Cabel, Cajaro - BSCE 4A - Beams and Columns Takeoff

This document outlines the quantity takeoff for a municipal fire station project, focusing on beam and column works. It details various concrete and steel works for columns and beams across different levels, including specifications for materials and grid locations. The assignment is prepared by students Rheannie Cabel and Christy Ann Cajaro for their Quantity Surveying course.

Uploaded by

Rheannie Cabel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views52 pages

Cabel, Cajaro - BSCE 4A - Beams and Columns Takeoff

This document outlines the quantity takeoff for a municipal fire station project, focusing on beam and column works. It details various concrete and steel works for columns and beams across different levels, including specifications for materials and grid locations. The assignment is prepared by students Rheannie Cabel and Christy Ann Cajaro for their Quantity Surveying course.

Uploaded by

Rheannie Cabel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 52

Course/Subject: Quantity Surveying (CE 17)

Project: Typical Municipal Fire Station with Mezzanine


Assignment/Activity: Beam and Column Quantity Takeoff
Area: 212.50 sq.m
Prepared by: Rheannie Cabel and Christy Ann Cajaro
Course & Section: BSCE 4A

Item No. Description


I. CIVIL WORKS
A Column Concrete Works - Type A, 40 kg Cement
A.1 A.1.1) Columns - FOUNDATION TO MEZZ LEVEL
a) C1
b) C2
c) C3
d) C4
A.1.2) Columns - MEZZ LEVEL TO ROOF DECK
a) C1
b) C2
c) C3
d) C4
A.1.3) Column - ROOF DECK LINE TO PARAPET LINE
a) C1
b) C2
c) C4
A.1.4) Column - ROOF DECK TO STAIRWELL ROOF
a) C5

A.2 Beam Concrete Works - Type A, 40 kg Cement


A.2.1) Beams - AT MEZZANINE FLOOR LEVEL
a) GB2, @ GRID B2-B3 & C2-C3
b) MB1
b.1) MB1, @ GRID A2-A3, B3-B4, C3-C4
b.2) MB1, @ GRID B1-B2, C1-C2, D1-D2, E1-E2
b.3) MB1, @ GRID C1-D1, C2-D2
b.4) MB1, @ GRID D1-E1, D2-E2
c) MB2
c.1) MB2, @ GRID A2-B2, A3-B3,
c.2) MB2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4, along GRID B&C
c.3) MB2, along GRID 2&3
c.4) MB2, along GRID 2&3
c.5) MB2, along GRID B&C
d) SB
d.1) SB, @ GRID C4-D4
d.2) SB, @ GRID D4-E4
A.2.2) Beams - AT ROOF DECK FLOOR LEVEL
a) B1
a.1) B1, @ GRID B1-B2, C1-C2, D1-D2, E1-E2
a.2) B1, @ GRID B3-B4, C3-C4, D3-D4, D2-D3
a.3) B1, @ GRID C1-D1, C2-D2, C3-D3, C4-D4
a.4) B1, @ GRID D1-E1, D2-E2, D3-E3, D4-E4
b) B2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4
c) GB1, @ GRID E2-E4
d) GB2, @ GRID B2-B3, C2-C3
e) MB2, along B&C
A.2.3) Beams - AT STAIRCASE ROOF
a) B3
a.1) B3, along B&C
a.2) B3, along 1&3

B
Column Steel Works
B.1
B.1.1 COLUMN MAIN VERTICAL REBARS
B.1.1.A) Columns - FOUNDATION TO MEZZ LEVEL
a) C1
b) C2
c) C3
d) C4
B.1.1.B) Columns - MEZZ LEVEL TO ROOF DECK
a) C1
b) C2
c) C3
d) C4
B.1.1.C) Column - ROOF DECK LINE TO PARAPET LINE
a) C1
b) C2
c) C4
B.1.1.D) Column - ROOF DECK TO STAIRWELL ROOF
a) C5

B.1.2 COLUMN LATERAL TIES


B.1.2.A) Columns - FOUNDATION TO MEZZ LEVEL
a) C1
b) C2
c) C3
d) C4
B.1.2.B) Columns - MEZZ LEVEL TO ROOF DECK
a) C1
b) C2
c) C3
d) C4
B.1.2.C) Column - ROOF DECK LINE TO PARAPET LINE
a) C1
b) C2
c) C4
B.1.2.D) Column - ROOF DECK TO STAIRWELL ROOF
a) C5

B.1.3 COLUMN TIE WIRES


B.1.3.A) Columns - FOUNDATION TO MEZZ LEVEL
a) C1
b) C2
c) C3
d) C4
B.1.3.B) Columns - MEZZ LEVEL TO ROOF DECK
a) C1
b) C2
c) C3
d) C4
B.1.3.C) Column - ROOF DECK LINE TO PARAPET LINE
a) C1
b) C2
c) C4
B.1.3.D) Column - ROOF DECK TO STAIRWELL ROOF
a) C5

B.2
Beam Steel Works
Beam Steel Works
B.2.1 BEAM MAIN VERTICAL REBARS
B.2.1.A) Beams - AT MEZZANINE FLOOR LEVEL
a) GB2, @ GRID B2-B3 & C2-C3
b) MB1
b.1) MB1, @ GRID A2-A3, B3-B4, C3-C4
b.2) MB1, @ GRID B1-B2, C1-C2, D1-D2, E1-E2
b.3) MB1, @ GRID C1-D1, C2-D2
b.4) MB1, @ GRID D1-E1, D2-E2
c) MB2
c.1) MB2, @ GRID A2-B2, A3-B3,
c.2) MB2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4, along GRID B&C
c.3) MB2, along GRID 2&3
c.4) MB2, along GRID 2&3
c.5) MB2, along GRID B&C
d) SB
d.1) SB, @ GRID C4-D4
d.2) SB, @ GRID D4-E4
B.2.1.B) Beams - AT ROOF DECK FLOOR LEVEL
a) B1
a.1) B1, @ GRID B1-B2, C1-C2, D1-D2
@ GRID E1-E2
a.2) B1, @ GRID B3-B4, C3-C4, D3-D4, D2-D3
a.3) B1, @ GRID C1-D1, C2-D2, C3-D3, C4-D4
a.4) B1, @ GRID D1-E1, D2-E2, D3-E3, D4-E4
b) B2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4
c) GB1, @ GRID E2-E4
@ GRID E2-E4, torsion bars
d) GB2, @ GRID B2-B3, C2-C3
e) MB2, along B&C
B.2.1.C) Beams - AT STAIRCASE ROOF
a) B3
a.1) B3, along B&C
along B&C, in between planted column
a.2) B3, along 1&3
ORDERS
QUANTITY
WASTAGE ALLOWANCE (10%)
TOTAL QUANTITY
UNIT COST
TOTAL COST
TOTAL COST OF BEAM MAIN BARS=
B.2.2 BEAM STIRRUPS
B.2.2.A) Beams - AT MEZZANINE FLOOR LEVEL
a) GB2, @ GRID B2-B3 & C2-C3
b) MB1
b.1) MB1, @ GRID A2-A3, B3-B4, C3-C4
b.2) MB1, @ GRID B1-B2, C1-C2, D1-D2, E1-E2
b.3) MB1, @ GRID C1-D1, C2-D2
b.4) MB1, @ GRID D1-E1, D2-E2
c) MB2
c.1) MB2, @ GRID A2-B2, A3-B3,
c.2) MB2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4, along GRID B&C
c.3) MB2, along GRID 2&3
c.4) MB2, along GRID 2&3
c.5) MB2, along GRID B&C
d) SB
d.1) SB, @ GRID C4-D4
d.2) SB, @ GRID D4-E4
B.2.2.B) Beams - AT ROOF DECK FLOOR LEVEL
a) B1
a.1) B1, @ GRID B1-B2, C1-C2, D1-D2
@ GRID E1-E2
a.2) B1, @ GRID B3-B4, C3-C4, D3-D4, D2-D3
a.3) B1, @ GRID C1-D1, C2-D2, C3-D3, C4-D4
a.4) B1, @ GRID D1-E1, D2-E2, D3-E3, D4-E4
b) B2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4
c) GB1, @ GRID E2-E4
@ GRID E2-E4, torsion bars
d) GB2, @ GRID B2-B3, C2-C3
e) MB2, along B&C
B.2.2C) Beams - AT STAIRCASE ROOF
a) B3
a.1) B3, along B&C
along B&C, in between planted column
a.2) B3, along 1&3

B.2.3 BEAM TIE WIRES


B.2.3.A) Beams - AT MEZZANINE FLOOR LEVEL
a) GB2, @ GRID B2-B3 & C2-C3
b) MB1
b.1) MB1, @ GRID A2-A3, B3-B4, C3-C4
b.2) MB1, @ GRID B1-B2, C1-C2, D1-D2, E1-E2
b.3) MB1, @ GRID C1-D1, C2-D2
b.4) MB1, @ GRID D1-E1, D2-E2
c) MB2
c.1) MB2, @ GRID A2-B2, A3-B3,
c.2) MB2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4, along GRID B&C
c.3) MB2, along GRID 2&3
c.4) MB2, along GRID 2&3
c.5) MB2, along GRID B&C
d) SB
d.1) SB, @ GRID C4-D4
d.2) SB, @ GRID D4-E4
B.2.3.B) Beams - AT ROOF DECK FLOOR LEVEL
a) B1
a.1) B1, @ GRID B1-B2, C1-C2, D1-D2
@ GRID E1-E2
a.2) B1, @ GRID B3-B4, C3-C4, D3-D4, D2-D3
a.3) B1, @ GRID C1-D1, C2-D2, C3-D3, C4-D4
a.4) B1, @ GRID D1-E1, D2-E2, D3-E3, D4-E4
b) B2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4
c) GB1, @ GRID E2-E4
@ GRID E2-E4, torsion bars
d) GB2, @ GRID B2-B3, C2-C3
e) MB2, along B&C
B.2.3.C) Beams - AT STAIRCASE ROOF
a) B3
a.1) B3, along B&C
along B&C, in between planted column
a.2) B3, along 1&3

C Form Works
C.1 C.1.1) Columns - FOUNDATION TO MEZZ LEVEL
a) C1
b) C2
c) C3
d) C4
C.1.2) Columns - MEZZ LEVEL TO ROOF DECK
a) C1
b) C2
c) C3
d) C4
C.1.3) Column - ROOF DECK LINE TO PARAPET LINE
a) C1
b) C2
c) C4
C.1.4) Column - ROOF DECK TO STAIRWELL ROOF
a) C5
C.2 C.2.1) Beams - AT MEZZANINE FLOOR LEVEL
a) GB2, @ GRID B2-B3 & C2-C3
b) MB1
b.1) MB1, @ GRID A2-A3, B3-B4, C3-C4
b.2) MB1, @ GRID B1-B2, C1-C2, D1-D2, E1-E2
b.3) MB1, @ GRID C1-D1, C2-D2
b.4) MB1, @ GRID D1-E1, D2-E2
c) MB2
c.1) MB2, @ GRID A2-B2, A3-B3,
c.2) MB2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4, along GRID B&C
c.3) MB2, along GRID 2&3
c.4) MB2, along GRID 2&3
c.5) MB2, along GRID B&C
d) SB
d.1) SB, @ GRID C4-D4
d.2) SB, @ GRID D4-E4
C.2.2) Beams - AT ROOF DECK FLOOR LEVEL
a) B1
a.1) B1, @ GRID B1-B2, C1-C2, D1-D2
@ GRID E1-E2
a.2) B1, @ GRID B3-B4, C3-C4, D3-D4, D2-D3
a.3) B1, @ GRID C1-D1, C2-D2, C3-D3, C4-D4
a.4) B1, @ GRID D1-E1, D2-E2, D3-E3, D4-E4
b) B2, @ GRID B1-C1, B2-C2, B3-C3, B4-C4
c) GB1, @ GRID E2-E4
@ GRID E2-E4, torsion bars
d) GB2, @ GRID B2-B3, C2-C3
e) MB2, along B&C
C.2.3) Beams - AT STAIRCASE ROOF
a) B3
a.1) B3, along B&C
along B&C, in between planted column
a.2) B3, along 1&3
Unit Dimension Set/s Q
L W H Estimated Volume
(pcs)
(m) (m) (m) (cu.m)

0.6 0.4 4.5 1 1.08


0.4 0.4 4.5 1 0.72
0.4 0.3 4.5 6 3.24
0.4 0.3 4.5 9 4.86

0.6 0.4 2.9 1 0.7


0.4 0.4 2.9 1 0.46
0.4 0.3 2.9 6 2.09
0.4 0.3 2.9 9 3.13

0.6 0.4 1 1 0.24


0.4 0.4 1 1 0.16
0.4 0.3 1 9 1.08

0.4 0.15 2.8 2 0.34


TOTAL QUANTITY
WASTAGE ALLOWANCE (10%)
UNIT COST
TOTAL COST
TOTAL CONCRETE COLUMN COST=

0.4 0.3 4.5 2 1.08

0.4 0.3 4.5 3 1.62


0.4 0.3 3.5 4 1.68
0.4 0.3 5.1 2 1.22
0.4 0.3 5.7 2 1.37

0.4 0.2 3 2 0.48


0.4 0.2 3.2 5 1.28
0.4 0.2 2.125 1 0.17
0.4 0.2 1.125 1 0.09
0.4 0.2 2.075 1 0.17
0.4 0.3 5.1 1 0.61
0.4 0.3 5.7 1 0.68

0.45 0.25 3.5 4 1.58


0.45 0.25 4.5 4 2.03
0.45 0.25 5.1 4 2.3
0.45 0.25 5.7 4 2.57
0.4 0.3 3.2 4 1.54
0.65 0.35 9 1 2.05
0.4 0.3 4.5 2 1.08
0.4 0.2 3.2 1 0.26

0.4 0.25 2.45 2 0.49


0.4 0.25 4.25 2 0.85
TOTAL QUANTITY
WASTAGE ALLOWANCE (10%)
UNIT COST
TOTAL COST
TOTAL CONCRETE BEAM COST=

MAIN REBARS BEND Depth of Foundation NGL TO FIRST STOREY HEIGHT COLUMN MAIN REBARS
(m) from NGL (m) FIN. FLR. LINE (m) (m) DOWEL (m)

0.4 1.5 0.2 2.8 0.4


0.4 1.5 0.2 2.8 0.4
0.4 1.5 0.2 2.8 0.4
0.4 1.5 0.2 2.8 0.4

2.9 0.4
2.9 0.4
2.9 0.4
2.9 0.4

1
1
1

2.8
ORDERS 16mm x 6m 20mm x 6m
QUANTITY 4 180
WASTAGE ALLOWANCE (10%) 1 18
TOTAL QUANTITY 5 198
UNIT COST ₱412.80 ₱645.11
TOTAL COST ₱2,064.00 ₱127,731.78
TOTAL COST OF COLUMN MAIN BARS=
l w hook length lateral tie length column height
(m) (m) (m) (m) (m)
0.52 0.32 0.82 4.18 4.5
0.32 0.32 0.82 3.38 4.5
0.32 0.22 0.82 2.98 4.5
0.32 0.22 0.82 2.98 4.5

0.52 0.32 0.82 4.18 2.9


0.32 0.32 0.82 3.38 2.9
0.32 0.22 0.64 2.48 2.9
0.32 0.22 0.46 2.08 2.9

0.52 0.32 0.82 4.18 1


0.32 0.32 0.82 3.38 1
0.32 0.22 0.46 2.08 1

0.32 0.07 0.82 2.38 2.8


ORDERS
QUANTITY
WASTAGE ALLOWANCE (10%)
TOTAL QUANTITY
UNIT COST
TOTAL COST
TOTAL COST OF COLUMN LATERAL TIES =
NO. OF MAIN REBARS NO. OF LATERAL TIES NO. OF TOTAL NO. TIE LENGTH OF EACH TIE
per column (pcs) per column (pcs) COLUMNS (pcs) WIRES (pcs) WIRES (m)
12 29 1 348 0.4
12 29 1 348 0.4
12 29 6 2088 0.4
12 29 9 3132 0.4

12 21 1 252 0.4
12 21 1 252 0.4
10 21 6 1260 0.4
12 21 9 2268 0.4

12 11 1 132 0.4
12 11 1 132 0.4
12 11 9 1188 0.4

4 20 2 160 0.4
ORDERS (G.I. #16 TIE WIRE) (kg) 87.25
WASTAGE ALLOWANCE (10%) 9
TOTAL QUANTITY 96.25
UNIT COST ₱80.00
TOTAL COST OF COLUMN TIE WIRES = ₱7,699.62

COLUMN WIDTH CONCRETE COVER DISCO


BEND (m) LENGTH OF BEAM (m)
(m) (m)
COLUMN WIDTH CONCRETE COVER
BEND (m) LENGTH OF BEAM (m)
(m) (m)
TOP BAR LENGTH (m)

0.6 4.5 0.3 0.025 2

0.6 4.5 0.3 0.025 2


0.6 3.5 0.3 0.025 1.75
0.6 5.1 0.3 0.025 2.15
0.6 5.7 0.3 0.025 2.3

0.6 3 0.35 0.025 1.68


0.6 3.2 0.3 0.025 1.68
0.6 2.125 0 0.025 1.11
0.6 1.125 0 0.025 0.86
0.6 2.075 0 0.025 1.09

0.6 5.1 0.3 0.025 2.15


0.6 5.7 0.35 0.025 2.35

0.6 3.5 0.3 0.025 1.75


0.6 3.5 0.35 0.025 1.8
0.6 4.5 0.3 0.025 2
0.6 5.1 0.3 0.025 2.15
0.6 5.7 0.3 0.025 2.3
0.6 3.2 0.3 0.025 1.68
0.6 9 0.4 0.025 3.23
0.6 9 0.4 0.025 0
0.6 4.5 0.3 0.025 2
0.6 3.2 0 0.025 1.38

0.6 2.45 0 0.025 1.19


0.6 2.45 0.15 0.025 1.34
0.6 4.25 0.15 0.025 1.79
16mm x 6 m 16mm x 7.5 m 16mm x 9 m 16mm x 10 m 16mm x 12 m
84 124 14 17 5
9 13 2 2 1
93 137 16 19 6
₱412.80 ₱516.01 ₱619.21 ₱688.01 ₱825.61
₱38,390.40 ₱70,693.37 ₱9,907.36 ₱13,072.19 ₱4,953.66

l w hook length stirrup length beam span


(m) (m) (m) (m) (m)
0.32 0.22 0.1 1.18 4.2

0.32 0.22 0.1 1.18 4.2


0.32 0.22 0.1 1.18 3.2
0.32 0.22 0.1 1.18 4.8
0.32 0.22 0.1 1.18 5.4

0.32 0.12 0.1 0.98 2.65


0.32 0.12 0.1 0.98 2.9
0.32 0.12 0.1 0.98 2.125
0.32 0.12 0.1 0.98 1.125
0.32 0.12 0.1 0.98 2.075

0.32 0.22 0.1 1.18 4.8


0.32 0.22 0.1 1.18 5.35

0.37 0.17 0.1 1.18 3.2


0.37 0.17 0.1 1.18 3.15
0.37 0.17 0.1 1.18 4.2
0.37 0.17 0.1 1.18 4.8
0.37 0.17 0.1 1.18 5.4
0.32 0.22 0.1 1.18 2.9
0.57 0.27 0.1 1.78 8.6
0.57 0.27 0.1 1.78 8.6
0.32 0.22 0.1 1.18 4.2
0.32 0.12 0.1 0.98 3.2

0.32 0.17 0.1 1.08 2.45


0.32 0.17 0.1 1.08 2.3
0.32 0.17 0.1 1.08 4.1
ORDERS
QUANTITY
WASTAGE ALLOWANCE (10%)
TOTAL QUANTITY
UNIT COST
TOTAL COST
TOTAL COST OF BEAM STIRRUPS=
NO. OF MAIN REBARS NO. OF STIRRUPS per NO. OF BEAMS TOTAL NO. TIE LENGTH OF EACH TIE
per beam (pcs) beam (pcs) (pcs) WIRES (pcs) WIRES (m)
58 28 2 3248 0.4

72 28 3 6048 0.4
96 23 4 8832 0.4
48 31 2 2976 0.4
48 34 2 3264 0.4

26 20 2 1040 0.4
65 21 5 6825 0.4
13 17 1 221 0.4
13 11 1 143 0.4
13 17 1 221 0.4

24 31 1 744 0.4
24 34 1 816 0.4

72 23 4 6624 0.4
72 23 4 6624 0.4
72 28 4 8064 0.4
72 31 4 8928 0.4
72 34 4 9792 0.4
64 21 4 5376 0.4
18 50 1 900 0.4
2 50 1 100 0.4
58 28 2 3248 0.4
13 23 1 299 0.4

32 19 2 1216 0.4
32 18 2 1152 0.4
32 27 2 1728 0.4
ORDERS (G.I. #16 TIE WIRE) (kg) 667.39
WASTAGE ALLOWANCE (10%) 67.00
TOTAL QUANTITY 734.39
UNIT COST ₱80.00
TOTAL COST OF BEAM TIE WIRES = ₱58,751.09

L (m) W (m) H (m) Set/s Perimeter (m)


0.6 0.4 4.5 1 2.2
0.4 0.4 4.5 1 1.8
0.4 0.3 4.5 6 1.6
0.4 0.3 4.5 9 1.6

0.6 0.4 2.9 1 2.2


0.4 0.4 2.9 1 1.8
0.4 0.3 2.9 6 1.6
0.4 0.3 2.9 9 1.6

0.6 0.4 1 1 2.2


0.4 0.4 1 1 1.8
0.4 0.3 1 9 1.6

0.4 0.15 2.8 2 1.3

0.4 0.3 4.2 2 1.6


0.2
0.4 0.3 4.2 3 1.6
0.4 0.3 3.2 4 1.6
0.4 0.3 4.8 2 1.6
0.4 0.3 5.4 2 1.6

0.4 0.2 2.65 2 1.4


0.4 0.2 2.9 5 1.4
0.4 0.2 2.125 1 1.4
0.4 0.2 1.125 1 1.4
0.4 0.2 2.075 1 1.4

0.4 0.3 4.8 1 1.6


0.4 0.3 5.35 1 1.6

0.45 0.25 3.2 4 1.6


0.45 0.25 3.15 4 1.6
0.45 0.25 4.2 4 1.6
0.45 0.25 4.8 4 1.6
0.45 0.25 5.4 4 1.6
0.4 0.3 2.9 4 1.6
0.65 0.35 8.6 1 2.2
0.65 0.35 8.6 1 2.2
0.4 0.3 4.2 2 1.6
0.4 0.2 3.2 1 1.4

0.4 0.25 2.45 2 1.5


0.4 0.25 2.3 2 1.5
0.4 0.25 4.1 2 1.5
ORDERS
QUANTITY
WASTAGE ALLOWANCE (10%)
TOTAL QUANTITY
UNIT COST
TOTAL COST
TOTAL COST OF FORMWORKS =
QUANTITY OF MATERIALS
Cement Fine Sand Gravel
(bags) (cu.m) (cu.m)
9 0.5 1
10 0.54 1.08
7 0.36 0.72
30 1.62 3.24
44 2.43 4.86

7 0.35 0.7
5 0.23 0.46
19 1.05 2.09
29 1.57 3.13

3 0.12 0.24
2 0.08 0.16
10 0.54 1.08

4 0.17 0.34
170 10 19
17 1 2
₱250.00 ₱2,000.00 ₱1,600.00
₱46,750.00 ₱22,000.00 ₱33,600.00
₱102,350.00

10 0.54 1.08

15 0.81 1.62
16 0.84 1.68
11 0.61 1.22
13 0.69 1.37

5 0.24 0.48
12 0.64 1.28
2 0.09 0.17
1 0.05 0.09
2 0.09 0.17
6 0.31 0.61
7 0.34 0.68

15 0.79 1.58
19 1.02 2.03
21 1.15 2.3
24 1.29 2.57
14 0.77 1.54
19 1.03 2.05
10 0.54 1.08
3 0.13 0.26

5 0.25 0.49
8 0.43 0.85
238 13 26
24 2 3
₱250.00 ₱2,000.00 ₱1,600.00
₱65,500.00 ₱30,000.00 ₱46,400.00
₱141,900.00

TOTAL LENGTH OF MAIN NUMBER OF MAIN BARS ORDER QUANTITY


Set/s
BARS (m) per column
(pcs)

5.3 1 12 12
5.3 1 12 12
5.3 6 12 72
5.3 9 12 108

3.3 1 12 4
3.3 1 12 4
3.3 6 10 20
3.3 9 12 36

1 1 12 1
1 1 12 1
1 9 12 9

2.8 2 4 4
20mm x 10 m 25mm x 6m 25mm x 10 m 25mm x 12 m
20 24 44 11
2 3 5 2
22 27 49 13
₱1,075.17 ₱1,007.94 ₱1,679.91 ₱2,015.89
₱23,653.74 ₱27,214.38 ₱82,315.59 ₱26,206.57
₱262,979.49
No. ties spaced at
50 mm 75 mm 100 mm 150 mm
2 2 2 4
2 2 2 4
2 2 2 4
2 2 2 4

2 2 2 4
2 2 2 4
2 2 2 4
2 2 2 4

2 2 2 4
2 2 2 4
2 2 2 4

2 2 2 4
10mm x 7.5 m 10mm x 9 m 10mm x 12 m
73 292 8
8 30 1
81 322 9
₱203.28 ₱243.94 ₱325.25
₱16,465.68 ₱78,548.68 ₱2,927.25
₱97,941.61
TOTAL LENGTH OF TIE AMOUNT OF TIE
WIRES (m) WIRES (KG)
139.2 2.63
139.2 2.63
835.2 15.76
1252.8 23.64

100.8 1.90
100.8 1.90
504 9.51
907.2 17.12

52.8 1.00
52.8 1.00
475.2 8.97

64 1.21

DISCONTINUOUS BARS AT SUPPORT


Set of bars per Beam BOTTOM BAR Set of bars per Beam
TOP BAR LENGTH (m)
Length (pcs) LENGTH (m) Length (pcs)

4 2 1 6.25

2 2 2 6.25
2 1.75 2 5.25
2 2.15 2 6.85
2 2.3 2 7.45

1 1.68 1 4.85
1 1.68 1 4.95
1 1.11 1 3.28
1 0.86 1 2.28
1 1.09 1 3.23

2 2.15 2 6.85
2 2.35 2 7.55

2 0 0 5.25
2 0 0 5.35
2 0 0 6.25
2 0 0 6.85
2 0 0 7.45
2 0 0 4.95
2 0 0 10.95
0 0 0 10.95
4 2 1 6.25
1 1.38 1 4.35

2 0 0 3.6
2 0 0 3.9
2 0 0 5.73
20 mm x 6 m 20 mm x 7.5 m 20 mm x 9 m 20 mm x 10 m
67 85 16 23
7 9 2 3
74 94 18 26
₱645.11 ₱806.38 ₱967.66 ₱1,075.17
₱47,738.14 ₱75,799.72 ₱17,417.88 ₱27,954.42
₱339,905.23
No. stirrups spaced at
50 mm 75 mm 100 mm 150 mm
1 3 3 5

1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5

1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 3
1 3 3 5

1 3 3 5
1 3 3 5

1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5
1 3 3 5

1 3 3 5
1 3 3 5
1 3 3 5
10mm x 6 m 10mm x 9 m 10mm x 12 m
261 20 25
27 2 3
288 22 28
₱162.62 ₱243.94 ₱325.25
₱46,834.56 ₱5,366.68 ₱9,107.00
₱61,308.24
TOTAL LENGTH OF TIE AMOUNT OF TIE
WIRES (m) WIRES (KG)
1299.20 24.51

2419.20 45.65
3532.80 66.66
1190.40 22.46
1305.60 24.63

416.00 7.85
2730.00 51.51
88.40 1.67
57.20 1.08
88.40 1.67

297.60 5.62
326.40 6.16

2649.60 49.99
2649.60 49.99
3225.60 60.86
3571.20 67.38
3916.80 73.90
2150.40 40.57
360.00 6.79
40.00 0.75
1299.20 24.51
119.60 2.26

486.40 9.18
460.80 8.69
691.20 13.04

Total Area of Forms (sq. No. of Plywood Total no. of Plywood 2" X 2" Wood Frame
m.) Required (pcs) Required (pcs) (Bd. Ft.)
9.9 4
8.1 3
43.2 15
64.8 23

6.38 3
5.22 2
27.84 10 85 2521
41.76 15

2.2 1
1.8 1
14.4 5

7.28 3

13.44 5
0 0
20.16 7
20.48 8
15.36 6
17.28 6

7.42 3
20.3 8
2.975 2
1.575 1
2.905 2

7.68 3
8.56 3
141 3533

20.48 8
20.16 7
26.88 10
30.72 11
34.56 12
18.56 7
18.92 7
18.92 7
13.44 5
4.48 2

7.35 3
6.9 3
12.3 5
Marine Plywood (6 mm x 2" x 2" x 10 m Wood
1.2m x 2.4m) (pcs) Frame (Bd. Ft.)
226 6054
23 606
249 6660
₱435.00 ₱105.00
₱108,315.00 ₱699,300.00
₱807,615.00
Note:
Depth of Foundation from NGL (m) 1.5
NGL TO FIRST FIN. FLR. LINE (m) 0.2
FIN. FIRST FLR. LINE TO MEZZ FLR. LINE (m) 2.8
MEZZ FLR. LINE TO ROOF DECK FLR. LINE (m) 2.9
ROOF DECK FLR. LINE TO PARAPET LINE (m) 1
ROOF DECK FLR. LINE TO STAIRWELL ROOF (m) 2.8
MAIN REBARS BEND (m) 0.4
COLUMN MAIN REBARS DOWEL (m) 0.4
Concrete Cover (m) 0.04
Outer Hook Length (m) 0.05
Inner Hook Length (m) 0.09
Bar diameter COMMERCIAL LENGTH OF BAR
(mm) (m)

25 6
25 6
20 6
20 6

25 10
25 10
20 10
25 10

25 12
25 12
25 12

16 6

No. of lateral ties per column


200 mm (pcs)
18 29
18 29
18 29
18 29

10 21
10 21
10 21
10 21

0 11
0 11
0 11

9 20

CONTINUOUS BARS AT SUPPORT


Set of bars per Beam Length (pcs) BOTTOM BAR LENGTH (m)

2 6.25

3 6.25
3 5.25
3 6.85
3 7.45

2 4.85
2 4.95
2 3.28
2 2.28
2 3.23

3 6.85
3 7.55

4 5.25
4 5.35
4 6.25
4 6.85
4 7.45
3 4.95
4 10.95
2 0
2 6.25
2 4.35

3 3.6
3 3.9
3 5.73
20 mm x 12 m 25 mm x 6 m
6 2
1 1
7 3
₱1,290.21 ₱1,007.94
₱9,031.47 ₱3,023.82

No. of stirrups per beam


200 mm (pcs)
15 28

15 28
10 23
18 31
21 34

7 20
8 21
4 17
0 11
4 17

18 31
21 34

10 23
10 23
15 28
18 31
21 34
8 21
37 50
37 50
15 28
10 23

6 19
5 18
14 27
Bd. Ft. of Wood Frame for Column and Beam Per Plywood Form (

Size of Wood Frame

2" x 2"

Area of Plywood (1.2m x 2.4 m) (sq. m.)


from the total length of main bars,
use 6 m bars

from the total length of main bars,


use 7.5 m bars, therefore number of
bars is halved to reduce waste

from the total length of main bars,


use 12m bars to avoid excess

from the total length of main bars,


use 6 m bars, therefore number of
bars is halved to reduce waste

Set of Columns Total Lateral Ties NO. OF STEEL BARS FROM COM.
BAR LENGTH (pcs)
NO. OF STEEL BARS FROM COM.
(pcs) (pcs) BAR LENGTH (pcs)
1 29 14.5
1 29 14.5
6 174 58
9 261 130.5

1 21 10.5
1 21 10.5
6 126 42
9 189 47.25

1 11 5.5
1 11 5.5
9 99 24.75

2 40 8

CUT BARS
Set of bars per Beam Length Set of bars per Beam Length BOTTOM BAR
TOP BAR LENGTH (m)
(pcs) (pcs) LENGTH (m)

2 2.7 1 2.7

3 0 0 2.7
3 0 0 2.1
3 0 0 3.06
3 0 0 3.42

2 0 0 1.8
2 0 0 1.92
2 0 0 1.28
2 0 0 0.68
2 0 0 1.25

3 0 0 3.06
3 0 0 3.42

4 0 0 2.1
4 0 0 2.1
4 0 0 2.7
4 0 0 3.06
4 0 0 3.42
3 0 0 1.92
4 0 0 5.4
0 0 0 0
2 2.7 1 2.7
2 0 0 1.92

3 0 0 1.47
3 0 0 1.47
3 0 0 2.55
25 mm x 7.5 m 25 mm x 12 m
2 8
1 1
3 9
₱1,259.93 ₱2,015.89
₱3,779.79 ₱18,143.01

Set of Beams Total Stirrups NO. OF STEEL BARS FROM COM.


(pcs) (pcs) BAR LENGTH (pcs)
2 56 11.2

3 84 16.8
4 92 18.4
2 62 12.4
2 68 13.6

2 40 6.67
5 105 17.50
1 17 2.83
1 11 1.83
1 17 2.83

1 31 6.2
1 34 6.8

4 92 18.4
4 92 18.4
4 112 22.4
4 124 24.8
4 136 27.2
4 84 16.8
1 50 10
1 50 10
2 56 11.2
1 23 3.83

2 38 3.45
2 36 3.27
2 54 4.91
e for Column and Beam Per Plywood Form (6mm x 1.2m x 4m)

Post Beam

29.67 25.06

2.88
TRIAL DIVISION FOR MOST ECONOMICAL BAR LENGTH, COLUMN LATERAL TIES

6 7.5 9
2.08 2.88 3.61 4.33
2.38 2.52 3.15 3.78
2.48 2.42 3.02 3.63
2.98 2.01 2.52 3.02
3.38 1.78 2.22 2.66
4.18 1.44 1.79 2.15

ORDER SUMMARY, COLUMN LATERAL TIES


NO. OF STEEL COMMERCIAL
ORDER QUANTITY Bar diameter
BARS REQUIRED LENGTH OF BAR
(pcs) (pcs) (mm) (m)
2.08 72 10 9
2.38 8 10 12
2.48 42 10 7.5
2.98 189 10 9
3.38 31 10 7.5
4.18 31 10 9

DISCONTINUOUS BARS AT SUPPORT


Set of Beams
(pcs)
Set of Beams
Set of bars per Beam (pcs) NO. OF STEEL BARS
TOTAL NO. OF BARS BAR DIAMETER
Length (pcs) FROM COM. BAR
(pcs) (mm) LENGTH (pcs)
4 2 20 20 6.67

2 3 24 20 8.00
2 4 32 20 8.00
2 2 16 20 4.00
2 2 16 20 4.00

1 2 8 20 1.14
1 5 20 20 2.86
1 1 4 20 0.80
1 1 4 20 0.67
1 1 4 20 0.80
0
2 1 8 20 2.00
2 1 8 20 2.00

2 4 16 16 4.00
2 4 16 16 4.00
2 4 16 16 4.00
2 4 16 16 4.00
2 4 16 16 4.00
2 4 16 16 4.00
2 1 4 25 2.00
0 1 0 0 0.00
4 2 20 20 6.67
1 1 4 20 1.00

2 2 8 16 1.00
2 2 8 16 1.00
2 2 8 16 2.00

TRIAL DIVISION FOR MOST ECONOMICAL BAR LENGTH, BEAM STIRRUPS

6 7.5 9
0.98 6.12 7.65 9.18
1.08 5.56 6.94 8.33
1.18 5.08 6.36 7.63
1.78 3.37 4.21 5.06

ORDER SUMMARY, BEAM STIRRUPS


NO. OF STEEL COMMERCIAL
ORDER QUANTITY Bar diameter
BARS REQUIRED LENGTH OF BAR
(pcs) (pcs) (mm) (m)
0.98 36 10 6
1.08 25 10 12
1.18 225 10 6
1.78 20 10 9
ENGTH, COLUMN LATERAL TIES

10 12 6
4.81 5.77 0.86 6.98
4.20 5.04 1.09 5.50
4.03 4.84 1.11 5.41
3.36 4.03 1.19 5.04
2.96 3.55 1.34 4.48
2.39 2.87 1.38 4.35
1.68 3.57
1.75 3.43
1.79 3.35
1.8 3.33
2 3.00
2.15 2.79
2.3 2.61
2.35 2.55
3.23 1.86
2.28 2.63
3.23 1.86
3.28 1.83
3.6 1.67
3.9 1.54
4.35 1.38
4.85 1.24
4.95 1.21
5.25 1.14
5.35 1.12
5.73 1.05
6.25 0.96
6.85 0.88
7.45 0.81
7.55 0.79
10.95 0.55

CONTINUOUS BARS CUT BARS


NO. OF STEEL
TOTAL NO. OF BARS BAR DIAMETER BARS FROM TOTAL NO. BAR DIAMETER NO. OF STEEL BARS
COM. BAR OF BARS FROM COM. BAR
(pcs) (mm) LENGTH (pcs) (pcs) (mm) LENGTH (pcs)
8 20 8.00 10 20 5.00

18 20 18.00 6 20 3.00
24 20 24.00 8 20 2.00
12 20 12.00 4 20 1.33
12 20 12.00 4 20 2.00

8 20 4.00 2 20 0.67
20 20 10.00 5 20 1.00
4 20 2.00 1 20 0.17
4 20 1.00 1 20 0.13
4 20 2.00 1 20 0.25
0 0 0
6 20 6.00 2 20 0.67
6 20 6.00 2 20 1.00

32 16 32.00 8 16 2.00
32 16 32.00 8 16 2.00
32 16 32.00 8 16 4.00
32 16 32.00 8 16 4.00
32 16 32.00 8 16 4.00
24 16 12.00 8 16 2.00
8 25 8.00 2 25 2.00
2 20 2.00 0 0
8 20 8.00 10 20 5.00
4 20 2.00 1 20 0.33

12 16 6 4 16 1.00
12 16 4 4 16 1.00
12 16 12 4 16 2.00

AR LENGTH, BEAM STIRRUPS

10 12
10.20 12.24
9.26 11.11
8.47 10.17
5.62 6.74
TRIAL DIVISION FOR MOST ECONOMICAL BAR LENGTH, BEAM MAIN VERTICAL BARS

7.5 9 10 12 6
8.72 10.47 11.63 13.95 0.68 8.82
6.88 8.26 9.17 11.01 1.25 4.80
6.76 8.11 9.01 10.81 1.28 4.69
6.30 7.56 8.40 10.08 1.47 4.08
5.60 6.72 7.46 8.96 1.8 3.33
5.43 6.52 7.25 8.70 1.92 3.13
4.46 5.36 5.95 7.14 2.1 2.86
4.29 5.14 5.71 6.86 2.55 2.35
4.19 5.03 5.59 6.70 2.7 2.22
4.17 5.00 5.56 6.67 3.06 1.96
3.75 4.50 5.00 6.00 3.42 1.75
3.49 4.19 4.65 5.58 5.4 1.11
3.26 3.91 4.35 5.22
3.19 3.83 4.26 5.11
2.32 2.79 3.10 3.72
3.29 3.95 4.39 5.26
2.32 2.79 3.10 3.72
2.29 2.74 3.05 3.66
2.08 2.50 2.78 3.33
1.92 2.31 2.56 3.08
1.72 2.07 2.30 2.76
1.55 1.86 2.06 2.47
1.52 1.82 2.02 2.42
1.43 1.71 1.90 2.29
1.40 1.68 1.87 2.24
1.31 1.57 1.75 2.09
1.20 1.44 1.60 1.92
1.09 1.31 1.46 1.75
1.01 1.21 1.34 1.61
0.99 1.19 1.32 1.59
0.68 0.82 0.91 1.10
counted within
same 6 m
commercial bar

1.47
1.47
2.55
BARS
CUT BAR LENGTH
7.5 9 10 12
11.03 13.24 14.71 17.65 (pcs)
6.00 7.20 8.00 9.60 0.86
5.86 7.03 7.81 9.38 1.09
5.10 6.12 6.80 8.16 1.11
4.17 5.00 5.56 6.67 1.19
3.91 4.69 5.21 6.25 1.34
3.57 4.29 4.76 5.71 1.38
2.94 3.53 3.92 4.71 1.68
2.78 3.33 3.70 4.44 1.68
2.45 2.94 3.27 3.92 1.75
2.19 2.63 2.92 3.51 1.75
1.39 1.67 1.85 2.22 1.79
1.8
2
2
2.15
2.15
2.3
2.3
2.35
3.23
ORDERS OF BEAM MAIN VERTICAL BARS
DISCONTINUOUS BAR CONTINUOUS BAR
ORDER BAR COMMERCIAL CUT BAR LENGTH ORDER BAR
QUANTITY DIAMETER LENGTH OF BAR QUANTITY DIAMETER
(pcs) (m) (m) (pcs) (pcs) (m)
1 20 6.0 2.28 1 20
1 20 6.0 3.23 2 20
1 20 6.0 3.28 2 20
1 16 10.0 3.6 6 16
1 16 12.0 3.9 4 16
1 20 6.0 4.35 2 20
4 16 7.5 4.85 4 20
4 20 12.0 4.95 12 16
4 16 7.5 4.95 10 20
8 20 7.5 5.25 32 16
2 16 7.5 5.25 24 20
4 16 7.5 5.35 32 16
4 16 9.0 5.73 12 16
22 20 6.0 6.25 32 16
4 16 9.0 6.25 34 20
6 20 9.0 6.85 32 16
4 16 10.0 6.85 18 20
4 20 10.0 7.45 32 16
2 20 10.0 7.45 12 20
2 25 7.5 7.55 6 20
10.95 2 20
10.95 8 25
ERTICAL BARS
ONTINUOUS BAR CUT BAR
COMMERCIAL CUT BAR ORDER BAR COMMERCIAL
LENGTH OF BAR LENGTH QUANTITY DIAMETER LENGTH OF BAR
(m) (pcs) (pcs) (m) (m)
10.0 0.68
7.5 1.25 1 20 6
7.5 1.28
7.5 1.47 2 16 6
12.0 1.8 1 20 6
9.0 1.92 2 16 9
10.0 1.92 2 20 6
10.0 2.1 4 16 9
10.0 2.1 2 20 9
6.0 2.55 2 16 6
6.0 2.7 4 16 6
6.0 2.7 13 20 6
6.0 3.06 4 16 7.5
7.5 3.06 2 20 10
7.5 3.42 4 16 7.5
7.5 3.42 3 20 7.5
7.5 5.4 2 25 6
7.5
7.5
9.0
12.0
12.0