Name of work: Construction of compound fencing for Khataoed ECCD
Title: Detail Estimate
Location: Khatoed, Jigmechhoeling BSR 2024 Base rate: Gelephu
Sl.n Dimension (m)
o BSR ref Description No L B H Qty Unit Rate Amount
CHAIN - LINK FENCING
Page 4 of 8
Name of work: Construction of compound fencing for Khataoed ECCD
Title: Detail Estimate
Location: Khatoed, Jigmechhoeling BSR 2024 Base rate: Gelephu
Sl.n Dimension (m)
o BSR ref Description No L B H Qty Unit Rate Amount
Providing & laying in position reinforced cement
concrete excluding the cost of centering,
shuttering and reinforcement - all work upto 0.71 cu.m ### 3,912.46
plinth level 1:2:4 ( 1 cement: 2 sand: 4 graded
10 RC0003crushed rock 20mm nominal size)
Base footing pad 2.00 0.80 0.8 0.20 0.26
Column 2.00 0.30 0.3 2.50 0.45
Providing & fixing centering and shuttering
(formwork), including strutting, propping etc. and
### 7.28 Sq.m 707.41 5,149.94
removal of formwork: Columns, Pillars, post,
11 struts etc.
Footing pad 2.00 3.20 0.20 1.28
Column 2.00 1.20 2.50 6.00
12 PL0041Providing & laying 20mm cement plaster C.M 1:4 6.00 sq.m 284.57 1,707.42
On sides of gate 2.0 1.20 2.5 6.00
Providing and applying finishing coats, with :-
### Aluminium paint, two coats on new work 22.17 Sq.m 96.84 2,146.94
13
On angle post 31 1.5 0.21 9.77
Flat 2 62 0.1 12.40
Providing & applying one coat of primers -
5.52 sq.m 43.37 239.40
14 PT0010 Cement primer
On sides of gate 2.0 1.20 2.3 5.52
Finishing wall with Water - Proof Cement paint.
5.52 sq.m 100.39 554.15
15 PT0030 New work, three coats
On sides of gate 2.0 1.20 2.3 5.52
Providing & applying white or colour washing: ### sq.m 31.92 1,537.27
16 PT0020 White washing with lime - new work - three coats
2.0 60.20 0.4 48.16
PERMANENT
Earth STRUCTURE
work in excavation over areas, depth
>300mm, width >1.5m, area >10 Sq.m on plan,
including disposal of excavated earth within 50m 32.13 cu.m 209.56 6,733.16
lead and 1.5m lift & disposed soil to be neatly
17EW0031dressed: All type of soil
Above ECCD Breast wall 0.5 20 1.53 1.5 22.95
Retaining wall below building 0.5 8 1.53 1.5 9.18
Excavation in foundation trenches or drains not
exceeding 1.5m in width or area 10sq.m on plan, 21.42 cu.m 221.5 4,744.53
including dressing & ramming, disposal of surplus
18 EW0106soil within 50m lead & 1.5m lift. All types of soil
Above ECCD Breast wall 1.0 20 1.53 0.5 15.30
Retaining wall below building 1.0 8 1.53 0.5 6.12
Providing and laying hand packed stone soling or
### 6.43 Cu.m1,633.10 ###
19 filling with stones .
Above ECCD Breast wall 1.0 20 1.53 0.15 4.59
Retaining wall below building 1.0 8 1.53 0.15 1.84
Providing and laying in position plain cement
concrete excluding the cost of centering and
shuttering - All work upto plinth level. 1:3:6 (1 3.22 cu.m 4701.59 ###
cement : 3 sand : 6 graded crushed rock 20 mm
20 CW0005nominal size)
Base Above ECCD Breast wall 1.0 20 1.53 0.08 2.30
Retaining wall below building 1.0 8 1.53 0.08 0.92
Providing & laying Random Rubble Masonry with
hard stone in foundation & plinth In cement 51.24 cu.m 4391.19 ###
21 SM0006mortar 1:5
Base Above ECCD Breast wall 1.0 20 0.92 2 36.60
Retaining wall below building 1.0 8 0.92 2 14.64
Page 5 of 8
Name of work: Construction of compound fencing for Khataoed ECCD
Title: Detail Estimate
Location: Khatoed, Jigmechhoeling BSR 2024 Base rate: Gelephu
Sl.n Providing and laying in position plain cement Dimension (m)
o BSR refconcrete in retaining walls, return walls, walls
Description No L B H Qty Unit Rate Amount
(any thickness) including attached pilasters,
columns, piers, abutments, pillars, posts, struts,
buttresses, string or lacing courses, parapets,
coping, bed blocks, anchor blocks, plain window
sills, fillets etc. upto floor five level, excluding the 0.84 cu.m 5951.89 4,999.59
cost of centering and shuttering 1:2:4 (1 cement:
2 sand: 4 graded crushed rock 20mm nominal
22 CW0022size)
Base Above ECCD Breast wall 1.0 20 0.6 0.05 0.60
Retaining wall below building 1.0 8 0.6 0.05 0.24
Filling of trenches, sides of foundation etc. in
layers <200mm using selected excavated earth, 21.00 cu.m 111.32 2,337.72
23 EW0195ramming etc. within lead 50m & lift 1.5m
Base Above ECCD Breast wall 0.5 20 1 1.5 15.00
Retaining wall below building 0.5 8 1 1.5 6.00
Page 6 of 8
Name of work: Construction of compound fencing for Khataoed ECCD
Title: Travel Expenses
Location: Khatoed, Jigmechhoeling
Total Expenses
Travel Distance
allowance ( B )
Allowance ( C )
No. of visit per
Approve Min.
Particular of
Rate per Km
Total travel
Total TADA
Total Daily
Allowance
(D=B+C)
official
(A * D)
Daily
Sl.no
days
(A)
Chief fro
DE/other
1 official 2 2 69 16 2208 ### 2 3000 5208 ###
2 Site Engineer 6 2 69 16 2208 ### 2 3000 5208 ###
3 Technician 6 2 69 16 2208 ### 2Total
2500 4708
travel ###
Expense ###