The document presents a micro project focused on the rate analysis of painting work using various types of paint, including OBD, plastic emulsion, and luster paint, submitted by a group of civil engineering students. It outlines the project's aims, methodology, and learning outcomes, emphasizing the importance of accurate cost estimation in construction projects. The report includes evaluations, resources used, and the significance of rate analysis in determining project costs and optimizing resource use.

Uploaded by

Rohit Bharadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views23 pages

DOC-20250416-WA0002

The document presents a micro project focused on the rate analysis of painting work using various types of paint, including OBD, plastic emulsion, and luster paint, submitted by a group of civil engineering students. It outlines the project's aims, methodology, and learning outcomes, emphasizing the importance of accurate cost estimation in construction projects. The report includes evaluations, resources used, and the significance of rate analysis in determining project costs and optimizing resource use.

Uploaded by

Rohit Bharadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 23

A

MICROPROJECT

On

“PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD ,


PLASTIC EMULSION OIL PAINT, LUSTER PAINT.”

Submitted By

1. Kangune Gaurav Changdev , Enrollment No: 2200300303


2. PRANAV VIJAY GURULE , Enrollment NO : 24650910537
3. CHATTAR SATYAM BABASAHEB , Enrollment No: 24650910531
4. Om Pandurang Yeole , Enrollment No: 246509525
Class: CE4K
Under The Guidance
Mr. G. P. Walhekar

DEPARTMENT OF CIVIL ENGINEERING


Padmashri Dr. Vitthalrao Vikhe Patil Institute of Technology and
Engineering (Polytechnic) Pravaranagar-413736.
(2024-2025)
Padmashri Dr. Vitthalrao Vikhe Patil Institute of Technology and
Engineering (Polytechnic) Pravaranagar-413736

CERTIFICATE
This is to certify that

1. Kangune Gaurav Changdev , Enrollment No: 2200300303


2. PRANAV VIJAY GURULE , Enrollment NO : 24650910537
3. CHATTAR SATYAM BABASAHEB , Enrollment No: 24650910531
4. Om Pandurang Yeole , Enrollment No: 246509525

Class: CE4K
Has successfully submitted the Micro Project on

“PREPARE RATE ANALYSIS OF PAINTING WORK USING


OBD , PLASTIC EMULSION OIL PAINT, LUSTER PAINT.”
Towards the partial fulfillment of
Diploma in Civil Engineering affiliated to Maharashtra State Board of
Technical Education, Mumbai during academic year 2024-2025

(Mr. G. P. Walhekar.) (Mr. S. K. Gorde)

Guide HOD

Place: Loni
Date:

Micro Project Evaluation Sheet (Group)


Academic Year: 2024-25 Name of Faculty: Mr. G. P. Walhekar.

Course: EAC Course Code: 314313 Semester: 4th

Title of Micro Project: PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC
EMULSION OIL PAINT, LUSTER PAINT.

Cos addressed by the Micro Project:

A: Formulate grammatically correct sentences.


B: Give presentation by using audio visual aids.
C: Communicate Skillfully.
D: Write reports using correct guidelines...
Major Learning Outcomes achieved by students by doing the project:

a) Practical Outcomes: DELIVER presentation (seminar) effective.

b) Outcomes in Cognitive domain: 1) Prepare the points for computer presentation.

2) Make seminar presentation

c) Outcomes in Affective domain: a) Function as team member.


b) Follow Ethics.
c) Make proper use of computer and Internet.

d) Comments /Suggestions about team work / leadership/inter-personal communication (if any)


……………………………………………………………………………………

Marks out Marks out


of 6 for of 4 for
Total
Roll Enrollment Performance Performance
Full Name of Student out of
No. No. in group in oral/
10
activity presentation

(D5) (D5)

04 Kangune Gaurav Changdev 2200300303

45 Pranav Vijay Gurule 24650910537


24 Chattar Satyam Babasaheb 24650910531

35 Om Pandurang Yeole 246509525

Name & Sign of Faculty


Micro Project Evaluation Sheet (individual)
Name of Student: Om Pandurang Yeole Enrollment No: 246509525

Name of Programe: Civil Engineering. Semester : 4 th

Course Title: EAC Code:314313

Title of the Micro-Project: PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC
EMULSION OIL PAINT, LUSTER PAINT.

Course Outcomes Achieved:

A: Formulate grammatically correct sentences.


B: Give presentation by using audio visual aids.
C: Communicate Skillfully.
D: Write reports using correct guidelines...
Sr. No Characteristic to be Poor (Marks 1- Average (Marks Good (Marks 6-8) Excellent (Marks Sub
assessed 3) 4-5) 9-10) Total

A) Process and Product Assessment (Convert above total marks out of 6 marks)

01 Relevance to the course

02 Literature review /
information collection

03 Completion of the target


as per project proposal

04 Analysis of data and


representation

05 Quality of
prototype/Model

06 Report Preparation

(B) Individual Presentation / Viva (Convert above total marks out of 4 Marks)

07 Presentation

08 Viva

(A) Process (B) Total Marks 10


and product Individual
Assessment(6 marks) Presentation /Viva

Name and designation of the Teacher: Mr. G. P. Walhekar. Dated Signature:


Micro-Project Proposal
Title of Micro Project: PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC
EMULSION OIL PAINT, LUSTER PAINT.
1.0 Aims/Benefits of Micro Project (min 30-50 words)
To work out the actual cost per unit of the items at the locality. To examine the viability of rates
offered by contractors. To calculate the number of materials and labour strength required for project
planning. To fix labour contract rates.

2.0 Course Outcome(s) Addressed:

A: Formulate grammatically correct sentences.


B: Give presentation by using audio visual aids.
C: Communicate Skillfully.
D: Write reports using correct guidelines...
3.0 Proposed Methodology (procedure in brief that will be followed to do the micro project in about
100-200 words)
Rate analysis is the basis for arriving at a correct rate per unit work or supply of work specifications
such as labor, materials, and equipment. It can also be defined as the analytical study that leads to
the definition of unit rates of work by identifying the basic requirements.

4.0 Action Plan (sequence and time required for major activities)
Sr. Planned start date Planned finish date Name of responsible
Details of Activity
No. team members

1. SEARCH THE TITLE

2. COLLECT THE INFORMATION

3. LITERATURE REVIEW

4. ABSTRACT

5. DIAGRAM OF FIXED

DOME TYPE BIGAS

PLANT ON FOAM SHEET

6. CONCLUSION

7. REFRENCES
5.0 Resources Required (Major resources such as raw material, some machining facility, software,
etc.)

Sr.
Name of resource/material Specifications Qty. Remark
No.

Pen, Pencil, Scale, Eraser 1


1.

Internet www.slideshare.nic 2
2. www.onlinecreator.co.in

3. MS Word 1

Name of Team Members:

Roll No. Name of Student

04 Kangune Gaurav Changdev

45 Pranav Vijay Gurule

24 Chattar Satyam Babasaheb

35 Om Pandurang Yeole

Name & Sign of Faculty


Mr. G. P. Walhekar
Micro-Project Report
1.0 Rationale (Importance of the project, in about 30-50 words)
In the construction of any civil structure, specifications of the civil work are the significant
parameters in deciding the cost of the project. In construction, it is often required to use the local
material for which the rates are varying in greater extent across the country. The rate analysis
justifies the rates to be finalized for various items of works based on local market survey for budget
provision.

2.0 Aims/Benefits of the Micro Project:


To work out the actual cost per unit of the items at the locality. To examine the viability of rates
offered by contractors. To calculate the number of materials and labour strength required for project
planning. To fix labour contract rates.

3.0 Course Outcome(s) Achieved:

A: Formulate grammatically correct sentences.


B: Give presentation by using audio visual aids.
C: Communicate Skillfully.
D: Write reports using correct guidelines...
4.0 Literature Review:

This review examines the cost value, building production and infrastructure costs, and evaluation
approaches. It helps to understand the role of evaluation methods in synthesizing the cost and
project life-cycle.

5.0 Actual Methodology Followed (Write step wise work done, data collected and its analysis (if
any).

Rate analysis is the basis for arriving at a correct rate per unit work or supply of work specifications
such as labor, materials, and equipment. It can also be defined as the analytical study that leads to
the definition of unit rates of work by identifying the basic requirements.
6.0 Actual Resources Used (Mention the actual resources used for Micro Project).

Sr.
Name of resource/material Specifications Qty. Remark
No.

1. Pen, Pencil, Scale, Eraser 1

Internet www.slideshare.nic 2
2.
www.onlinecreator.co.in

3. MS Word 1

7.0 Output(s) of the Micro project: (drawings of prototype or survey, presentation is collected data,
findings, etc.)

Rate analysis is the basis for arriving at a correct rate per unit work or supply of work specifications
such as labor, materials, and equipment. It can also be defined as the analytical study that leads to
the definition of unit rates of work by identifying the basic requirements
8.0 Skill(s) developed / Learning outcome of this Micro Project:
We get to learn the proper use of renewable energy skills, expertise in the management of waste,
teamwork while doing the microproject, leadership of a member while designing the foam sheet of
the microproject, proper management of the process followed while working on the preparation of
the foam sheet.
9.0 Application(s) of this Micro project:
This app provides rate analysis for construction items, material requirements, and costing. It's useful
for architects, civil engineers, contractors, and others involved in construction..
INDEX
SR.NO. CONTENT PAGE
NO.
INTRODUCTION
1 1
FACTORS AFFE-
CTING RATE ANA-
2 LYSIS 2
3 ELEMENTS 3
4 ANALYSIS OF 5
RATES
5 REFFERENCE 13
6 CONCLUSION 14
INTRODUCTION
In order to determine the rate of a particular item,
the factors affecting the rate of that item are studied
carefully and then finally a rate is decided for that item.
This process of determining the rates of an item is
termed as analysis of rates or rate analysis.
The cost of materials in rate analysis is calculated as
combination of cost of material at origin, its
transportation costs, taxes. The rate of labour is based
on skill of the labour, such as skilled labour, semi-
skilled and unskilled labour. The cost of materials and
labours vary from place to place. Thus, the cost of each
construction work varies from place to place.
The capacity of doing work by an artisan or skilled
labour in the form of quantity of work per day is known
as the task work or out turn of the labour.
The cost of any construction project is calculated
based on each works associated with every
construction activity. Thus it is essential to calculate
cost of each small works.
What are the Factors Affecting
Analysis of Rates of Civil Works?
Factors which affect the rate analysis
of civil works are:
o Specification of the civil work and materials such as
quality of materials, proportion of mortar or concrete,
thickness of plastering, number of coats of painting,
depth of excavation, type of soil etc.
o Location of the construction site – Distance of
construction site from source of materials, availability
of labours, availability of water, machinery etc.
influence the rate analysis of construction work.
o Quantity of materials, number of different types of
labours and rates of materials and labours influence the
rate analysis.
o Profit of the contractor, miscellaneous expenses and
other overheads also influence the rate analysis.
What are the Elements of Rate
Analysis of Civil Works?
Elements which constitute the rate analysis are:
a) Material cost inclusive of wastage
b) Labour cost
c) Plant & machinery owning and operating charges
d) Water charges
e) Taxes
f) Insurance/ risk coverage charges
g) Contractor’s overheads and profit
Why Analysis of Rates is
Required in Construction
Projects?
The rate analysis may be required in construction
projects for following purposes:
o For the purpose of tendering. In the case of tendering,
the contractor may calculate cost of unit work involved
in each construction activity for justified quoting of
rates. The client may also require rate analysis to
calculate the cost of construction project.
o To assess the requirements of quantities of labours,
materials, machineries and capital to complete the
project.
o To optimise the use of labour, materials and
machineries and to know the alternatives to optimize
the resources.
o To assess the rate of unit work from time to time for
payment increase in material or labour costs or any
deviations in work specifications, extra items of work to
the contractor.
o To compare the cost of project with the sanctioned
capital of the project to take necessary action or
regularization of excess or less cost.
o To workout the budget of the construction project and
control the cash flows at various stages of construction
work.
o To find out the irrational rates quoted by the contractors
during tendering process.
o To serve as the basic data in case of dispute among
project owner and contractor.

ANALYSIS OF RATES :

●Tools and plants : 2.5 to 3% of labour cost


●Transportation cost more than 8 km is considered
●Water charges : 1.5 to 2% of total cost
●Contractor’s profit : 10%

This section includes examples of floor plans,


elevations, and details commonly used to estimate
the cost of painting exterior masonry walls.
Masonry Unit: natural or manufactured building units
of burned clay, stone, glass, gypsum, concrete, etc.

Rule-of- Thumb: a statement or formula that is not


exact but is close enough for practical work.

Split-Face Unit: concrete masonry units with one or


more faces produced by purposeful fracturing of the
unit to provide architectural effects in masonry wall
construction.
Masking: the temporary covering of areas adjacent to
those to which paint is to be applied.

Cutting-In: a painting technique used to paint around


the edges of an object or areas, such as trim, light
fixture, or an opening.
REFERRANCE

●TEXTBOOK
●WIKIPEDIA
●FROM NEWSPAPERS
●WWW.CIVILWORKS.COM
CONCLUSION

By making these micro project, We know the


All information about rate analysis of painting
works containing internal wall, outer wall.
And we understood how to calculate rate
analysis of painting works using plastic
emulsion, oil paint ,luster paint.