AD-19.1-M-650002-SHT-002 - Rev 02 First Floor Storm Water Layout-First Floor Plan - Storm Water Layout

The document appears to be a detailed architectural plan for a healthcare facility, outlining various rooms and their functions, including surgical rooms, quarantine isolation rooms, and utility areas. It includes specifications for drainage systems, slopes, and dimensions, indicating a focus on both functionality and compliance with health regulations. Additionally, it contains notes on construction standards and references to other drawings for further details.

Uploaded by

imnoor1708
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views1 page

AD-19.1-M-650002-SHT-002 - Rev 02 First Floor Storm Water Layout-First Floor Plan - Storm Water Layout

The document appears to be a detailed architectural plan for a healthcare facility, outlining various rooms and their functions, including surgical rooms, quarantine isolation rooms, and utility areas. It includes specifications for drainage systems, slopes, and dimensions, indicating a focus on both functionality and compliance with health regulations. Additionally, it contains notes on construction standards and references to other drawings for further details.

Uploaded by

imnoor1708
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

N

Expansion

M
A B B' B'' C C' D D' E F G H

GATE
W-03

Eq. Bay
1
Waste L01.PAT.31

N
N

N
N

N
L01.QUA.14

N
N
Ensuite Dirty Utility
L01.QUA.02 L01.QUA.13 Ø110 RWP-FA/TB
ROOF Ensuite
L01.PAT.17
T.O.P 7.850 m RWP-TB
RWP-TB
Isolation-1
Eq. Bay L01.PAT.18
L01.QUA.15
Ante Room
L01.PAT.24
SLOPE 2.5% 9
Quarantine Isolation Room-1 Surgical Two Bed RM-1 RWO SLOPE 2.5% SLOPE 2.5% KEY PLAN
L01.QUA.04 L01.PAT.01 Surgical Two Bed RM-2 Surgical Two Bed RM-3 Medical Two Bed RM-5
RWO
Surgical Two Bed RM-4 Medical Two Bed RM-6 Medical Two Bed RM-7 HDU Two Bed RM-8
Ante Room L01.PAT.02 L01.PAT.03 L01.PAT.04 L01.PAT.05 L01.PAT.06 L01.PAT.07
L01.QUA.07 L01.PAT.08

SLO
PE 2

SLOPE 2.5%
.5%
10

%
Medical Single

RIDGE

2.5
Ante Room Clean Utility L01.PAT.19
Quarantine Isolation Room-2 L01.QUA.12
L01.QUA.08 Ensuite

N
E
L01.QUA.05
L01.PAT.25

OP

SLO
SL
Ensuite

PE 2
L01.PAT.09 Ensuite
Ensuite Ensuite
L01.PAT.33
Ensuite Ensuite Ensuite L01.PAT.12 Ensuite
2 NOTES :

.5%
L01.PAT.14 L01.PAT.37 L01.PAT.10 L01.PAT.11 L01.PAT.13

.5%
RIDGE

PE 2

RIDGE
Ensuite Med. 1. ALL DIMENSIONS ARE IN MM AND ALL LEVELS ARE IN MM
Corridor L01.QUA.11
L01.QUA.01 L01.QUA.16 Ensuite

SLO
Corridor
L01.PUB.06
L01.PAT.26
HDU Single
L01.PAT.20 Roof 11 2.
UNLESS OTHERWISE NOTED.
DO NOT SCALE FROM THIS DRAWING.
Pantry Ø110 RWP-FA/TB Corridor
L01.PAT.35 L01.PAT.38
Ø110 RWP-FA/TB 3. FOLLOW THE WRITTEN DIMENSIONS.

SLOPE 2.5%
RIDGE

RIDGE

SLOP
Ante Room Nurse Station Wheel CH Bay
2.5%
L01.QUA.09 L01.QUA.10 L01.QUA.17
PE
SLO

E
Wheel Chair / Eq. Bay CPR Bay Ante Room 5.750 m
Quarantine Isolation Room-3 Janitor Shaft L01.PAT.36 L01.PAT.34

2.5%
L01.PAT.32 L01.MEP.07 L01.PAT.23 Isolation-2
L01.QUA.06
L01.PAT.21
IDF
L01.MEP.01 Dirty Utility
ELEC.
L01.MEP.05 L01.PAT.16
Nurse Station Eq.Store
L01.PAT.15 Clean Utility/ MED. L01.PAT.29

D1
Ensuite
L01.QUA.03
Corridor
Trolley Bay
L01.PAT.27
L01.PAT.28 Ensuite
L01.PAT.22 12

%
DA14458

Ø110 - RWP L01.PUB.02

.5
Waste
L01.PAT.30 RWO SSL 5.550 m

SLOPE 2
File Cabinet
T.O.P 7.850 m T.O.P 7.850 m
CO L01.SUP.01
Bay.
L01.PAT.39

Toi.
3 13
SLOPE 2.5% L01.OCR.04 T.O.P 7.850 m
Ø110 RWP-TB
RWO SL Corridor
Corridor
L01.RST.06
OP Toi. L01.PUB.03 On Call T.O.P 7.850 m

RIDGE
L01.OCR.02 L01.OCR.03
E RWP-TB

Decontamination

RWO
L01.CSD.03

RWO

AS-BUILT
Dirty Service Lift
On Call
L01.OCR.01
L01.ELV.04 SLOPE 2.5%
Stair
RAIN WATER OUTLET PIPES Ø110 RWP-T/B
L01.STR.02
25.1 m² Chemical Store
L01.CSD.02
EQ. Store
L01.STO.01 14
(RWP) ARE TERMINATED AT CONCEALED T.O.P 7.850 m
RWP-TB
CANOPY 150mm ABOVE FLOOR LEVEL INSIDE WALL Corridor
Staff CH.
L01.CSD.04 RWP-TB T.O.P 7.850 m
SL Reception
L01.CSD.21
H.K Store
O
SLOPE 2.5%

PE L01.VSP.05 L01.HOK.02
2.5
%
Shaft
L01.MEP.08
Office
L01.CSD.05
Dish Wash
L01.CAT.05
Cart Wash
L01.CAT.06
J K L M N P Q R
Store
L01.STO.02
Ø110 RWP-FA
Janitor
L01.CSD.22
H.K Staff Room
L01.HOK.01
Corridor
L01.CAT.09 General Store
L01.CAT.08
4 Roof Floor Plan - Ancillary Building - Storm Water Layout
Clean Lift
L01.ELV.03
Corridor
L01.RST.01 Assembly Packing Area
Trolley Wash
L01.CSD.06
1A 1 : 150
L01.CSD.13 Staff. CH. Linen Soiled Holding
Lift Lobby L01.CSD.14 L01.LIN.01
L01.PUB.01 Supervisor office
L01.CAT.10
Air Lock
L01.PUB.04

RIDGE RIDGE Lift


L01.ELV.01 ?
Airlock
L01.CSD.12 Corridor
15.6 m² Patients Lift L01.CSD.19 Ø110 RWP-FA/TB
L01.ELV.02
CORE & SHELL
SPACE
8.9 m² Regeneration
L01.CAT.03
Clean Store Cart
ROOF WATER OULET(RWO) STORM WATER LEGEND
L01.CAT.02
Wheel Chair Bay REFERENCE SHOP DRAWING : DISCIPANCY/ADJUST DRWGS :
L01.RST.02 Corridor Cart Wash
L01.LIN.03 DOME TYPE AD-19.1-M-275121-SHT-003
Store Non-sterile L01.CSD.17
Staff CH. SYMBOL & ABBREVIATION DESCRIPTION
L01.CSD.11 L01.CSD.15 SEALING FOR WATER PROOF JOIN
AirLock Stair
Service Corridor L01.CSD.10 L01.STR.03 SHALL BE AS PER APPROVED RAIN WATER PIPE
Waiting (M) L01.RST.05
CANOPY L01.VSP.03 Corridor
L01.RST.03
CIVIL STRUCTURAL REQUIREMENTS REF. CONTRACT DRAWING :
Outdoor Seating Area
L01.VSP.09
Corridor
L01.RST.04
Trolley Bay Cleaners
Clean Linen
5 SLOPE 2:100 SLOPE 2:100
FCO FLOOR CLEAN OUT
AD227-104-0-A-30033
SLOPE 2.5%

Server Room
L01.CSD.07 L01.CSD.01
L01.LIN.02
Receiving/ Dispatch STONE BALLAST
L01.MEP.02
Sterile Store
L01.CSD.09
L01.CAT.04
RWO RAIN WATER OUTLET AD227-104-0-SW-30503
.5%
Dispatch

E2
L01.CSD.08
ROOF FINISHES TO H/L HIGH LEVEL
OP INSULATION
SL
UPS Room CONTRACTORS REPRESENTATIVES DATE INITIALS
L01.MEP.04 ARCHITECT'S DETAILS
Waiting (F) L/L LOW LEVEL
L01.VSP.04
PROJECT TECH. COORDINATOR
Supervisor Office
DN
MEMBRANE TA TO ABOVE
L01.LIN.04
Elec.
Store
MEP COORDINATOR
L01.MEP.06 Clean Service Lift Stair
L01.STO.04 L01.ELV.05 L01.STR.03
8.8 m² 22.2 m² FA FROM ABOVE SR ARCH./ENGR.
DRAIN BODY GROUTED
PE
Cafe Store
L01.VSP.02 L01.STO.03
110∅ RWP TB TO BELOW CIVIL/ST.ENGR.
LO IN ROOF SLAB
S ADA Toilet
PROJECT:
L01.VSP.06 TA TO ABOVE
Staff Change (F) Corridor Corridor
DAS ISLAND RESIDENTIAL DEVELOPMENT
Ø110 RWP-TB RWO L01.SUP.02 L01.RST.04 L01.RST.03 CO CLEAN OUT CONSTRUCTION OF DAS NEW HOSPITAL
SLOPE 2.5% 11O∅RWP
Toilet (F)
L01.VSP.07
6 GROUND FLOOR
REVIEW STATUS A B C D

DATE REVIEWED
IDF Room TO BE CONNECT TO THE
Clean Utitlity L01.MEP.10
N

Dirty Utility
L01.PHS.03
L01.PHS.04 Pantry
L01.SUP.04
General Workshop
STORM WATER NETWORK REVIEWED BY
Consult / Exam
Cubicles-1 L01.PHS.02 L01.WRK.03 Biomedical Workshop
L01.PHS.01 L01.WRK.02 IN NO C AS E S HALL A P PR OV A L AC CEP TANC E BY THE C OM P ANY B E
Toilet (M)
Medical Record L01.VSP.08
L01.REC.01 LECTURE ROOM INTERPRETED AS RELEASING CONTRACTOR FROM HIS RESPONSIBILITIES
L01.LEC.01
Waiting (M) TO FULFILL ALL REQUIREMENT OF THE CONTRACT DOCUMENT.
L01.PHS.13

Staff Change (M) DTF NO. -- DATE : 10.01.2023


L01.SUP.03 ELEC.
R.O. Room Pantry L01.MEP.03
ADA Toilet L01.LAB.11 PREVIOUS DTF NO. DATE :
L01.VSP.01
Reception
L01.PHS.12
APPROVAL STATUS
Ø110 RWP-FA/TB
N

Cubicles-2 Cubicles-3 Corridor


L01.PHS.05 L01.PHS.06 L01.PHS.18
Corridor
L01.PUB.05 02 21/06/24 FOR APPROVAL GTJ MK

Workstation
7 01 10/02/23 FOR APPROVAL ANWR EL

Shaft Cool Room L01.ADM.03 00 12/01/23 FOR APPROVAL ANWR EL


Toilet L01.LAB.12
Janitor L01.LAB.07
L01.SUP.06 Specimen Collection(F)
Waiting (F) L01.LAB.09 Blood Bank Store Photocopy NO DATE DESCRIPTION DRAWN CHKD
Janitor
L01.PHS.10
L01.PHS.11 Reception
L01.LAB.02 ADA Toilet
L01.LAB.08
Specimen Reception
L01.LAB.10
L01.LAB.21
urine
L01.ADM.06

Coridor
11O∅ RAIN WATER 11O∅ RAIN WATER REVISIONS
Exercise Hall Linen Bay L01.ADM.04
L01.PHS.07 L01.PHS.08 ER. shower Bay

ADA Toilet
L01.LAB.18
OUTLET(RWO) TYPE-SIDE OUTLET(RWO) TYPE-SIDE COMPANY:
N

Toilet (F)
L01.PHS.16 L01.PHS.14 LAB General
Ø110 RWP-FA/TB
N

Bay. Corridor L01.LAB.15


Stair
L01.STR.01
L01.LAB.01 L01.LAB.16
Corridor
40.7 m² Pantry
L01.ADM.05 DISCHARGE DISCHARGE
D1

L01.LAB.17

ID09010 ROOF ROOF


Meeting +10.100 SSL +10.100 SSL
SLOPE 2.5% SLOPE 2.5%
ADA Toilet L01.ADM.01
L01.LAB.20

SHAFT
Equipment Store Toilet (M) ADA Toilet Specimen Collection (M) Disposal Store File hematology
L01.PHS.09 L01.PHS.15 Waiting (F) L01.LAB.05 L01.LAB.13 L01.LAB.14
L01.PHS.17 L01.LAB.03 CEO
Toilet Office L01.ADM.02
Ø110 RWP-FA/TB Waiting (M) L01.LAB.19 L01.LAB.06 Abu Dhabi National Oil Company
L01.LAB.04
F
MAIN CONSULTANT:

First Floor Plan - Storm Water Layout


1 1 : 150
11O∅ RAIN WATER HDP (OVERSEAS) Ltd. P.O.BOX:47037 ABU
DHABI, UAE, Tel: +971 26420033
11O∅ RAIN WATER 11O∅ RAIN WATER BUILDING GFL GROUND LVL 11O∅ RAIN WATER PIPE-F/A
OUTLET(RWO) DOME TYPE MEP CONSULTANT:

DISCHARGE OUTLET(RWO) DOME TYPE PIPE-F/A RUNNING RUNNING THROUGH THE WALL

150
TOP ROOF

SHAFT
DISCHARGE THROUGH THE WALL (INSIDE THE SHAFT)
+11.250 SSL
SLOPE 2.5%
ROOF
+10.10 FFL
SLOPE

800x300 CONTRACTOR :

800x300 FORCE 1O UAE L.L.C.


BEAM
BEAM
DETAIL E DETAIL D DETAIL C P.O. Box - 29998, Abu Dhabi,
Tel : 971 2 6762121 - Fax : 971 2 6762122
Web: www.force10.ae,Email: [email protected]
FALSE CEILING
MEP CONTRACTOR :
11O∅ RAIN WATER PIPE-F/A
RUNNING INSIDE THE WALL 11O∅ RAIN WATER PIPE-F/A
RUNNING INSIDE THE WALL
UAE ABU DHABI, P.O.BOX 6152, Tel: 02-4450707 / Fax
ROOF :02-4455052 www.arco.ae/electromechanical
+10.10 FFL FIRST FLOOR DRAWING TITLE :
+05.00 FFL
FIRST FLOOR PLAN
STORM WATER LAYOUT
DRAWN BY : JOB NO: DATE:

DETAIL - A GTJ 10332 21-06-2024

DETAIL B CHECKED BY:


MK
SCALE:
1:150
SHEET SIZE:
A1
PROJECT NO: PACKAGE NO: SHOP DRAWING NO: REV:

4700016709 AD-19.1-M-650002-SHT-002 02