E20 sheet123
E20 sheet123
HR
LOCATION DBT WBT RH DBT
(GR/LB)
INSIDE
HR
WBT RH ADP PROJECT FLOOR
(GR/LB)
CEILING LIGHTING EQUIPMENT
ROOM / SPACE DETAILS AREA
HEIGHTIN FT's LOAD W/SFT LOAD IN W.
OT-1
OT-2
OT-3
OT-4
NO.OF NO.OF AIR
CFM/PERSON CFM/SFT Glass - N Glass - NE
PEOPLE CHANGES
Glass - E Glass - SE Glass - S Glass - SW Glass - W Glass - NW
Skylight Wall - N Wall - NE Wall - E Wall - SE Wall - S
OPTED
DEHUMIDIFIED OPTED
Wall - SW Wall - W Wall - NW TONNAGE UNIT
AIR CFM TR
TYPE
#DIV/0! 0
HVAC LOAD CALCULATION - E20 FORM SHEET
PROJECT 0.00
LOCATION 0.00
CLIENT AHLL
CONSULTANT
= 0.12
= 0.88
FM Ventilation
No = 0.00 = 0.00
Sqft x 0.00 = 0.00 WALL TEMP WRT MEDIUM WAIGHT
= 0.00
x 0.00 x1/60 = 0.00
FM Infiltration wall.temp- wall.temp-
x cfm/door = 0.00 NE 12 10
x cfm/door = 0.00 E 12 18
x 1.00 cfm/door = 0.00 SE 18 18
x cfm/ft = 0.00 S 26 16
0.00 SW 32 14
CFM from Machine W 28 12
NW 12 6
= #DIV/0! N 10 4
tus Dew Point (ADP)
=
= 0.00
humidified Rise
= 0.00
= #DIV/0! CFM
= #DIV/0! L/s
= 0.00 TR
= 0.00 TR
MP WRT MEDIUM WAIGHT OF 80 LB/SFT
= 0.12
= 0.88
FM Ventilation
No = 0.00 = 0.00
Sqft x 0.00 = 0.00 WALL TEMP WRT MEDIUM WAIGHT
= 0.00
x 0.00 x1/60 = 0.00
FM Infiltration wall.temp- wall.temp-
x cfm/door = 0.00 NE 12 10
x cfm/door = 0.00 E 12 18
x 1.00 cfm/door = 0.00 SE 18 18
x cfm/ft = 0.00 S 26 16
0.00 SW 32 14
CFM from Machine W 28 12
NW 12 6
= #DIV/0! N 10 4
tus Dew Point (ADP)
=
= 0.00
humidified Rise
= 0.00
= #DIV/0! CFM
= #DIV/0! L/s
= 0.00 TR
= 0.00 TR
MP WRT MEDIUM WAIGHT OF 80 LB/SFT