G-F (Column) BBS
G-F (Column) BBS
BAR BENDING SCHEDULE FOR T-7 Strip (Super-Structure) Col Supr Str. GF to FF Slab ND (27-5-11)
""3 "9
Stirrups PB top to Slab Top 3 12 44 528 3.5 1848
"9
Dia #3 #4 #5 #6 #7 #8 Splice Length
Grand Total Length (ft) 1,848.00 440.00 - 967.90 - - # 3 = 1'-7.5"
Unit wt (kg/ft) 0.171 0.303 0.473 0.681 0.927 1.211 # 4 = 2'-2"
Total wt (kg) 316.01 133.32 - 659.14 - - # 5 = 2'-8"
Grand Total wt (kg) 1,108.47 # 6 = 3'-3"
Grand Total wt (Tons) 1.108 # 8 = 4'-4"