0% found this document useful (0 votes)
4 views

Interview Coding Analysis Rev5!08!07 24 Final

The document outlines a project aimed at enhancing early childhood education through free tutorials and enrichment programs for young learners, focusing on basic literacy and socialization skills. Participants, including educators and parents, express their motivations for involvement, highlighting the benefits for children and the community, such as increased literacy and social engagement. Overall, the project is perceived positively, with few reported negative effects and challenges primarily related to attendance issues.

Uploaded by

Tabor, Trisia C.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Interview Coding Analysis Rev5!08!07 24 Final

The document outlines a project aimed at enhancing early childhood education through free tutorials and enrichment programs for young learners, focusing on basic literacy and socialization skills. Participants, including educators and parents, express their motivations for involvement, highlighting the benefits for children and the community, such as increased literacy and social engagement. Overall, the project is perceived positively, with few reported negative effects and challenges primarily related to attendance issues.

Uploaded by

Tabor, Trisia C.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Matrix of Responses

Interview Coding / Analysis


Dr. Janet P. Espada
Ms. Angelyn A. Dichos
Indicators:

S/N 1. What do you know about the project? Initial Codes


1 Free tutorials Free tutorials
2 Nagtututdo hit mga kabataan Teaching young learners
3 Color shapes, write names, hold pencils and socialization socialization
4 Color, identify pictures, identify letters enhancement
5 Color, to know animals, to write Learning the basics
6 To have an advance learning Advance learning
7 Nagtututdo pagbasa, pagsurat, pag-ihap Teaching reading, writing
and math
8 An mga bata gintututduan han shapes ngan numbers Teaching shapes and
numbers
9 The opportunity to let my children learn Opportunity to learn
10 okay naman po hiya. Maupay. Bisan 2 years pla akon anak, Learning for children
mayda hiya nababaruan bisan tala gudti. Kanan LNU proyekto
11 Maupay pra kabataan ngan barangay. Dako ini nga bulig para Big help for parents
ha amon. Nagpapasalamat han kanan LNU para ha kabataan.
Dungan nga nahihibaruan.
12 This is a project on enhancing learners on the basic teaching Enhancing learners
styles of the pupils in order to achieve more
13 Maupay additional learning han kabataan kanan LNU Additional learning
14 Nagpapadugang kaadman ha kabataan Additional learning
15 It’s about learning for the children and teachers Learning for children and
teachers
16 Nagtututdo hit mga kabataan, toddler, daycare, kinder to Teaching young learners
grade 1 from day care to grade 1
17 The project boxskwelahan is an enrichment program for Enrichment program for
young learners. This project aims to teach or fill in gaps of the basic literary, gross and
young learners to write, read and enhance their fine and gross fine motor skills
motor skills.
18 It is an enrichment for young learners Enrichment program
19 LNU Project Boxskwelahan is an enrichment programf or Enrichment program
young children progress monitoring
20 The project is to help the early years learn more in advance Advance learning
21 The project is all about an enrichment program in which some Enrichment program
students will teach a specific level in san miguelay
22 This project extends help and assistance to learners learn Assistance to learners
more and master some skills that would be benefitial for them
23 This project designed to cater aged 3-6 years old. Each age Stimulate development
level offers variety subjects and program to stimulate
development. These subjects include cosmic education,
storytelling, numeracy, writing and reading.
24 This extension project was initiated by our unit and I am one
of the Project Leaders.

S/N 2. Why are you participating the project?


1 to let my students learn in advance Advance learning
2 Na cooperate kay kaupayan man hit eskwehalan ngan support the extensionists
kabataan
3 To learn more and for socialization socialization

Page 1 of 7
4 For learning learning
5 To know and let students learn Learning
6 To let my son learn, to identify letters, pictures and consonant Learn literacy
7 Maupay nga proyekto pra mahibaro an bata Good project
8 Para mahibaro an akon anak ma 4 years old na Learning
9 Letter identification, to hold the pencil and count Learning basic literacy
10 Para ha sunod oras na sumulod na hiya ha daycare dire hya Advance learning
mabe-behind Diri na hiya maawod
11 Para matikangan an hibaro, para makipag-participate upod Take first steps in learning,
han iba nga bata ngan para masanay cooperation
12 Being a school head it is my prime duty to be part of this Achievement for school
project in order to achieve more
13 Require tungod ma grade 1 na hiya bagen may maupay na Added learning
mababaruan. Madungngan an mababaruan
14 Para mabaro an akon anak ngan katungod ko nga pabuligon in Help children learn; attain
akon anak para liwat ha iya kabubuwason mabaro hiya hin better future
mas maupay
15 To remind/encourage the parents and children. Remind the Encourage children and
kagawads and other concerns to secure the place and the parents; provide security
school and safety

16 An malupyo ha barangay, kinahanglan gihap mag-assist ha To assist extensionists


extentionist. Para an imo pagtutdo ma-develop gihap ha iba
na mga masunod nga kabataan. Karuyag ko nga magpadayun
ini nga proyekto.
17 I am doing the project because I want to help young learners. Help young learners;
As future educator, I know that this project will help me better Deepens understanding of
understand the field I am taking. teaching
18 As an undergraduate student, the program is a great Gain experience in
experience for me to handle and be involved in the teaching
beneficiaries learning.
19 The project helps daycare, kindergarten and Grade 1 learners Helps young learners
20 Being a graduate student who keeps and participates in this Opportunities for growth
project will help me grow, be more confident in teaching and and confidence
also it is a big help for kids.
21 I am participating in the project mainly because it is part of Compliance of
our subject in Masteral but I’ve got to experience teaching, I requirement; gaining
learned in which also helped me as a teacher. experience to teach
22 Apart from it is part of our extension projects, I also do love Fulfilling advocacy to help
giving assistance to people especially kids and joining this others
project is a big help not just for me personally and
professionally but to the beneficiaries and to the community.
Also, as a teacher, this project builds my confidence and the
sense of being more empathetic towards others.
23 To establish an extension project program for the MAED Pre- Establish extension project
Elementary Level
24 We are undertaking this extension project for several reasons. fulfilling
Firstly, it fulfills one of our core functions as university faculty:
conducting extension activities. Secondly, it contributes to our
accreditation requirements. Lastly, as educators teaching
young minds is just rewarding as a teacher!

S/N 3. How does the project affect the beneficiaries, the


barangay, and the school?
1 This was an excitement of children to go to school and for Breeds excitement among
advanced learning children

Page 2 of 7
2 Maupay hiya makakahalubilo han igkasi-bata pagmulay. Ha Socialization, happiness;
school nag-enjoy hiya ngan dire na hiya naawod ha school reduced shyness
3 To advance learn and to help student to learn Advanced learning
4 To participate in order for the learners to be aware and learn Increased participating and
the initials of sounds, identify pictures and to be aware of and learning of basics
help the students to learn
5 It was a nice experience for children in the barangay and Advance learning,
advance learning and socialization socialization, happy
experience
6 To let my son learn, to identify letters, pictures and can count Opportunities to learn
7 Nakakabulig gihap ha brgy ngan nakakabulig gihap ha Support for school and
eskwelahan barangay
8 Kaparte na hiya ha mulupyo bga maaram magbasa ngan mag- Enhanced literacy;
ihap. Nakihalubilo na hiya pagmulayha iba nga bata. Maaram Socialization;
an bata magbaton parti ha leksyon Active engagement
9 Advance learning and opportunity for the change Advanced learning; better
change
10 Mayakan na hiya, malipayun pag-attend, mayda bag-o na Children becoming more
sangkay-sangkay. Ngan para ha eskwelahan damo nga bulig ha talkative, happy and
mga bata, lalo na ha toddlers, advance learning. friendly
11 Maniguro in pag-eskwela kadungan nga nahihigaman han Grateful for rare
hibaro han mga bata. Maupay nga proyekto. Kay dire tanan opportunity
nga kag-anak nabubuligan pagtutdo an ira mga anak
12 It is a great help to the community. To achieve literacy in our Enhanced literacy
barangay and to enhance learning.
13 Kun nasiring nga makanhi, an mga bata na-excite nakaon ngan Active participation,
narissyuhan. Nakabulig ha kabataan nga dire pa na daycare. collaboration
Maupay ini kay dako na bulig. Dire na duro tungod pagtutdi
han mga kag-anak. Abtik ha klasi ngan na-enjoy an mga
kabataan.
14 Nababaro an mga kabataan makig-socialize ha ira classmate socialization
15 The children and parents became aware of the benefits of this Lessen teachers’ burden
project. Instead of the children playing during saturdays, the
go to school instead to attend the enrichment. The teachers
will not have a big problem on teaching kindergarten and
other grade level.
16 Imbis an mga bata nagmiminulay hin cellphone ha balay, na- Reduced digital
attender hira ha enrichment. Nakak-obserba gihap ako han engagement;
maupay nga katutdo nga puydi ko masubad pagtutdo ko. Active learning;
Nade-develop an mga bata. Mag-aram na hira, mag-aktib, na- cooperation
cooperate an mga bata hin maupay.
17 The project affect the beneficiaries, the barangay, the school Build strong partnership
in building strong partnership
18 For the beneficiaries of this project, it fosters their Fosters and strengthen
development in the different learning areas, for the school parent-school- community
and brgy, it creates collaboration and partnership. partnership
19 The project helps build teachers, schools and community Build teachers, school,
partnership community
20 For the barangay, it is a big help since they have limited Support for barangay and
resources and the school will be more equipped if they are school
going to continue the program.
21 Students will have reinforcement and will be reviewed with Reinforcement, review of
the topics being discussed by the volunteers. lessons
22 It could help the students retain and master basic concepts Mastery of basic concepts
they learned in school and it could greatly affect the teachers Additional manpower
and the school as a whole as there will be manpower added to

Page 3 of 7
help these children improve and create progress overtime.
23 The project affects the beneficiaries such as barangay and Enhances quality
school to several specific ways. For school, gaining education;
extracurricular activities enhances the overall quality Provides learning
education and provide students with broader learning opportunities
opportunities. For barangay, exposure to various extension Promotes participation
projects, boosting their confidence, skills and active
participation in improving the surroundings.
24 They excel in their academics. Promotes excellence in
The Barangay? It will help address the issue of out-of-school academics;
youth in the barangay. Reduce dropout rates;
The school? It will help teachers reduce the number of Reduce number of
struggling learners in their classes. struggling learners

S/N 3.a. What are the positive effects of the projects?


1 it was a good project for children free of charge Free of charge
2 An bata malipayon pagsulod ha school Child is Happy
3 Lessen shyness Reduced shyness
4 To prepare the children for schooling and for the socialization Socialization; preparedness
5 Identify the animals, write names learning
6 Learning advance and for socialization Advance learning/
socialization
7 Para dumamo it students nga masulod ha skwelahan. An Increase in
maupay kay na mga bata nahibabaro. enrollment/learning
8 Nahibaro hiya hin durudamo nga leksiyon ha eskwelahan ngan Learning more; reduced
dire na hiya naawod shyness
9 Excitement for children to come to school excitement
10 Advance learning , dire na hiya awdunon, excited, malikot, Advance learning; reduced
active na hiya ngan friendly shyness; active
11 Excited na nga bata, nagtratrabaho han iya mga assignmnent Excited; actively engaged;
ngan activities, dire na naawod, namamati na ha titser reduced shyness; attentive
12 There was an increase in literacy in school Increased literacy level
13 Advance learning, excited labi na hit december. Di na Advanced learning
makukurian an bata ha daycare
14 Nababaro tak anak makaipag-socialize ha iya classmates, Socialization; retention of
nakahinumdum hiya han mga lessons ha school lessons
15 Useful for all the children/participate and also to the teachers Active participation;
since the children learn the basic literacy like reading. advanced learning
16 An mga bata nahibaro pag-cooperate. Nakayakan na an Collaboration;
toddlers communication
17 One of the positive effects of the project is that it will help the Fills the gaps in learning
children in the area where ther have difficulty in learning.
18 It caters the needs of students in different areas such as Establish basic literacy
writing, numeracy and literacy skills
19 The positive effects of the project are the improvement in Improvement in basic
learners’ reading, writing, and numerical literacy. Fine and literacy
gross motor skills were also monitored and improved.
20 The prime effort of this project is being able to help the Establish readiness
students to be more ready in school
21 The positive effect is that students are being taught lessons in Advanced learning
which will help the kids know more about their lesson in
school
22 Better retention, preparedness and mastery of the skills of the Better retention;
learners preparedness, mastery
23 For school, there is follow-ups with the children on the Enriched learning; better

Page 4 of 7
covered topics ensuring continuous learning and better retention
retention of knowledge
24 They excel in their academics. Excellence; reduce out of
The Barangay? It will help address the issue of out-of-school school youth; reduce
youth in the barangay. struggling learners
The school? It will help teachers reduce the number of
struggling learners in their classes.

S/N 3.b. What are the negative effects of the project?


1 None None
2 Waray
3 None
4 None
5 None
6 None so far
7 Waray malain
8 Waray man malain nga epekto
9 None
10 Waray
11 Waray
12 Some do not take this project seriously Indifference
13 Waray man, puros positive
14 None
15 None
16 Waray man. Gan ok man pasensyosa, maghusay
17 I havent seen any negative effects of the project as of now
18 No answer
19 There are no negative effects
20 N/A
21 I don’t see any negative effects on this project
22 None so far
23 None so far
24 Poor Support from the school administration especially in Lack of administrative
financial matters. support

S/N 4. What challenges and issues have you encountered while


participating in this project?
1 None
2 Waray
3 Illnesses
4 None
5 None
6 Students nga waray makasulod, specially kun may ngan sakit Inability to attend sessions
nga inaabat
7 Waray
8 Waray man malain nga epekto
9 None
10 Waray
11 Waray
12 Absence of some learners during classes Absence
13 Waray
14 None
15 Teachers commitment to go to school on Saturdays. They Complaint over Saturday
complain that Saturdays are for rest day. being rest day
16 Waray. Ok ha akon an proyekto

Page 5 of 7
17 The challenge that I have encountered while implementing Lack of parental awareness
this project was some of the parents are not aware that there
is an enrollment of the program
18 Parent issue/unaware parents about the program Gaps in information
dissemination
19 The challenges that I encountered while implementing the absenteeism
project were learners absenteeism only showing up on the
closing day
20 Nothing since all the expenses and transportation are covered
by the LNU
21 I think the minor challenge I encounter was that the schedule Conflict with work
is conflict with work schedules. schedules
22 Insufficient budget allocation but somehow the organizers are Insufficient budget
very flexible resolving problems and looking for ways just to allocation
push through every session
23 Limited budget, human resources, transportation and Problems in logistics----
problems with equipment Limited budget, resources,
manpower, transportation
24 I cannot say negative but the project requires an additional Lack of commitment from
commitment from both parents and faculty extensionists. parents and faculty
Every first Saturday of the month will be dedicated to extensionists
extension activities.

S/N 5. How can these challenges and issues be resolved? What


changes can be made?
1 None
2 Waray
3 To be healthy Good health
4 No answer
5 To let the pupils be aware/has an advanced learning Awareness of program
6 To be healthy all the time Good health
7 Waray
8 Waray problema
9 None
10 Waray
11 No answer
12 Massive information and dissemination among the parents as Information dissemination
well as to the learners
13 Waray
14 None
15 Teachers commitment to go to school on Saturdays. They Commitment
complain that Saturdays are for rest day.
16 Waray
17 These challenges can be resolved through conducting Regular communication
assembly meetings with the parents. between parents and
teachers
18 It can be resolved by explaining and informing the parents Regular communication
about it between parents and
teachers
19 To resolve challenges and issues with learners absenteeism Increased project
leading to unmet or low-educational enrichment, increased promotion
project promotion may be encouraged with parents and
increased attendance monitoring with learners.
20 N/A
21 For the schedule I think if possible it it will be given a month or Early scheduling

Page 6 of 7
2-3 weeks prior since the extensionist in the Grad school are
working
22 Perhaps giving full-support on this extension for a better Full support of the project
service and output we could give to the beneficiaries
23 By having capacity building, collaborative and continuous Capacity building,
improvement collaboration; continuous
improvement
24 I cannot identify as of the moment.

Additional Question for Senior Extensionists/Junior Extensionist Undergrad and Grad School Students:

S/N 6. What goals/objectives of the project have been met?


What goals/objectives were not attained?
17 Based on the post-test we did, I can say that the learners Increased knowledge
really gain more knowledge compared when we conducted
the pre-test
18 All of the goals/objectives have been met All goals were met
20 No answer
21 The goals I think was met since some students have learned Students have learned
something and was able to accomplish the post-test. It is not
achieved when some forget the lessons but that is not
something that we can control.
22 No answer
23 We successfully achieved all the goals and objectives outlined Successfully achieved goals
in our project and objectives
24 I cannot identify as of the moment.

Page 7 of 7

You might also like