Fall2022_Incremental Project Plan

The document outlines a project timeline with various tasks, their durations, and scheduled start and finish dates. Key tasks include project reports, coding iterations, testing phases, and final reporting. The project is structured to progress from initial ideas to final implementation and testing over several months.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

Fall2022_Incremental Project Plan

The document outlines a project timeline with various tasks, their durations, and scheduled start and finish dates. Key tasks include project reports, coding iterations, testing phases, and final reporting. The project is structured to progress from initial ideas to final implementation and testing over several months.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID Task Task Name Duration Start Finish 04 Sep '22 11 Sep '22 18 Sep '22

Mode S M T W T F S S M T W T F S S M T W T
1 Project Idea 7 days Mon 05/09/22 Tue 13/09/22
2 Report 1 – Project 7 days Wed 14/09/22 Thu 22/09/22
3 Introduction 7 days Wed 14/09/22 Thu 22/09/22
4 Report 2 – Project Management 10 days Fri 23/09/22 Thu 06/10/22
Plan
5 Report 3 – SRS 10 days Fri 23/09/22 Thu 06/10/22
6 Report 4 – Software Design 18 days Fri 07/10/22 Tue 01/11/22
7 Code & Implement Iteration 1 10 days Fri 07/10/22 Thu 20/10/22
8 Code & Implement Iteration 2 15 days Fri 21/10/22 Thu 10/11/22
9 Report 5 – Test Document 27 days Wed 02/11/22 Thu 08/12/22
10 System Test 22 days Wed 02/11/22 Thu 01/12/22
11 Create Test case 7 days Wed 02/11/22 Thu 10/11/22
12 Execute Testcase 15 days Fri 11/11/22 Thu 01/12/22
13 Acceptance Test 5 days Fri 02/12/22 Thu 08/12/22
14 Report 6 – Software Guides 5 days Fri 09/12/22 Thu 15/12/22
15 Code & Implement Iteration 3 20 days Fri 11/11/22 Thu 08/12/22
16 Final Code and Report 9 days Fri 09/12/22 Wed 21/12/22

Task Inactive Summary External Tasks

Split Manual Task External Milestone

Milestone Duration-only Deadline


Project: Template_Incrematal Pr
Summary Manual Summary Rollup Progress
Date: Tue 27/09/22
Project Summary Manual Summary Manual Progress

Inactive Task Start-only

Inactive Milestone Finish-only