The document outlines the bar bending schedule for the reconstruction of fully damaged schools under the PaRRSA program in Malakand Division, KPK. It provides detailed specifications for various types of bars required for the super-structure from ground floor to first floor slab, including dimensions, quantities, and total lengths. The total weight of the materials is calculated to be approximately 1.108 tons.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

G-F (Column) BBS

The document outlines the bar bending schedule for the reconstruction of fully damaged schools under the PaRRSA program in Malakand Division, KPK. It provides detailed specifications for various types of bars required for the super-structure from ground floor to first floor slab, including dimensions, quantities, and total lengths. The total weight of the materials is calculated to be approximately 1.108 tons.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

RECONSTRUCTION OF FULLY DAMAGED SCHOOLS UNDER PaRRSA PROGRAM, MALAKAND DIVISION, KPK

BAR BENDING SCHEDULE FOR T-7 Strip (Super-Structure) Col Supr Str. GF to FF Slab ND (27-5-11)

Nos Bars Total Nos of Cut Length Total


S.No Description Dia No of Unit in Each Length Shape Remarks
Unit Bars
ft ft

C1 (3-No) Up To FF Slab 6 4 8 32 15.08 482.56

C2 (3-No) Up To FF Slab 6 4 8 32 15.167 485.344 # 6=15'-2"


# 4=13'-
10"

C3 (3-No) Up To FF Slab 4 4 8 32 13.75 440

""3 "9
Stirrups PB top to Slab Top 3 12 44 528 3.5 1848

"9
Dia #3 #4 #5 #6 #7 #8 Splice Length
Grand Total Length (ft) 1,848.00 440.00 - 967.90 - - # 3 = 1'-7.5"
Unit wt (kg/ft) 0.171 0.303 0.473 0.681 0.927 1.211 # 4 = 2'-2"
Total wt (kg) 316.01 133.32 - 659.14 - - # 5 = 2'-8"
Grand Total wt (kg) 1,108.47 # 6 = 3'-3"
Grand Total wt (Tons) 1.108 # 8 = 4'-4"

Prepared By Checked By Re Checked By


Q.S. AGES Site Engineer (AGES) M & E Engineer (AGES)