Concrete PQT check list( LAB.)

The document outlines the specifications and testing results for the concrete weight coating of a 36-inch pipe. It includes details on raw material storage, acceptance tests, production tests, and required compressive and shear strength values. The document serves as a quality assurance record for the coating process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views1 page

Concrete PQT check list( LAB.)

The document outlines the specifications and testing results for the concrete weight coating of a 36-inch pipe. It includes details on raw material storage, acceptance tests, production tests, and required compressive and shear strength values. The document serves as a quality assurance record for the coating process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONCRETE WIEGHT COATING OF 36” PIPE – PQT

GL orderNo.: 0942-04-06636-90

Date: ,2005. - Application method :


Designed Conc. Thick.: mm -Pipe Dia :

ITEM NO. TEST RESULT REMARKS


RAW MATERIAL RECIPT
Storage of coating material
- Cement - In Silos.
2.4 - Aggregates - Open &clean site
- Wire mesh - Covered on clean site.
- PE sheet film - Covered on clean site
2.5 Cement Manuf. Certificates
2.6 Aggregates Manuf. Certificate
2.7 Wire mesh Manuf. Certificate
2.8 P.E Film Manuf. Certificate
* Laboratory inst calibration certificates
RAW MATERIAL INCOMING ACCEPTANCE TESTS
Agg. Sieve analysis 9.5mm…….100-97%
cleanliness Control 4.75………..100-80
2.36…………90-50
1.18…………60-30
0.60…………50-20
030………….30-5
0.15…………15-0
3.1
Sand Sieve analysis 9.5mm……
cleanliness Control 4.75………
2.36………
1.18………
0.60……….
030……….
0.15……….
3.4 Water chemical analyses
PRODUCTION TESTS
4.1 Temp. (water, sand, iron ore)
4.2 Moister content (sand, iron ore),Mix < 5%
4.6 Mix Control (Cement- Agg.)
Cement content 450-650 kg/m3
4.7 Conc. Coating mix temp. <35 oC
4.8 Water – cement ratio 0.28-0.45 by weight
Compressive strength – 7 days -1: (≥ 25 MP)
-2:
a- Cubes 28 days -1: (≥ 35 MP)
-2:
5.2
7 days -1: (≥ 25 MP)
b-Cores -2:
28 days -1: (≥ 35 MP)
-2:
5.8 Shear strength 2.0 Kg/cm2