2023_1stbids(0)
2023_1stbids(0)
Establishment of Family Super Health Center, Brgy. Vista DMC Building, Narra Extension, Capitol Shopping
1 BAC-23-01-0007
Alegre, Bacolod City
13,000,000.00 B.C. SALMEGA BUILDERS
Center, Bacolod City
12,770,000.00 FEB. 07, 2023 240 days
Road Improvement at various prks., Brgy. Singcang Airport, Venus St., Puentebella Subd., Brgy. Taculing,
2 BAC-23-01-0008A
Bacolod City
2,128,613.37 B.C. NBM CONSTRUCTION & SUPPLY, INC.
Bacolod City
1,894,321.80 FEB. 07, 2023 240 days
Rehab/ Improvement of Pavement at Palanca Road, JJ Gonzaga Village, Bakyas, Brgy. Mansilingan,
3 BAC-23-01-0009A
Bacolod City
4,590,022.35 B.C. M.K.U. CONSTRUCTION & SUPPLY
Bacolod City
4,494,900.00 FEB. 07, 2023 240 days
Improvement of CMO, BCGC, Brgy. Villamonte, Bacolod JJ Gonzaga Village, Bakyas, Brgy. Mansilingan,
4 BAC-23-01-0014
City
15,813,388.00 B.C. M.K.U. CONSTRUCTION & SUPPLY
Bacolod City
1,262,074.00 FEB. 07, 2023 240 days
LEGACY CONSTRUCTION CORPORATION AND 3 Kawilihan Lane Bagong Ilog, Pasig City/ JJ
The Project Design & Build of Bacolod City General
6 BAC-23-01-0112
Hospital
250,000,000.00 B.C. M.K.U. CONSTRUCTION & SUPPLY (JOINT Gonzaga Village, Bakyas, Brgy, Mansilingan, 250,000,000.00 MAR. 27, 2023 840 days
VENTURE) Bacolod City
We hereby certify that we have reviewed the contents and hereby attest to the veracity of the data or information contained in this document.
(SGD) (SGD)
CHERYL D. JAVELLANA MARY JEAN L. RAMOS, CPA, EnP, MBA, MPA
Head BAC Secretariat BAC Chairperson