Time Table

The document outlines a project named 'Product Release' managed by Alex B., with a timeline from September 2 to October 10, showing 20% overall progress. It includes a detailed task list with responsible individuals, statuses, and a stakeholder list for final approvals. Additionally, it provides cost baselines and expectations for downtime and QA testing.

Uploaded by

sa.sarim.yt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Time Table

The document outlines a project named 'Product Release' managed by Alex B., with a timeline from September 2 to October 10, showing 20% overall progress. It includes a detailed task list with responsible individuals, statuses, and a stakeholder list for final approvals. Additionally, it provides cost baselines and expectations for downtime and QA testing.

Uploaded by

sa.sarim.yt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Project Name Product Release

Project Manager Alex B.


Project Deliverable
Scope Statement:

Start Date 2-Sep


End Date 10-Oct
Overall Progress 20%

Tasks Responsible Start End Days Status

Set kick-off meeting Alex B. 9/2 9/3 1 Complete


Agree on objectives Frank C. 9/3 9/7 4 Complete
Detailed Reqs. Jacob S. 9/7 9/12 5 Complete
Hardward Reqs. Jacob S. 9/9 9/11 2 Overdue
Final Resource Plan Jacob S. 9/11 9/15 4 In progress
Staffing Alex B. 9/16 9/17 1 In progress
Techincal Reqs. Frank C. 9/17 9/21 4 Not started
DB Development Shari W. 9/22 9/24 2 Not started
API Development Shari W. 9/23 9/27 4 Not started
UI Client Alex B. 9/25 9/29 4 Not started
Testing Kennedy K. 9/24 10/2 8 Not started
Dev. Complete Jacob S. 10/2 10/5 3 Not started
Hardware Config. Alex B. 10/5 10/7 2 Not started
System Testing Kennedy K. 10/6 10/9 3 Not started
Launch 10/9 10/10 1
9/2 9/7 9/12 9/17 9/22 9/27 10

Set kick-off meeting

Agree on objectives

Detailed Reqs.

Hardward Reqs.

Final Resource Plan

Staffing

Techincal Reqs.

DB Development

API Development

UI Client

Testing

Dev. Complete

Hardware Config.

System Testing

Launch
/22 9/27 10/2 10/7 10/12
Stakeholder List

Name Position Role in project Email address

Final approval of
John Smith VP of Product milestones [email protected]
Requirements Expectations

Downtime of no longer QA to take less than 1 week, marketing to


than 20 minutes promote new features in newsletter
Cost Baseline

Item/task % Complete Base Cost Cost

Extra devices for QA testing 50% $2,800 $3,500


Actual Cost % Budget Spent

$3,600 15%
Class Time-Table [ Pr
Days/Periods Time [Mon - Sat] Monday

ASSEMBLY [ 8:

1 8:15-8:50 MATH

2 8:50-9:25 CHEMISTRY

3 9:25-10:05 BIO/COMP

BREAK [ 10:05-10:

4 10:30-11:05 PHYSICS

5 11:05-11:40 PHYSICS

6 11:40-12:15 ENGLISH

7 12:15-12:50 TAJWEED

8 12:50-1:30

9 1:30-2:05 ARABIC
Time-Table [ Pre9-B1 ]
Tuesday Wednesday Thursday

ASSEMBLY [ 8:00-8:10 ]

MATH TAJWEED URDU

PHYSICS PHYSICS CHEMISTRY

URDU MATH TAJWEED

BREAK [ 10:05-10:30 ] FRIDAY BREAK [ 9:35-10:00 ]

ENGLISH MATH MATH

BIO/COMP BIO/COMP BIO/COMP

PAK.ST CHEMISTRY BIO/COMP

ISLAMIAT ENGLISH PAK.ST

SPORTS CLUB

ARABIC ARABIC ARABIC


FRIDAY TIME FRIDAY SATURDAY

8:20-8:45 URDU ISLAMIAT

8:45-9:10 PHYSICS MATH

9:10-9:35 ISLAMIAT URDU

0]

10:00-10:25 TAJWEED URDU

10:25-10:50 CHEMISTRY TAJWEED

10:50-11:15 PAK.ST CHEMISTRY

11:15-11:40 ENGLISH PAK.ST

CEF/B.A SPORTS CLUB

11:40-12:05 ..... ARABIC

You might also like