELEASING CONTRACTOR FROM HIS RESPONSIBILITIES
L01.LEC.01
Waiting (M) TO FULFILL ALL REQUIREMENT OF THE CONTRACT DOCUMENT.
L01.PHS.13
Workstation
7 01 10/02/23 FOR APPROVAL ANWR EL
Coridor
11O∅ RAIN WATER 11O∅ RAIN WATER REVISIONS
Exercise Hall Linen Bay L01.ADM.04
L01.PHS.07 L01.PHS.08 ER. shower Bay
ADA Toilet
L01.LAB.18
OUTLET(RWO) TYPE-SIDE OUTLET(RWO) TYPE-SIDE COMPANY:
N
Toilet (F)
L01.PHS.16 L01.PHS.14 LAB General
Ø110 RWP-FA/TB
N
L01.LAB.17
SHAFT
Equipment Store Toilet (M) ADA Toilet Specimen Collection (M) Disposal Store File hematology
L01.PHS.09 L01.PHS.15 Waiting (F) L01.LAB.05 L01.LAB.13 L01.LAB.14
L01.PHS.17 L01.LAB.03 CEO
Toilet Office L01.ADM.02
Ø110 RWP-FA/TB Waiting (M) L01.LAB.19 L01.LAB.06 Abu Dhabi National Oil Company
L01.LAB.04
F
MAIN CONSULTANT:
DISCHARGE OUTLET(RWO) DOME TYPE PIPE-F/A RUNNING RUNNING THROUGH THE WALL
150
TOP ROOF
SHAFT
DISCHARGE THROUGH THE WALL (INSIDE THE SHAFT)
+11.250 SSL
SLOPE 2.5%
ROOF
+10.10 FFL
SLOPE
800x300 CONTRACTOR :
4700016709 AD-19.1-M-650002-SHT-002 02