2. Gate entry of vehicles, 1. Physical hazard HIGH 1. The following documents to be enclosed before LOW
Equipment’s & 2. while handling permit the vehicle;
Delivery of material to job 3. Material. 2. Vehicle documents (Registration and Insurance)
site. 4. Working at 3. Driver License with valid date
5. Height. 4. Speed limit is 15kmph at inside the campus.
6. Struck by 5. Ensure Safety and traffic marshals been
7. Moving vehicle. informed about the vehicle entry.
8. Unskilled Labour 6. Ensure logistic plan explained to the driver by
9. Unconditioned banks man.
10. Damaged Equipment &. Vehicle accident 7. Stop the other tenant vehicle movement by
campus security while entering and reversing
the vehicle.
8. Provide barricade (cone with chain) at around
the vehicle while unloading
9. Basic PPE’S (Safety, Helmets, Reflective jacket, ,
Project HS Risk Assessment
Hand gloves, Full body harness belt, Safety
shoe,)
3. Traffic Management and 1. Injuries to public whilst unloading and carrying HIGH 1. Council approved Hoarding/Barricades and warning LOW
Materials Delivery 2. materials, Signage.
3. Traffic accident 2. Personal Protective Equipment – gloves for
4. Manual Handling / hand injuries deliveries.
3. Internal Designated goods lift, use of trolleys, team
lifting
4. Establish Traffic Management Plan
5. Offset timings for arrival of trades each day
Project HS Risk Assessment
7.Mobile Scaffolding 1. Fall of men and material, Hand injury, HIGH 1. Deploy trained person to erected the scaffolds LOW
Erection and dismantling by 2. Scaffold collapse. 2. Job specific Training will be provide
trained person. 3. Tool box training also given to all workers
4. Height work permit should be taken
(Erection & Dismantling) 5. Ensured scaffolding certificate should be
certified competent person
6. Area should free from unwanted materials and
debris
7. Don’t using bend and dent materials
8. Good housekeeping done for before and after work
9. Area should be barricaded using Cones with
chained
10.Following proper tagging system
11.Don’t use unstable platform
12.Provide proper guard rail system (top rail, mid rail,
13.toe board)
14.Ensure scaffolding checklist and display SWL &
Tag Provide the wheels in good condition
15.Using Proper PPE’s Hand gloves, Goggles, nose
mask, safety Helmet, safety shoe, safety Belt more
than 1.8 m)
Project HS Risk Assessment
13.Installation of Gypsum 1. Exposure of Dust / Noise HIGH 1. Maintain good housekeeping at work location. LOW
work Using drilling & Cutting 2. Manual Handling 2. Loose & Un-wanted has to be secure in designated location.
Mach (Ceiling & Floor) 3. Electric Shock 3. Ensure the industrial plug-top & cable routed through insulated
4. Contact with sharp edges cable stand.
5. Vision Impairment 4. Cover all sharp edges.
6. Collapse of scaffold 5. Ensure the proper illumination for work place.
7. Fall of man / materials 6. Conduct the Job specified training for workers.
7. If required Vertigo test conducted for the
workforce at vertigo set up prepared at site.
8. Ensure the PPE’S Like Safety Helmet, safety shoe, reflective
jackets, full-body harness, ear plug, nose mask, cotton gloves &
goggle.
Project HS Risk Assessment