SD & DC for Falsework Lvl 10

This document is a Shop Drawing Approval (SDA) submission for the Mori 2 Residences project by Scientex Contract Sdn Bhd, dated April 9, 2025. It includes a request for comments and approval on the shop drawing and design calculation for Falsework Level 10. The document outlines the respective consultants involved and requests their action and feedback.

Uploaded by

jordan2xkl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

SD & DC for Falsework Lvl 10

This document is a Shop Drawing Approval (SDA) submission for the Mori 2 Residences project by Scientex Contract Sdn Bhd, dated April 9, 2025. It includes a request for comments and approval on the shop drawing and design calculation for Falsework Level 10. The document outlines the respective consultants involved and requests their action and feedback.

Uploaded by

jordan2xkl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCIENTEX CONTRACT SDN BHD (1505191-M)

SHOP DRAWING APPROVAL (SDA)


PROJECT : MORI 2 Residences Date : Ref. No Rev. No
Rawang
TO : Perunding Manh Sdn Bhd 09 April 2025 SCSB/002/R8/SDA/PMSB/081 00
WO/
Copied to : W/A
A
Submitted For Initiated by : Scientex Contract Sdn Bhd
Scientex Park (M) Sdn Bhd √ APPROVAL √ Name : Lim Peck Soon
Scientex Contract Sdn Bhd √ YOUR INFORMATION
Perunding Manh Sdn Bhd FOR ACTION Signature :
UIG Architects Sdn Bhd √ FOR ENDORSEMENT
VectorOne Engineering
√ REQUESTED
Consultant Sdn Bhd Date : 09 April 2025
Tres IQS Sdn Bhd √
SUBJECT : Submission of Shop Drawing & Design Calculation for Falsework Level 10

Enclosed the shop drawing for your comment and approval.

Your reply highly appreciated.

Respective Consultants to Act :


COMMENTS / ACTION (STATUS CODE)
APPROVED A Acknowledge Receipt by :
APPROVED WITH COMMENT B Name :
Signature :
REVISED/RESUBMIT/ REJECTED C
FOR INFORMATION D Date :
Architect/Consultant to enter Action Codes and Comments :

C.c. to
1. Scientex Park (M) Sdn Bhd (SPSB) Mr Beh Chun Chong / Mr Tong / Mr Kelvin Ng
2. Scientex Contract Sdn Bhd (HQ) Mr Eddie Ng / Mr Max Ting
3. Perunding Manh Sdn Bhd (PMSB) Ir. Ma Wee Lee / Ir. Tan Mok Seng
4. UIG Architects Sdn Bhd (UIG) Ar. Reno Lee / Mr Jackie / Mr Jim Ngui
5. Vectorone Engineering Consultant Sdn Bhd (VECSB) Ir Edward Lim / Mr Eric Chan / Faiz Roslan
6. Tres IQS Consultant Sdn Bhd (IQS) Mr Lee Chay Line / Ms Carmen Hon / Mr Loke Kong Wei / Mr Alan