TRANSFORMER CONTROL[1]
TRANSFORMER CONTROL[1]
Signature
Purpose
This document consists in the inspection test procedure for the factory test of the “Local, Protection and
Control Cubicles” for the “220 KV Transformer Remote Control Panel".
Scope
• This procedure applies to all tests that are carried out for products.
Definitions
• None
References
Responsibility
• Operation Manager
• Quality Control Engineer
• Project Manager
PRELIMINARY VERIFICATIONS TESTS
Conformity
Y N
2 Position Selector,
AS PER SCHEME AS PER SCHEME
Remote/Supervisory, 4 Packet,
With Key Free ln Two Positions
2 Position Selector,
AS PER SCHEME AS PER SCHEME
Auto/Manual. 4 Packet, Without
Key
2 Position Selector,
AS PER SCHEME AS PER SCHEME
Master/Follow, 4 Packet,
Without Key
Observations:
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………….....
Conformity
2.1 General presentation of cubicle(s)
Y N Observation(ref.)
Cubicle side notification plates
Dimensions :H x W x D
Labels on the equipment
Equipment’s(Terminals , Auxiliary relays and Switches)
Cable side notification
Earthing (Panel Earthing ,Earthing connection on door, Earthing
on main equipment)
Wiring ducts
Lighting ,doorswitch,socket
Heating resistor
Thermostat / Hygrostat
Cubicle Painting & Coating characteristics (RAL 7035)
Observations:
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………..
Conformity
2.2 Mechanical aspect of cubicle(s) Observation(ref.)
Y N
Paint(color)
Accessibility(swing frames ,doors ,side panels)
Lock
Observations:
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
Conformity
2.3 Scheme Wiring check Connections Observation(ref.)
Y N
Power distribution(AC and DC)
Grounding distribution
Internal wiring and cables
Observations:
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
Decision:
Conformity
3.1 Measurement of insulation resistance of panels using 1000VDC for 1 min Remarks
Y N
Initial conditions:
Observations:
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
Decisions:
Conformity
The material is correctly supplied when the appropriate MCB is closed
Y N
Supply the lighting and heating circuits with 230 VAC and close the appropriate
MCBs. Then verify the operation of door switch, light, socket, thermostat,
heating resistor on each cabinet.
Supply the main equipment’s by closing the appropriate MCBs .Then verify the
operation of this equipment’s.
Equipment 1 :
Equipment2:
Equipment3 :
Observations:
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………