D Daily Report 21NOV22
D Daily Report 21NOV22
10
0
DAILY DRILLING REPORT
Report No 66
FAIAD BERGIN OIL SERVICE CO Date: 21 11 2022
Rig Name FBOS-B6 Conssion NC151 Type Objective: DEVELOPMENT Company ZALLAF
SPUD DATE 15/09/2022 WELL No B6-NC151 Days : 66 Days Since Last Injury: 6
Proposed TD 4130 R.O.P Depth 4130 FD of Today Total Footge 4130 Move From: Move To:
Rig
Move Distance: Time:
B
H
A
8.5 BIT &BIT SUB&12*4 3/4 DC
N
O
0
Hole Size
12 1/4'' Casing Size 9 5/8 Casing Shoe 4120 Mud Weight 8.4
BOP A-Date Last P/T: 6/11/2022 B - PRESSURE 1500-200 C -Date Last F/T: 17/11/2022
TON MILE 6 A-SINCE LAST CUT 383 B-Length of Rope Remaining: 3380 Safety Meeting date 21/11/2022 Supject TRIP/SLIP HAZARD
REPAIRS A-Last 24 Hrs 0 B-Month: 0 TOTAL PERSONNELS 73 SET CARD 5 TRIC CARD 5
From To OPERATIONS
00.00 00.30 Cont. CIR till Brine in/out the Same. Flow Check. OK
00.30 04.00 Proceeded W/POOH W/9 5/8''RBP on 3 1/2''Tbgs, Rack Back Tbgs and L/D 9 5/8''RBP and Retrieving Tool.
04.00 10.00 RIH W/3 1/2''Open End Tbg to TD (4000ft), CIR BU F/1hr, Spot 100bbls of 8.5ppg Inhibited Brine. Flow Check. Ok.
10.00 15.30 POOH W/3 1/2''Tbg and Rack Back on the Rig Floor
15.30 P/U, M/U 9 5/8''CMT Retainer
16.00 HPJSM, Discuss Running Procedures and Setting Mechanism.
16.00 RIH W/9 5/8''CMT Retainer T/2740ft, Set the Same by Rotating Clockwise 10times. Apply 25klbs Overpull. Sting-out,
19.30 Apply 10klbs as a Weight Test.
19.30 22.00 POOH W/3 1/2''Tbgs and CMT Retainer Setting Tool, L/D Setting Tool and Rack Back 3 1/2''Tbgs on the Rig Floor.
22.00 00.00 RIH W/3 1/2''Open End Tbg again T/2100ft
L/U CMT Lines and CIR Head. Flush Lines and P/T the Same T/500/2000psi
Perform 1st CMT Balanced Plug