Date of Raised RFI Company Inspection Request Date Inspection Request Time Actual Inspetion Time
RHPPL
INSPECTION DETAILS
Location / Structure :-
MPCL Representative :-
Inspection Description :-
Name Name
Date Date
Time Time
Signature Signature
RESULT OF INSPECTION
Inspection undertaken and there are no remedial works required. Work can continue.
Inspection undertaken and there are items that need to be addressed/fixed/corrected as indicated above but work can continue.
Inspection undertaken and there are items that need to be addressed/fixed/corrected as indicated above. Re-inspection is required to ensure all items are addressed/fixed/corrected.
SIGN OFF
RHPPL MPCL
Name Name
Date Date
Time Time
Signature Signature
Page 1 of 11
CLIENT CONTRACTOR
Location :-
Chainage :-
Date :-
Elevation:-
Checked Remarks
Sr. no Description of Activity/Item
Yes No
Remarks/Notes/HSE Observation:
Location :- Chainage :-
Date :-
Elevation:-
Checked Remarks
Sr. no Description of Activity/Item
Yes No
Remarks/Notes/HSE Observation:
Location :- Chainage :-
Date :- Elevation:-
Checked Remarks
Sr. no Description of Activity/Item
Yes No
Remarks/Notes/HSE Observation:
Remarks/Notes/HSE Observation:
Location : Date :
Location :-
Chainage (m):-
Date :-
Slope El.
From To
Checked Remarks
Sr. no Description of Activity/Item
Yes No
Remarks/Notes/HSE Observation:
Remarks/Notes/HSE Observation
Chainage :
Checked
Sr. No. Description of Activity/Items REMARKS
YES NO
3 Geotextile Felt of 275 gsm laid with 500mm overlap of adjacent roll.
Initial test pressure shall be 2 bar for a test period of 5 minutes or 1.5
bar for a test period of 10 minutes. The joint shall be considered
5
waterproof if the loss of air pressure in both cases not more than
20%.
Restoration and Rehabilitation of Storage Reservoir, Diversion Channel, Head Regulator, Undersluice, Spillway and Infrastructure
NAME OF WORK
of (2x43 MW) Malana Hydro Electric Project, Kullu.
LOSS OF
TIME
INITIAL AIR FINAL AIR AIR
SR. NO. DATE OF TESTING LOCATION CHAINAGE DURATION REMARKS
PRESSURE PRESSURE PRESSURE(%
(MIN)
)
TEST RESULT :-
Location :- Date :-
8 Preparation of mix
9 Execution of repairing