Risk Assessment - Height Work - SEC 5 Star Format

The document outlines a comprehensive risk assessment process that includes identifying, analyzing, and evaluating risks associated with workplace activities, particularly in height work. It provides a structured approach to assess the severity and likelihood of risks, implement control measures, and develop a risk reduction action plan. The document emphasizes the importance of existing risk controls and opportunities for improvement to ensure safety in the workplace.

Uploaded by

kawasa27
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views6 pages

Risk Assessment - Height Work - SEC 5 Star Format

The document outlines a comprehensive risk assessment process that includes identifying, analyzing, and evaluating risks associated with workplace activities, particularly in height work. It provides a structured approach to assess the severity and likelihood of risks, implement control measures, and develop a risk reduction action plan. The document emphasizes the importance of existing risk controls and opportunities for improvement to ensure safety in the workplace.

Uploaded by

kawasa27
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

HAZARD IDENTIFICATION & RISK ASSESSMENT

RISK ASSESSMENT PROCESS


1. Identify Risks – These may include brainstorming, Intracting with workforces, Site visit, systematic process reviews, Process Hazard Analysis
and Job Observations

2.Analyse Risks – Determine consequences and likelihood of each risk. Write these items onto the table next to each risk.
Severity Likelihood
Level Descriptor Level Descriptor
1 Minor 1 Improbable
2 Appreciable 2 Remote
3 Serious 3 Occasional
4 Major 4 Probable
5 Catastrophic 5 Frequent
3. Evaluate Risks –Use the grid below to identify the level of risk.
How severely could it How likely is it to be that bad?
-- + + + ++
Hurt someone or how will could it make someone? Extremely Common or
1-7=Low Risk, 8-14= Medium Risk, 15-19= High Risk, 20-25= very high risk unlikely to repeating
occur occurrences

! (1) Minor (Not signifiacnt/No lost time) 1 2 3 4 5

!! (2) Appreciable (First aid required) 2 4 6 8 10

!!!(3) Serious (medical attention and several days off work) 3 6 9 12 15

!!!!(4) Major (Fatality) 4 8 12 16 20

N Catastrophic (Multiple fatality) 5 10 15 20 25

4. Identify and evaluate existing risk controls – Identify what happens already to manage the risks and consider how well these strategies are
working (good, adequate, variable). How does this effect the level of risk? Fill these items in on the table. If you are not happy with the level of risk
at this stage proceed to step 5.

5. Further risk treatments and opportunities for improvement – What actions are needed to bring risks to an acceptable level (these actions
are incorporated into other planning processes and include responsibilities, resources and timelines)? What opportunities are there for
improvement? Write these onto the table.
5. Further risk treatments and opportunities for improvement – What actions are needed to bring risks to an acceptable level (these actions
are incorporated into other planning processes and include responsibilities, resources and timelines)? What opportunities are there for
improvement? Write these onto the table.
Risk Assessment and Analysis

Workplace/Task/Activity/Process - Height Work

Company:
Deptartment/Area Page No: 1 of 1
RA Number: Rev: 00 Date
RA Team: Reviewed by: Approved by Manager/Supervisor:

Signature: Signature:

Hazards Identifications Control Risk Assessment Risk Reduction Action Plan


Controls
Risk Issue (Possible Implemented
Workplace Yes or No
Incident) (What can go Follow up by Whom
Activity/ Process/ Risk Risk
Item # Hazards wrong) Control Measures Consequence Likelihood (Name) and by When Consequence Likelihood
Equipment/ Ranking Ranking
(Accident, ill health to person (Date)
Material
, fire or propety loss)
• Obtain permit prior to start the activity. Conduct
TBM and address the risk associated with the
work to the worker prior to start the activity. the
attendence shall be signed by the crew only after
understanding the hazard duing TBM.
• Only 3rd
• Unsafe Access to the Party Certified Scaffolding Erectors to be
work location. appointed in the job.
• • Approved Method
Not Using Fall • Fall of person Statement and Risk Assessment must be in place.
Proteection. •
Access to the Project Manager/Site 4
1 • No lifeline/adequate fall Fall of Material • Safe access to be ensured. 4 4 16 Yes 1 4
Work Location Engineer
protection to hook the • Fall of Planks • Workers must be given
full body harness. tool box talk before starting the job.
• Unsecured planks • Lifeline/Fall
protection must be provided from starting point to
the the end.
• Continious Anchorage to be ensured for fall
protection. Full body harness must be attached to
anchorage at all time.

• Planks to be clamped/secured properly.


• Planks to be secured against slip of the same
while erection of the scaffolding..
• Unsecure Platform • Adequate width of
• Inadequate width of the plafform e.g. 600 mm to ensured.
Preparation of platform • Use of
Working Platform • Use of Damaged standard which is tested by the compliance body.
on Scaffold and Planks • Fall from Height • All loose Project Manager/Site
2 5 4 20 Yes 5 1 5
Pulling the • Loose Material • Fall of Material material/tools to be secured/tied off. • Engineer
material to higher over the working Standard rope and pulley to be used to pull the
elevation. platform. • material. Landing platform must be wide enough
Unsafe pulling of and have fall protection arrangements.
material •
Underneath area must be barricaded prior to start
the work.
• Safe working platform must be provided before
starting the erection of Scaffold. •All
personnel must wear double lanyard full body
harness with shock absorber.
• Adequate Fall Protection
• No Working Platform
measures e.g. anchorage, lifeline must be
• No • Fall of Person
provided.
Fall Protection • Fall of Material from Construction
Erection of • All the material to be
3 • Loose Material at Edge height 4 3 12 Manager/Site Yes 4 1 4
Scaffolding stacked 1 m away from the edge.
• Material stacked over • Collapse of stacking Engineer
• All the rolling
the acceptable height
material should be secured.
• Underneath area to be completely
barricaded and. Wherever access is must,
overhead protection to be given.
• Material should not be
stacked over the allowable height.

• Substandard materials
used
• Faulty erection
• Defective access •Allow only trained and qualified persons.
device • Permit to work should be provided.
• Over loading of •Restricted Supervision to be
Falling from edge of the
platform followed. •Edge protection must
building.
• Vertigo while working be provided. •Pre task Construction
Working at Multiple injuries, fatality, and
4 at height perifing to be conducted 5 5 25 Manager/Site Yes 5 1 5
Height death due to fall from
• Lack of platform •Area below working to barricated. Engineer
inadequacy of the platform
• Inadequate area on the •Stand by man out of barrication to not
provided or dizziness
platform allowed un uthrized to enter.
• Defective platform •Always harness when working on elevated
• Defective or unguarded platform or edge of the building / opening
ladder or stair
• Faulty mounting of
ladder

• Additional P.P.E such as goggles, respirators,


• Accidents
ear plugs for strong windy and dusty conditions.
• Low to zero visibility • Dust entering to eye, ears,
• Stop all height works and outdoor works and Project Manager/Site
5 Windy conditions • Heavy dust all around nose and mouth 3 3 9 Yes 3 1 3
remain indoor. Engineer
• Fire • Fire due to friction of hot
• Adequate Fire Fighting Arrangements must be
materials
available at spot.
• Drink plenty of cold water and re-hydrant liquids.
• Intermittent rest under shade.
• Encourage people to eating more vegetable and
• Heat stress due to
fruits.
failure thermo regulatory
Working in hot • Heat ailment such as heat • Appropriate PPE’s to protect body against direct
system of the body Project Manager/Site
6 weather exhaustion, heat cramps and exposure to heat or hot sun. 3 3 9 Yes 3 1 3
• Dehydration due to Engineer
Heat stress heat strokes • Summer breaks, sufficient ventilation at work
excess loss of body
places, short intervals between works, Tool Box
fluids
Talks for awareness, posters and campaigns.
• First Aid should be available at all times.
• Suitable vehicle to transport victims.

• Multilevel activity strictly not allowed.


• Coordination should be there within the task
incharges for time setup of this type of activity.
Loose plyboard or Only one activity shall be allowed at a time. Project Manager/Site
7 Multilevel Activity Fall of Material 4 4 16 Yes 4 1 4
runner • Engineer
Downside area should be barricaded as required.

Bank Man should be provided.
Likelihood (L) Severity (S) Risk Rating (R)

1 <Improbable> - Extremely unlikely to occur 1 <Minor> - Minor: No lost time / NOT significant Index Rating

2 <Remote> - Unlikely to occur 2 <Appreciable> - minor injury; 1-6 (L) Low

3 <Occasional> - Could possibly or known to


3 <Serious> - serious injury; 8 - 10 (M) Medium
occur

4 <Probable> - Likely to occur more than once 4 <Major> - 1 fatality; 12 - 15 (H) High

5 <Frequent> - Common or repeating


5 <Catastrophic> - Multiple fatality; 16 - 25 (Ex) Extreme
occurrences