0% found this document useful (0 votes)
4 views

Rebar Calculation

The document provides detailed rebar calculations for the 4th floor slab of the New Yangon Specialist Hospital project, including quantities, diameters, wastage, and total cutting lengths for various rebar items. The total quantities include 1,472 units of DB10 and 934 units of DB12, amounting to 21.50 tons of rebar. The calculations are organized by different sections of the slab, indicating specific requirements for each area.

Uploaded by

Wunna Zaw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Rebar Calculation

The document provides detailed rebar calculations for the 4th floor slab of the New Yangon Specialist Hospital project, including quantities, diameters, wastage, and total cutting lengths for various rebar items. The total quantities include 1,472 units of DB10 and 934 units of DB12, amounting to 21.50 tons of rebar. The calculations are organized by different sections of the slab, indicating specific requirements for each area.

Uploaded by

Wunna Zaw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Summary

Total Total
No. Diameter Wastage 5% Tons Remark
Nos. QTY
T1
1 10 283 14 297 2.20
2 12 411 21 432 4.90
T2
3 10 432 22 454 3.36
4 12 22 1 23 0.26
B2
5 10 500 25 525 3.89
6 12 - - - -
B1
7 10 - - - -
8 12 456 23 479 5.44
Additional Slab
7 10 186 9 195 1.45
8 12 - - - -

Total Nos. of DB10 1,472.00 Nos.


Total Nos. of DB12 934.00 Nos.
Total Tons 21.50 Tons
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


T1
01 10 2,875 149 428.375
02 10 4,450 30 133.500
03 10 5,325 30 159.750
04 12 9,660 28 270.480
05 12 4,654 2 9.308
06 12 2,240 2 4.480
07 12 7,040 2 14.080
08 12 8,890 16 142.240
09 12 3,970 2 7.940
10 12 2,490 2 4.980
11 10 2,795 21 58.695
12a 12 9,340 1 9.340
12b 12 9,540 1 9.540
12c 12 9,740 1 9.740
12d 12 9,940 1 9.940
12e 12 10,140 1 10.140
12f 12 10,340 1 10.340
12g 12 10,540 1 10.540
12h 12 10,740 1 10.740
12i 12 10,940 1 10.940
13 12 11,650 112 1,304.800
14 12 4,640 8 37.120
15 12 4,220 8 33.760
16 12 10,070 10 100.700
17 12 8,990 4 35.960
18 12 11,440 16 183.040
19 12 10,550 26 274.300
20 12 5,540 32 177.280
21 12 9,820 17 166.940
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


T1
22 12 4,975 1 4.975
23 12 10,105 39 394.095
24 12 7,115 4 28.460
25 12 5,600 17 95.200
26 12 7,410 31 229.710
27 12 10,420 30 312.600
28 12 8,700 30 261.000
29 12 11,620 30 348.600
30 12 10,390 30 311.700
31 10 5,035 31 156.085
32 10 8,740 31 270.940
34 10 2,895 101 292.395
35 10 7,015 38 266.570
36 12 7,015 11 77.165
37 10 9,020 64 577.280
38 10 3,680 6 22.080
39 10 5,975 6 35.850
40 10 2,515 53 133.295
40a 10 2,820 1 2.820
40b 10 3,020 1 3.020
40c 10 3,220 1 3.220
41a 10 2,670 1 2.670
41b 10 2,470 1 2.470
41c 10 2,270 1 2.270
41d 10 2,070 1 2.070
41e 10 1,870 1 1.870
01a 10 1,440 440 633.600
01b 10 1,550 128 198.400
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


T1

TOTAL M TON NOS


DB 10 3,387.225 2.09 283
DB 12 4,922.173 4.66 411
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


T2
01a 10 10,650 5 53.250
02a 10 11,700 109 1,275.300
04a 10 8,500 3 25.500
05a 10 10,690 5 53.450
06a 10 9,060 3 27.180
08a 10 9,190 5 45.950
09a 10 6,400 3 19.200
10a 10 8,200 6 49.200
11a 10 10,510 4 42.040
13a 10 10,165 8 81.320
14a 10 9,400 8 75.200
15a 10 6,000 21 126.000
16a 10 8,000 8 64.000
17a 10 11,165 8 89.320
18a 10 7,070 28 197.960
19a 10 2,850 1 2.850
19b 10 2,650 1 2.650
19c 10 2,450 1 2.450
19d 10 2,250 1 2.250
19e 10 2,050 1 2.050
19f 10 1,850 1 1.850
19g 10 1,650 1 1.650
19h 10 1,450 1 1.450
20a 12 9,150 28 256.200
21a 10 2,840 15 42.600
22a 10 8,865 14 124.110
23a 10 5,205 14 72.870
24a 10 10,865 7 76.055
25a 10 10,690 41 438.290
26a 10 3,510 28 98.280
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


T2
27a 10 3,205 16 51.280
28a 10 7,430 14 104.020
29a 10 4,140 32 132.480
30a 10 9,390 23 215.970
331a 10 9,040 14 126.560
32a 10 11,410 21 239.610
33a 10 9,510 5 47.550
34a 10 6,730 5 33.650
35a 10 11,700 5 58.500
36a 10 11,460 5 57.300
37a 10 10,250 7 71.750
38a 10 3,515 7 24.605
39a 10 2,650 1 2.650
39b 10 2,450 1 2.450
39c 10 2,250 1 2.250
39d 10 2,050 1 2.050
39e 10 1,850 1 1.850
39f 10 1,650 1 1.650
40a 10 4,590 37 169.830
41a 10 2,840 4 11.360
42a 10 7,500 3 22.500
43a 10 7,000 3 21.000
44a 10 10,510 4 42.040
45a 10 10,700 2 21.400
46a 10 10,000 3 30.000
47a 10 5,090 2 10.180
48a 10 3,205 16 51.280
49a 10 7,600 8 60.800
50a 10 8,400 8 67.200
51a 10 8,310 8 66.480
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


T2
52a 10 5,840 7 40.880
53a 10 3,260 7 22.820
55a 10 5,240 7 36.680
56a 10 3,860 7 27.020
57a 10 3,205 16 51.280
58a 10 5,000 7 35.000
59a 10 7,000 4 28.000
60a 10 9,330 4 37.320
61a 10 10,500 4 42.000
62a 10 2,310 4 9.240
TOTAL M TON NOS
DB 10 5,174.760 3.19 432
DB 12 256.200 0.24 22
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


B2
01b 10 11,700 144 1,684.800
02b 10 9,175 5 45.875
03b 10 11,400 6 68.400
05b 10 8,300 3 24.900
06b 10 6,710 3 20.130
07b 10 11,000 6 66.000
08b 10 7,290 10 72.900
09b 10 7,460 3 22.380
10b 10 8,240 6 49.440
11a 10 6,910 32 221.120
13b 10 7,460 5 37.300
14b 10 6,590 16 105.440
15b 10 6,000 21 126.000
16b 10 9,320 8 74.560
17b 10 11,000 8 88.000
18b 10 8,620 8 68.960
20b 10 6,275 28 175.700
21b 10 10,650 14 149.100
22b 10 9,000 14 126.000
23b 10 10,300 8 82.400
24b 10 9,350 8 74.800
25b 10 2,750 1 2.750
25c 10 2,550 1 2.550
25d 10 2,350 1 2.350
25e 10 2,150 1 2.150
25f 10 1,950 1 1.950
25g 10 1,750 1 1.750
25h 10 1,550 1 1.550
25i 10 1,350 1 1.350
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


B2
26b 10 8,750 29 253.750
27b 10 7,465 7 52.255
28b 10 5,785 7 40.495
29b 10 2,800 6 16.800
30b 10 1,550 16 24.800
31b 10 7,350 30 220.500
32b 10 6,650 14 93.100
33b 10 5,150 9 46.350
34b 10 8,950 26 232.700
35b 10 1,700 38 64.600
36b 10 10,200 5 51.000
37b 10 9,950 9 89.550
38b 10 2,760 5 13.800
42b 10 8,110 4 32.440
44b 10 3,165 7 22.155
45b 10 2,600 1 2.600
45c 10 2,400 1 2.400
45d 10 2,200 1 2.200
45e 10 2,000 1 2.000
45f 10 1,800 1 1.800
45g 10 1,600 1 1.600
46b 10 7,500 13 97.500
47b 10 11,400 13 148.200
48b 10 8,400 8 67.200
49b 10 5,625 5 28.125
50b 10 11,600 16 185.600
51b 10 800 2 1.600
52b 10 5,075 3 15.225
54b 10 9,700 8 77.600
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


B2
55b 10 7,950 7 55.650
56b 10 10,450 14 146.300
57b 10 3,100 7 21.700
58b 10 10,160 7 71.120
59b 10 6,000 13 78.000
60b 10 7,250 2 14.500
61b 10 8,550 13 111.150
62b 10 7,650 1 7.650
63b 10 3,760 4 15.040
64b 10 9,110 5 45.550
65b 10 7,750 5 38.750
66b 10 7,160 5 35.800
67b 10 10,160 4 40.640
68b 10 3,750 4 15.000
69b 10 1,050 7 7.350

TOTAL M TON NOS


DB 10 5,992.750 3.70 500
DB 12 - - -
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


B2
01c 12 2,500 149 372.500
02c 12 4,100 30 123.000
03c 12 5,000 30 150.000
04c 12 10,800 14 151.200
05c 12 8,600 13 111.800
06c 12 4,450 2 8.900
06d 12 1,025 1 1.025
06e 12 7,620 1 7.620
06f 12 2,505 19 47.595
07c 12 11,450 2 22.900
08c 12 5,420 1 5.420
09c 12 3,650 2 7.300
10c 12 7,275 8 58.200
11c 12 7,990 1 7.990
11d 12 10,390 1 10.390
11e 12 8,390 1 8.390
11f 12 10,790 1 10.790
11g 12 8,790 1 8.790
11h 12 11,815 1 11.815
11i 12 11,400 1 11.400
11j 12 9,390 1 9.390
11k 12 11,790 1 11.790
13c 12 2,320 1 2.320
13d 12 2,120 1 2.120
13e 12 1,920 1 1.920
13f 12 1,720 1 1.720
13g 12 1,520 1 1.520
14c 12 9,875 9 88.875
15c 12 10,325 9 92.925
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


B2
15d 12 9,225 8 73.800
16c 12 7,900 2 15.800
16d 12 6,800 2 13.600
17c 12 9,450 13 122.850
17d 12 8,350 13 108.550
18c 12 6,675 38 253.650
20c 12 6,175 16 98.800
21c 12 7,275 16 116.400
23c 12 9,720 16 155.520
26c 12 9,700 38 368.600
27c 12 6,775 4 27.100
28c 12 7,355 8 58.840
29c 12 6,255 8 50.040
30c 12 9,900 30 297.000
31c 12 10,035 2 20.070
32c 12 10,570 15 158.550
33c 12 2,740 15 41.100
34c 12 3,930 14 55.020
35c 12 9,360 14 131.040
36c 12 7,065 31 219.015
37c 12 10,075 30 302.250
38c 12 10,750 15 161.250
41c 12 10,275 15 154.125
42c 12 9,125 15 136.875
43c 12 9,600 15 144.000
44c 12 2,500 98 245.000
46c 12 8,900 45 400.500
47c 12 3,500 2 7.000
48c 12 2,500 2 5.000
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


B2
49c 12 5,835 4 23.340
50c 12 2,130 53 112.890
51c 12 2,490 1 2.490
51d 12 2,290 1 2.290
51e 12 2,090 1 2.090
52c 12 3,875 8 31.000

TOTAL M TON NOS


DB 10 - - -
DB 12 5,465.050 5.18 456
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Additional Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


Additional Slab
01 10 775 319 247.225
01a 10 925 70 64.750
01b 10 765 206 157.590
01c 10 915 101 92.415
02 10 4,275 6 25.650
03 10 2,370 5 11.850
04 10 1,925 4 7.700
05 10 1,545 16 24.720
06 10 550 1 0.550
06a 10 880 1 0.880
06b 10 1,050 1 1.050
06c 10 1,300 1 1.300
06d 10 1,550 1 1.550
06e 10 1,800 1 1.800
06f 10 2,050 1 2.050
06g 10 2,300 1 2.300
07 10 5,825 51 297.075
08 10 5,425 5 27.125
09 10 2,650 4 10.600
10a 10 750 1 0.750
10b 10 1,000 1 1.000
10c 10 1,245 1 1.245
10d 10 1,500 1 1.500
10e 10 1,655 1 1.655
12 10 3,740 6 22.440
13 10 2,775 11 30.525
14 10 2,375 1 2.375
15 10 2,200 1 2.200
16 10 2,600 11 28.600
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Additional Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


Additional Slab
17 10 9,050 7 63.350
18 10 8,650 1 8.650
19 10 2,550 15 38.250
20 10 2,350 1 2.350
21 10 2,460 1 2.460
22 10 2,260 2 4.520

02a 10 6,175 49 302.575


03a 10 7,275 6 43.650
04a 10 9,720 7 68.040
05a 10 9,700 1 9.700
07a 10 6,775 1 6.775
07b 10 7,355 1 7.355
07c 10 6,255 1 6.255
07d 10 9,900 1 9.900
07e 10 10,035 1 10.035
07f 10 10,570 1 10.570
08a 10 2,740 1 2.740
08b 10 3,930 1 3.930
08c 10 9,360 1 9.360
08d 10 7,065 1 7.065
08e 10 10,075 1 10.075
08f 10 10,750 1 10.750
08g 10 10,275 1 10.275
09a 10 9,125 4 36.500
11a 10 9,600 24 230.400
12a 10 2,500 13 32.500
15a 10 8,900 5 44.500
16a 10 3,500 13 45.500
New Yangon Specialist Hospital (NYSH Project)

Rebar Calculation for 4FL Additional Slab

Bar Wasting Total Cutting


No. Item Cutting Length Qty
Diameter Length/12M Length

(mm) (MM) (M) (nos.) (M)


Additional Slab
17a 10 2,500 13 32.500
18a 10 5,835 1 5.835
19a 10 2,130 23 48.990
20a 10 2,490 1 2.490
21a 10 2,290 10 22.900

TOTAL M TON NOS


DB 10 2,221.215 1.37 186