Siminto Final
Siminto Final
UNIT
1 Embankment site 48,000 0
Birr 48,000.00
clearance
2 Excavation of ordinary soil 346,968.00 346,968 0
Birr
3 Excavation of hard Birr 411,811.20 170,067.60 241,743.60
4 formation
Cart Away soil
excavated soil 0 170640
in to enbankment Birr 170,640.00
Total 977,419.20 565035.6
VAT 15% 146,612.88 84755.34
TOTAL WITH VAT 1,124,032.08 649790.94
Item Description
Unit Qty Rate CONTRACT Amount previous Qty previous Amount
No
1 excavation and earth work of pond
1.1 20cm thick site clearing m2 ### 41.8 33440
Trunch excavation not exceeding
1.2 60cm m3 ### 213.9 15400.8
1.3 Back fill around stone massonary m3 ### 327.8 7867.2
prepared by________________________
2;3
2;3
3;1
3;2
3;3
1;1
1;2
1;3
2;1
3.10
3.20
3.30
3.40
3.04
4;1
4.2
4;4
5;1
5;2
6.1
6.2
6.3
6.4
7.1
7.2
8.1
8.2
9.1
9.2
9.3
9.4
9.5
9.6
9.7
TODATE AMOUNT
241,743.60
170640
412383.6
61857.54
474241.14
76.5 8944.38
8944.38
65652.38
48 266678.4 266678.4
48 340252.8 340252.8
606931.2
116960
1222541.12
2012084.7
TAKEOFF SHEET
DISCRIPTION
Site clearing 40
60
2400 m2
excavation of ordinary 1.5
50.56
75 5688 m3
excavation of hard form
1.5
29
54 2349 m3
cart away
1.5
50.56
75
5688 m3
excavation of hard form 1.5
40.473
55
3339.023 m3
3
item Discrpition Unit
1.00 1. EXCAVATION & EARTH WORKS
Diameter 15 mm
10.03 Diameter 20 mm
Diameter 25 mm No.
Diameter 32 mm No.
10.04 SANITARY FIXTURES & FITTINGS No
10.05
Mt
Copper grouding rod of 1.5mt long and
120mm diameter tape furse or approved
driven down to ground in a grounding
manhole low
1*35m2 as shown
bare in detai drawing
copper voltage earthing
11.15 system Mt
Construct manhole with brick wall 250mm
11.16 thick on mass concrete bed of 100mm thick
with inside walls to be platered in too cats of Mt
mortar with reinforced concrete slab of
60mm thick
11.17 SUPPLY POWER Mt
Supply power from VIP-T-TO Bath Heater
11.18 through 3x2.5sq.mm PVC sheathed power
Mt
cable
11.19 Supply power from CMDB TO VIP-SH
Mt
3x4sq.mm PVC sheathed power cable
11.20
Mt
Supply power from CMDB TO OPD 3x6sq.mm
PVC sheathed power cable
TOTAL 977419.20
VAT 146612.88
G.TOTAL 1124032.08
553.75 553.75 553.75
553.75 553.75 553.75
TOTAL 412383.60
VAT 61857.54
G.TOTAL 474241.14
b) In 100mm ground floor slab m2 553.75 553.75 553.75
c) 10cm Concrete bedding m2 553.75 553.75 553.75
Mt
Copper grouding rod of 1.5mt long and
120mm diameter tape furse or approved
driven down to ground in a grounding
manhole
1*35m2 lowas shown
bare in detai drawing
copper voltage earthing 150.00 150.00 150.00
11.15 system Mt 150.00 150.00 150.00
Construct manhole with brick wall 250mm
11.16 thick on mass concrete bed of 100mm thick
with inside walls to be platered in too cats of Mt
mortar with reinforced concrete slab of
60mm thick 150.00 150.00 150.00
11.17 Supply power SUPPLY POWER Bath Heater
from VIP-T-TO Mt 150.00 150.00 150.00
11.18 through 3x2.5sq.mm PVC sheathed power
Mt
cable 150.00 150.00 150.00
11.19 Supply power from CMDB TO VIP-SH
Mt
3x4sq.mm PVC sheathed power cable 150.00 150.00 150.00
11.20
Mt
Supply power from CMDB TO OPD 3x6sq.mm
PVC sheathed power cable 150.00 150.00 150.00