0% found this document useful (0 votes)
2 views

Description of Low Current Work - IHS Offices

The document outlines the installation and configuration of various low current systems in IHS offices across the 3rd and 4th floors, including video surveillance, fire safety systems, network sockets, access control systems, and safety lighting. It details the specific tasks to be performed, such as running cables, moving equipment, and connecting active devices. Additionally, it notes the control units for fire detection systems and access control will be centralized for efficiency.

Uploaded by

Ivan Ndantouo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Description of Low Current Work - IHS Offices

The document outlines the installation and configuration of various low current systems in IHS offices across the 3rd and 4th floors, including video surveillance, fire safety systems, network sockets, access control systems, and safety lighting. It details the specific tasks to be performed, such as running cables, moving equipment, and connecting active devices. Additionally, it notes the control units for fire detection systems and access control will be centralized for efficiency.

Uploaded by

Ivan Ndantouo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DESCRIPTION OF LOW CURRENT WORK - IHS OFFICES

Sections Descriptions Comments


03rd FLOOR
Installation of 08 digital video surveillance cameras according to the We're going to pass the cables in the 2nd floor tech room, where the digital recorder will
Video surveillance/ monitoring
positions indicated on the plan be installed.
We will run the cables through the second floor technical room, where the conventional
Installation and configuration of a conventional fire detection system as well
fire detection system will be located.
Fire safety as the installation of fire extinguishers according to the positions indicated
Note: the fire detection systems on floors 02 and 03 will be controlled by the same
on the plan
control unit.
We will pass the cables in the technical room of floor 02 especially in the existing bay
Installation of network sockets and terminals (wifi access point, ...)
where the active equipment will be installed.
Computing Mixing of the bay, installation and connection of active equipment (Switch,
Note: A switch will be disconnected from the 4th floor and installed in the 2nd floor
...)
brewing bay on behalf of 3rd floor terminals
We're going to send all the cables to the access control unit, which will be brought back
Access control system Installation of a two-door access control system
to floor 05.
Installation of a safety lighting system according to the positions indicated on
Safety lighting
the plan
04th FLOOR

Dismantling and reinstalling existing cameras according to plan;


We're going to disconnect the digital recorder placed on the 4th floor and install it in the
Video surveillance/ monitoring Moving equipments from the technical room of the 4th floor to the 5th floor;
bay on the 5th floor.
Rewire all connections in the 5th floor brewing bay

Return cables to the Floor 05 Engineering Room.


Installation of a fire safety system and installation of fire extinguishers
Fire safety Note: the fire detection systems of stage 04 and 05 will be controlled by the same
according to the plan
central unit.

We will bring all cables back into the 05 floor patch bay, where all the active equipment
Installation of network outlets and terminals (wifi access point, ..).
will be installed.
Computing Mixing of the bay, installation and connection of active equipment (Switch,
Note: We will disconnect all the equipment from the brewing bay of floor 04 and install
...)
them again in the brewing bay of floor 05.

ADS ENGINEERING SARL N° RCCM: RC/DLA/2018/B/3760 N° Contr.: M101812729475K Cameroun, Douala "Akwa – Immeuble SAPEUR" Phone : (+237) 699 14 04 61 / 650 684 716 [email protected]
Disconnect the 02 access control units installed on floor 04 and reinstall them on floor
05.
Access control system Installation of a two-door access control system
Note: We will disconnect the access control unit on floor 02 and install it in the technical
room on floor 05.
Installation of a safety lighting system according to the positions indicated on
Safety lighting
the plan