0% found this document useful (0 votes)
8 views

Bombas Data Sheet

This document provides a detailed data sheet for a crude oil fiscalization pump (TAG-P-925 01 A/B) designed for Mansarovar Energy Combia Ltd. It includes specifications such as operating conditions, construction materials, and performance metrics, as well as applicable standards and requirements for installation. The document is intended for internal review and comments, with a revision date of December 4, 2012.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Bombas Data Sheet

This document provides a detailed data sheet for a crude oil fiscalization pump (TAG-P-925 01 A/B) designed for Mansarovar Energy Combia Ltd. It includes specifications such as operating conditions, construction materials, and performance metrics, as well as applicable standards and requirements for installation. The document is intended for internal review and comments, with a revision date of December 4, 2012.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

No.

MANSAROVAR
NNU-DS-M-MTB-004-825-801

INGENIERÍA CONCEPTUAL Y BÁSICA UNDER No. DOCUMENTO


RIVER FASE III Y DIAGNÓSTICO DEL MTB DUB-1004-DS-M-110
ELABORÓ: ORDON
REV. C1

HOJA DE DATOS BOMBA DE FISCALIZACIÓN CRUDO A TECA


TAG-P-925 01 A/B

0
C1 EMITIDO PARA COMENTARIOS 04-12-12 ORDON WILCA3 SANAJ3
A1 EMITIDO PARA REVISIÓN INTERNA 29-11-12 ORDON WILCA3 SANAJ3
REV. DESCRIPCIÓN FECHA ELABORÓ REVISÓ APROBÓ
AREA DE DISTRIBUCIÓN DISTRIBUIDO POR: Carlo Vladimir Rua (GP) ARCHIVO
MAGNÉTICO
Err:502
No.
No. PETROBRAS
ITANSUCA
REV.
H--ME--905-001
--M--010
No. MANSAROVAR
NNU-DS-M-MTB-004-825-801
INGENIERÍA CONCEPTUAL Y BÁSICA UNDER RIVER No. DOCUMENTO
FASE III Y DIAGNÓSTICO DEL MTB DUB-1004-DS-M-110

HOJA DE DATOS BOMBA DE FISCALIZACIÓN CRUDO A REV. C1


INGENIERÍA DE DETALLE PARA01LA
TECA TAG-P-925 A/BPLANTA
DE MALLAS DE 04-12-12

PAGE 2 OF 4
APPLICABLE SPECIFICATIONS API 676 THIRD EDITION
ROTARY PUMP (API 676-3RD)
DATA SHEET JOB No. PDUB-1004 TAG(S) TAG-P-925 01 A/B
U.S. CUSTOMARY SPEC NO./ MR. HOLD
P&ID NNU-PL-P-MTB-004-125-117
REQ'N Nº
1 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
2 FOR MANSAROVAR ENERGY COMBIA LTD. (MECL) UNIT
3 SITE PUERTO BOYACÁ Nº OF PUMPS REQUIRED TWO (2) = 1 oper. + 1 stby.
4 SERVICE FISCALIZACIÓN CRUDO A TECA SIZE AND TYPE
5 MANUFACTURER SERIAL NO'S
6 GOVERNING SPECIFICATION

7 NOTES: INDICATES INFORMATION TO BE COMPLETED BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER


8 GENERAL
9 Nº MOTORS DRIVEN per Pump OTHER DRIVER TYPE N/A
10 PUMP ITEM NO'S PUMP ITEM NO'S
11 MOTOR ITEM NO'S MOTOR ITEM NO'S GEAR ITEM NO'S per Pump
12 MOTOR PROVIDED BY Pump Mnf. MOTOR PROVIDED BY GEAR PROVIDED BY Pump Mnf.
13 MOTOR MOUNTED BY Pump Mnf. MOTOR MOUNTED BY GEAR MOUNTED BY Pump Mnf.
14 MOTOR DATA SHEET NO. MOTOR DATA SHEET NO. GEAR DATA SHEET NO.

15 OPERATING CONDITIONS PUMPED FLUID


16 MIN NORMAL RATED MAX(1) TYPE OR NAME OF PUMPED FLUID CRUDO LIMPIO
17 CAPACITY (gpm) 645 OPERACIÓN 1 OPERACIÓN 2 RATED
18 OTHER OPER CONDITIONS (gpm) TEMPERATURE (⁰F) 180 140
19 DISCHARGE PRESSURE (psig) 300.0 VAPOR PRESS. (psia) 10
20 SUCTION PRESSURE (psig) -2.0 RELATIVE DENSITY (SG):
21 DIFFERENTIAL PRESSURE (psi) 302.0 VISCOSITY (cP) 700.00 2600.00
22 NPSH AVAILABLE (ft) 8 SPECIFIC HEAT, Cp (BTU/lb ⁰F)
23 NPIP AVAILABLE (psia) CORROSIVE / EROSIVE AGENT DESCRIPTION
24 NPSHA/NPIP DATUM : C.L. SUCTION NOZZLE EROSIVE CORROSIVE
25 TOP OF FOUNDATION CHLORIDE CONCENTRATION (ppm)
26 DUTY CYCLE CONTINUOUS INTERMITTENT H2S CONCENTRATION (ppm)
27 (1) Maximum - mechanical design FLUID HAZARDOUS FLAMMABLE OTHER
28 PERFORMANCE GAS ENTRAINED SLUG FLOW % BY VOLUME or GVF
29 RATED CAPACITY (gpm) SOLIDS PARTICLE SIZE DISTRIBUTION & MIN/MAX (μ)
30 NPSHA / NPIP REQUIRED (ft) (psia) SHAPE CONCENTRATION HARDNESS
31 RATED SPEED (rpm)
32 RATED VOLUMETRIC EFFICIENCY (%) SITE DATA AND UTILITY DATA
33 RATED PUMP EFFICIENCY (%) LOCATION: INDOOR OUTDOOR
34 REQUIRED POWER @ MAXIMUM VISCOSITY (BHP) HEATED UNHEATED UNDER ROOF
35 REQUIRED POWER @ PRESSURE LIMITING VAL (BHP) ELECTRICAL AREA CLASS I GROUP D DIV 2
36 REQUIRED POWER @ RATED CONDITION (BHP) ZONE GROUP TEMP CLASS
37 MAXIMUM ALLOWABLE SPEED (rpm) WINTERIZATION REQ'D TROPICALIZATION REQ'D
38 SITE DATA ALTITUDE 180 (msnm) BAROMETER 14.5 (psia)
39 RANGE AMBIENT TEMPERATURE MIN/MAX 68 / 104 (⁰F)
40 CONSTRUCTION (NOTE 3) UNUSUAL CONDITIONS:
41 ANSI DUST FUMES SALT ATMOSPHERE
CONNECTIONS SIZE FACING POSITION
42 RATING OTHER
43 SUCTION 12 300 (NOTE 5) UTILITY CONDITIONS
44 DISCHARGE 12 300 (NOTE 5) ELECTRICITY DRIVERS HEATING CONTROL SHUTDOWN
45 GLAND FLUSH VOLTAGE 480 --- --- ---
46 DRAINS* HERTZ 60 --- --- ---
47 VENTS* PHASE 3 --- --- ---
48 JACKET COOLING WATER INLET RETURN DESIGN MAX Δ
49 *PIPE VENTS & DRAINS TO EDGE OF BASEPLATE TEMP (ºF) MAX
50 PUMP TYPE PRESS (psig) MIN
51 INTERNAL GEAR TWIN-SCREW VANE LOBE SOURCE
52 EXTERNAL GEAR 3-SCREW PROGRESSING CAVITY INSTRUMENT AIR MAX MIN
53 ROTARY GEAR TYPE PRESSURE (psig)
54 ORIENTATION:
55 HORIZONTAL VERTICAL APPLICABLE SPECIFICATIONS:
56 API-676 POSITIVE DISPLACEMENT PUMP - ROTARY
57 REMARKS: GOVERNING SPECIFICATION (IF DIFFERENT)
58 NACE MR0103 (6.13.2.13) NACE MR0175
59 OTHER

HOJA 3 DE 5
No.
No. PETROBRAS
ITANSUCA
REV.
H--ME--905-001
--M--010
No. MANSAROVAR
NNU-DS-M-MTB-004-825-801
INGENIERÍA CONCEPTUAL Y BÁSICA UNDER RIVER No. DOCUMENTO
FASE III Y DIAGNÓSTICO DEL MTB DUB-1004-DS-M-110

HOJA DE DATOS BOMBA DE FISCALIZACIÓN CRUDO A REV. C1


INGENIERÍA DE DETALLE PARA01LA
TECA TAG-P-925 A/BPLANTA
DE MALLAS DE 04-12-12

PAGE 3 OF 4
ROTARY PUMP (API 676-3RD) JOB No. TAG(S) TAG-P-925 01 A/B
DATA SHEET SPEC NO./ MR.
U.S. CUSTOMARY
REQ'N Nº
1 CONSTRUCTION MATERIALS (NOTE 1 Y 2)
2 CASING MIN DESIGN METAL TEMP (6.13.6.1)
3 MAX. ALLOWABLE CASING PRESS. (6.3.1): PSIG @ ºF CASING
4 MAXIMUM ALLOWABLE SUCTION PRESS.: PSIG @ ºF STATOR / LINER
5 HYDROSTATIC TEST PRESSURE - Suct / Disch: (psig) END PLATES
6 ROTATING ELEMENTS ROTOR(S)
7 ROTOR MOUNT BETWEEN BEARING OVERHUNG VANES
8 TIMING GEARS YES NO TYPE SHAFT
9 BEARING TYPE: RADIAL THRUST SLEEVE(S)
10 BEARING NUMBER: RADIAL THRUST GLAND(S)
11 LUBRICANT TYPE: CONSTANT LEVEL OILERS BEARING HOUSING
12 PUMPED FLUID RING OIL OIL MIST TIMING GEARS
13 EXTERNAL OIL FLOOD GREASE ELASTOMERS / GASKETS
14 LUBRICANT Info (Visc, etc)
15 MECHANICAL SEALS QA INSPECTION AND TEST
16 MANUFACTURER AND MODEL SPECIAL MATERIAL TESTS (See design codes + weld + inspection sheet )
17 MANUFACTURER CODE LOW AMBIENT TEMP. MATERIALS TESTS (6.13.6.5)
18 API 682 AND DATA SHEETS COMPLIANCE WITH INSPECTORS CHECK LIST
19 API 682 SEAL FLUSH PLAN CERTIFICATION OF MATERIALS (vanes, rotor, stator and casing)
20 API 682 SEAL CODE SURFACE / SUBSURFACE EXAM'S (user to define affected components in remarks )
21 RADIOGRAPHY
22 DRIVER TYPE ULTRASONIC
23 INDUCTION MOTOR STEAM TURBINE GEAR OTHER MAGNETIC PARTICLE
24 DRIVE MECHANISM LIQUID PENETRANT
25 DIRECT COUPLED ASD OTHER COMPONENT PMJ
26 COUPLING MANUFACTURER HARDNESS OF PARTS, WELDS & HEAT AFFECTED ZONES
27 COUPLING TYPE VENDOR SUBMIT TEST PROCEDURES (8.3.1.2)
28 RATING (MAX TORQUE) MODEL SUPPLIER TO KEEP REPAIR AND HT RECORDS (8.2.1.1)
29 SPACER LENGTH S.F NON-WIT WIT OBSERV
30 COUPLING BALANCED MANF STD AGMA 9000 CLASS SHOP INSPECTION (8.1)
31 COUPLING PER API 671 (7.2.4) 10 (7.2.3) HYDROSTATIC (8.3.2)
32 COUPLING HUB ATTACHMENT WITH WETTING AGENT
33 STRAIGHT KEYED TAPERED PERFORMANCE(8.3.4)
34 COUPLING GUARD TYPE RETEST ON SEAL LEAKAGE
35 STELL BRASS NON-METALLIC OTHER NPSH / NPIP (8.3.7.1)
36 NON SPARK COUPLING GUARD (7.2.15) TRUE PEAK VELOCITY DATA
37 COMPLETE UNIT TEST (8.3.7.2)
38 MOTOR DRIVER (SEE MOTOR DATA SHEET) SOUND LEVEL TEST (8.2.7.3)
39 IEEE 841 API 541 API 546 OTHER CLEANLINESS PRIOR TO
40 ASD SUPPLIED BY PURCHASER MOTOR SUPPLIER FINAL ASSEMBLY (8.2.3.3)
41 MANUFACTURER TYPE HIGH DISCHARGE PRESSURE @ PLV
42 FRAME ENCLOSURE CHECK FOR CO-PLANAR AT
43 HORIZONTAL VERTICAL MOUNTING PAD SURFACES (7.4.7)
44 (HP) 250 (NOTE 3) (rpm) 900 (NOTE 3) 1 HR MECHANICAL RUN TEST AFTER
45 VOLTS 460 PHASE 3 HERTZ 60 SERVICE FACTOR 1.15 OIL TEMP STABLE (8.3.5.1)
46 VARIABLE SPEED RANGE (rpm) 4 HR. MECH RUN AFTER
47 MINIMUM STARTING VOLTAGE (7.1.2.2) OIL TEMP STABLE (8.3.5.2)
48 INSULATION AUXILIARY EQUIPMENT TEST (8.3.4.3)
49 FULL LOAD AMPS OTHER
50 LOCKED ROTOR AMPS TEST WITH SUBSTITUTE SEAL (8.3.5.3)
51 STARTING METHOD soft-starting SUPPLIER SUBMIT TEST DATA WITHIN 24 HOURS
52 LUBE INCLUDE PLOTTED VIBRATION SPECTRA
53 BEARINGS (TYPE/NUMBER): RECORD FINAL ASSEMBLY RUNNING CLEARANCES (8.2.1.1f)
54 RADIAL / PERFORMANCE CURVE & DATA APPROVAL PRIOR TO SHIPMENT (8.3.9)
55 THRUST /
56

HOJA 4 DE 5
No.
No. PETROBRAS
ITANSUCA
REV.
H--ME--905-001
--M--010
No. MANSAROVAR
NNU-DS-M-MTB-004-825-801
INGENIERÍA CONCEPTUAL Y BÁSICA UNDER RIVER No. DOCUMENTO
FASE III Y DIAGNÓSTICO DEL MTB DUB-1004-DS-M-110

HOJA DE DATOS BOMBA DE FISCALIZACIÓN CRUDO A REV. C1


INGENIERÍA DE DETALLE PARA01LA
TECA TAG-P-925 A/BPLANTA
DE MALLAS DE 04-12-12

PAGE 4 OF 4
ROTARY PUMP (API 676-3RD) JOB No. TAG(S)
DATA SHEET SPEC NO./ MR.
U.S. CUSTOMARY
REQ'N Nº
1 PIPING & APPURTENANCES PREPARATION FOR SHIPMENT
2 MANIFOLD PIPING FOR PURCHASER CONNECTION DOMESTIC EXPORT EXPORT BOXING REQ'D
3 VENT DRAIN STEAM/COOLING WATER OUTDOOR STORAGE MORE THAN 6 MONTHS
4 HATING JACKET REQ'D. (6.3.6) COOLING REQ'D SURFACE PREPARATION AND PAINT
5 PIPE TUBING FITTINGS MANUFACTURER'S STANDARD OTHER (SEE BELOW)
6 C.S GALVANIZED S. STEEL SPECIFICATION NO.
7 VALVES: CARBON STEEL S. STEEL PUMP: (8.4.3.1)
8 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS PRIMER
9 MOUNT SEAL POT OFF BASEPLATE FINISH COAT
10 CONNECTION BOLTING CADMIUM PLATED BOLTS PROHIBITED BASEPLATE: (8.4.3.1)
11 PTFE COATING ASTM A153 GALVANIZED PRIMER
12 PAINTED SS FINISH COAT
13 HEATING AND COOLING
14 HEATING MEDIUM: STEAM OTHER WEIGHTS (lb) (NOTE 4)
15 STEAM JACKET/COOLING WATER PRES: (psig) (ºF) PUMP BASE GEAR DRIVER
16 COOLING WATER REQUIREMENTS: TOTAL WEIGHT
17 BEARING HOUSING (gpm) @ (psig) BASEPLATE
18 LUBE OIL COOLER (gpm) @ (psig) BY PUMP MANUFACTURER SUITABLE FOR EPOXY GROUT
19 SEAL OIL COOLER (gpm) @ (psig) EXTENDED FOR
20 OTHER (gpm) @ (psig) DRAIN-RIM DRAIN-PAN
21 TOTAL COOLING WATER (gpm) @ (psig) NON-GROUT CONSTRUCTION (7.4.2)
22 INSTRUMENTATION OTHER PURCHASER REQUIREMENTS (NOTE 6)
23 ACCELEROMETER NAMEPLATE UNITS U.S. CUSTOMARY SI
24 PROVISION FOR MTG ONLY NO RELIEF VALVES BY PUMP MFRG INTERNAL EXTERNAL
25 FLAT SURFACE REQUIRED PIPING FOR SEAL FLUSH FURNISHED BY:
26 BEARING PUMP RTD's PUMP VENDOR OTHERS
27 WINDING RTD PIPING FOR COOLING/HEATING FURNISHED BY:
28 PRESSURE GAUGE TYPE OTHER PUMP VENDOR OTHERS
29 JUNCTION BOX PROVIDE TECHNICAL DATA MANUAL
30 SEAL RTD's INSTALLATION LIST IN PROPOSAL (9.2.3.1)
31
32
33
34 REMARKS
35 NOTE 1: THE VENDOR SHALL CONFIRM AND GUARANTEE ALL MATERIALS, WHICH MUST MEET THE QUALITY STANDARDS OF MECL.
36 NOTE 2: THE VENDOR COMPLETE THE DATA SHEET AND PROVIDE ANY ADDITIONAL INFORMATION.
37 NOTE 3: APPROXIMATE/REFERENCE VALUE, THE VENDOR SHALL CONFIRM.
38 NOTE 4: VENDOR SHALL INCLUDE THE WEIGHTS AND DIMENSIONS IN THE OFFER.
39 NOTE 5: ACCORDING TO ASME B16.5.
40 NOTA 6: RELIEF VALVE IS EXTERNAL AND SUPPLIED BY MANSAROVAR
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

HOJA 5 DE 5

You might also like