Chapter III Concrete and ROMAR Step and Gravity Septic Tank Installations
Chapter III Concrete and ROMAR Step and Gravity Septic Tank Installations
MARYLAND
CHAPTER III
REFERENCE DRAWINGS
for
CONCRETE AND ROMAR
STEP AND GRAVITY
SEPTIC TANK INSTALLATIONS
April 2024
INDEX OF DRAWINGS
3. Reference Step and Gravity Septic Tank Design Plan View SS-S-1c
4. Plan – Romar SDG Septic Tank, Severe Duty, Gravity Installation SS-S-2a
10. One Line Diagram for Pumps ½ H.P. to 2 H.P. (230V) SS-E-3
RISER,
SUBMERSIBLE SEE DETAIL
EFFLUENT SHEET NO. S-5
SEPTIC TANK 1-1/2" PVC ELECTRICAL
PUMP JUNCTION CONDUIT
4" PVC BOX 1-1/2"Ø SPR 21 PVC
CLEANOUT DISCHARGE PIPE
4" PVC
INLET
1-1/2"
PVCTRUE
6"x4" TEE FLOAT UNION BALL
SWITCHES VALVE
AASHTO NO.67 PUMP INSERT
AGGREGATE SEE DETAIL, 1
2" POLYPROPYLENE
SHT. NO. M-2 ROPE
SLEEVE ROPE
THRU BLOCK (TYP.)
4" (TYP.)
1.5", CALL OUT DISTANCE NEOPRENE COMPRESSION
TO DROP LINE TO 4' OF SEAL - TYP. ALL PIPE
COVER PENETRATIONS
EXTEND 6" TO MATCH ELEV.
HOMEOWNERS 10' MAX. OF COVER & PROVIDE PVC
RESPONSIBILITY CAP
RISER AND COVER
PANELLA CAP, (SEE DETAIL, SHT. S-3)
PER COUNTY
PROVIDE BENTONITE 6' SERVICE LOOP FOR PUMP AND
AROUND ALL PENTRATIONS STANDARD S/9 FLOAT REMOVAL- ATTACH TO
AND SEALS HORIZONTAL
SECTION OF DISCHARGE PIPE
TOP OF CAP ABOVE
METALLIC DETECTION TAPE
EXISTING GRADE ELECTRICAL JUNCTION BOX (SEE DETAIL; SHT. E-4 & E-5)
1 1/2"PVC ELECTRICAL CONDUIT ELBOWS (SEE DETAIL E-5)
4"
4" PVC 18-24" METALLIC
CLEANOUT MAX. DETECTION
TAPE &
GEOTEXTILE TRACER WIRE
MAX. DEPTH MATERIAL 1-1/2" PVC TRUE UNION BALL VALVE
4" OVER TOP OF 1-1/2" PVC TRUE Hayward
BACKFILL WITH GRAVEL
CLEAN SAND ball valve GEOTEXTILE MATERIAL
TO OVER TOP OF GRAVEL
4"x 4" WYE
WITHIN 4" OF 1-1/2" Ø SDR 21
GRADE & 81 BEND HDPE DISCHARGE PIPE
11 21 " LIQUID ANTISYPHON 42" MIN. COVER
LEVEL DEVICE
HIGH WATER
ALARM GRAVEL UNDER
4"PVC PUMP ON
SCH 40 DISCHARGE PIPE
PUMP OFF
THROUGHOUT 23 21 " PUMP INSERT 1
#67 STONE 6"x 4" 2" POLYPROPYLENE
UNDER PIPE (SEE DETAIL, SHT. 1 ROPE
TEE M-2) 2"STAINLESS
2"X 1-1/2" STEEL CABLE CLAMP
REDUCER 1000 POLYPROPYLENE CONNECT TO OUTER PART
GAL. LIFTING ROPW WITH OF RIB, ALLOWS
4' SERVICE LOOP- GROMMET TO SEAL
6" PVC 19"
ATTACH TO HORIZ. BETTER
DISTANCE FROM BOTTOM OF BELOW LIQUID
SECTION OF DIS- (3)8"x 8"X 16" CMU
TANK SHALL BE CENTERED LEVEL
CHARGE PIPE ATTACHED AS SHOWN
ANCHOR SHALL 30" SUBMERSIBLE GEOTEXTILE MATERIAL
BE WITHIN 10 FEET EFFLUENT PUMP OVER TOP OF GRAVEL AND
GEOTEXTILE MATERIAL OVERLAP AT TANK AND
6" MIN. GROUND
OVER TOP OF GRAVEL A MINIMUM OF 1'-0"
AND OVERLAP AT TANK
AND GROUND A MINIMUM 1' AROUND TANK FOR STONE
OF 1'-0".
AASHTO NO.67
AGGREGATE
ADD WOOVEN
GEOTEXTILE
NOTES:
INLET
OUTLET
PUMP
DISCHARGE
PROVIDE
CLEARANCES
TO BE ABLE
TO REMOVE
AND OPERATE "B"
SEE NOTE BELOW
1
2"STAINLESS
STEEL CABLE
EXCAVATION FOR CLAMPS
ANTIFLOATATION (TYP.)
DEVICE
(TYP.)
CORRUGATED
POLYETHYLENE
RISER (SEE
SEPTIC TANK DETAIL SHT.
NO. S-6)
4" PVC 4" PVC OUTLET
CLEANOUT
SCH 40 PVC
THROUGHOUT
R,
A T .
GL ORA O.D
F 2"
AASHTO NO.67
.D
2
SS " I
AGGREGATE 1
2" POLYPROPYLENE
ROPE
1
4
RUBBER HOSE
4" (TYP.)
4" PVC
19"
SCH 35 OUTLET
LIQUID
4" PVC, SCH LEVEL
40 INLET
23 21 "
1
GRAVEL COMBINATION SAN. 2" POLYPROPYLENE
UNDER PIPE WYE PLUS EIGHTH ROPE
BEND, NO TEES
4"
NOTES:
FINISHED FOAM
GRADE GASKET
4'-8"
SLOPE GRADE AWAY
FROM TANK
COMPACTED
BACKFILL
HDPE RISER
2
1
3
RISER
GASKET MATERIAL
SEPTIC TANK
STAINLESS STEEL
SCREWS AND WASHERS
12"
CHECK HEIGHT FOR
DETECTION TAPE
METALLIC
DETECTION
TAPE
42" MIN.
EARTH BACKFILL
COMPACTED IN
8" LIFTS
CALL OUT SPEC MAXIMUM TRENCH WIDTH=O.D.+12"
REQUIREMENTS DO NOT EXCEED MAXIMUM TRENCH
WIDTH WITHOUT WRITTEN
PERMISSION OF THE ENGINEER.
AASHTD# 67 OR
6" MIN.
WASHED SAND
BEDDING
6" O.D.
PVC PRESSURE
SEWER TRACER WIRE
(SEE COUNTY STD.
SECTON 02570)
MIN.
3"
O.D.+6"
2
O.D.+6" MIN.
FLOAT WIRING SHALL BE 2-#14
PUMP POWER WIRING SHALL BE 1-#10
EXISTING
HOUSE
MAIN BREAKER
EXISTING SERVICE BOX AND PANEL
ENTRANCE
ARRANGEMENT A
(USE WHEN "x"= 4 FEET
EXISTING METER OR LESS)
SOCKET
18" MIN.
COVER
3
4" CONDUIT,
1-#8 GND.
1" CONDUIT, 2-#14, 1-#10 GND.&
6-#14 TO JUNCTION BOX
GROUND ROD
ARRANGEMENT B (USE WHEN "x"=
MORE THAN 4 FEET)
NOTES:
1. ALL CONDUIT PENETRATIONS IN
PUMP CONTROL PANEL SHALL BE
AT BOTTOM
1-1/2" CONDUIT, 3
JUNCTION BOX
SEPTIC TANK
FS(3)
START
STOP
HIGH WATER LEVEL
NOTE:
1. ALL CONDUIT PENETRATIONS TO
PUMP CONTROL PANEL SHALL
ENTER AT BOTTOM OF PANEL.
2. A DISCONNECT PANEL SHALL BE
SQUARE D.
EXISTING 120/240V.,
1"Ø, 3W SERVICE
1-1/2" CONDUIT, 3
JUNCTION BOX
SEPTIC TANK
FS(3)
NOTE:
1. ALL CONDUIT PENETRATIONS TO
PUMP CONTROL PANEL SHALL
ENTER AT BOTTOM OF PANEL.
2. A DISCONNECT PANEL SHALL BE
SQUARE D.
+
+