The document provides an overview of recent developments in Indian Railways, highlighting infrastructure improvements, including the world's tallest rail bridge, the Chenab Bridge, and dedicated freight corridors aimed at enhancing efficiency. It also discusses the Kavach safety system designed to improve passenger safety and the introduction of the Vande Bharat Express as part of the 'Make in India' initiative. Additionally, it outlines the Delhi-Meerut Regional Rapid Transit System and the National High-Speed Rail project, emphasizing their environmental benefits and funding sources.

Uploaded by

Mudit Shah
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

COMMUNICATION PRESENTATION

The document provides an overview of recent developments in Indian Railways, highlighting infrastructure improvements, including the world's tallest rail bridge, the Chenab Bridge, and dedicated freight corridors aimed at enhancing efficiency. It also discusses the Kavach safety system designed to improve passenger safety and the introduction of the Vande Bharat Express as part of the 'Make in India' initiative. Additionally, it outlines the Delhi-Meerut Regional Rapid Transit System and the National High-Speed Rail project, emphasizing their environmental benefits and funding sources.

Uploaded by

Mudit Shah
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

RECENT DEVELOPMENT IN BHARATIYA RAIL

INDIAN RAILWAYS-AN OVERVIEW

7300 STATIONS
800 CRORE PASSENGERS PER YEAR
22000 TRAINS PER DAY RUNNING
12 LAKH EMPLOYEES
INFRASTRUCTURE
DEVELOPMENT

• FOR DEVELOPMENT OF ANY


COUNTRY THE
INFRASTRUCTURE HAS TO BE
DEVELOPED, SAME WAY TO
TRANSFORM THE INDIAN
RAILWAYS INFRASTRUCTURE OF
RAILWAYS HAS TO BE
DEVELOPED.
• SOME OF THE MAJOR STEPS
HAVE BEEN TAKEN SUCH AS
DEVELOPMENT OF PLATFORMS.
PRIME FOCUS ON UTLITIES
• NOWADAYS A PRIME FOCUS IS KEPT ON DEVELOPMENT OF
PLATFORMS WITH ALL UTILITIES PROJECTING THE NEED FOR NEXT 20
YEARS.
• CLEAN WASHROOMS, PROPER WAITING AREAS, CLEAN PLATFORMS
ARE THE MAJOR FOCUS OF INDIAN RAILWAYS.
• ANOTHER FOCUS OF RAILWAYS IS TO CONNECT ALL MODES OF
TRANSPORT TO A SINGLE HUB SO THAT TRANSPORT SYSTEM
BECOMES EFFICIENT.
CHENAB
BRIDGE- AN
ENGINEERING
MARVEL
LOCATION

This bridge is a part of Constructed in Bakkal


Udhampur-Srinagar- and kauri of Reasi district
Baramulla Rail link of Jammu
project.
SPECIFICATIONS
• WORLDS TALLEST RAIL BRIDGE
• STEEL AND CONCRETE ARC
• LENGTH 1315 M
• 1178 FEET ABOVE RIVERBED.
• WITHSTAND WIND SPEED OF 266 KMPH.
• BLAST PROOF
• ONE FOUNDATION=1 FOOTBALL GROUND
FUTURE
PLANNING
• It is inaugurated On 13 Aug 2022.
• It is stated that it will be open for public
from Dec 2023 or Jan 2024.
• As Stated by Railway department a
Vande Bharat Express will run on this
bridge .
• It will play a important role in the stretch
from Katra to Banihal.
DEDICATED
FREIGHT CORRIDOR
• FREIGHT CORRIDORS ARE GIVEN
FOR TRANSPORT OF GOODS
ONLY.
• FASTER TRANSPORT OF FREIGHT.
• TO REDUCE TRANSPORT COST OF
COUNTRY.
WESTERN FREIGHT CORRIDOR

BETWEEN JNPT AND DADRI IN


UTTAR PRADESH

EASTERN FREIGHT CORRIDOR

BETWEEN LUDHIANA AND


DANKUNI VIA. DADRI
PURPOSE

• CONNECTING EASTERN AND WESTERN


PORTS OF INDIA.
• DEDICATED FOR TRANSPORT OF GOODS
• IT IS SAID THAT COUNTRY IS SAID TO
DEVELOPED WHEN ITS TRANSPORT
SYSTEM IS EFFICIENT.
SPECIFICATIONS

• WESTERN FREIGHT CORRIDOR-


1506 KM DOUBLE STACK
ELECTRIC LINE
• EASTERN FREIGHT CORRIDOR-
1873 KM SINGLE STACK ELECTRIC
LINE
• CONNECTING ALL FREIGHT
GENERATING POINTS
(INDUSTRIAL AREAS)
FACTS
• TOTAL PROJECT COST- 1.25 LAKH
CRORE
• MACHINE LAYED TRACKS-FIRST TIME
IN INDIA.
• 1.5 KM TRACK LAYING PER DAY SPEED.
• 77% OF THE WORK COMMISSIONED.
• DUE TO FREIGHT TRAFFIC DIVERSION
PASSENGER TRAINS ARE ABLE TO
ARRIVE ON TIME.
• FIRST TUNNEL BUILT IN ARAVALLI
RANGE.
KAVACH SYSTEM
IN INDIAN
RAILWAYS
CURRENT
CHALLANGES
• The Indian Railway faces
numerous safety and security
challenges, including accidents
and terrorist activities. These
challenges pose a significant
risk to passengers and railway
infrastructure.
• Head-to-head collisions of
trains due to interlocking fault
is also a major issue.
TECHNOLOGY
• The Kavach System comprises three key
components: sensor network, central
monitoring system, and response
mechanism.
• Real-time monitoring is a crucial aspect
of the Kavach System. It enables
continuous tracking of train
movements, identification of potential
risks, and prompt response to
emergencies.
BENEFITS OF KAVACH
SYSTEM

• Kavach System brings numerous


benefits to the Indian Railway. It
improves passenger safety, reduces
accidents, enhances security, and
minimizes response time during
emergencies. It utilizes sensors to
detect track abnormalities,
obstructions, and potential
collisions. The system can
automatically apply brakes, issue
warnings, and take necessary
actions to avoid accidents.
CONCLUSION
• The Kavach System has
revolutionized safety and
security in the Indian Railway. By
leveraging advanced
technologies and intelligent
algorithms, it provides proactive
measures to prevent accidents
and address security threats.
VANDE BHARAT EXPRESS
INTRODUCTION
• The Indian Government has
dedicated significant efforts towards
strengthening the ‘Make in India’
campaign. As an excellent example of
the ‘Make in India’ success story, the
Indian Railways launched India’s first
indigenous Semi High Speed train,
Vande Bharat Express. The first Vande
Bharat Express train was flagged off on
15 February, 2019 on the New Delhi
Kanpur-Allahabad-Varanasi route.
• Objectives behind Vande Bharat
Express
This train has been introduced to
upgrade maintenance technologies and
methodologies and achieve
improvement in productivity and
performance of all Railway assets and
manpower in which inter-alia would
cover reliability, availability, utilization
and efficiency.
• Culmination of ‘Make in India’ effort
of Indian Railways
In keeping with the Prime Minister’s
vision of "Make in India", the major
systems of the train have been designed
and built in India. Impact of this train,
matching global standards of
performance, safety and passenger
comfort and yet costing less than half of
global prices, has the potential to be a
game changer in the global rail business.
VISION FOR
A NEW INDIA
Features and Amenities
in Vande Bharat Express
REGIONAL RAPID TRANSPORT SYSTEM

• RRTS is a new, dedicated,


high speed, high capacity,
comfortable commuter
service connecting regional
nodes in NCR.
• RRTS is different from
metro as it caters to
passengers looking to
travel a relatively longer
distance with fewer stops
and at higher speed.
INTRODUCTION
• The Delhi–Meerut Regional Rapid
Transit System, also called as Delhi–
Meerut RRTS, is an 82.15 km long
With a maximum speed of 180 km/h
• The distance between Delhi and
Meerut will be covered in less than 60
minutes. It will have 22 stations and
two depots at Duhai and Modipuram.

ROUTE
• Length of the corridor:
82 km
• No. of stations: 22
• No. of depots: 2
• Names of depots: Duhai
and Modipuram.

OPERATIONAL
PHASES OF WORKS

Phases Target Opening Date Status

Phase 1 -Sahibabad to Duhai


October, 2023 Completed
Depot
Phase 2 - Duhai Depot to
March, 2024 Under Construction
Meerut South

Phase 3 - Complete Line


Jan, 2025 Under Construction
Including Meerut, Delhi Section
SOURCES OF FUNDS

$1 billion $500 million $500 million from


Multilateral from Asian from New Asian Infrastructure
Funding: Development Bank Development Investment Bank
(ADB), Bank (NDB) (AIIB).

Government of
Contribution from Government of Government of
Uttar Pradesh:
governments: India: 20% Delhi: 3.22%
16.78%
SUSTAINABILITY AND
ENVIRONMENTAL IMPACT

• As per estimates, this corridor will


significantly reduce air pollutants,
namely PM 2.5 by 60,000
tonnes, Nitrogen Oxide by
475,000 tonnes, Hydrocarbons by
80,000 tonnes and Carbon
Monoxide by 80,000 tonnes per
year.
NATIONAL
HIGHSPEED
RAIL (BULLET
TRAIN)
ROUTE
• ECONOMICALLY STRONG CITIES
• INDUSTRIAL CORRIDOR
• MUMBAI BKC
SPECIFICATIONS
• OPERATING SPEED: 320-350KMPH
• 80% ELEVATED TRAVEL ON VIADUCT
• 7 KM LONG UNDERWATER TUNNEL
• 0-100 KMPH SPEED IN 59 SECONDS.
• PROJECT COMPLETION ESTIMATED
DATE-2027
FACTS
• LIDAR SURVEY-3 MONTHS
(CONVENTIONAL-1.5 YEARS)
• SINGLE LARGEST TENDER- 25000
CRORE
• FINALISATION IN 35 DAYS (3000-4000
CRORE IN 8 MONTHS)
• FULL SPAN LAUNCHER
• PROJECT COST-1.1 LAKH CRORE
• 99.8% LAND ACQUISITION
COMPLETED
• ONLY 17M LAND STRETCH
ACQUIRED(200-300M)
FUNDS
• PROJECT COST:1.1 LAKH CRORES
• ALMOST 80% OF THE PROJECT COST IS FUNDED BY JAPAN
AS A SOFT LOAN AT AN INTEREST RATE OF 0.1% FOR 50
YEARS.
• LAND PRICE AND TAXES EXCLUDED.
NEED OF BULLET TRAIN

• TIME IS MONEY (10 HR)


• LESS THAN AIRFARE BETWEEN THE
CITIES.
• BULLET TRAIN IS MOST FEASIBLE
FOR DISTANCE BETWEEN 500-800
KM
• ROAD TRAFFIC BETWEEN
AHMEDABAD TO MUMBAI
• COMFORT LEVEL
THANK YOU!!

CONTRIBUTORS IN PRESENTATION:

• ABHINAV CHAUDHARY (P2370460)


• MUDEET SHAH (P2370461)
• VRINDA S. (P2370462)
• GOURAV G. T (P2370463)
• JYOTIRANJAN (P2370464)
• JAYSURIYA (P2370465)
• ANKIT OJHA (P2370466)

You might also like