Description of Low Current Work - IHS Offices
Description of Low Current Work - IHS Offices
We will bring all cables back into the 05 floor patch bay, where all the active equipment
Installation of network outlets and terminals (wifi access point, ..).
will be installed.
Computing Mixing of the bay, installation and connection of active equipment (Switch,
Note: We will disconnect all the equipment from the brewing bay of floor 04 and install
...)
them again in the brewing bay of floor 05.
ADS ENGINEERING SARL N° RCCM: RC/DLA/2018/B/3760 N° Contr.: M101812729475K Cameroun, Douala "Akwa – Immeuble SAPEUR" Phone : (+237) 699 14 04 61 / 650 684 716 [email protected]
Disconnect the 02 access control units installed on floor 04 and reinstall them on floor
05.
Access control system Installation of a two-door access control system
Note: We will disconnect the access control unit on floor 02 and install it in the technical
room on floor 05.
Installation of a safety lighting system according to the positions indicated on
Safety lighting
the plan