HAC Quality Management System Quality Department
QMS Ref#HAC-QLT-PR-14-F01E Rev.01
Issued Date. 01/07/2021
Inspection Test Plan - ITP Page 3 of 14
ITP TITLE: INSPECTION AND TEST PLAN FOR BUS DUCT INSTALLATION &TESTING
Inspection involvment
Sr#. Description of Activity Test/ Inspection Reference Document Acceptance Criteria Frequeney Verification Document
HAC CS / Eng.
1- Material
2-Installation work
Inspect Complete
Compare name Plate Data With Approved IFC DWGs &
Assemply Including As per datasheet in PO I W1 HEM 6733
Drawing &Specification Data Sheet Specification
Assosiated Accessories
2.1
Clearance as per specification Approved IFC DWGs & Compliance to approved IFC
Check location,clearnce W1 W2 HEM 6733
&manufactures recommendation Specification Drawings
2.2
2.3
HAC Quality Management System Quality Department
QMS Ref#HAC-QLT-PR-14-F01E Rev.01
Issued Date. 01/07/2021
Inspection Test Plan - ITP Page 4 of 14
ITP TITLE: INSPECTION AND TEST PLAN FOR BUS DUCT INSTALLATION &TESTING
Inspection involvment
Sr#. Description of Activity Test/ Inspection Reference Document Acceptance Criteria Frequeney Verification Document
HAC CS / Eng.
Check grounding Safety ground connection at two Approved IFC DWGs & Compliance to approved IFC
W1 W1 HEM 6703
connection location Specification Drawings
2.5
Check cable installation Proper cable gland & wires marking Approved IFC DWGs & Compliance to approved IFC
W1 W1 HEM 6719
and termination and &identification Specification Drawings&specs
2.6
Minimum bending radius Approved IFC DWGs & Exceed min.allowable bending
Check cable bending radius W1 W1 HEM 6733
requirment Specification radius for all cable
2.7
2.8
3-Pre commissioning & Testing
ITP TITLE: INSPECTION AND TEST PLAN FOR BUS DUCT INSTALLATION &TESTING
Inspection involvment
Sr#. Description of Activity Test/ Inspection Reference Document Acceptance Criteria Frequeney Verification Document
HAC CS / Eng.
BUS DUCT torque test on Bolt tightness using calibrated Approved IFC DWGs &
3.4 As per Manuf.requirement H H
Bus bar bolted connection torque wrench Specification Party /Vendor
,check list
ITP TITLE: INSPECTION AND TEST PLAN FOR BUS DUCT INSTALLATION &TESTING
Inspection involvment
Sr#. Description of Activity Test/ Inspection Reference Document Acceptance Criteria Frequeney Verification Document
HAC CS / Eng.
Final inspection
PROJECT NO.
PURCHASE ORDER NO
REQUISITION NO.
PURCHASE SPEC NO.
INSPECTION ITEMS INVOICE NO
CHECK RESULT
REQD CHECK ITEM PROCEDURE
SAT UNSAT
QUNITUITY
PACKING
VISUAL &APPERANCE
INSPECTION
MARKING
SIZE&DIMENTION
VENDOR DATA
DOCUMENTA RECORD
TION
AVAILABLE CONFORMATION
CERTIFICATE
RELEASE NOTE
MRR
PO
REFERANCE FAT REPORT/TEST
DOCUMENT CERTIFICATE
PACKING LIST
ITP -EMI-1
RECORD NO.
DATE
REV.
REV.
NOT NOT
COMPLETION AVAILABLE
BY APPROVED BY
APPROVAL
ACCEPTABLE
REJECT
INSTALLATION INSPECTION OF NEUTRAL GROUNDING
RESISTOR (BUS DUCT) INSPECT
HEM 6734
INSTALLATION INSPECTION OF NEUTRAL GROUNDING RESISTOR INSPECT RECORD NO
DATE
PROJECT NO. AREA
DRAWING NO. LOCATION
ACCEPTABLE
ACTIVITY
YES
Receiving Operations/ Inspection complete. Wiring Point to Point Check
1-
As per internal wiring DWG
Check for missing parts using supplier drawings. Inspect each unit or
2-
cubicle for proper name plate in accordance with approved DWGs
Manually operate switches and contractors.check for freedom of all
3-
moving parts
Check nameplate data for switches.contractors, fuses and relays against
4- approved supplier DWGs.verify contractor auxiliary contacts, normally
open /closed according to dwgs
Check for correct sizing of overload relay heater in accordance with
5-
approved DWGs
Protective grounding/earthing is correctly installed and connected to
6-
main ground /earth
Spot check overload relays for trip action by injection currentfrom relay
7-
tesing equipment in accordance with relay sheet
Check to see that enclosure space heater are connected and operable
8-
(when applicable) and that motor space heater circuits are functional
9- Overload rested button free and functional
Perform functional Check of contractor .use supplier or fluor elementary
10-
DWG.Observe all project safety precautions
Check timing relays for correct type .size and time setting in Accordance
11-
with DWGs
Check control ADJUSTABLE FREQUANCY(BUS DUCT) for correct size
12-
and voltage in accordance with DWGs
13- Check main contact pressure.alignment and full contact area
SUBCONTRACTOR CONTRACTOR
NAME
SIGNATURE
DATE
HEM 6734
PAGE
ACCEPTABLE
REMARKS
NO
CLIENT
VISUAL INSPECTION LIST OF GROUNDING WORK
HEM 6703
VISUAL INSPECTION LIST OF GROUNDING WORK RECORD NO
DATE
PROJECT
NO. AREA NO. LOCATION
PLAN DRAWING NO.
WEATHER
EQUIPMENT TAG SUNNY CLOUDY WINDY RAINY
ACCEPTABLE
ACTIVITY
YES NO
1- The construction drawings and document is the final edition
The Preparation of safety facility and action of excavation is
2-
acceptable
Thesize and location of grounding bar and cable is met the
3-
drawing
The connection by connector /compression connector of
4-
grounding system is acceptable
The connection between grounding cable to equipment is
5-
acceptable
6- The location and installation of grounding rod is acceptable
The connection between grounding rod and cable is
7-
acceptable
8- The backfill and grading is acceptable
NOTE:
LOCATION
CLIENT
VISUAL INSPECTION LIST OF LV CONTROL AND
INSTRUMENT CABLE TERMINATION
HEM 6719
VISUAL INSPECTION LIST OF LV CONTROL AND INSTRUMENT CABLE RECORD NO
TERMINATION
DATE
PROJECT NO. AREA
CABLE TAG NO LOCATION
DRAWING NO.
ACCEPTABLE
ACTIVITY
YES
1- The construction drawings and document is the final edition
The cable rating ,size ,number of core is compling with cable
2-
schedule/ connection drawings
The cable tage no,phase marker are according to construction
3-
drawing
The type and size of cable lug is correct.the crimpingof lug is good
4-
without loose or crack
5- The cable/wires dressing inside terminal champer is acceptable
The terminal block ,wire and cable number is according to the
6-
connection list and meet specification reqirement
The terminal block ,terminal and lug is fastend with out loose and
7-
stress on terminals
8- The entrance of cable is sealed
Cable gland size &installation is correct and the glang is bonded with
9-
ground grid
All wires are restored after insulation/continuity test and termination
10- are tight well
The termination of field devices(PB Station,Device/fixture)is as per
11- termination schedual
12- The surround of work area is kept clean and inner of panel is clean
NOTE: