Drainage Design
Drainage Design
L0414-00-C-04D00-00
DESIGNED BY
CONSULTANT APPROVAL
ADMINISTRAÇÃO NACIONAL DE ESTRADAS CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813
MANAGING DIRECTOR - CPG
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N1 N1
Prof. Reg. No. 202001586
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 0.00 67.70
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME
DRAWING TYPE TYPICAL DRAWING - DRAINAGE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515 M.C. BARNARD (PrEng) MINOR CULVERT STRUCTURES: -
00
e-mail: [email protected] e-mail: [email protected] BRIDGE / STRUCTURE No.
18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN Prof. Reg. No. 970404 CULVERT SCHEDULE
CONSULTING DRAWN BY VER
NO. DATE REVISION CONSULTANT DRAWING No. L0414-03-C-04D01-00
ENGINEER NAME T. ESPAG SCALE - SHEET 01 OF 01 00
40.29 40.49
EP
00
0 54005
4
1350
15
00
34003
40
MH MH1
20
88 31
480
280 040
+
040+ 00m
m
m Ø10
00m
Ø10
30
MH1
87
MH
-15
80
.436
404
-105 404
88
0
9 4.68
402
CULVERT CH:CULVERT
40+280 CH: 40+480
80
402
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-15
-15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15
18 18 18 18
16 16 16 16
14 14 14 14
0,56
0,58
1,49
0,86
Horizontal 1:250 10 17,2 10 Horizontal 1:250 10 10
8,77
Vertical 1:250 Vertical 1:250
8 8
L = 17.20 m L = 17.30 m
12.610
12.570
11.400
11.280
0.23% 0.69%
LENGTH AND SLOPE 1:430.04 LENGTH AND SLOPE 1:144.18
0
41.01 43.62 46.39 46.74 76
50 46
6
46
73
43
8.1
83
46
-15
38
5.6
32
43
-15
62
0 0 0
64 040 75
2.5
406
MH
3
4 46
37
46
14
2
-15
MH
41020
14
MH
0
40
13
7
46
8
VM-18
41014.5 -15
14
0
VM-17
MH136
Ø1
460
00
0
+m7m
Ø1
Null
401+010
00
St.
25
0m
m
4Ø61 000mm
0+
003
Null
mm7
Ø1
St.
04
80
3
0
+6
VM-19 MH137 15 62 46
3
43
1 0
43 1
MH
VM-16
1
14
15
H
0
CULVERT CH:CULVERT
41+010 CH:CULVERT
M
9
72
13
46
M H
15
43+610 CH:CULVERT
46+370 CH: 4
15
41 0401000
0
060
0 36
6403 46
43 PIPE CULVERT 10 X 900 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15
12 12 26 26 32 32
34 34
SCALES: 10 10 24 24 30 30
32 32
2,03
1,8
Horizontal 1:250 8 8 22 22 28 28
0,36
0,45
Vertical 1:250 7,43
30 30
6
L = 3.74 m L = 9.62 m L = 3.76 m SCALES: 20
9,29
20 SCALES: 26 26 SCALES:
CULVERT INVERT 18,16 28 28
8.161
8.339
8.300
8.200
1,28
1,38
1.04% 1.04% 1.04% 18 18 24 24 8,87
LENGTH AND SLOPE 1:96.15 1:96.16 1:96.15 Vertical 1:250 Vertical 1:250 Vertical 1:250 26 19,72 26
16 22 25
L = 18.44 m L = 0.88 m L = 17.28 m L = 2.40 m L = 17.33 m
20.401
20.769
CULVERT INVERT
27.856
27.850
27.730
27.869
27.850
27.710
CULVERT INVERT CULVERT INVERT
PLAN No.
2.00% 0.69% 0.69% 0.81% 0.81%
LENGTH AND SLOPE 1:50.00 LENGTH AND SLOPE 1:144.93 1:144.01 LENGTH AND SLOPE 1:123.46 1:123.78
L0414-03-C-04X01-01
Av. de Moçambique, 1225
Caixa Postal 403
Maputo
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO)
J. KAMPMAN (PrEng)
CHECKED BY
202001586
Name
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
: R. de G. CORREIA (I.Eng)
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
17/DIPRO-ANE/313/2018
START
N10
CU
END
N10
46
91
8.4
480 Ø1000mm
20
+Ø1090
48
-15
0
03
mm0
94
94
48
2.7
14 -
0
15
96
48
0
MH
14
4
7
14
MH
MH
MH
50
14
0
0
92
6
46 0
95
48
0
4600mm
Ø1
0
20
+9 48
9
480 Ø1000mm
05
Ø+1
09
003
0
mm0
94
48
5
20
14
23
H
1
.0
M
50
15
MH
9
48
7
15
14
MH
0
C:
090
46+905 CH:CULVERT
48+930 CH: 48+920
H
CULVERT CH:CULVERT
BC
50
M
9406 Graveyard
0
46
15
30
0
090
0 9408
92 48
48
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15
32 32 0 5 10 15 20 25 30
34 34 32 32
30 30 30 30
32 32
28 28
30 30 SCALES: 28 28
SCALES: Horizontal 1:250
0,92
0,19
0,74
SCALES: 26 26
0,52
8,18 26 26
0,66
0,73
28 7,65 28 8,64
Horizontal 1:250 18,46 Horizontal 1:250 24 17,75 24 Vertical 1:250
24
Vertical 1:250 26 26 Vertical 1:250 L = 16.29 m
27.196
26.870
25 22 CULVERT INVERT 2.00%
L = 1.18 m L = 17.29 m L = 1.43 m L = 16.32 m
28.827
28.820
28.720
26.670
26.670
26.670
0.58% 0.58% CULVERT INVERT 0.00% 0.00% 1:50.00
LENGTH AND SLOPE 1:172.41 1:172.86 LENGTH AND SLOPE Horizontal Horizontal
PLAN No.
L0414-03-C-04X02-01
DESIGNED BY
CONSULTANT APPROVAL
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Av. de Moçambique, 1225 Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813
MANAGING DIRECTOR - CPG
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N10 N10
Prof. Reg. No. 202001586
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 46.92 49.27
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME DRAINAGE
DRAWING TYPE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE REVISION CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-03-C-04X02-01
ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 02 OF 02 01
PLAN No.
L0414-04-C-04D01-01
DESIGNED BY
CONSULTANT APPROVAL
ADMINISTRAÇÃO NACIONAL DE ESTRADAS CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813
MANAGING DIRECTOR - CPG QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N1 N1
Prof. Reg. No. 202001586
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 0.00 67.70
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME
DRAWING TYPE TYPICAL DRAWING - DRAINAGE
01 23/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515 M.C. BARNARD (PrEng) MINOR CULVERT STRUCTURES: -
00
e-mail: [email protected] e-mail: [email protected] BRIDGE / STRUCTURE No.
18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN Prof. Reg. No. 970404 CULVERT SCHEDULE
CONSULTING DRAWN BY VER
NO. DATE REVISION CONSULTANT DRAWING No. L0414-04-C-04D01-01
ENGINEER NAME T. ESPAG SCALE - SHEET 01 OF 02 01
PLAN No.
L0414-04-C-04D02-00
DESIGNED BY
CONSULTANT APPROVAL
ADMINISTRAÇÃO NACIONAL DE ESTRADAS CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813
MANAGING DIRECTOR - CPG
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N1 N1
Prof. Reg. No. 202001586
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 0.00 67.70
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME
DRAWING TYPE TYPICAL DRAWING - DRAINAGE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515 M.C. BARNARD (PrEng) MINOR CULVERT STRUCTURES: -
00
e-mail: [email protected] e-mail: [email protected] BRIDGE / STRUCTURE No.
18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN Prof. Reg. No. 970404 CULVERT SCHEDULE
VER
NO. DATE REVISION CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04D02-00
ENGINEER NAME T. ESPAG SCALE - SHEET 02 OF 02 00
Telecom
05.19 05.44 05.49 05.66
20
52
80
56
60
17
54
17
00
505
17 15
5
MH MH
20 21
9 3 MH
MH 21
0
21 5
45
1
93
5
mm 4
00
5+
00
0
Ø1 mm
5220
60
00 7 m
Ø1 +44 0m 0 1
56
8 66
5
40
54
12
80
0 2
54
21 MH
0
65
3
MH -1 21
4
5
MH
8 -13
H 20
M
-13 -15
CULVERT CH:CULVERT
5+198 CH:CULVERT
5+447 CH:CULVERT
5+493 CH: 5
80
51
40
56
20
54
PIPE CULVERT ??? X 600 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° RECTANGULAR CULVERT 10 X H 900 X W 1 800 mm ANGLE 10° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-13 -10 -5 0 5 10 15 17 -13 -10 -5 0 5 10 15 17 -13 -10 -5 0 5 10 15 17 -15 -10 -5 0 5 10 15
6 6 8 8 6 6 8 8
4 4 6 6 4 4 6 6
2,78
2,85
2,43
2,69
2 2 4 4 SCALES: 2 2 4 4
1,66
1,7
2,22
2,4
SCALES: 0 0 SCALES: 2 2 Horizontal 1:250 0 7,06 0 SCALES: 2 2
Horizontal 1:250 3,9 8,01
Horizontal 1:250 6,18 Vertical 1:250 22,29 Horizontal 1:250
-2 27,8 -2 0 0 -2 0 7,54 0
Vertical 1:250 Vertical 1:250 19,7 L = 4.55 m L = 17.73 m Vertical 1:250
CULVERT INVERT 22,64
0.900
0.530
0.995
-4 -2 2.09% 2.09% -2
L = 3.91 m L = 23.94 m L = 3.42 m L = 16.29 m LENGTH AND SLOPE L = 3.19 m L = 19.45 m
CULVERT INVERT CULVERT INVERT 1:47.85 1:47.93 CULVERT INVERT
0.940
1.010
1.000
0.897
0.850
0.560
1.523
1.510
1.450
0.25% 0.25% 0.37% 0.37% 1.49% 1.49%
LENGTH AND SLOPE 1:400.00 1:400.00 LENGTH AND SLOPE 1:270.27 1:271.43 LENGTH AND SLOPE 1:67.07 1:67.07
80
71
17
17 30 15
80
65
MH MH
21 MH 37
7 7
0
21 MH
2
66
9 22
1
mm 20
00
80
0
Ø1 mm
60
7 4
mm 00
0
mm 61 16 mm Telecom
6 50 m Ø1 00
6+ 6+ 7+Ø1000
m 10
Ø
5 m
0 Ø650 50mm 0 0
60
Ø
73 m
00
6+
71
0
Ø6 Ø1 mm
08
00
0
0
Ø1
MH398
18 20
H2
Null
6 St. 2
37 MH
60
6 M
21 MH
65
M H
0
15
-13 -13
7
00
0 -15
606
CULVERT CH:CULVERT
6+080 CH:CULVERT
6+573 CH:CULVERT
6+617 CH: 7
6
60
60
0
55
40
71
6
PIPE CULVERT ??? X 900 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° RECTANGULAR CULVERT 10 X H 1 000 X W 1 500 mm ANGLE 10° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-13 -10 -5 0 5 10 15 17 -13 -10 -5 0 5 10 15 17 0 5 10 15 20 25 30 -15
-15 -10 -5 0 5 10 15
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
1,62
1,71
4 4 4 4 4 4 4 4
2,37
2,53
2,18
2,3
1,39
6,28 5,99
Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 9,12 0 Horizontal 1:250 0 0
11,64 19,2 18,93
Vertical 1:250 Vertical 1:250 Vertical 1:250 22,3 Vertical 1:250
-2 -2 -2 -2
L = 24.44 m L = 2.90 m L = 16.30 m L = 2.93 m L = 19.37 m L = 3.68 m L = 15.25 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.071
0.790
0.827
1.078
1.040
1.732
1.730
1.720
2.020
1.990
1.985
PLAN No.
1.00% 0.18% 0.18% 1.29% 1.29% 0.06% 0.07%
LENGTH AND SLOPE 1:100.00 LENGTH AND SLOPE 1:555.56 1:543.28
LENGTH AND SLOPE 1:77.52 1:77.47 LENGTH AND SLOPE 1:1555.70 1:1524.71
L0414-04-C-04X01-01
ULVERT CH: 7+164 Av. de Moçambique, 1225
Caixa Postal 403
Maputo
Mozambique
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO)
CHECKED BY
J. KAMPMAN (PrEng)
202001586
Name
Date
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
: R. de G. CORREIA (I.Eng)
:
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
DRAWING DESCRIPTION
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
DRAWING km DISTANCE
17/DIPRO-ANE/313/2018
START
N10
5.19
END
N10
7.16
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME
DRAWING TYPE DRAINAGE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04X01-01
REVISION ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 01 OF 11 01
Telecom
07.29 07.42 07.52 08.22
40
40
74
82
16
15
30
00 MH MH 15
7330
23 2 2
25
MH MH
7
20
75 3 22
75
7
20 mm
8
5207 mm 51 m
6
Ø4 0 7+000m
3 7+ 65 mm 0 Ø1
+ 29 m 0 Ø Ø650 m
Ø625 m
0m
7 m 5
0
+2 Ø650 mm
m
00
Ø1 08
20
20
50
Ø6
74
82
224
MH
4 22
37 2
MH MH -14
6
80
22
72
MH
-15
00
7550
0 -15
CULVERT CH:CULVERT
7+293 CH:CULVERT
7+427 CH:CULVERT
7+518 CH: 8
7
00
00
7440
8220
7
8
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 900 mm ANGLE ???° PIPE CULVERT ??? X 900 mm ANGLE ???°
0 5 10 15 20 25 30 -15 -10 -5 0 5 10 15 -14 -10 -5 0 5 10 15 16 -15 -10 -5 0 5 10 15
15
8 8 6 6 8 8 8 8
6 6 SCALES: 4 4 6 6 6 6
2,27
2,3
9,29
Horizontal 1:250
1,84
1,85
1,81
2 2 4 4
1,84
4 4
2,18
4 4
2
Vertical 1:250 23,63
SCALES: 2 2 0
L = 1.75 m L = 21.87 m SCALES: 2 2 SCALES: 2 2
8,26 CULVERT INVERT 10,07
1.556
1.560
1.610
Horizontal 1:250 0 0 0.23% 0.23% Horizontal 1:250 0 0 Horizontal 1:250 0 0
Vertical 1:250 21,31 LENGTH AND SLOPE 1:434.78 1:437.46 Vertical 1:250 21,73
Vertical 1:250
10,42
-2 -2 -2
L = 1.57 m L = 19.73 m L = 1.78 m L = 19.95 m L = 22.91 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.777
1.780
1.810
1.661
1.737
1.394
1.660
1.650
9 250
08.49 08.73 09.23 10.07
10080
750
8
16
16
9240
00
5805
MH
8
22 MH
40
9 23
87
1
-13
MH286 -15 MH379
5 m
49 Ø1000m mm 5
Telecom
8+0 50 3
Ø6750mm 0 9+23
5 10+065
+
8 Ø6 m
Ø10 00mm 0 Ø1000m
m
0 Ø 65
0m
17 MH380
10060
7
MH28 15
8
H22
80
M
84
2 30 Telecom
-14 MH Telecom
-14
20
8+495 CH:CULVERT
CULVERT CH:CULVERT 8+735 CH:CULVERT
9+235 CH: 1
9220
87
10 050
PIPE CULVERT ??? X 900 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-14 -10 -5 0 5 10 1516 -14 -10 -5 0 5 10 1516 -13 -10 -5 0 5 10 15 17 -15 -10 -5 0 5 10 15
8 8 8 8 6 6 8 8
1,62
1,62
6 6 6 6 SCALES: 4 4 6 6
Horizontal 1:250
1,7
1,7
1,83
2,03
4 4 4 4 2 2 4 4
2,8
2,13
6,86
Vertical 1:250 19,71
SCALES: 2 2 SCALES: 2 2 0
L = 2.44 m L = 17.06 m SCALES: 2
5,79
2
10,06 8,84 CULVERT INVERT
2.207
2.190
2.070
Horizontal 1:250 0 0 Horizontal 1:250 0 0 0.70% 0.70% Horizontal 1:250 0 0
Vertical 1:250 Vertical 1:250 24,66 LENGTH AND SLOPE 1:142.86 1:142.20 Vertical 1:250 19,62
-2 -2 -2
L = 21.25 m L = 2.98 m L = 21.68 m L = 4.03 m L = 15.59 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.431
1.749
1.654
1.640
1.540
2.190
2.190
2.190
PLAN No.
1.50% 0.46% 0.46% 0.00% 0.00%
LENGTH AND SLOPE 1:66.67 LENGTH AND SLOPE 1:216.81 1:216.81 LENGTH AND SLOPE Horizontal Horizontal
L0414-04-C-04X02-01
DESIGNED BY
CONSULTANT APPROVAL
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Av. de Moçambique, 1225 Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813 Prof. Reg. No. 202001586
MANAGING DIRECTOR - CPG
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N10 N10
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 7.29 10.07
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME
DRAWING TYPE DRAINAGE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04X02-01
REVISION ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 02 OF 11 01
11140
10.21 10.33 Telecom 11.12 11.39
10 350
8
1139.80
BCC: 1
0
400
1410
11
Lamp
-14
MH
29
4
10340
10220
-15 MH288 -15 MH290 -14 MH292
01
1+Ø650
Ø6 3 mm
010Ø6+502mm15 50 8
mm 5
Ø650mm
0 10Ø1+0030m3m5 0 11Ø6+501m2m 5
11120
Ø650mm
0
Ø650mm Ø1000m
38
m
Ø650mm
15
11
MH289 15 16
MH291 MH293
5
29
MH 16
10320
00
10 12020
0
36
PIPE CULVERT ??? X 675 mm ANGLE ???°
11
PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???°
-15 -10 -5 0 5 10 15
15 -15 -10 -5 0 5 10 15 -14 -10 -5 0 5 10 1516 -14 -10 -5 0 5 10 1516
8 8 6 6 8 8 8 8
2,13
2,16
6 6 SCALES: 4 4 6 6 6 6
Horizontal 1:250
2,35
2,37
2,17
2,17
4 4 2 2 4 4 4 4
6,54
Vertical 1:250 22,37
SCALES: 2
8,5
2 0
L = 4.03 m L = 18.33 m SCALES: 2 8,03 2 SCALES: 2
8,33
2
CULVERT INVERT
2.028
2.030
2.040
Horizontal 1:250 0 0 0.05% 0.05% Horizontal 1:250 0 0 Horizontal 1:250 0 23,38 0
Vertical 1:250
21,69 LENGTH AND SLOPE 1:2000.00 1:1833.40 Vertical 1:250 22,03 Vertical 1:250
-2 -2 -2
L = 2.12 m L = 19.57 m L = 2.40 m L = 19.62 m L = 2.44 m L = 20.74 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
2.200
2.160
2.205
2.201
2.200
2.190
2.522
2.510
2.410
0.05% 0.05% 0.51% 0.51% 0.19% 0.19%
LENGTH AND SLOPE 1:2000.00 1:1957.46 LENGTH AND SLOPE 1:196.08 1:196.24
LENGTH AND SLOPE 1:526.32 1:518.44
0
14540
15.20
100
12.15 14.52 15.08
0
150
22
15
15
0
16
12
-15
MH 13 14
36 MH
8 301
-14 MH29 29
MH
6 MH414
0
9
15
Null
St.
12
80
0Ø100012+1 104+5 9m0
0
0 Ø6 10
50m
15+Ø650mmmm
15
2
200
Ø100
0
70
0mm
mm 50
1250
5 +000mm Ø6
50
1 10
15
Ø
14520
mm
00
Ø10
0
14
12
16 8
29 300
9 97
36 MH2
MH MH M H
-16
15 -17
14+520 CH:CULVERT
12+150 CH:CULVERT
CULVERT CH:CULVERT 15+070 CH: 15
0
06
0
15
18
15
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???°
0
12
-15 -10 -5 0 5 10 15 -14 -10 -5 0 5 10 1516 -17 -15 -10 -5 0 5 10 13 -16-15 -10 -5 0 5 10 14
12
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
1,61
2,87
2,09
4 4
2,32
2,38
4 4 4 4 4 4
1,46
4,63
1,55
5,48 10,61
Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0
18,02 20,34 25,19
Vertical 1:250 Vertical 1:250 Vertical 1:250 Vertical 1:250
-2 -2 -2 -2
L = 4.44 m L = 13.58 m L = 24.25 m L = 16.25 m L = 4.09 m L = 22.34 m L = 2.44 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.751
1.940
1.770
2.080
2.080
2.080
2.447
2.440
2.420
1.580
1.460
PLAN No.
0.15% 0.15% 0.49% 0.00% 0.00% 0.76% 0.76%
LENGTH AND SLOPE 1:679.17 1:679.17 LENGTH AND SLOPE 1:202.09 LENGTH AND SLOPE Horizontal Horizontal LENGTH AND SLOPE 1:131.40 1:131.58
L0414-04-C-04X03-01
LVERT CH: 15+070 Av. de Moçambique, 1225
Caixa Postal 403
Maputo
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO)
CULVERT CH: 16+010
Rua Beijo da Mulata, 248
Sommerschield II
Maputo
CPG CONSULTING ENGINEERS
CHECKED BY
J. KAMPMAN (PrEng)
202001586
Name
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
: R. de G. CORREIA (I.Eng)
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
17/DIPRO-ANE/313/2018
START
N10
END
N10
0
46
16
0
84
16
13 15
13 15
MH MH
MH416 30 MH428 305 MH MH
30
3 Null
0
3
0
Null 9
72
St. 07
45
St.
16
16
0
02
16
10 350
+0 0mm +4 mm 05
16 Ø100 16 Ø1000 6 +7000mm 150
1 10 Ø
6 +8Ø1000mm
1
0
4
44
BC
30
0
6 C:
16
82
H 30
M 08
16
MH
16
02
81
3
H3 MH
7.9
M 60
0
700
1760
CULVERT CH:CULVERT
16+010 CH:CULVERT
16+435 CH:CULVERT
16+705 CH: 16
0
16
00
1060
16
0
42
0
16
PIPE CULVERT ??? X 1050 mm ANGLE ???°
800
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
1860
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -15 -10 -5 0 5 10 15
15 -15 -10 -5 0 5 10 15
15
8 8 8 8 8 8 6 6
20,91
2,23
6 6 6 6 SCALES:
1,57
6 6 4 4
1,75
Horizontal 1:250
1,86
1,67
1,74
1,66
1,66
4 4 4 4 4 4 2 2
Vertical 1:250 6,96
SCALES: 2
9,58 7,17
2 SCALES: 2 2 SCALES: 2
7,76
2 0
L = 16.71 m L = 4.20 m
6,86 CULVERT INVERT
1.750
1.670
1.650
Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0 0.48% 0.48%
Vertical 1:250 21,7
Vertical 1:250 19,77 Vertical 1:250 18,52 LENGTH AND SLOPE 1:208.89 1:208.33
-2 -2 -2
L = 2.04 m L = 16.76 m L = 2.91 m L = 16.74 m L = 3.03 m L = 16.72 m L = 1.79 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
2.161
2.226
2.220
2.170
2.030
1.780
1.780
1.780
1.980
1.989
0.30% 0.30% 0.30% 0.30% 0.30% 0.00% 0.00%
LENGTH AND SLOPE 1:333.33 1:335.13 1:333.33 LENGTH AND SLOPE 1:334.79 1:333.33 LENGTH AND SLOPE Horizontal Horizontal
0
17.00 17.19 17.64 18.20
22
18
0
66
15
17
15
16
MH313
20
170
MH
311
0
65
M
17
BTC: 17 189.388
15
ETC: 17
H 31
5
190.388
00 0 MH
17 127020 64 31
5
17 7
62 m
5
0m
17mm+017
7Ø1+00
00
mm
0700
0
01
0
00
1 m
8Ø1500
0m
Ø1
200
0
mm
17 1
Ø1000
16+
1280
Ø1000
17180 108
m
0m
00
m
Ø1
0m
99
18
mm
00
Ø1
000
0
Ø1
17160
3 16
MH
4
31
MH312
310
MH
0 8 20
169 -15
MH
6
17
-14
16+990 CH:CULVERT
CULVERT CH:CULVERT 17+175 CH:CULVERT
17+625 CH: 18
-15
-15
0
18
18
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15 -14 -10 -5 0 5 10 15 16 -15 -10 -5 0 5 10 15
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
2,2
2,63
4 4 4 4 4 4 4 4
1,92
1,41
1,39
7,03
1,54
8,15 8,13 6,52
Horizontal 1:250 9,12 Horizontal 1:250 Horizontal 1:250
0 0 0 0 0 0 Horizontal 1:250 0 0
Vertical 1:250 Vertical 1:250 20,71 18,43
Vertical 1:250 22,33 20,29 Vertical 1:250
-2 -2 -2 -2
L = 20.28 m L = 2.05 m L = 2.03 m L = 16.27 m L = 1.99 m L = 4.42 m L = 16.29 m L = 2.15 m L = 16.28 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT CULVERT INVERT
2.105
2.100
2.080
1.931
1.920
1.930
1.919
2.034
2.030
2.000
1.370
1.350
1.348
PLAN No.
0.10% 0.10% 0.06% 0.06% 0.06% 0.12% 0.12% 0.18% 0.18%
LENGTH AND SLOPE 1:1014.19 1:1000.00 LENGTH AND SLOPE 1:1666.67 1:1627.26 1:1666.67 LENGTH AND SLOPE 1:833.33 1:814.28 LENGTH AND SLOPE 1:555.56 1:542.66
L0414-04-C-04X04-01
LVERT CH: 17+625 Av. de Moçambique, 1225
Caixa Postal 403
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO)
J. KAMPMAN (PrEng)
202001586
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
17/DIPRO-ANE/313/2018
START
N10
END
N10
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 16.02 18.20
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME
DRAWING TYPE DRAINAGE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04X04-01
REVISION ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 04 OF 11 01
18.75 18.81 18.87 19.26
0
76
18
15
0
82
18
31
MH 15 15
9
15
0
88
MH MH
0
18
32 3
26
0
3 71
75
19
18
MH
32
240
m 18 1
0m
65
0Ø 1900+0mm
+7 m
0m
Ø 65
0 3
mm 18
50 mm
Ø6 Ø0
0 +8
Ø1
0
50 00 1
m
0m 18
00
0 Ø1 90 00
+7
0m
m
0 Ø1
74
0
18
25
18 370
19
3 2
MH H3
2 MH
0
800
20 M
1880
3
-15 MH -15
18
-15
-15
0
86
0
18
24
19
CULVERT CH:CULVERT 18+790 CH:CULVERT
18+730 CH:CULVERT 18+850 CH: 1
0
0
85
72
PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
18
18
-15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15
15 -15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15
6 6 6 6 8 8 8 8
1,61
SCALES: 4 4 SCALES: 4 4 6 6 6 6
2,34
2,42
23,87
Horizontal 1:250 Horizontal 1:250 6,18
2,02
2,03
2,06
2,07
2 2 2 2 4 4 4 4
1,56
Vertical 1:250 8,96 Vertical 1:250 20,18
0
L = 2.23 m L = 21.64 m
0
L = 3.87 m L = 16.30 m SCALES: 2 2 SCALES: 2 2
CULVERT INVERT CULVERT INVERT 7,87
1.921
8,28
2.020
1.940
1.467
1.480
1.610
1.642
1.640
1.630
1.498
1.500
1.520
0.10% 0.10% 0.05% 0.05%
LENGTH AND SLOPE 1:1000.00 1:1007.51 LENGTH AND SLOPE 1:2000.00 1:1910.05
0
19.37 19.41 19.54 19.92
94
0
56
19
19
204
80
19
3
19
15 15
MH 17
0
MH
55
15
32 327
5 MH
19
32
9 MH
33
1
55 m
+31000mm
19+ 0m
00
19 Ø
0 Ø1
395
0
0
2
05
40
99
+9
mm
19
1
50
9
+5
19
0 Ø6 Ø650mm m
30 1 m
0 Ø1000
m
m
50
Ø6
26
0
400
3
MH
60
1490
4
32
3
19
MH
19
-15 28
3 30
M3H MH
3
-15 - 1
-15
0
900
0
1990
52
19
19
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT 10 X 1050 mm ANGLE ???°
0
-15 -10 -5 0 5 10 15
38
8 8 6 6
6 6 SCALES: 6 6
2,45
6 6
2,45
4 4
9,62
Horizontal 1:250
2,05
2,35
2,05
2,05
4 4 4 4 4 4
2,4
2 2
3,08
1.355
1.360
1.420
Horizontal 1:250 Horizontal 1:250 Horizontal 1:250 9,46
0 0 0 0 0.25% 0.25% 0 0
Vertical 1:250 23,68 Vertical 1:250 23,02 LENGTH AND SLOPE 1:400.00 1:395.40 Vertical 1:250 23,93
-2 -2 -2
L = 1.66 m L = 22.02 m L = 2.59 m L = 20.43 m L = 1.77 m L = 22.17 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.400
1.490
1.393
1.639
1.640
1.650
1.748
1.740
1.630
PLAN No.
0.50% 0.50% 0.05% 0.05% 0.41% 0.41%
LENGTH AND SLOPE 1:200.00 1:200.16 LENGTH AND SLOPE 1:2000.00 1:2042.83 LENGTH AND SLOPE 1:243.90 1:246.28
L0414-04-C-04X05-01
9+395 Av. de Moçambique, 1225
Caixa Postal 403
Maputo
Mozambique
NAME
DESIGNED BY
CHECKED BY
J. KAMPMAN (PrEng)
202001586
Name
Date
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
: R. de G. CORREIA (I.Eng)
:
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
DRAWING DESCRIPTION
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
DRAWING km DISTANCE
17/DIPRO-ANE/313/2018
START
N10
18.75
DRAINAGE
END
N10
19.92
DRAWING TYPE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04X05-01
REVISION ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 05 OF 11 01
20
214
20.43 20.51 21.41 21.79
0
01080
40
Lamp
2
8
204
21
20
205
12
37
MH 14
3 MH
333
13
13
MH
337
MH
335
0 0
95
0+4
2 0mm m0
0
m
Lamp 7Ø170000m
0m
10400
00
00
Ø1 Ø10
0
1+
41
5 +39 1000mm 2 m
4
2
+ 21 Ø Ø10
00m
20
21
332
80
MH 336
217
20
H33
4 MH
2 04
M
00
-18
52005
-17
-17
20
2
H 37
M -020
-2
CULVERT CH:CULVERT
19+905 CH:CULVERT
20+495 CH:CULVERT
21+390 CH: 21
0 8
213
PIPE CULVERT 10 X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-15 -10 -5 0 5 10 15 -18 -15 -10 -5 0 5 10 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 8 8 8 8 8
6 6 6 6 6 6 6
1,65
1,66
2,35
1,69
1,72
4 4 4 4 4
2,4
2,46
2,49
4 4
SCALES: 2 2 SCALES: 2
8,39 SCALES: 2 2 SCALES: 2 2
9,46 7,05 7,3
Horizontal 1:250 0 0 Horizontal 1:250 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0
Vertical 1:250 23,93 Vertical 1:250 25,93 21,29 22,34
Vertical 1:250 Vertical 1:250
-2 -2 -2 -2
CULVERT INVERT L = 1.77 m L = 22.17 m L = 20.51 m L = 5.42 m L = 18.30 m L = 2.99 m L = 18.31 m L = 4.03 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.393
1.400
1.490
2.120
2.090
2.082
1.171
1.220
1.180
1.960
1.920
1.913
0.41% 0.41% 0.15% 0.15% 0.22% 0.22% 0.22% 0.22%
LENGTH AND SLOPE 1:243.90 1:246.28 LENGTH AND SLOPE 1:683.57 1:666.67 LENGTH AND SLOPE 1:457.58 1:454.55 LENGTH AND SLOPE 1:457.81 1:454.55
00
242040
22
20
227
13
BC
C: 2
13
20
13
291
9.8
229
13
MH 66
350
MH 343
341 MH
345
22
MH
339
0
700
5 0 22+000mm 0
30 m
0 37 Ø1
+ 90m0
22+
m
2+3 Ø1000m Ø6
50m
m
2
2 Ø1000m
2 Ø6
50m
m
6 50m
40
Ø
342
MH
223
80
338 344
223
MH 340 -17 MH
MH
00
-17 -17
720207
-17
22
00
22+330 CH:CULVERT
CULVERT CH:CULVERT 22+375 CH:CULVERT
22+700 CH: 22
920209
22
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
2,16
2,02
2,06
2,2
2,46
2,53
4 4 4 4 4 4
2,03
2,09
4 4
1.720
1.660
1.649
1.450
1.330
1.316
1.780
1.720
1.712
1.860
1.720
1.708
PLAN No.
0.30% 0.30% 0.61% 0.61% 0.32% 0.32% 0.57% 0.57%
LENGTH AND SLOPE 1:328.29 1:333.33 LENGTH AND SLOPE 1:163.84 1:163.93
LENGTH AND SLOPE 1:315.28 1:312.50 LENGTH AND SLOPE 1:173.97 1:175.44
L0414-04-C-04X06-01
ULVERT CH: 22+700 Av. de Moçambique, 1225
Caixa Postal 403
Maputo
Mozambique
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO)
CHECKED BY
J. KAMPMAN (PrEng)
202001586
Name
Date
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
: R. de G. CORREIA (I.Eng)
:
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
DRAWING DESCRIPTION
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
DRAWING km DISTANCE
17/DIPRO-ANE/313/2018
START
N10
20.43
END
N10
22.91
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME DRAINAGE
DRAWING TYPE
01 Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
CONSULTING DRAWN BY VER
NO. DATE REVISION CONSULTANT DRAWING No. L0414-04-C-04X06-01
ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 06 OF 11 01
BC
C: 2
364
650
9.8
18
23.37 23.63 23.72 24.08
23
80
23 3
13
40
13
23 6
MH
353
MH
13 13
80
347
240
MH
mm 0
MH
005
351
106
Ø0
349
+
20
24
23 7
0
360
23+000mm 0
Ø1
20
0 705 352
23+
m
3+6
0m
Ø65
2 1000mm Ø65
0m
m
0m
m
MH
Ø
Ø65
346 -17
MH 348 0
60 MH M H35
-17 23 3
-17
-17
20
236
60
CULVERT CH:CULVERT
23+360 CH:CULVERT
23+620 CH:CULVERT
240
23+705 CH: 24
00
720307
350
23
23
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° RECTANGULAR CULVERT 10 X H 750 X W 900 mm ANGLE 10°
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 8 8 8 8 6 6
6 6 SCALES: 4 4
1,57
6 6 6 6
1,7
7,57
Horizontal 1:250
2,16
4 4
2,25
2 2
2,07
2,15
4 4 4 4
2,49
2,5
Vertical 1:250 21,02
SCALES: 2 2 SCALES: 2 2 SCALES: 2 2 0
L = 18.71 m L = 2.31 m
7,85 CULVERT INVERT
1.970
1.780
1.756
Horizontal 1:250 0
8,48
0
Horizontal 1:250 0 0 Horizontal 1:250 0
9,49
0 1.02% 1.02%
Vertical 1:250 23,81 Vertical 1:250 22,87 Vertical 1:250 24,88 LENGTH AND SLOPE 1:98.45 1:98.04
-2 -2 -2
L = 21.56 m L = 2.25 m L = 19.79 m L = 3.08 m L = 23.18 m L = 1.70 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.460
1.320
1.298
1.520
1.380
1.365
1.390
1.360
1.358
0.65% 0.65% 0.71% 0.71% 0.13% 0.13%
LENGTH AND SLOPE 1:154.00 1:153.85
LENGTH AND SLOPE 1:141.37 1:140.85 LENGTH AND SLOPE 1:772.59 1:769.23
80
247
24.30 24.52 24.76 25.03
40
250
13
13
13
13
20
MH
245
00
MH 357
MH
320403
355 361
MH
359
24
m0
5Ø100005m
50 24+
+28 m 5 0
60
m
000m
24 m Ø1
m01
247
000
EC
Ø1
00 25+50mm
50m
+75 m
C: 2 Ø6
24
429 m Ø6
000
356
2.3 Ø1 m
50m
Ø6
MH
21
354
MH
20
358 360
MH
250
-17 MH
-17 -17
-17
750
24
00
CULVERT CH:CULVERT
24+285 CH:CULVERT
24+505 CH:CULVERT
24+750 CH: 25
520405
80
242
24
40
247
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???°
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 6 6 8 8 8 8
6 6 SCALES: 4 4 6 6 6 6
6,27
4 4 Horizontal 1:250 2 2 4 4 4 4
1,77
1,79
1,96
1,99
2,15
2,16
1,27
1,28
1.950
1.948
1.230
1.223
1.470
1.440
1.436
1.460
1.450
1.449
PLAN No.
0.28% 0.28% 0.17% 0.17% 0.05% 0.05%
LENGTH AND SLOPE 1:362.50 1:357.14 LENGTH AND SLOPE 1:604.59 1:588.24 LENGTH AND SLOPE 1:2120.03 1:2000.00
L0414-04-C-04X07-01
DESIGNED BY
CONSULTANT APPROVAL
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Av. de Moçambique, 1225 Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813
MANAGING DIRECTOR - CPG
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N10 N10
Prof. Reg. No. 202001586
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 23.37 25.03
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME DRAINAGE
DRAWING TYPE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE REVISION CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04X07-01
ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 07 OF 11 01
25.31 25.49 26.07 28.31
20
253
00
520505
80
260
25
13
13
13
20
MH
3
363 MH
28
23
15
MH 9
365
0
2109005mm
25+Ø 00mm 7
MH3
6
0
Ø1
0 0
3 00
m
2 0mm8+
362
0m
55
25+
Ø10
0
0
261+0000mm
470
MH Ø1
00
00
Ø
320503
80
364
2 54
MH 66
-17 MH3
60
25
26 0
-15 8
H 23
-17 M
-17
0
030
3208
28
CULVERT CH:CULVERT 25+470 CH: CULVERT
25+295 CH:CULVERT 26+055 CH: 28
050
26
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
80
252
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -15 -10 -5 0 5 10 15 -17 -15 -10 -5 0 5 10 13
8 8 6 6 8 8 8 8
6 6 SCALES: 4
6,43
4 6 6 6 6
Horizontal 1:250
1,69
1,73
4 4 2 2 4 4 4 4
1,63
1,67
1,68
1,52
1,54
Vertical 1:250 20,77
SCALES: 2 2 0
L = 17.73 m L = 3.04 m SCALES: 2 2 SCALES: 2 2
1,52
6,79 CULVERT INVERT 6,91 9,99
1.690
1.680
1.678
Horizontal 1:250 0 0 0.06% 0.06% Horizontal 1:250 0 0 Horizontal 1:250 0 0
Vertical 1:250 19,85 LENGTH AND SLOPE 1:1772.87 1:1666.67 Vertical 1:250 21,74 Vertical 1:250 23,09
-2 -2 -2
L = 17.25 m L = 2.60 m L = 18.92 m L = 2.82 m L = 23.09 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.740
1.670
1.780
1.610
1.585
1.570
1.560
1.558
28.42 28.45
CULVERT CH: 28+400 28.60 28.75
0
62
28
0
46
13 13
28
13
MH MH
24 24
13
MH
0
1 3
42
24
28
0
76
MH
28
47 2
0
0
00
45
0 440
+4 +
20080mm
28 mm 0
28
Ø1 0
59
0
Ø1
00 0 mm
Ø1
00
8+ mm
0
2 Ø1000 0
060
0
6208
4
40 24
2 +7
2 281000mm
28
MH MH
0
Ø
75
44
0
44
28
MH
28
-17 -17 6
24
MH
-17
0
400
-17
2480
0
74
28
28
28+400 CH:CULVERT
CULVERT CH:CULVERT 28+440 CH:CULVERT
28+590 CH: 28
0
58
28
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
1,67
1,78
4 4
1,61
1,61
1,69
4 4
1,75
4 4 4 4
2,24
2,25
SCALES: 2 2 SCALES: 2 2 SCALES: 2 2 SCALES: 2 2
6,79 6,49 6,32
Horizontal 1:250 0 0 Horizontal 1:250 0 0
Horizontal 1:250 0 0 Horizontal 1:250 0 8,87 0
19,92 Vertical 1:250 20,67
Vertical 1:250 19,65 Vertical 1:250 -2
Vertical 1:250 23,79
-2 -2 -2
L = 16.40 m L = 3.26 m L = 16.27 m L = 3.65 m CULVERT INVERT L = 16.72 m L = 3.95 m L = 21.59 m L = 2.21 m
CULVERT INVERT CULVERT INVERT
1.780
1.630
1.594
CULVERT INVERT
1.170
1.160
1.159
1.740
1.660
1.644
1.790
1.820
1.827
PLAN No.
0.49% 0.49% 0.18% 0.18% 0.90% 0.90% 0.05% 0.05%
LENGTH AND SLOPE 1:204.94 1:204.08 LENGTH AND SLOPE LENGTH AND SLOPE 1:111.45 1:111.11 LENGTH AND SLOPE 1:2158.68 1:2000.00
1:542.29 1:555.56
L0414-04-C-04X08-01
DESIGNED BY
CONSULTANT APPROVAL
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Av. de Moçambique, 1225 Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813
MANAGING DIRECTOR - CPG
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N10 N10
Prof. Reg. No. 202001586
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 25.31 28.75
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME DRAINAGE
DRAWING TYPE
01 Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
CONSULTING DRAWN BY VER
NO. DATE REVISION CONSULTANT DRAWING No. L0414-04-C-04X08-01
ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 08 OF 11 01
20
0
29.16 29.43 29.86 30.30
18
3
30
29
0
45
29
13 14
13
40
13
4
29
MH
MH 25 MH
24 1
9 MH 25
25 5
3
60 8
29
00 0 0
0
15 000mm
29
030
+ 90000mm
16
+4
9 Ø1 2
30
2
30+ Ø1
20
0
29
m
40
0m
00
Ø1
8
30
+
291000mm
Ø
2 48 4
MH 25
MH
0
2
25
85
50 H
H2 M
29
M
-16
0
-17 0
42
15 -17
29
29
-17
29+150 CH:CULVERT
CULVERT CH:CULVERT 29+420 CH:CULVERT
29+840 CH: 30
0
84
29
0
0
28
14
30
29
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-17 -15 -10 -5 0 5 10 13 -16 -15 -10 -5 0 5 10 14 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
1,57
1,82
1,91
4 4 4 4 4 4 4 4
1,87
1,87
2,31
2,23
SCALES: 2 2 SCALES: 2 2 SCALES: 2 2 SCALES: 2 2
1,55
1.610
1.480
1.448
1.860
1.830
1.823
1.037
1.060
1.190
1.206
1.520
1.520
1.520
0.20% 0.20% 0.68% 0.68% 0.68% 0.81% 0.81% 0.00% 0.00%
LENGTH AND SLOPE 1:508.87 1:500.00 LENGTH AND SLOPE 1:147.06 1:147.57 1:147.06 LENGTH AND SLOPE 1:122.83 1:123.46 LENGTH AND SLOPE Horizontal Horizontal
0
82
30
13 13
13
0
12
31
13 MH MH
259 MH 26
261 3
0
MH
36
257
31
0
+790 0
0
0 0 m
56
3 00
0m
100
Ø1
30
mm 31
50 mm
0 Ø6
mm
1 + +3 00
0
m
350mm Ø1
0
0m 50
Ø6 45
080
00
Ø1 Ø6
mm
380
30+ m 50
0m Ø6
00
Ø1
258
550
30
MH 26
2
0
260 MH
35
256 MH
31
MH
-17
0
55
0
-17
010
-17
1301
30
-17
31
CULVERT CH:CULVERT
30+550 CH:CULVERT
30+790 CH:CULVERT
31+100 CH: 31
0
34
31
EC
C:
31
09
0
1.2
54
5
30
7
0
78
30
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
1,65
1,66
1,81
1,81
4 4 4 4 4 4 4 4
2,03
2,12
2,07
2,29
SCALES: 2
6,39
2 SCALES: 2 2 SCALES: 2 2 SCALES: 2 2
7,42 7,42 6,93
Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0
Vertical 1:250 19,82 Vertical 1:250 20,32 Vertical 1:250 21,65 Vertical 1:250 20,83
-2 -2 -2 -2
L = 16.29 m L = 3.53 m L = 17.53 m L = 2.80 m L = 17.96 m L = 3.68 m L = 17.34 m L = 3.49 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT CULVERT INVERT
1.742
1.730
1.740
1.710
1.450
1.397
1.580
1.580
1.580
1.300
1.360
1.372
PLAN No.
0.06% 0.06% 0.00% 0.00% 1.45% 1.45% 0.35% 0.35%
LENGTH AND SLOPE 1:1629.01 1:1666.67 LENGTH AND SLOPE Horizontal Horizontal LENGTH AND SLOPE 1:69.08 1:68.97 LENGTH AND SLOPE 1:288.95 1:285.71
L0414-04-C-04X09-01
CULVERT CH: 31+345 Av. de Moçambique, 1225
Caixa Postal 403
Maputo
Mozambique
NAME
DESIGNED BY
CHECKED BY
J. KAMPMAN (PrEng)
202001586
Name
Date
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
: R. de G. CORREIA (I.Eng)
:
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
DRAWING DESCRIPTION
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
DRAWING km DISTANCE
DRAWING TYPE
17/DIPRO-ANE/313/2018
START
N10
29.16
DRAINAGE
END
N10
31.36
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE REVISION CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04X09-01
ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 09 OF 11 01
31.96 32.01 32.46 32.51
13 13
0
13
02
0
13
52
32
32
MH MH
26 MH 27
0
5 26 1
96
7
31
0
46
32
MH
0 26 0
005
m
Ø14
0m 0 9
0m
9
1+ 00mm
0
m44
5 50Ø650m 0mm
3 00 00 +
+
32 Ø65
Ø1
0
+0 3Ø 2 0m
32650mm
1
m
0m
00
Ø m Ø1
50m
Ø6
0
64 27
0
95
2 68 MH
MH H2
31
0
6 M
45
26
MH
32
0
00
0
050
-17 -17
0302
-17
5302
32
-17
32
0
94
0
44
32
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???°
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
8 8 8 8 8 8 8 8
6 6 6 6 6 6 6 6
1,67
4 4
1,82
4 4 4 4
1,83
4 4
1,98
1,5
SCALES: 2 2 SCALES: 2 2 SCALES: 2 2 SCALES: 2 2
1,55
1,56
1,53
6,3 7,39 6,3 5,52
Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0 Horizontal 1:250 0 0
Vertical 1:250 19,67 Vertical 1:250 20,95 Vertical 1:250 19,53 Vertical 1:250 19,23
-2 -2 -2 -2
L = 16.29 m L = 3.38 m L = 18.08 m L = 2.44 m L = 16.32 m L = 3.21 m L = 14.73 m L = 4.50 m
CULVERT INVERT CULVERT INVERT CULVERT INVERT CULVERT INVERT
2.110
1.930
1.875
1.840
1.820
1.816
1.980
1.760
1.730
1.842
1.890
1.850
0.12% 0.12% 1.22% 1.22% 0.25% 0.25% 1.22% 1.22%
LENGTH AND SLOPE 1:814.39 1:800.00 LENGTH AND SLOPE 1:82.17 1:81.97 LENGTH AND SLOPE 1:408.04 1:400.00 LENGTH AND SLOPE 1:81.84 1:81.97
32+000 34.27
CULVERT CH: 32+500 34.35 34.54 34.57
0
58
34
0
28
0
34
55
34
13 13
0
13
36
34
13 27
MH
MH MH 9
27 27
3 5
0
MH
54
27
34
7
0 0 0
5 5mm m 40Ø650mm m 0
0
0
65
+2 650m +3 55650mm
35
34 34 +
m
Ø Ø6
50
0 34 Ø
34
2050mm
0
+5 Ø6 50mm
56
34
34
Ø6
7 2
H2
0
4
6
M 27 78
42
Lamp 2
MH MH
3
2 76
MH
0
34
-17
34
-17 -17
0
-17
55
34
0
CULVERT CH:CULVERT
34+255 CH:CULVERT
34+340 CH:CULVERT
34+520 CH: 34
52
0
25
34
34
0
54
34
PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???° PIPE CULVERT ??? X 675 mm ANGLE ???°
0
24
-17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13 -17 -15 -10 -5 0 5 10 13
34
16 16 16 16 16 16 16 16
14 14 14 14 14 14 14 14
12 12 12 12 12 12 12 12
1,71
1,75
1,76
1,91
1,58
1,73
9.390
9.328
9.700
9.630
9.604
9.590
9.410
9.349
9.400
9.210
9.162
PLAN No.
1.27% 1.27% 1.26% 1.26% 1.25% 1.25% 0.46% 0.46%
LENGTH AND SLOPE 1:78.55 1:78.74 LENGTH AND SLOPE 1:79.49 1:79.37 LENGTH AND SLOPE 1:79.82 1:80.00 LENGTH AND SLOPE 1:218.95 1:217.39
L0414-04-C-04X10-01
34+340 CULVERT CH: 34+550 Av. de Moçambique, 1225
Caixa Postal 403
Maputo
Mozambique
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO)
CHECKED BY
J. KAMPMAN (PrEng)
202001586
Name
CONSULTANT APPROVAL
..............................................
MANAGING DIRECTOR - CPG
: R. de G. CORREIA (I.Eng)
PROJECT DESCRIPTION
REHABILITATION OF ROADS N1/N10 FROM
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE
CONTRACT NUMBER
DRAWING LOCATION DATA
ROUTE
DRAWING km DISTANCE
17/DIPRO-ANE/313/2018
START
N10
31.96
END
N10
34.57
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME DRAINAGE
DRAWING TYPE
01 Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
CONSULTING DRAWN BY VER
NO. DATE REVISION CONSULTANT DRAWING No. L0414-04-C-04X10-01
ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 10 OF 11 01
34.83 35.03 35.36
0
3484
35040
14
MH
281
MH458
Null
St.
35360
0 15
MH28
3 15
m
0 0m MH28
34+Ø10 0Ø1000mm 5
0
305+34
m
815 00m 35+01
Ø10 m
Ø1000m
5 Ø1000
mm
H282 mm
20
Ø1000
5M
348
-1
0
4
MH28
35 35
-15
35020
-20
280
MH
-30 Lamp
35340
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-30 -25 -20 -15 -10 -5 0 5 10 14 -15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15
16 16 16 16 18 18
14 14 14 14 16 16
1,79
1,79
2,78
1,95
12 12 12 12 14 14
1,1
SCALES: 10 10 SCALES: 10 10 SCALES:
0,6
12 12
7,79 8,86 5,99 7,33
Horizontal 1:250 8,98 Horizontal 1:250
8 8 8 26,92 8 Horizontal 1:250 10 10
Vertical 1:250 36,89 Vertical 1:250 23,37
6 6
Vertical 1:250
L = 31.61 m L = 5.28 m 8
CULVERT INVERT L = 5.38 m L = 16.65 m L = 4.88 m L = 6.60 m L = 13.33 m L = 3.45 m
10.340
10.340
10.340
10.340
CULVERT INVERT
12.641
11.957
12.150
12.540
CULVERT INVERT
9.760
9.740
9.743
0.06% 0.06% 0.00% 0.00% 0.00% 2.93% 2.93% 2.93%
LENGTH AND SLOPE 1:1580.40 1:1666.67 LENGTH AND SLOPE Horizontal Horizontal Horizontal LENGTH AND SLOPE 1:34.13 1:34.17 1:34.13
00
150
7807
BC
8
37
C:
69 8
3.7
20
08
358
19 30
15
15
0
714
MH
3
MH
MH450
EC MH
60
C: 233 235 MH 99 4
356
356 Null
85
58. St.
463
20
8000m0m
0 Ø1000mm 350+Ø10 120
80
35+
37+ 0
86
640 m
0 0m
Ø10
Lamp
MH451
650
232 234
Null
St.
MH MH
35
00
8
-15 -15 49
830508
MH
35
-1186
2.0
20
1 3 0
37 H84
371
CULVERT CH:CULVERT 35+800 CH:CULVERT
35+640 CH:CULVERT 37+120 CH: 8+
M
0 4
356
60
86
PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???° PIPE CULVERT ??? X 1050 mm ANGLE ???°
-15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15 -18 -15 -10 -5 0 5 10
18 18 18 18 14 0 5 10 15 20 25 30
16 16 16 16 12 6 6
2,14
2,03
4 4
1,57
14 14 14 14 10
SCALES:
2 2
SCALES: 12 12 SCALES: 12 12 SCALES: 8 Horizontal 1:250
0,96
0,99
8,25 9,08
1,46
6,77 7,78 6,45 10,81
Horizontal 1:250 10 10 Horizontal 1:250 10 23,85 10 Horizontal 1:250 6 Vertical 1:250 0 10,41 0
23,63 26,91 -1
Vertical 1:250 Vertical 1:250 Vertical 1:250 L = 21.19 m
CULVERT INVERT
1.908
1.590
8 8 4
L = 4.78 m L = 14.55 m L = 4.31 m L = 3.12 m L = 17.34 m L = 3.40 m L = 4.50 m L = 17.26 m L = 4.88 m 1.50%
CULVERT INVERT
12.155
12.150
12.120
12.114
11.740
11.790
11.805
7.879
7.850
7.740
7.709
PLAN No.
0.34% 0.34% 0.34% 0.17% 0.17% 0.17% 0.64% 0.64% 0.64% 1:66.67
LENGTH AND SLOPE 1:294.12 1:290.94 1:294.12 LENGTH AND SLOPE 1:588.24 1:577.88 1:588.24 LENGTH AND SLOPE 1:156.25 1:156.95 1:156.25
L0414-04-C-04X11-01
DESIGNED BY
CONSULTANT APPROVAL
CHINA HENAN INTERNATIONAL COOPERATION GROUP (CHICO) CPG CONSULTING ENGINEERS PROJECT DESCRIPTION CONTRACT NUMBER 17/DIPRO-ANE/313/2018
NAME
.............................................. REHABILITATION OF ROADS N1/N10 FROM DRAWING LOCATION DATA START END
Av. de Moçambique, 1225 Rua Beijo da Mulata, 248 Av. Kwame Nkrumah, 1335 J. KAMPMAN (PrEng)
Caixa Postal 403 Sommerschield II P.O. Box 1813
MANAGING DIRECTOR - CPG
QUELIMANE TO NAMACURRA IN THE ZAMBEZIA PROVINCE ROUTE N10 N10
Prof. Reg. No. 202001586
Maputo Maputo Maputo Name : R. de G. CORREIA (I.Eng)
CHECKED BY
Mozambique Mozambique Mozambique DRAWING km DISTANCE 34.83 37.13
Date : DRAWING DESCRIPTION
Tel : +258 21 476 163 / 7 Tel : +258 21 492 429 Tel : +258 21 414 506 / 8 NAME DRAINAGE
DRAWING TYPE
Fax: +258 21 477 235 Fax: +258 21 496 054 Fax: +258 21 414 515
01 18/02/2022 REVIEW COMMENTS - CHICO J. KAMPMAN
e-mail: [email protected] e-mail: [email protected]
M.C. BARNARD (PrEng) MINOR CULVERT CROSS SECTIONS BRIDGE / STRUCTURE No. -
00 15/12/2021 WORK PACKAGE 1 - 4 SUBMISSION J. KAMPMAN Prof. Reg. No. 970404
VER
NO. DATE REVISION CONSULTING DRAWN BY CONSULTANT DRAWING No. L0414-04-C-04X11-01
ENGINEER NAME T. ESPAG SCALE 1:250 SHEET 11 OF 11 01