0% found this document useful (0 votes)
14 views

Access-Scaffolding-Calculation

The document outlines the design calculations for light-duty scaffolding used in the construction of the Philippine Coast Guard Office Building in Nagpayong, Pasig City. It includes detailed specifications of materials, loading conditions, and safety checks to ensure structural integrity and compliance with regulations. The calculations confirm that the scaffolding design is safe and meets the required standards for load capacity and stability.

Uploaded by

Andro Rebuyas
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

Access-Scaffolding-Calculation

The document outlines the design calculations for light-duty scaffolding used in the construction of the Philippine Coast Guard Office Building in Nagpayong, Pasig City. It includes detailed specifications of materials, loading conditions, and safety checks to ensure structural integrity and compliance with regulations. The calculations confirm that the scaffolding design is safe and meets the required standards for load capacity and stability.

Uploaded by

Andro Rebuyas
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 9

DESIGN CALCULATION FOR SCAFFOLDING

FOR FORMWORKS OF SLAB

NAGPAYONG, PASIG CITY

JANUARY 25, 2025

No construction or fabrication work is to start until the design and calculations have
been approved by the Building Control

Prepared by:

Engr. Andro S. Rebuyas, RCE, ME-1, RMP, RME, PE-1, M.Eng-SE


Civil/Structural Engineer, Materials Engineer 1, Master Plumber,
Master Electrician, Project Engineer 1, Associate SEAD and ASEP Member
CE Registered No.: 0150465
Validity: May 16, 2026
PTR No.: 2118667
Date Issued: January 23, 2025
Issued at: City of Manila
T.I.N.: 341–514–30

Wall Vision Corporation


Specialty Contractor of Aluminum and Glass Works
8487 Sandoval Avenue, Pinagbuhatan, Pasig City,
Philippines
Telephone: +632-407-1064/666-3757
Facsimile: +632-824-3776
DESIGN CALCULATION FOR LIGHT DUTY SCAFFOLDING:
Height of structure = 14.113 m
Cuplock system scaffolding = independent run tower scaffold
Grid size = 2.0 m x 2.0 m
Height of external scaffolding = 14.113 m
Maximum no”s of planks levels = 1.0 plank level
Maximum no”s of working platform = 1.0 working platform at a time.
Live load rating (light duty): 2.0 kN/m2

MATERIAL:

1) CUPLOCK SYSTEM SCAFFOLDING PROPERTIES:

Outside Diameter “OD” = 60.30 mm


Tube Thickness = 3.91 mm
Yield Strength “Fy” = 241 N/mm2

PHYSICAL PROPERTIES OF TUBE:

Inner Diameter “ID” = 60.3 mm - 2(3.91 mm) = 52.48 mm


Area of Cross Section “A” = 3.14{(OD)2-(ID)2}/4 = 692.67 mm2
Section Modulus “Z” = (OD)3/6)-(ID3/6) = 12453.069 mm3
Moment Of Inertia “I” = 3.14{(OD4)-(ID4)}/64 = 276506.735 mm4
Radius OF Gyration “r”= Sqrt (I/A) = 19.98 mm

2) LOADING:
Rating of Scaffold = Light Duty Rating
Dead Load (D.L) = Wt of Scaffold Plank + Wt of Ledger +Wt of standard+ Accessories
Live Load (L.L) = 2.0 kN/m2 (42 psf) as per SSH

3) CHECK FOR PLANKS:


Length of plank = 2.15 m
Self-weight of plank = 0.25 kN/m2
Live load = 2.0 kN/m2
Load on plank W = 0.225 m * (0.25 kN/m2+ 2.0 kN/m2) = 0.506 kN/m
M = (W*L2) / 8 = 0.506 kN/m*(2.15m)2 / 8 = 0.29 kN-m
Max allowable BM for 38mm thick plank as per TG 20:08 table 18 = 0.48 kN-m
BM permissible = 0.48 kN-m > 0.29 kN-m (Safe)

4) SAFE WORK LOAD ON STRANDS:


Load Carry Capacity of Cuplock Standard Per Vertical Leg.
Properties Of Vertical Standard Pipes
Using Allowable Stress Design (ASD) Formulas from AISC, ASD Manual (9th Edition)

Outer Diameter “OD” = 60.30 mm


Tube Thickness = 3.91 mm
Cross Section “A” = 692.67 mm2
Radius OF Gyration “r” = 19.98 mm
Fy = Minimum Yield Strength = 241 N/mm2
Maximum vertical lift Height of ledger = 2.0 m
Unbraced Length “L” = 2000 mm
Effective Length “Leff”= K*L = 1.0*2000 = 2000 mm
Slenderness Ratio Leff /rmin =2000/19.98 = 100.100
Modulus of Elasticity “E” = 200000 N/mm2
Euler Critical Stress Cc = Sqrt (2x (π)2X E)/Fy = Sqrt (2x (3.14) 2 x 200000 / 241 = 127.92 N/mm2

Leff/rmin < Cc

Allowable Stress {Corresponding to Leff/rmin = 100.100

Fa = [FY*(1-1/2*(KL/R)2/CC2] / [5/3+3/8*(KL/R)/CC-1/8*(KL/R)3/CC3]
Fa = [241*(1-1/2*(100.100)2/(127.92)2] / [5/3+3/8*(100.100)/127.92 -1/8*(100.100)3/(127.92)3]
Fa = 87.997 N/mm2
Allowable Load Carry Capacity per Vertical “Pf”= Fa x A
Pf = 87.997 x 692.67 / 1000 = 60.95 kN
5) CHECK VERTICAL POST (STRANDS):
Tributary Area A1= (1.0*1.0) = 1.0 m2
Dead Load (D.L) Calculation on one Vertical Standard (Post)
Note: 1 Plank Levels to be boarded only

No Item Quanti U.Wt (kN) Total Weight


ty (kN)
1 3 m Standards + Cups Cup lock @ 400 mm 20 0.049 0.98
(Strands 18 L.m.)
2 Spigot With Nuts/Bolts attach to standard 6 0.005 0.03
3 Cup lock Ledger 2.0 m LEDGER 30 0.0971 2.913
and 2.0 m 30 0.0971 2.913

Total Dead Weight = 6.836 kN


Add 10% For Bracing & Fitting and Tying = 0.4893 kN
Scaffold Board (0.25 kN/m2 x 2.0 m x 2.0 m) @ 1 level = 1.0 kN
Total Dead Load (D.L) = 8.33 kN

Total Live Load on one Standard (L.L) = 2.0 kN /m2 x 2.0 m x 2.0 m = 8.0 kN
Total Load on Vertical Standard (D.L.+L.L) = 6.836 kN + 8.0 kN = 14.84 kN

6) CHECK FOR WIND LOAD:

The Wind load calculation is in accordance with NSCP 2015 Section 207C.3.2 page 2-106
Velocity Pressure, qz = 0.613 Kz Kzt Kd V2, N/m2

Where;

Kd = wind directionality, 0.85 (see table 207A.6-1, NSCP page 2-42)


Kz = velocity pressure coefficient, 0.81 (see table 207C.3-1, NSCP page 2-112)
Kzt = topographic factor, 1.0 (see section 207A.8.2, NSCP page 2-47)
V = basic wind speed, 61.11 m/s (As per NSCP wind code, NSCP page 2-38)
Therefore;

Velocity Pressure = 0.613 x 0.81 x 1.0 x 0.85 x (61.11 m/s)2


Velocity Pressure = 25.79 N/m2 or 0.026 kN/m2
7) CHECK OF BUCKLING OF COMPRESSION MEMBER:

P (D.L+L.L) = Load due to (Dead Load+ Live Load) Per Leg.


Pf = Allowable Load due to Allowable Stress (Fa) Per Leg.
Load combination = 1.2*DL + 1.6*LL + 0.5*W
P (D.L+L.L+ W.L) = 1.2*(8.33 kN)+1.6*(8.0 kN)+0.5*(0.026 kN)
Pf = 60.95 kN < 22.809 kN (Safe)

8) CHECK FOR COUPLER CONNECTION WITH BRACING:

Considering 2.5 % of vertical load = 22.809 x 0.025 = 0.57 kN x 2.0 (Safety factor)
Capacity of coupler in slip = 5 kN > 1.14 kN (Safe)

9) CHECK FOR BRACING:

ALLOWABLE SHEAR FORCE CAPACITY (Bearer, Transom, & Runner &Tube).

Vc = Allowable shear capacity = 0.4 x Fy x SIF x A


Fy = Minimum yield strength = 235 N/mm2
A = Area of C/S of tube.
Vc = 0.4 x 241 x 1.2 x (692.67/1000) = 80.13 kN.

ALLOWABLE FLEXURAL MOMENT (Bearer, Transom, & Runner & Tube).

Mf = SIF x Fy (min) x Z
Mf = allowable flexural moment.
SIF = Strength increase factor (Max SIF : 1.20, actual Yield strength as per test result is 241 MPa)
Z = Plastic section modulus
Fy = Minimum yield strength = 241 N/mm2
Mf = 1.20 x 241 x 12453.069 x 10-6 = 3.60 kN-m

Self-weight of the tuber = 0.039 kN/m


Loads of plank = 0.25*0.225 = 0.0562 kN/m
Live load = 2.0 kN/m2*1.0 m = 2.0 kN/m

Total load = 0.0562 + 2.0 + 0.039 = 2.09 kN/m

Maximum Bending moment = (W*L2)/8 = (2.09*2.02)/8 = 1.045 kN-m


Maximum Allowable permissible bending moment = 3.60 kN-m > 1.045 kN-m (Safe)

Maximum shear Force = (W*L)/2 = (2.09*2.0)/2 = 2.09 kN


Maximum Allowable permissible shear capacity = 2.09 < 80.13 kN (Safe)

Allowable Deflection = L/240 = 2000/240 = 8.33 mm

Max. Def. = (5*2.09*2000*2000*2000*2000) / (384*210000* 276506.735) = 7.5 mm < 8.33 mm (Safe)


ANALYSIS STRENGTH OF SCAFFOLDING STRUCTURE

1. GENERAL
1.1. OUTLINE OF STRUCTURE
Project : CONSTRUCTION OF PHILIPPINE COAST GUARD OFFICE BUILDING
Location : NAGPAYONG, PASIG CITY
Structure : SCAFFOLDING PIPE

1.2. DESIGN PHILOSOPHY


The purpose of this calculation is to design the scaffolding structure and to check/analyses its
structural integrity, strength, and stability.

1.3. MATERIAL
1. Galvanized Iron Pipe Scaffolding (Schedule 40)
Symbol Description Unit 2”ø G.I. Pipe
OD Outside Diameter mm 60.3
t Thickness mm 3.91
Fy Yield Strength MPa 241
Ty Tensile Strength MPa 414
e Elongation % 25
Bend Flattening Test GOOD

2. Metal Plank Galvanized (JIS)


Symbol Description Unit
Dimension 250 x 40 x 1.2 x 3000 mm
Fy Yield Strength MPa 280
Ty Tensile Strength MPa 385
e Elongation % 29
Bend Flattening Test GOOD
3. Coupler
Type of Coupler Type of Load Safe Working Load
Right angle coupler Slip along tube 7.5 kN
Swivel coupler Slip along tube 7.4 kN
Sleeve coupler Tension 3.1 kN
Adjustable base plate Slipping loading test 30 kN
Girder coupler Axial compression 10 kN

1.4. CHECK & DESIGN


1. Stress Ratio of Frame
The Stress Ratio of Frame shall be less than 1

1.5. UNIT MEASUREMENT


Unit of measurement in design shall be in metric system.

2. OUTLINE
2.1. Outline of Scaffolding Structure on PB2
Figure 1 - 3D View of Scaffolding Structure

3. LOADING
3.1. SELF WEIGHT / DEAD LOAD
Self-weight is automatic calculated by STAAD Pro

3.2. LIVE LOAD


Aprox Weight of Worker (Max. 70 kg) x 4 person Wp = 280 kg
Aprox. Weight of Material & Tools Wp = 125 kg
Total Weight Wp = 405 kg

3.3. LOAD COMBINATION


1. 1D
2. 1D + 3L

Note : L = Live Load


D = Dead Load

Figure 2 - Load Definition of Scaffolding Structure


4. ANALYSIS OF STRESS RATIO

Max. Stress ratio = 0.945 ≤ 1 Safe

Figure 3 - Maximum stress ratio of Scaffolding Structure