IPA & IPC in Construction
IPA & IPC in Construction
B) Additions
C) Deductions
The Contract Quantity Surveyor shall submit the IPA (Interim Payment Application) to the Employer or Engineer,
along with the necessary supporting documents, to ensure timely certification of the works or services by the
Employer or Engineer.
Supporting Documents for the IPA
1. Quantity Takeoff and Breakdown Sheets.
2. Drawings (Approved by Engineer)
3. Contractor Store Stoks Balance report (Material On side Cost)
4. Surveyor level Sheets.
5. Material inspection report (MIR) for any Special work item.
6. Work Inspection Reports. (WIR).
7. Construction Verbal instructions (CVI) any additional Work.
8. Approved Request for Instruction (RFI)
9. Invoice Or Delivery notes for Variation / daywork items.
10. Original or true copy of Construction Bonds and insurance documents.
11. Bulletins for Price Escalation.
12. Related Later (variation approved, any special work request by Client or engineer).
13. Any Additional Supporting Documents for Work Completed by the Contractor
What is the Interim payment Certification (IPC) / Valuation?
The process of determining the amount payable to the Contractor during periodic payments is known as "valuation."
This involves an assessment conducted by the Consultants or Engineer at regular intervals (monthly or completion
of certain work) to evaluate the work properly executed by the Contractor. The purpose of this valuation is to
enable the Employer to make payments to the Contractor in accordance with the terms of the Contract.
What are the FIDIC Clauses Related to the Interim Payment Certificate (IPC)?
• The Contractor submits the IPC in accordance with Sub-Clause 14.3 [Application for Interim Payment
Certificates].
• Employer pays the Contractor in accordance with Sub-Clause 19.6 [Optional Termination, Payment and
Release].
• Progress report for relevant month in accordance with Sub-Clause 4.21 [Progress Reports].
• Contractor Payment Sub-Clause 14.7(B) [Payment] the amount certified in the Interim Payment
Certificate should be paid to the Contractor
• Changes in legislation in accordance with Sub-Clause 13.7 [Adjustments for Changes in Legislation]
• Changes in cost in accordance with Sub-Clause 13.8 [Adjustments for Changes in Cost]
• The advance payment and repayments in accordance with Sub-Clause 14.2 [Advance Payment]
• Plant and Materials in accordance with Sub-Clause 14.5 [Plant and Materials intended for the Works]
1 Value of Permanent Works executed to date and all other matters payable
SL.Rs.
7 Net Valuation ( 4 - 5 + 6 )
SL.Rs.
Please Certify that in accordance with the Conditions of Contract the Payment as detailed above is due to IPA-XX for contractor Interim payment
Amount in words
Date : Date :
Resident Engineer (Engineer): Team Leader (Engineer) :
Date : Date :
IPA-xx month of February-2020
BILL NO : 04 SUB - BASES, BASES AND SHOULDERS XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX
Material at Site
Project NAME
Package
Employer Interim Payment Application : XX
IPA-xx month of February-
Consultant NAME Period Ending :
2020
Contractor Sub Clause : 13.8
Price Adjustment
Ixb Ixc (Ixc-Ixb) Px (Ixc-Ixb)
Sl No. Description Px February-
Formula (Oct. 2021) Ixb Ixb
2024
F = 0.966 ( V - Vna ) ∑ Px (Ixc - Ixb) P2 Heavy Equipment 13.06 418.20 563.80 0.3482 4.546954
100 Ixb L1 Skilled Labour 10.44 617.80 750.60 0.2150 2.244144
L3 Unskilled Labour 8.19 761.60 925.40 0.2151 1.761452
M48 Aggregate Base Course 6.04 253.40 461.50 0.8212 4.960237
V = V2-V1 = (Vc + Mc) - (Vp + Mp) M13 Reinforcement 5.14 1,192.10 1,621.30 0.3600 1.850590
V1 - Cum. value of work done up to the previous IPC IPA No : = 15 M 3 Cement 50kg (Nos) 6.28 618.90 1,192.00 0.9260 5.815266
( Work done + Materials at site ) = XXXXXXXX + = 0.00 P3 Fuel 4.88 1,084.70 3,547.20 2.2702 11.078639
M30C Bitumen 60/70 3.78 621.20 884.60 0.4240 1.602788
V2 - Cum. value of work done in the current IPC IPA No : = 16 M15 GI Sheets 5.45 1,119.00 2,240.60 1.0023 5.462663
( Work done + Materials at site ) = XXXXXXXX + = 0.00 L2 Semi skilled Labour 3.77 670.30 814.50 0.2151 0.811031
M 8 Sand 3.65 3,929.80 5,937.70 0.5109 1.864938
V - Vna = (V2 - Vna2) - (V1 - Vna1) M7 Metal 3.46 429.90 740.80 0.7232 2.502242
V - Vna = ( 0.00 - 0.00 ) - ( 0.00 - 0.00 ) P 1 Light Equipment 1.51 475.90 635.80 0.3360 0.507352
V - Vna = 0.00 M21 Timber 2.52 1,225.00 1,756.10 0.4336 1.092549
M43 Precast items 5.40 604.80 1,417.50 1.3438 7.256250
M45 Earth 1.87 1,400.00 2,713.70 0.9384 1.754728
M38 Light Fittings 4.03 324.10 490.10 0.5122 2.064116
M53 Cabion Boxes 0.53 137.40 271.60 0.9767 0.517656
Non Adjustable Element
Preliminary & General - XXXXXXXX # ## -
Provisional Sum - XXXXXXXX # ## -
0.966( V - Vna ) = 0.00 Extra Works & Additional Works - XXXXXXXX Px ( Ixc -Ixb ) ------------------------------------------> 57.693595
100 Day Works - XXXXXXXX Ixb
Vna2 - 0.00
Latest date for submission of tender :
08 Total Amount of Advance Payment (as per the clause 14.2 PCC - 20%) XXXXXXXX
= XXXXXXXX
XXXXXXXXX
X =
Y = ( X - 0.1 ) X -
(0.8 - 0.1)
Y =
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21A -
21B -
-
3 301(14) Excavation in marshy material and disposal of soft soils. 45.00 Cu.m.
4 302(1) Excavation for structures, soil suitable for backfill 115.00 Cu.m.
17 1011A(1) Mild Steel Dowels (Dia. 20mm , Length 1.0m ) 60.00 Nos.
21 706(1) Weep holes using 100mm dia. PVC pipes (type 400) 290.00 L.m.
23 805(2) Filter Fabric for Gabion boxes.(TS-30 Non wowen) 800.00 Sq.m. - - -
SSCM No
Item Rate Amount
/ Pay Item Description Qty. Unit Amount (Rs.) Amount (Rs.) Amount (Rs.)
No. (Rs.) (Rs.)
No
10.1 TRAFFIC SAFETY AND ROAD MAINTENANCE
Temporary by-passes for Culverts, Bridges and
1 103(2) PS Sum Allow
other Structures
2 103(2)A Cost for the initial road maintanance PS Sum Allow
10.2 TESTING LABORATORY
Special Tests ordered by the Engineer,
3 109 (3) PS Sum Allow
including Contractors markup
10.9 LANDSCAPING
10.11
Item Rate
DESCRIPTION Unit Qty. Amount (Rs.) Qty. Amount (Rs.) Qty. Amount (Rs.) Qty. Amount (Rs.)
No. (Rs.)
11.1 : LABOUR DAY WORKS
All Quantities are Provisional
1 Surveyor Hrs 100 - - - -
2 Survey Assistant (Skilled) Hrs 150 - - - -
3 Laboratory Technician (Skilled) Hrs 100 - - - -
4 Cad Operator Hrs 60 - - - -
5 Draughtman Hrs 60 - - - -
6 Foreman Hrs 25 - - - -
7 Operator, Heavy Equipment Hrs 50 - - - -
8 Operator, Light Equipment Hrs 100 - - - -
9 Driver, Heavy Duty Vehicles Hrs 25 - - - -
10 Driver, Light Duty Vehicles Hrs 50 - - - -
11 Mechanic Hrs 10 - - - -
12 Welder Hrs 60 - - - -
13 Electrician Hrs 8 - - - -
14 Carpenter Hrs 5 - - - -
15 Mason Hrs 75 - - - -
16 Steel Fixer Hrs 5 - - - -
17 Plumber/Fitter Hrs 50 - - - -
18 Semi- skilled Labour Hrs 400 - - - -
19 Unskilled Labour Hrs 400 - - - -
Labour Day Works Carried to summary 11.1 - - -
For Contractor For Engineer
Prepared By:Quantity Surveyor Submitted By:Project Manager Checked By:Quantity Surveyor Certifyed By:Team Leader
VARIATIO ODERS PREVIOUS THIS MONTH CUMULATIVE
Approved Approved
VO.No Description Unit Rate (Rs.) Qty. Amount (Rs.) Qty. Amount (Rs.) Qty. Amount (Rs.)
Qty Amount
Bituminous Prime coat using MC 30 at 1
VO.01 Sq.m
ltr/sq.m)
Claim
No.01
Claim
No.02
Claim
November-2023
No.03
Claim
December-2023
No.04
Claim
January-2024
No.05
Claim
February-2024
No.06
Total 'A' - - -