The Sudha Bio Power Pvt Ltd shut down report outlines maintenance and cleaning activities completed on various equipment including the boiler, turbine, cooling tower, economizer, E.S.P, R.O plant, and electrical systems. Key tasks include super heater cleaning, turbine assembly work, cooling tower welding, and R.O fitting work. Several activities are still in progress, such as furnace bed material cleaning and economizer plate changing.

Uploaded by

sudha C R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views2 pages

Shutdown Report 10-10-2020-Converted

The Sudha Bio Power Pvt Ltd shut down report outlines maintenance and cleaning activities completed on various equipment including the boiler, turbine, cooling tower, economizer, E.S.P, R.O plant, and electrical systems. Key tasks include super heater cleaning, turbine assembly work, cooling tower welding, and R.O fitting work. Several activities are still in progress, such as furnace bed material cleaning and economizer plate changing.

Uploaded by

sudha C R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SUDHA BIO POWER PVT LTD

SHUT DOWN REPORT


10-10-2020
Boiler
• Super heater cleaning work done.
• coal by-pass line cleaning work done of 1,2,3 compartment.
• Air box fuel cross patching work done.
• Air box bed drain line maintenance work done.
• P.A. drain line door replacement work done.
• 1 and 2 compartment bed coil phosecast work done.
• Furnace bed material cleaning work In progress.
• M.C.W.P. strainer inspection and cleaning work done.

Turbine
• Power relay cylinder spindle piston assemble, pilot valve assemble and link assemble work done.
• Power relay cylinder top cover, pilot top cover oil pipe line assemble work done.
• Power relay cylinder fitted to current position.
• Actuator drive shaft bearings and worm wheel changing work done.
• Actuator drive system assemble work done.
• Hand trip valve fitted to current position.
• Throttle valve bearing checking and assemble to current position.
• Gear box top cover fitted to current position and bearing clearance work in progress.
• L.P. trip valve open and cleaning work done.
• Condenser cleaning work in progress.

Cooling Tower
• Cooling Tower Welding Work(Under Process).
• NRV Changed for MCW pump.

Economizer
• Economizer front plate and tube changing work (Under Process).

E.S.P
• APH pipe line cutting and new pipe line fitting.
• Bank Zone band zone fitting work , silo top.
• Economizer to band pipe line fitting work.
• ESP 1 discharge motor inspection and dismantle completed.
• ESP G.D screen fabrication work (Under Process).

R.O Plant
• 16m 3 R.O new base grouting done.
• 55m 3 R.O alignment completed.
• 16 m3 R.O fitting work done.

Electrical
• Turbine gauge panel and DC motor starter panel cleaning completed.
• Turbine vibration sensor ,thrust and turbine front, rear(X-Y) reconnection done.
• Coal crusher motor(100HP) overhauling ,varnishing(Under Process).
• ESP field and DE motor testing done.
• Lighting and welding machine arrangements done.