0% found this document useful (0 votes)
2 views

IW21-Create Corrective Notification

The document outlines the process for creating a corrective maintenance notification (IW21) in a maintenance department. It serves to request maintenance for technical objects and record the history of maintenance activities, with priorities categorized as high, medium, or low. The prerequisite for this process is the availability of maintenance master data, and it includes specific steps to follow in the system menu.

Uploaded by

mison mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

IW21-Create Corrective Notification

The document outlines the process for creating a corrective maintenance notification (IW21) in a maintenance department. It serves to request maintenance for technical objects and record the history of maintenance activities, with priorities categorized as high, medium, or low. The prerequisite for this process is the availability of maintenance master data, and it includes specific steps to follow in the system menu.

Uploaded by

mison mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Create corrective Notification (Planed) – IW21

Definition:-

Corrective maintenance activities requested through


Notification will be planned and part of the day to day
workload of any maintenance department.

Its two primary purposes are


Request maintenance for technical object (equipment
or functional location)
Record the history of the maintenance performed to
rectify the reported problem.

Priorities are mentioned in the maintenance


notification. Normally following priorities are used.
ƒ High
ƒ Medium
ƒ Low

Prerequisite:-

Maintenance master data must be available.

Menu Path:-

Logistics → Plant Maintenance → Maintenance


processing → Notification → IW21 – Create (General)

Double click IW21

Enter Notification type


Click

Maintain the following fields

ƒ Description
ƒ Equipment
ƒ Planner group
ƒ Subject and description
Click

Maintain priority
Click

Message appear at the bottom