The document is a Piling Inspection Request form that requires details such as plot number, permit number, contractor, and consultant information. It certifies that the provided information is accurate and agrees to compliance with approved drawings and safety standards. The form must be signed and stamped by both the contractor and consultant, confirming their responsibility for the inspection request.

Uploaded by

saudalaaddin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1 views

ZA DC F 81 Piling Inspection Request v1

The document is a Piling Inspection Request form that requires details such as plot number, permit number, contractor, and consultant information. It certifies that the provided information is accurate and agrees to compliance with approved drawings and safety standards. The form must be signed and stamped by both the contractor and consultant, confirming their responsibility for the inspection request.

Uploaded by

saudalaaddin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PILING INSPECTION REQUEST

Plot Number Permit Number


Consultant
Contractor
Submission Details Initial Submission
(Tick Appropriate Box) Re-submission

Note
The following to be available at site:
1. Approved drawings by DDA

CONTRACTOR & CONSULTANT

• We hereby certify that the information, data and documents provided with this application are true, genuine and correct
to the best of my knowledge. In case of default/failure to comply with any of the aforesaid conditions or the documents
submitted by us is found false/forged, our application will be rejected forfeiting any applicable fees paid.
• We hereby undertake that the above inspection is checked and found to be consistent with the zoning affairs approved
drawings, specifications, building construction workmanship and industrial safety.

Contractor Consultant

Contact Person Contact Person

Contact No. Contact No.

Date Date

Signature & Signature


Stamp & Stamp

Public. ZA-DC-F-81 Issue 8