Turbine
• Power relay cylinder spindle piston assemble, pilot valve assemble and link assemble work done.
• Power relay cylinder top cover, pilot top cover oil pipe line assemble work done.
• Power relay cylinder fitted to current position.
• Actuator drive shaft bearings and worm wheel changing work done.
• Actuator drive system assemble work done.
• Hand trip valve fitted to current position.
• Throttle valve bearing checking and assemble to current position.
• Gear box top cover fitted to current position and bearing clearance work in progress.
• L.P. trip valve open and cleaning work done.
• Condenser cleaning work in progress.
Cooling Tower
• Cooling Tower Welding Work(Under Process).
• NRV Changed for MCW pump.
Economizer
• Economizer front plate and tube changing work (Under Process).
E.S.P
• APH pipe line cutting and new pipe line fitting.
• Bank Zone band zone fitting work , silo top.
• Economizer to band pipe line fitting work.
• ESP 1 discharge motor inspection and dismantle completed.
• ESP G.D screen fabrication work (Under Process).
R.O Plant
• 16m 3 R.O new base grouting done.
• 55m 3 R.O alignment completed.
• 16 m3 R.O fitting work done.
Electrical
• Turbine gauge panel and DC motor starter panel cleaning completed.
• Turbine vibration sensor ,thrust and turbine front, rear(X-Y) reconnection done.
• Coal crusher motor(100HP) overhauling ,varnishing(Under Process).
• ESP field and DE motor testing done.
• Lighting and welding machine arrangements done.