0% found this document useful (0 votes)
11 views

Preventive-Action-Procedure

The document outlines a procedure for implementing preventive actions through a structured process involving internal audits, management reviews, and customer feedback. It emphasizes identifying potential problems, conducting root cause analysis, and preparing a preventive action plan. The procedure also includes verification of effectiveness and updating records as necessary.

Uploaded by

itzzdeva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Preventive-Action-Procedure

The document outlines a procedure for implementing preventive actions through a structured process involving internal audits, management reviews, and customer feedback. It emphasizes identifying potential problems, conducting root cause analysis, and preparing a preventive action plan. The procedure also includes verification of effectiveness and updating records as necessary.

Uploaded by

itzzdeva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Procedure

PREVENTIVE ACTION
START

1. Internal Audit,
2. Management Review, Identify the Potential Problem & area where Preventive
3. Customer Satisfaction, action Required
4. Customer Complaint,
5. Process Monitoring & Measure #Action Report

Review Suggestions/Recommandation

m
Form a Team

co #Action Report

ff.
u
-Root Cause Analysis Method -5
Determine the Nature of Potential Problem & Root

t
Why,Ishikawa Diagram ,etc
Cause

s
#Action Report

er
ne Prepare & Implement Preventive Action Plan

gi OR #Action
Report

en
il ty Assign to an Individual

ua
q Verification of Preventive Action
#Action
Report

no
Is PA Effective?

Yes

m
Procedure for Control of

o
Documents Update Records as applicable

.c
#Control plan / PFMEA /

f
Work Instruction

uf
st Closeout AR

r
OR #Action Report

ee
in If required Apply for Similar Products

g
Horizontal Deployment

en
ity end

l
Individual

OR

CFT

u
(CROSS FUNCTIONAL TEAM)
a Qualityengineerstuff.com

You might also like