WORK PERMIT LOG REPORT update 2018
WORK PERMIT LOG REPORT update 2018
1 CHP BC-1
1-Jan-18
2 U-1 SA Fan Control Damper
3 U-1 SA Fan Control Damper
4 BOP Air Dryer 1&2 Instrument Air
2-Jan-18
5 BOP CWP # 4
6 WTP Mixer Polimer
7 U2 BM Transfer Line & Elbow 6
8 U2 Soot Blower No 6
9 U1 Fly Ash Silo Area
10 U1&2 STG Area
3-Jan-18 11 U1 Boiler Area
12 Boiler Chimney Area
13 CHP Primary Screen 2
14 DCS Panel Alarm
15 U1 PA Fan 1 DE Fan Bearing
16 BSDG Muffler
17 U2 BFP # 1
18 U1&2 Back Pass & Combuster
4-Jan-18 19 U2 Soot Blower No 1
20 U2 Coal Bunker
21 BOP AC no 1 GD
22 BOP AC no 1 GD
23 CHP BC # 4 & 5 , Primary House
24 U1 PA FAN 1 Lube Oil
25 U1 BM Transfer Elbow 1
26 U1 APH 1 & 2
5-Jan-18 27 U1 APH 1 & 2
28 BOP Air Compressor GD 3
29 BOP All Motor
30 STG & Boiler STG CEP & Elgi Compressor
31 CHP Sand Silica Screen BC 1
32 U-1 Check level coal bunker
33 RSS Duct buliding near 20 KV
34 U-1 BM line Elbow-4
6-Jan-18 35 U-1&2 Boiler Area
36 CHP All Motor BC-1-5 & DE ral & TW flap gate
37 CHP Primary & Sec Screen line -2
38 BOP CT Basin 1-4
7-Jan-18 39 U-2 Elbow -3 BM
40 CHP Primary Crusher 1&2 and DSS Pump 1&2
41 U-2 ESP Field 5
8-Jan-18
8-Jan-18 42 U-1 APH 2
43 U-2 Field 5 ESP
44 U-1 APH # 2
45 U-1&2 Boiler 1&2 ERV
46 WTP WTP
47 RSS RSS
48 U-2 APH # 2
9-Jan-18
49 U-2 APH # 2
50 BOP Compressor House TAC Bed & Ash
51 BOP Oily Water Pump # 3
52 CHP BC-4
53 U2 Manual Valve Main Steam Press
54 U1&2 Line Fly Ash Silo ESP Field 1
10-Jan-18 55 U2 BM Transfer Elbow 6
56 U1 Line Service Water
57 CHP DSS Pump 1
58 Switch Yard Bus Bar 2
59 U-2 APH
60 U-1 Service Water Line
61 Demin SBA B
62 U-2 APH 1.
63 CHP DSS Pump 1
11-Jan-18
64 U-1 HP Dosing Pump 1
65 Life Passanger Life Passanger
66 U-2 Bed Material Elbow No 5
67 U-1 Tapping Line Drain Hp Dosing
68 U-2 APH 1
69 U1 RAF 1 Stuck
70 BOP Main Pump House
12-Jan-18 71 U-1 ,U-2 Lube Oil Fan ( PA & SA)
72 U-1 Seal Pot
73 U-1 Draig chain -1
74 U-1 Seal Pot
75 U-1 Boiler
76 RSS Trafo IBT RSS
77 U-1 Trafo GT-1
78 U-1 SAF no-1
79 BOP CT Fan -2
13-Jan-18 80 U-1 SUB -1 Gun
81 BOP CT Fan 1,2,3,4
82.a U-1 Rotary air lock feeder -1
82.b CHP BC-1
83 U-1 BFP # 1
84 U-1 Sub-1,2 nozle/gun
85 BOP Service Water Line
86 U-1 BFP # 1
87 U-2 Coal Bunker
88 U-2 Elbow-4 BM
89 U 1,2 Motor MV boiler 1,2
90 U-1 Elbow -6 BM
14-Jan-18
91 U-2 MOV PRDS
92 Demin Pressure gauge pump regent A error
93 U-1,2 APH elbow 6 & Field 1 elbow 5 & line after elbow 6
94 BOP CWP 1
95 CHP BC-1,2&3
96 U-2 Rotary air lock feeder -2
97 U-2 BM Line Elbow 3
15-Jan-18 98 CHP Three Way Bunker 1
99 U-1 Boiler
100 U-2 Area Coal Bunker # 2
101 U-1 Draig chain -1
102 WTP Turbidity Outlet Sand Filter
103 Demin All Motor Demin Plant
104 Demin FF & RW Motor
105 U2 Boiler SUB 1
16-Jan-18
106 Demin SAC B Inlet Line
107 U1 BM Transfer Elbow 1
108 U2 BM Transfer Elbow 3
109 Demin Degassed 1 Pump
110 Demin PH Guard Pond
111 CHP Primary Screen 1 & 2
112 U1 BM Transfer Elbow 5
113 U1 ESP Field 1 Elbow 1
17-Jan-18
114 LDO Line Oil Catcher
115 Demin/BOP Diesel Fire Fighting
116 U1 ESP field 1 Elbow 2
117 BOP CT Fan 1
118 U-1 ID Fan 2
119 BOP Oily Water Pump # 3
120 U-2 Bed Material Elbow No 1 & 3
18-Jan-18 121 U-2 Rotary Feeder 2
122 CHP CHP MCC
123 U-2 Steam Drum
124 U-1 Coal Bunker
125 Remote Sub IBT( Remote Sub Station)
19-Jan-18 126 U-1 Bed Material Elbow No 1
127 U-2 Coal Bunker 2
128 CHP Primary crusher house
20-Jan-18 129 CHP Primary Screen -1
130 U-1 Elbow BM-3
131 U-1 Greeting Parit Area BM Hopper
132 CHP Belt Feeder 1 & 2
133 U-1&2 BM Line Transfer Elbow 6 (U-1) & Elbow 5 (U-2)
134 BOP Compressor Gardner Danver 1,2 & 3
22-Jan-18
135 BOP TAC BM & Ash
136 DEMIN ADT V 01
137 CHP Primary & Sec Screen line -2
138 STG 1&2 Push Button Preheating
139 U1 Panel Bed Ash Drain Combuster
140 WTP SCU
141 U2 BFP no 2
23-Jan-18 142 U2 ESP Dome Valve Field 4
143 U2 ESP Dome Valve Field 4
144 CHP Secondary Crusser 1 & 2
145 BOP TAC Fly Ash 2
146 U2 ESP Field 1 Fly Ash line Elbow 6
147 U2 BM Transfer Elbow 6 Inlet Bunker
148 Boiler 1 & 2 Cems
24-Jan-18
149 CHP Primary Crusser 2
150 U1 Steam Drum Area
151 CHP Secondary Screen 1
152 STG Build Toilet
153 Cems LCD Analyzer
154 Swass Instrument Equipment
25-Jan-18 155 U-2 Insulation Eco Wall
156 U-1 BM Elbow No 3
157 U-2 BM Outlet Vessel.Elbow No 1,4,4
158 AHP AHP MCC, ACB TAC
159 U-2 BM bunker area
160 U-1 Sight glass SD no:7
161 U -1&2 U-1Line After Elbow-6 BM & U-2 Elbow 6 BM
26-Jan-18 162 BOP TAC BM no.2
163 U-1 STG-1
164 CCR Panel fire fighting
165 CHP Dust collector Rotary
166 U-1 Field-1 elbow-4
27-Jan-18
167 CHP Belt Feeder 2
168 CHP Secondary Crusher # 1
28-Jan-18 169 U-1 SA FAN 1
170 CHP BC-4
171 ALL STREET LIGHT Under BC-4 + Ash dyke
172 U-1 Drag Chain feeder no 1
173 CHP Primary Crusher House
29-Jan-18
174 CHP Vibrating Feeder # 2
175 CHP Secondary House
29-Jan-18
21_Feb-18
319 U-1 Coal Bunker 1.
21_Feb-18
320 U-2 Seal Pot Blower 2
321 U-1 Seal Pot Blower 1
322 CHP BC 5
323 Demin CDT-2
324 U-2 APH line after elbow-6
325 U-2 Elbow-1 BM
326 Office main Office
22-Feb-18
327 U-2 RAF -2
328 Demin Tanki CDT-2
329 U-1 FFS line Near LPG
330 CHP BC-4
331 Shetler Shetler Tower
332 U-2 RETURN LEG
333 ELECT BUILD ROOF DUCTING ELECT BUILDING
334 U-2 BFP NO 1
335 BOP TAD BM NO 1
23-Feb-18 336 U-2 DOME VALVE ESP FIELD 5
337 U-2 BM LINE INLET TO BUNKER
338 CHP Level bunker -1
339 CHP Sump pump hopper
340 U-2 RETURN LEG
341 U-2 Ducting SA fan at MFT area
342 U-2 Expantion Ducting SAF MFT # 2
24-Feb-18 343 U-1 Coal Drag chain # 1
344 CEMS CEMS
345 CHP BC # 5 Three Way
25-Feb-18
346 U1 Level bunker -1
347 BOP AC GD # 2
348 U2 ESP Field # 3
349 U2 RETURN LEG
26-Feb-18 350 U2 Sihglass Steam Drum STG Side no 4 ESP Side no 3
351 U1&2 STG & PA , SA 1 & 2
352 U1 Sight Glass Steam Drum STG Side
353 U1 Service Water Line Near LPG
354 U-1 & U-2 Bed Material System
355 CHP Belt Feeder 2
356 U-1 Bed Material Elbow 4
357 Chp Primary Screen 2
27-Feb-18 358 CHP BC 4
359 CHP Vibrating Feeder 2
360 U-1 ID Fan 2
361 CHP BC # 4
362 U-1 & U-2 Feed Water Tank
28-Feb-18
363 U-1 & U-2 Seal Pot Blower Motor
28-Feb-18 364 BOP TAC & GD Compressor
365 Shelter TWR Shelter Tower
366 CHP BC 4 , Tail Pulley
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
WORK TO BE DONE EXECUTOR DEPT
Cancel ( 07 Feb 18 )
Cancel 13-08-18
Cancel (03 Feb 18 )
Cancel ( 13 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel ( 13 Feb 18 )
Cancel (02/03/18)
Cancel ( 13 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel ( 15 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel (19 Feb 18 )
Cancel (02/03/18)
Cancel ( 14 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel ( 14 Feb 18 )
Cancel ( 15 Feb 18 )
Cancel ( 15 Feb 18 )
Cancel (02/03/18)
Cancel ( 15 Feb 18 )
Cancel (20 Feb 18 )
Cancel ( 15 Feb 18 )
Cancel 16 Maret 18
Cancel (20 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (17 Feb 18 )
Cancel (18 Feb 18 )
Cancel (19 Feb 18 )
Cancel (20 Feb 18 )
Cancel (02/03/18)
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
Cancel (19 Feb 18 )
9 Maret 2018
Cancel (19 Feb 18 )
Cancel (20 Feb 18 )
Cancel (20 Feb 18 )
Cancel (02/03/18)
Cancel (27 Feb 18 )
Cancel (27 Feb 18 )
Cancel (27 Feb 18 )
Cancel (27 Feb 18 )
Cancel (27 Feb 18 )
Cancel(01-03-2018)
Cancel(01-03-2018)
Cancel(01-03-2018)
Cancel (02/03/18)
Cancel (02/03/18)
Cancel (28 Feb 18 )
Cancel(01-03-2018)
TANGGAL WO NO Plant EQUIPMENT
15-Mar-18
455 U-1 Press gauge DE bearing STG-1
15-Mar-18
456 Building FO ROOM
457 BOP Oil Catcher pump
458 DMN WBA-A
459 BOP MCWP-4
460 DMN WBA-A TANK
461 DCS PM for EWS
462 U-2 Elbow-3 BM
16-Mar-18 463 BOP Comp GD-2
464 U-1 LP dosing Pump-1
465 BOP THWFG-1
466 U-1 APH
467 BOP AC GD no # 3
468 Elect Building Plafon
469 CHP BC 4 Return Idler no Tail Pully
470 CHP AC ELGI # 1
17-Mar-18
471 CHP Belt Feeder 1 Area
472 U1&2 SA & ID 1 & 2
473 U1&2 ESP Field 1 Elbow 6
474 U-1 Line APH
475 BOP TAC BM 2
476 U1 Pressure Gauge Outlet Desh 2
477 U1 Swass Sampling
18-Mar-18
478 U2 ESP Field 1 elbow 5
479 U1 BM Transfer Elbow 1
480 U2 BM transfer After Elbow 3
481 BOP CWP 3
482 BOP Compressor House
483 U-1 PRDS CV
484 Demin VOT AMT 3
485 Swass Room Swass Sampling U-1
19-Mar-18
486 U-2 ESP Field 1 (Line Venting)
487 CHP BC 4.
488 CHP Sec Hause
489 U-1 MFT 1 & 2
490 U-1 Coal Bunker 1 Level
491 U-1 ESP FIELD 3
492 Electric Gardu Compact 20 KV Lay Down
493 DCS OWS OWS DCS
494 BOP CWP 2
20-Mar-18 495 All Area Area Plant
496 CHP Pri & Sec Screen 1 , BC 1 Return Roller
497 U-2 Rotary Feeder 1 & 2
498 BOP TAC BM 2
20-Mar-18
9-Apr-18
615 U-1 ERV
616 Switch Yard PT (Potensial Trafo ) Bus
617 U-1,U-2 ESP U-1 & U-2
9-Apr-18
618 Demin Servive Water Pump
619 U-1 Rotary Feeder-2
620 U-2 Return Leg
621 BOP Air Compressor GD No 1
622 CHP BC 5 THWFG 1
623 U-2 Line after Elbow-6 field 1
624 U-1 Elbow BM no: 2&6
625 U-2 RAF-2 DE
10-Apr-18 626 DG DG -4 panel switch gear ( Stimulation)
627 U-1 LP Heater no.2
628 DMN Line Suction antara SAC A & B leak
629 CHP BC-3 carry roller No:14
630 U-1 Combustor Lower Temperature CT011
631 U-1&2 Coal Feeder 1&2
11-Apr-18 632 U-1 BM Elbow no 1
633 Switch Yard DS Coupler
634 CHP Sump Pump Ground Hopper
635 BOP Instrument Air Boiler
636 WTP WTP
637 WTP Transfer Pump A
638 U-2 Sootblower No 5
12-Apr-18
639 U-1 Coal Drag Chain
640 CHP Belt Feeder 1
641 CHP TWFG 5
642 U-2 Lighting Sight Glass STG Side
643 U1&2 CEMS
644 U2 Drag Chain 1
13-Apr-18 645 U1 Rotary BM DE & NDE
646 U2 Soot Blower Manual Valve Steam
647 U2 BM Transfer Elbow 1
648 Unit 1 BFP-1
649 BOP TAC 1,2,3 & 4
14-Apr-18
650 U1&2 ID,SA & PA Motor 1 & 2
651 U1 PA Fan 1
652 U-1 Rotary Feeder 1
653 U-1 Drag Chain 1
15-Apr-18 654 CHP Carry Roller BC 1
655 U-1 ESP ESP Field 1 - 6
656 U-1 Bed Material Elbow No 5
657 U-1 ESP field 3
658 U-1 Vacum pump-1
16-Apr-18 659 U-1 Hoist crane ID Fan-1
16-Apr-18
660 DMN AMT V01
661 U-1 BFP 1&2, All Fan
662 U-1 DCS MCC
663 U-1 Vessel BM-1
664 U-1 Elbow 6 & line after elbow 6 field 1
665 U-2 Elbow 6 APH
666 U-1 LOSA-1 Pump-1
667 U-1 Feed water Tank
17-Apr-18
668 U-1 ESP-1 Rapping motor
669 U-1 LP Dosing pump -1
670 CHP primary House
671 U-1 ESP
672 U-2 ID fan area
673 CHP primary screen-1
674 DMN ACF-A
675 U-1 ESP heater support & shaft insulation
676 U-1&2 Turbine Generator
18-Apr-18
677 U-1 LOSA-1 Pump-1
678 U-1 Rotary BM stuck
679 U-1&2 Trafo GT & UAT
680 BOP Compressor GD # 1
681 U-1 Unit 1 6.6 KV
682 U-2 Sootblower no 1
19-Apr-18 683 CHP Primary House
684 U-1 LP Dozing Pump 2
685 DMN Raw Water Pump A
686 CHP Coal Feeder
687 BOP ACWP 2
688 CHP BC # 4 Impeck Roller
689 CHP Belt Feeder 2
690 Demin MCC Demin Plant
20-Apr-18 691 U2 Hopper Heater ESP field 1 -6
692 STG 2 STG Oil Cooler
693 U2 BM Transfer Flange After Elbow 5
694 U1 LOSA-1 Pump-1
695 U2 ESP Field 3 Line fluidizing
696 U2 APH Line After Elbow 6 leak
21-Apr-18
697 CHP Fultcord 7 BC 3
698 U1-2 ID,PA & SA Motor
22-Apr-18
699 U2 BM Transfer After Elbow 4
700
701 U-1 Field 1 Elbow 6
702 CHP BC-3
703 CHP Primary crusher
23-Apr-18 704 CHP BC-2 bolt liner chute to Sec.chruser lepas
705 CHP Pulley primary screen-2 toucing
23-Apr-18
Rahmat Rahmat WS
Checl pull cloutch Zaini I&C
Check fire alarm Zaini I&C
install bolt Ramli Mech
Repair Ramli Mech
Repair cover bolt coupling Ali N Mech
Tack weld Riza WS
Replace Manhole Rahmat WS
Replace compressor Tora Mech
PM check Zaini I&C
Check Zaini I&C
Line flow meter leak Rahmat WS
Replace Bearing DE & NDE sogi Mech
Check abnormal sound Ramli Mech
Replace line pipe PVC Rahmat WS
remove looster Riza WS
Remove Scaffolding Riza WS
Repair Yunanda Mech
PM Motor M. Syakhbudin Elect
Check cable At Tray Zaini Yusuf I&C
Adjust Chain forward Reverse Ali N. Mech
Remove Scaffolding Riza WS
Adjust Due to hunting Zoeldes Mech
Welding Leaking at Line after 6th Elbow Bambang WS
Welding Leaking at 6th Elbow Bambang WS
PM Bulanan Dedek I&C
PM List Bulanan Dedek I&C
Check Trouble Shotting Dedek I&C
Adjusting Gland Packing Ali Mech
Check ( Hight Vibration ) Zoeldes Mech
Check Chute Block BC-1 (Verifikasi) Zaini Yusuf I&C
Check OWS WTP Zaini Yusuf I&C
Uncouple Zoeldes Mech
Repair passing to unit-2 sogi Mech
Welding Repair Reza WS
Replace Sproket Zuldes Mech
Check CCTV At Pri Crusher Jhon I&C
Regreasing Bearing DE & NDE Syahbudin Elect
Adjust Gland packing Yunanda Mech
Replace rubber mate Yunanda Mech
check CCTV Zaini I&C
Check Zaini I&C
Modife logic for ERV Zaini I&C
Support insulation tester & PM heater M. Syakhbudin Elect
PM Cleaning air filter & oil cooler sogi Mech
Cancel
Cancel 05 April 18
Cancel 1 April 18
Cancel 3 April 18
Cancel 3 April 18
Cancel 3 April 18
Cancel 05 April 18
Cancel 05 April 18
Cancel 04 April 18
Cancel 04 April 18
Cancel 17 April 18
Cancel 04 April 18
Cancel 05 April 18
Cancel 05 April 18
Cancel 11 April 18
Cancel 04 April 18
Cancel 04 April 18
Cancel 09 April 18
Cancel 04 April 18
Cancel 05 April 18
Cancel 05 April 18
Cancel 05 April 18
Cancel 09 April 18
Cancel 05 April 18
Cancel 05 April 18
Cancel 05 April 18
Cancel 09 April 18
Cancel 06 April 18
Cancel 09 April 18
Cancel 08 April 18
Cancel 08 April 18
Cancel 09 April 18
Cancel 09 April 18
Cancel 09 April 18
Cancel 09 April 18
Cancel 08 April 18
Cancel 08 April 18
Cancel 09 April 18
Cancel 09 April 18
Cancel 09 April 18
Cancel 12 April 18
Cancel 12 April 18
Cancel 09 April 18
Cancel 09 April 18
Cancel 09 April 18
Cancel 12 April 18
Cancel 09 April 18
Cancel 19 April 18
Cancel 19 April 18
Cancel 11 April 18
Cancel 10 April 18
Cancel 11 April 18
Cancel 11 April 18
Cancel 11 April 18
Cancel 11 April 18
Cancel 11 April 18
Cancel 11 April 18
Cancel 11 April 18
Cancel 11 April 18
Cancel 12 April 18
Cancel 12 April 18
Cancel 16 April 18
Cancel 12 April 18
Cancel 12 April 18
Cancel 12 April 18
Cancel 16 April 18
Cancel 16 April 18
Cancel 13 April 18
Cancel 13 April 18
Cancel 13 April 18
Cancel 13 April 18
Cancel 14 April 18
Cancel 14 April 18
Cancel 14 April 18
Cancel 14 April 18
Cancel 14 April 18
Cancel 14 April 18
Cancel 14 April 18
Cancel 14 April 18
Cancel 18 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel 21 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel 19 April 18
Cancel 19 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel 17 April 18
Cancel (23-05-18)
Cancel 17 April 18
Cancel 19 April 18
Cancel 18 April 18
Cancel 18 April 18
Cancel 18 April 18
Cancel 18 April 18
Cancel 25 Apr 18
Cancel 19 April 18
Cancel 25 Apr 18
Cancel 25 Apr 18
Cancel 20 April 18
Cancel (10 Mei 18)
Cancel 20 April 18
Cancel 19 April 18
Cancel 20 April 18
Cancel 20 April 18
Cancel 20 April 18
Cancel 22 April 18
Cancel (02 Mei 18 )
Cancel 20 April 18
Cancel 21 April 18
Cancel 20 April 18
Cancel 21 April 18
Cancel 22 April 18
Cancel 21 April 18
Cancel 22 April 18
Cancel 22 April 18
Cancel 23 April 18
Cancel 23 April 18
Cancel 28 Apr 18
Cancel (02 Mei 18 )
Cancel 27 Apr 18
Cancel 27 Apr 18
Cancel 28 Apr 18
Cancel 28 Apr 18
Cancel 29 Apr 18
Cancel 29 Apr 18
Cancel 29 Apr 18
Cancel 29 Apr 18
Cancel 30 Apr 18
Cancel 30 Apr 18
Cancel 30 Apr 18
Cancel (02 Mei 18 )
Cancel (03 Mei 18 )
TANGGAL WO NO Plant
746 U-1
1-May-18
747 CHP
748 U-2
749 BOP
750 COMMON Board
751 U-1
752 U-2
2-May-18
753 U-2
754 CHP
755 CHP
756 U-2
757 U-2
758 U1
759 STG Building
760 POS = 2
761 U2
3-May-18 762 U2
763 BOP
764 U2
765 U1
766 CHP
767 U2
768 U2
769 U1
770 U2
4-May-18 771 U1
772 U1
773 U2
774 CHP
775 U1
776 U1
777 U1
5-May-18 778 U2
779 U1
780 U-1
781 U-1 ,2
6-May-18
782 U-1
783 Demin
784 U-1
7-May-18
0785 U-1
0786 U-1
0787 BOP
0788 U-2
0789 U-1&2
0790 U-2
0791 A STG 1
0791 B U-1
0792 SWITC Yard
0793 U-1
8-May-18
0794 STG 1&2
0795 BOP
0796 CHP
0797 CHP
0798 WH
0799 BOP
0800 U-1&2
0801 BOP
802 U-2
803 U-2
804 Sand Screen
9-May-18
805 U-1
806 U-1
807 U-2
0808 U1
10-May-18 0809 CHP
0810 BOP
0811 Switch Yard
0812 Unit 1
11-May-18 0813 Unit 2
0814 Unit 2
0815 Unit 1
0816 U-2
12-May-18 0817 CHP
0818 CHP
0819 U-1,2
13-May-18
0820 BOP
0821 CHP
0822 BOP
0823 U-1
14-May-18
0824 U-2
0825 CHP
0826 Ware House
0827 U-1
15-May-18
0828 U-1
0829 STG 2
16-May-18
0830 RSS
0831 U2
16-May-18
0832 Demin
0833 BOP
0834 BOP
0835 STG 1
0836 U1
0837 Demin
0838 U1
0839 U1
17-May-18
0840 U2
0841 U2
0842 U1
0843 BOP
0844 U1
0845 U-1
0846 Demin
18-May-18
0847 CHP
0848 U-1
19-May-18 0849 CB HGU
0850 U-1
0851 U-2
20-May-18
0852 Pos-3
0853 U-1&2
0854 U-1
0855 U-2
23-May-18
0869 CHP
BM Elbow No 1 & 6
Primary & Secondary House
Boiler Backpass
Coolling Tower
CB To HEIN
Coal Rotary Feeder 1
Coal Rotary Feeder 1
PA FAN 1 Lube Oil
Primary crusher 1 & 2
CHP
TAC 1-4
LOPA 1 Pump 1
Line BM Transfer After Elbow 1
Smoke Ion ID 009
IP Phone
ESP Field 3
Lube Oil 1, PA Fan 1
Basin Strainer 1,2,3,4
Dome Valve Field 5
ERV
Secondary Crusser
ERV
Line BM Transfer Elbow 4
Line BM Transfer Sebelum Elbow 2
ESP Field 3 Dome Valve
CV Cycle Make Up
Area Lime stone & Roof Cyclone
ESP Field 3 Dome Valve
BC 2 ,BC 1 & Vibrating Feeder
Lime Stone Area
ID Fan 1
RAF 1
Soot Blower 3
ESP Motor Colecting no 1 Gear Box
Drag Chain # 1
SA Fan, PA Fan, ID Fan
RAF 1 NDE
V-10 SAC -A
ID Fan 1
Rotary air lock Feeder-1
Field -3 ESP
ACWP # 2
DCS unit 2
Boiler 1&2
Lube Oil PA Fan 1 Pump 1
Oily Water Pump 4
APH 2
Transmisi 70 KV
APH 2
CEP 1&2
Compressor Gardner 1,2, 3
Primary & Sec Crusher, DSS Compressor
BC-3&4
Ware House Belakang
Line Air dryer
Seal Pot 1&2
ACWP 1-3, MCWP 1-5, & CT FAN 1-4
Line Ash Field 1 Elbow 6
BM Line Elbow 5
Sand Screen BC-2
Field 3 Level Switch
Field 1 Collecting Gear Box
Lime Stone Bunker
APH 2 Dome & Manual Valve
Sand Screen
TAC BM & FA
Line OPCC
BM Transfer Line After Elbow 5
SA Fan 2 Motor Bearing Temp DCS to Local
RAF 1 & 2
ESP Field 3
Rotary air lock Feeder-2 DE & NDE
BC 1 Return Roller
Secondary Crusser 1
Motor MV boiler 1,2
SB-2 flange line steam
Primary house
Air dyer
ESP-3
DESH-2
BC-1,2,3,4,5
Ware House, BAT,& BCT tank
APH # 2
APH # 2 Dome Valve
Inst Equipment
Batery RSS 110 DC
ESP Field 3
Service Water Pump
Air Drayer New
Compressor Gardner Area
Inst Equipment
Lampu TL diatas LP dosing
Lampu TL Area Demin
Line Fly Ash Field 1 no 3
BM Transfer Line After Elbow 3
ESP Field 1 Elbow 1
ESP Field 2 Line Venting
ESP Field 3
AC GD 1,2,3
Manual Valve Drain WB SP
ESP Field 6 Dome Valve Passing
Guard Pond
Primary Screen 1
Soot Blower 11
Open & Close
Elbow BM no-6
Line setelah Elbow-3 & vessel BM
Lighting
PA,SA,ID Fan
Line Ash Field 1 & Elbow 6
Feed Water Line to Eco
WTP
Return Leg Area
Boiler 1&2
BC-6 Sand Screen
BC-4 Area
Boiler 1
DCS
Drag Chain # 1
Feed control Station Valve 100%
Coal Rotary Feeder 1
Vibrating 1 to BC-1
RAF 1 & 2 Gland Packing
Inst Equipment Area PA Fan & SA Fan
BC # 1
CV press Deaerator
ID Fan 1 Area
CCTV
BC # 2 Touching to frame & Screen Jebol
Fly Ash Silo
CEMS
Pully Conveyor
Flow TX Cycle MU to deaerator
CEMS
Lampu PJU
BC # 5
Line setelah elbow-1 field satu leak
Form absorber PAC
RAF-1
BC-4
area switch yard
Motor MV boiler 1,2
elbow-4 APH
Line regent from Demin tank
BM vessel
Instrument Air Dryer # 1
Boiler U1, Drag Chain, PS SP Blower, BFP, Vacuum Pump PA SA ID Fan
Boiler # 2 & SP Blower
DCS U-2
GD Compressor 1
Field 1 Setelah Elbow 1
Line Service Water at Pipe Rack (LPG)
STG Hall
Inst Equipment
TAC BM & FA
AC GD # 1 Relive valve
Service Water Line Dekat LPG
Secondary House
Drag Chain # 1
PAFan 1
STG 1
SUB 2
Dearator Press CV, Desuperheater CV
Manhole
LPH 2 Safety Valve
Pa Fan Header Ducting
Fly Ash Silo 1
MV Panel
Treturn Leg Area SP
ManHole All & Batu Api
WORK TO BE DONE EXECUTOR
Cancel 01-06-18
Cancel 02-06-18
Cancel 01-06-18
Cancel 02-06-18
Cancel 02-06-18
Cancel 02-06-18
Cancel 03-06-18
Cancel 02-06-18
Cancel 02-06-18
Cancel 05-06-18
Cancel 05-06-18
Cancel 02-06-18
Cancel 02-06-18
Cancel 03-06-18
Cancel 02-06-18
Cancel 03-06-18
Cancel 10-06-18
Cancel 03-06-18
Cancel 06-06-18
Cancel 03-06-18
Cancel 04-06-18
Cancel 05-06-18
Cancel 04-06-18
Cancel 04-06-18
Cancel 06-06-18
Cancel 04-06-18
Cancel 04-06-18
Cancel 04-06-18
Cancel 06-06-18
Cancel 05-06-18
Cancel 05-06-18
Cancel 05-06-18
Cancel 05-06-18
Cancel 05-06-18
Cancel 05-06-18
Cancel 06-06-18
Cancel 06-06-18
Cancel 06-06-18
Cancel 06-06-18
Cancel 06-06-18
Cancel 07-06-18
Cancel 08-06-18
Cancel 08-06-18
Cancel 08-06-18
Cancel 07-06-18
Cancel 07-06-18
Cancel 07-06-18
Cancel 08-06-18
Cancel 08-06-18
Cancel 10-06-18
Cancel 08-06-18
Cancel 10-06-18
Cancel 12-06-18
Cancel 10-06-18
Cancel 08-06-18
Cancel 08-06-18
Cancel 08-06-18
Cancel 11-06-18
Cancel 09-06-18
Cancel 29-06-18
Cancel 13-06-18
Cancel 11-06-18
Cancel 13-06-18
Cancel 12-06-18
Cancel 10-06-18
Cancel 12-06-18
Cancel 24-07-18
Cancel 19-06-18
Cancel 11-06-18
Cancel 11-06-18
Cancel 11-06-18
Cancel 14-07-18
Cancel 13-06-18
Cancel 02-07-18
Cancel 12-06-18
Cancel 14-06-18
Cancel 12-06-18
Cancel 29-06-18
Cancel 13-06-18
Cancel 13-06-18
Cancel 13-06-18
Cancel 13-06-18
Cancel 13-06-18
Cancel 18-06-18
Cancel 18-06-18
Cancel 16-06-18
Cancel 16-06-18
Cancel 16-06-18
Cancel 14-06-18
Cancel 14-06-18
Cancel 14-06-18
Cancel 20-06-18
Cancel 17-06-18
Cancel 18-06-18
Cancel 20-06-18
Cancel 16-06-18
Cancel 19-06-18
Cancel 18-06-18
Cancel 19-06-18
Cancel 26-06-18
Cancel 18-06-18
Cancel 18-06-18
Cancel 19-06-18
Cancel 19-06-18
Cancel 19-06-18
Cancel 19-06-18
Cancel 19-06-18
Cancel 13-08-18
Cancel 19-06-18
Cancel 21-06-18
Cancel 19-06-18
Cancel 21-06-18
Cancel 20-06-18
Cancel 20-06-18
Cancel 20-06-18
Cancel 20-06-18
Cancel 20-06-18
Cancel 21-06-18
Cancel 21-06-18
Cancel 21-06-18
Cancel 21-06-18
Cancel 21-06-18
Cancel 21-06-18
Cancel 23-06-18
Cancel 25-06-18
Cancel 22-06-18
Cancel 22-06-18
Cancel 23-06-18
Cancel 02-07-18
Cancel 22-06-18
Cancel 23-06-18
Cancel 24-06-18
Cancel 24-06-18
Cancel 19-07-18
Cancel 05-07-18
Cancel 25-06-18
Cancel 25-06-18
Cancel 03-07-18
Cancel 25-06-18
Cancel 28-06-18
Cancel 28-06-18
Cancel 25-06-18
Cancel 25-06-18
Cancel 25-06-18
Cancel 26-06-18
Cancel 25-06-18
Cancel 29-06-18
Cancel 26-06-18
Cancel 26-06-18
Cancel 28-06-18
Cancel 26-06-18
Cancel 02-07-18
Cancel 27-06-18
Cancel 27-06-18
Cancel 27-06-18
Cancel 27-06-18
Cancel 28-06-18
Cancel 28-06-18
Cancel 28-06-18
Cancel 29-06-18
Cancel 08-07-18
Cancel 29-06-18
Cancel 29-06-18
Cancel 29-06-18
Cancel 29-06-18
Cancel 02-07-18
Cancel 29-06-18
Cancel 02-07-18
Cancel 02-07-18
Cancel 30-06-18
Cancel 29-06-18
Cancel 30-06-18
Cancel 03-07-18
Cancel 30-06-18
Cancel 30-06-18
Cancel 01-07-18
TANGGAL WO NO Plant EQUIPMENT
6-Jul-18
1150 U-1 & U-2 Fly Ash Silo 1 & 2
6-Jul-18 1151 U-1 ESP Field 1 Gasket Gate Manual Valve
1152 U-1 Soot Blower, Steam Flow
1153 U-2 Soot Blower, Steam Flow
1154 U-1 ESP Field 1
1155 CHP Sec Crusher # 1
7-Jul-18
1156 U-2 BM Line Elbow 3 & 5
1157 BOP Fly Ash Silo 1
8-Jul-18
1158 U-1&2 Boiler MV Motor
1159 U1 APH 1 & ESP Field 4
1160 U1 Dome Valve APH 1
1161 U2 Soot Blower Flow TX
9-Jul-18
1162 U1 SA Fan 2 Temp TX
1163 U1 ESP Dome Valve Field 4
1164 U2 Return Leg
1165 Demin Panel & OWS
1166 U-1 & U-2 Inst Equipment At Comb Area
1167 Demin Line Inlet SAC
10-Jul-18
1168 U-2 Roof Cyclone & Plate Cyclone
1169 Demin Manual Valve Demin Portable Pump
1170 U-1 Line Service Water
1171 U-1 BM Vessel & Elbow 4 & 5
1172 U-1 Soot Blower Flow TX
1173 BOP Air Drayer
1174 Demin Fan Panel PLC
11-Jul-18 1175 U-1 Return Leg
1176 BOP GD Compresor 1,2,3
1177 BOP TAC BM 1 & 2
1178 U-1 Drag Chain, Rotary Feeder 1,2
1179 U-2 Seal Pot Blower 1 & 2
1180 U-1 MCC Soot Blower 1-11
1181 CHP BC-1
1182 U-2 Roof Cyclone Area
1183 U-2 Fly Ash Silo 2
1184 U-2 Panel MOV Emergency Drai
1185 STG 1 & 2 Inst Equipment
1186 WTP Leaking Inst Air At Regulator
1187 U-2 MCC Soot Blower 1-11
1188 U-1 APH Area
1189 U-1 Rotary Feeder 1 NDE
12-Jul-18
1190 U-1 Roof Support Cyclone
1191 CHP Sand Screen
1192 U-2 Line Exhaust Fan Ash Silo 2
1193 U-1 Line Fluidizing APH 1
1194 DCS VGA Card At OWS
1195 CHP Flap Gate TWFG
1196 U-2 Ash Silo 2
1197 CHP Primary Crusher
13-Jul-18
1198 AHP Panel AHP
1199 U-1-U-2 Cems
1200 U-2 BM Elbow 5
13-Jul-18 1201 U-1 Rotary Feeder 1 NDE
1202 U-2 Bed Material Flange No 6
1203 U-1 Seal Pot Area
1204 U-1 Esp Field 2
1205 U-1 Winchy
1206 U-1 ESP Field 2
1207 U-2 Motor Sootblower
14-Jul-18
1208 U-1&2 Motor SAF 1&2
1209 Demin Demin Plant
1210 U1&2 Motor SA,PA & ID 1 & 2
1211 U1 RAF 1
15-Jul-18
1212 Demin Net Pitpump
1213 CHP Return Roller BC 3
1214 STG 1 Lighting Area STG
1215 U1 Main Steam Press TX CP 003
1216 Demin Netpit Pump SAC
16-Jul-18
1217 U2 SB no 5
1218 U1 ESP Field 2 Dome Valve
1219 U1 RAF 1
1220 U-1 Fly Ash Silo 1
1221 U-1 & U-2 SUB 1 & 2 Area
1222 U-1 Motor Sootblower
1223 WTP Motor Feed Pump C
17-Jul-18
1224 BOP Cooling Water Basin Strainner 1 - 4
1225 CHP Secondary House
1226 U-2 APH Elbow No 5 Leaking
1227 U-1 Swass Room Feed Water Sampling Line
1228 U-2 APH Inlet & Outlet
1229 WTP PLC
1230 DCS CCTV
1231 U-1 Bed Material Elbow Venting Leaking
1232 U-1 & U-2 U1 SAF Motor & U2 SAF Motor Bearing
18-Jul-18
1233 U-1 Swass Valve Blow Down
1234 APH U-1 APH Elbow No 5
1235 Demin Pump House
1236 Demin Net Pit Pump Not Pumping
1237 WTP Inlet Service Sand Filter-1
1238 Demin V08 WBA B
1239 STG-1,2 Instrument eguipment at generator
1240 WTP Feede water pump A
1241 CHP Primary House
1242 AHP Sand Screen-1
1243 BOP TAC Motor 1,2,3,4
19-Jul-18 1244 STG Lampu penerangan
1245 U-2 Elbow-6 & line sebelum Elbow-5 BM
19-Jul-18
31-Jul-18
1294 U-2 APH # 2
31-Jul-18
1295 U-2 APH # 2
1296 CHP Primary Srcreen 1
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
WORK TO BE DONE EXECUTOR DEPT
Cancel 02-07-18
Cancel 02-07-18
Cancel 01-07-18
Cancel 01-07-18
Cancel 02-07-18
Cancel 05-07-18
Cancel 02-07-18
Cancel 02-07-18
Cancel 02-07-18
Cancel 02-07-18
Cancel 03-07-18
Cancel 02-07-18
Cancel 03-07-18
Cancel 02-07-18
Cancel 05-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 05-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 03-07-18
Cancel 11-07-18
Cancel 05-07-18
Cancel 04-07-18
Cancel 04-07-18
Cancel 04-07-18
Cancel 04-07-18
CANCEL
Cancel 04-07-18
Cancel 15-07-18
Cancel 05-07-18
Cancel 05-07-18
Cancel 18-07-18
Cancel 05-07-18
Cancel 07-07-18
Cancel 05-07-18
Cancel 05-07-18
Cancel 06-07-18
Cancel 06-07-18
Cancel 13-08-18
Cancel 06-07-18
Cancel 06-07-18
Cancel 06-07-18
Cancel 09-07-18
Cancel 07-07-18
Cancel 17-07-18
Cancel 13-08-18
Cancel 09-07-18
Cancel 09-07-18
Cancel 09-07-18
Cancel 09-07-18
Cancel 09-07-18
Cancel 09-07-18
Cancel 10-07-18
Cancel 10-07-18
Cancel 11-07-18
Cancel 10-07-18
Cancel 10-07-18
Cancel 11-07-18
Cancel 12-07-18
Cancel 11-07-18
Cancel 11-07-18
Cancel 11-07-18
Cancel 11-07-18
Cancel 18-07-18
Cancel 12-07-18
Cancel 11-07-18
Cancel 11-07-18
Cancel 11-07-18
Cancel 11-07-18
Cancel 12-07-18
Cancel 12-07-18
Cancel 12-07-18
Cancel 12-07-18
Cancel 12-07-18
Cancel 03/09/18
Cancel 12-07-18
Cancel 12-07-18
Cancel 17-07-18
Cancel 13-07-18
Cancel 13-07-18
Cancel 12-07-18
Cancel 12-07-18
Cancel 12-07-18
extend to 1367
Cancel 13-07-18
Cancel 13-07-18
Cancel 16-07-18
Cancel 13-07-18
Cancel 13-07-18
Cancel 14-07-18
Cancel 13-07-18
Cancel 17-07-18
Cancel 15-07-18
Cancel 15-07-18
Cancel 15-07-18
Cancel 15-07-18
Cancel 16-07-18
Cancel 16-07-18
Cancel 17-07-18
Cancel 16-07-18
Cancel 23-07-18
Close(26-07-18)
Cancel 17-07-18
Cancel 18-07-18
Cancel 17-07-18
Cancel 18-07-18
Cancel 17-07-18
Cancel 18-07-18
Cancel 17-07-18
Cancel 23-07-18
Cancel 18-07-18
Cancel 18-07-18
Cancel 19-07-18
Cancel 07-08-18
Cancel 18-07-18
Cancel 18-07-18
Cancel 19-07-18
Cancel 19-07-18
Cancel 19-07-18
Cancel 19-07-18
Cancel 19-07-18
Cancel 19-07-18
Cancel 19-07-18
z
Cancel 13-08-18
Cancel 20-07-18
Cancel 23-07-18
Cancel 13-08-18
Cancel 13-08-18
Cancel 23-07-18
Cancel 20-07-18
Cancel 19-07-18
Cancel 19-08-18
Cancel 22-07-18
Cancel 20-07-18
Cancel 10-08-18
Cancel 20-07-18
Cancel 20-07-18
Cancel 21-07-18
Cancel 22-07-18
Cancel 22-07-18
Cancel 22-07-18
Cancel 24-07-18
Cancel 27-07-18
Cancel 27-07-18
Cancel 23-07-18
Cancel 23-07-18
Cancel 24-07-18
Cancel 01-08-18
Cancel 27-07-18
Cancel 23-07-18
Cancel 23-07-18
Cancel 23-07-18
Cancel 28-07-18
Close(26-07-18)
Close(26-07-18)
Close(26-07-18)
Cancel 27-07-18
Cancel 27-07-18
Cancel 30-07-18
Cancel 29-07-18
Cancel 29-07-18
Cancel 30-07-18
Cancel 01-08-18
Cancel 01-08-18
Cancel 01-08-18
Cancel 31-07-18
TANGGAL WO NO Plant EQUIPMENT
20-Agu-18
1389 BOP TAC 1,2,3,4
1390 CHP Pri & Sec Crusher
20-Agu-18 1391 U-1 & U-2 Seal Pot Blower 1 & 2
1392 U-1 & U-2 Battery Panel
1393 CHP Sand Screen 1 , 3 & 6
1394 U-1 Rotary Feeder 1
1395 Pos 1 CCTV
1396 DEMIN Panel AMT 1-3
1397 U-2 I D FAN 1 NDE
1398 CHP Coal Ground Hopper
1398 U-2 Instrument Equipment Boiler-2
1399 CHP Line Service Water
1400 U-2 ESP Field 1
1401 CHP BC-1 &BC-4
21-Aug-18
1402 CHP Secondary chrusher
1403 U-1 Elbow no.5 BM
1404 U-1 DESH-1 CV
1405 POS-2 CCTV
1406 BOP ACWP-2
1407 U-2 LP heater-2
1408 BOP ACWP-2
23-Aug-18 1409 U-2 Cyclone area
1410 Demin BAT level & valve
1411 BOP Air dryer 1,2,3
1412 U-2 ESP & ID fan area
1413 U1 Boiler MSV
24-Aug-18 1414 BOP ACWP 1
1415 Demin Demin Area
1416 CHP DSS Line BC 2
1417 U1&2 PA, SA, & ID 1 & 2
25-Aug-18 1418 Demin Guard Pond PH On line
1419 Demin HCL PUMP
1420 U1 ID FAN Area
1421 U-2 ESP Field 1 Setelah Elbow 6
1422 CHP Primary Screen 1
26-Agus-18
1423 U-1 Rotary Feeder 2
1424 U-1 MOV EBD Isolating Leak
1425 U-1 ERV
1426 U-2 ESP Field 1 Elbow 6
1427 DEMIN Raw Water Pump 2
1428 CHP Hotter Bunker & Tranfer Tower
27-Agu-18
1429 STG 1 Sump Pump At Condenser
1430 DEMIN Raw Water Pump 2
1431 Shelter TWr Repeater Radio
1432 CHP Return & Carry Roller BC 5
1433 U-1 Boiler-1
1434 BOP CT Fan 1,2,3,4
1435 CHP BC_4
28-Aug-18
1436 CCR Toilet Elc Building
28-Aug-18
1437 STG Sump pump at condenser
1438 CHP Primary house
1439 CHP Coal bunker-2
1440 U-1 SA FAN 1 FAN Temp Bearing NDE
1441 U-2 Boiler & STG ( SP Blower 1,2)
1442 CCR AC at DCS & Baterrey
1443 U-2 STG-2
1444 U-1 SA FAN 1 FAN Temp Bearing NDE
29-Aug-18 1445 U-2 Field-1
1446 BOP ACWP-2
1447 U-1 SP Blower 1,2
1448 U-1 Field-1 elbow-3
1449 U-1 Line Service Water
1450 BOP GD 1,2,3
30-Aug-18 1451 CHP All equipment
1452 CHP Transfer tower
1453 U2 ID FAN Area
1454 BOP AC GD no 1 & Motor FAN
1455 BOP Oily Water Pump 3
31-Aug-18
1456 U1 Field 1 Elbow 4
1457 U2 RAF 1
1458 CHP BC4 & 5,BF1 &2,PS 1& 2,SC 1 & 2
1459 U-1 & U-2 ERV
WORK TO BE DONE EXECUTOR DEPT Cancel
7-Sep-18
1503 U-2 Line Ash Field 1 Elbow 2
1504 BOP Comp GD 1,2 &3
1505 BOP CT Make Pump # 1
7-Sep-18 1506 BOP Comp TAC Ash & Bed
1507 U-1 Boiler 1
1508 STG STG-BFP 1&2
1509 U-1 Rotary Feeder # 2
1510 U1 Suport Panel MOV Ash Drain
1511 Elect Build Plapond
1512 U2 ESP field 1 Elbow 2
1513 Elect Build Dinding & Atap UPS Room
1514 BOP CTF, ACWP,CWP
1515 STG 1 &2 Condensate Pump 1 & 2
8-Sep-18 1516 CHP Pri,Sec Crusher,& DSS Comp
1517 U-1 & U-2 Seal Pot Blower & SA Fan 2
1518 U-1 SB Main STM Isolating Valve
1519 U-2 ESP Field 3
1520 WTP HDPE Line Transfer To Plant
1521 U-1.U-2 Motor MV
9-Sep-18 1522 U-1 MOV Main Stm Soot Blower
1523 U-2 Esp Field 1 Elbow 6 Seterlah Line
1524 U-2 ESPField 3 Dome Valve
1525 U-2 Fielad -1 elbow-1
1526 STG STG Building
1527 U-2 CEMS
10-Sep-18 1528 CHP Primary house
1529 U-2 Field-3 valve fluidizing stuck
1530 U-2 ID fan area
1531 ASH Silo Fly Ash Silo Area
1532 U-2 CEP-1
11-Sep-18 1532 CHP Sec.screen -1 chute leak
1533 U-2 APH unit 2 to Unit-1
1534 U-1 APH SA Manhole
1535 CHP support RETURN ruller BC 3
1536 U-2 ESP Field 1 Sebelum Elbow 1 Leaking
12-Sep-18 1537 U-1 APH Manhole
1538 U-2 BFP 2.
1539 U-1 Field 1 Elbow 4
1540 STG Building STG Building Drain To access boiler
1541 STG 1 CEP # 1
1542 U2 ESP Field 3
1543 U1 ESP Field 1 Line Elbow 1
13-Sep-18 1544 U1 ESP Field 1 Line Fluidizing
1545 Demin Platfon
1546 U2 CEMS
1547 BOP ACWP # 2
1548 CHP BC # 4 Coloum Structure
1549 U1 RAF 1 & 2
14-Sep-18
1550 Demin HCl Area
1551 BOP ACWP 1 &2
1552 U1 APH 2 Manual Valve
14-Sep-18
1553 AHP Fly Ash Silo Area
1554 U2 Motor Vacuum Pump 1 & 2
1555 Demin Line Priming Netpit Pump
1556 Demin Line Fire Fighting
1557 CHP Valve Udara Primari House
1558 U1 Dinding Cyclone
1559 U2 RAF 1 DE & NDE
1560 BOP CT BASIN 1,2,3 & 4
1561 AHP Manhole Rotary Fly ash silo 1 & 2
15-Sep-18
1562 Demin Valve AMT V01 & 02 WBA B08 & Valve Release Guard Pond
1563 Boiler CEMS
1564 U2 SA Fan 2
1565 CHP BC#1,2,3,4 & 5
1566 CHP ELGI Air Compressor # 1
1567 U2 Drag Chain 1
1568 U1&2 ID,PA, & SA 1 & 2
1569 BOP TAC BM & FA 1& 2
16-Sep-18
1570 U1&2 BM Transfer U 1 Elbow 5 & U 2 Elbow 4 & 5
1571 U1 APH 1 Dome Valve & Flange Line Blocking
1572 U-2 APH-1
1573 U-1 & U-2 STG I&C
1574 CCR Elc Building
1575 DMN HCl Area
1576 U-1 Deaerator-1
17-Sep-18 1577 U-2 Drag Chain -2 putus
1578 CHP Primary Crusher
1579 U-2 SA Control damper
1580 Demin BAT
1581 U-2 STG Building
1582 CHP BC-1 Area
1583 AHP AHP MCC
1584 U-2 STG 2 Area
1585 U-1 Bed Material Line to Combustor
1586 U-1 U1 O2 Analyzer
18-Sep-18
1587 U-1 U1 ID FAN # 1
1588 DCS DCS Panel
1589 DMN Demin Plant
1590 U-1 Line APH
1591 U-2 Rotary Airlock Feeder No 1
1592 U-1 Line Fluidizing APH leak
1593 CHP Support Panel Instrument Primary Crusher
1594 U-1 APH 1 Dome Valve
1595 BOP ACWP # 2
19-Sep-18 1596 U-1 APH # 1
1597 U-1 Fly Ash Silo Area
19-Sep-18
Cancel 03/09/18
Cancel 01/09/18
Cancel 01/09/18
Cancel 01/09/18
Cancel 01/09/18
Cancel 01/09/18
Cancel 01/09/18
Cancel 07/09/18
Cancel 04/09/18
Cancel 02/09/18
Cancel 04/09/18
Cancel 19/09/18
Cancel 04/09/18
Cancel 05/09/18
Cancel 03/09/18
Cancel 05/09/18
Cancel 07/09/18
Cancel 04/09/18
Cancel 06/09/18
Cancel 05/09/18
Cancel 05/09/18
Cancel 06/09/18
Cancel 06/09/18
Cancel 06/09/18
Cancel 19/09/18
Cancel 06/09/18
Cancel 06/09/18
Cancel 06/09/18
Cancel 06/09/18
Cancel 05/09/18
Cancel 06/09/18
Cancel 06/09/18
Cancel 07/09/18
Cancel 06/09/18
Cancel 06/09/18
Cancel 09/09/18
Cancel 07/09/18
Cancel 07/09/18
Cancel 07/09/18
Cancel 09/09/18
Cancel 09/09/18
Cancel 08/09/18
Cancel 07/09/18
Cancel 07/09/18
Cancel 07/09/18
Cancel 13/09/18
Cancel 08/09/18
Cancel 13/09/18
Cancel 09/09/18
Cancel 09/09/18
Cancel 09/09/18
Cancel 09/09/18
Cancel 08/09/18
Cancel 09/09/18
Cancel 14/09/18
Cancel 21/09/18
Cancel 09/09/18
Cancel 10/09/18
Cancel 10/09/18
Cancel 12/09/18
Cancel 10/09/18
Cancel 10/09/18
Cancel 10/09/18
Cancel 11/09/18
Cancel 10/09/18
Cancel 13/09/18
Cancel 11/09/18
Cancel 22/09/18
Cancel 12/09/18
Cancel 19/09/18
Cancel 13/09/18
Cancel 12/09/18
Cancel 12/09/18
Cancel 14/09/18
Cancel 19/09/18
Cancel 13/09/18
Cancel 13/09/18
Cancel 14/09/18
Cancel 14/09/18
Cancel 13/09/18
Cancel 13/09/18
Cancel 14/09/18
Cancel 17/09/18
Cancel 18/09/18
Cancel 14/09/18
Cancel 14/09/18
Cancel 17/09/18
Cancel 17/09/18
Cancel 14/09/18
Cancel 15/09/18
Cancel 15/09/18
Cancel 15/09/18
Cancel 17/09/18
Cancel 24/09/18
Cancel 16/09/18
Cancel 16/09/18
Cancel 17/09/18
Cancel 15/09/18
Cancel 17/09/18
Cancel 17/09/18
Cancel 17/09/18
Cancel 16/09/18
Cancel 17/09/18
Cancel 17/09/18
Cancel 20/09/18
Cancel 19/09/18
Cancel 19/09/18
Cancel 19/09/18
Cancel 21/09/18
Cancel 17/09/18
Cancel 19/09/18
Cancel 18/09/18
Cancel 21/09/18
Cancel 19/09/18
Cancel 19/09/18
Cancel 18/09/18
Cancel 19/09/18
Cancel 18/09/18
Cancel 18/09/18
Cancel 18/09/18
Cancel 18/09/18
Cancel 19/09/18
Cancel 20/09/18
Cancel 21/09/18
Cancel 21/09/18
Cancel 19/09/18
Cancel 24/09/18
Cancel 21/09/18
Cancel 20/09/18
Cancel 24/09/18
Cancel 24/09/18
Cancel 21/09/18
Cancel 21/09/18
Cancel 20/09/18
Cancel 20/09/18
Cancel 24/09/18
Cancel 20/09/18
Cancel 20/09/18
Cancel 21/09/18
Cancel 21/09/18
Cancel 21/09/18
Cancel 21/09/18
Cancel 21/09/18
Cancel 22/09/18
Cancel 24/09/18
Cancel 24/09/18
Cancel 22/09/18
Cancel 22/09/18
Cancel 24/09/18
Cancel 22/09/18
Cancel 24/09/18
Cancel 23/09/18
Cancel 24/09/18
Cancel 24/09/18
Cancel 24/09/18
TANGGAL WO NO Plant
EQUIPMENT
WORK TO BE DONE EXECUTOR DEPT
Cancel
TANGGAL WO NO Plant
001 U-1
002 U-1
003 U-1
004 BOP
005 U1
006 U1
007 U1
008 DEMIN
009 U-1
010 U-1
011 U-1
012 U-1
013 U-1
24 Juli 2018 014 U-1
015 U-1
016 U-1
017 U-1
018 U-1
019 U-1
020 U-1
021 U-1
022 U-1
023 U-1
024 U-1
025 U-1
026 U-1
027 U-1
028 U-1
029 U-1
030 U-1
031 U-1
032 U-1
033 U-1
034 U-1
035 U-1
036 BOP
037 U-1
25 Juli 2018 037 U-1
038 U-1
25 Juli 2018
039 U-1
040 U-1
041 U-1
042 U-1
043 U-1
044 U-1
045 U-1
046 U-1
047 U-1
048 U-1
049 BOP
050 DEMIN
051 U-1
052 U-1
053 U-1
26 Juli 2018
054 U-1
055 U-1
056 Unit 1,2
057 U-1
058 U-1
059 BOP
060 U-1
061 U-1
062 U-1
063 U-1
064 U-1
065 U-1
27 Juli 2018 066 U-1
067 U-1
068 U-1
069 U-1
070 U-1
071 U-1
072 U-2
073 U-1
074 U-1
075 U-1
076 U-1
077 U-1
078 U-1
28 Juli 2018
079 U-1
080 U-1
081 U-1
082 CHP
083 U-1
084 U-1
085 U-1
086 BOP
8
087 BOP
088 U-1
089 U-1
090 STG 1
29 Juli 2018
091 U-1
092 U-1
093 U-1
094 U-1
095 U-1
096 U-1
097 U-1
098 U-1
099 U-1 STG
100 MCC U-1
101 U-1
102 U-1
103 U-1
30-Jul-18 104 DEMIN
105 U-1
106 STG 1
107 CHP
108 STG 1
109 U-1
110 U-1
111 STG 1
112 U-1
113 U-1
31-Jul-18 114 U-1
115 STG 1
116 STG 1
117 STG 1
118 STG 1
119 Trafo
120 U-1
121 U-1
122 BOP
123 U-1
124 U-1
125 U-1
126 BOILER-1
127 BOILER-1
127B STG 1
1-Aug-18
128 STG 1
129 ESP-1
130 BOP
131 U-1
132 U-1
133 U-1
134 U-1
135 U-1
136 BOP
137 BOILER-1
138 STG 1
139 BOP
140 BOP
141 BOP
142 U-1
143 Street
2-Aug-18 144 U-1
145 U-1
146 U-1
147 U-1
148 STG 1
149 U-1
150 U-1
151 U-1
152 U-1
153 DEMIN
154 U-1
155 U-1
156 U-1
3-Agust-18 157 STG 1
158 STG 1
159 U-1
160 U-1
161 U-1
162 U-1
163 U1
164 U1
165 BOP
166 STG 1
4-Agust-18
167 U1
168 U1
169 U1
170 U1
171 U1
172 U1
173 U1
174 U1
5-Agust-18
175 U1
176 U1
177 U1
178 U1
179 U-1
180 U-1
181 U-1
6-Agust-18
182 STG 1
183 U-1
6-Agust-18 184 U-1
185 BOP
186 U-1
187 U-1
188 U1
189 BOP
7-Agust-18 190 STG 1
191 U-1
192 U-1
193 U-1
194 STG 1
195 BOP
196 U-1
197 U-1
198 U-1
199 BOP
200 RSS
201 MCP
202 SWASS
203 STG 1
204 U-1
8-Aug-18
205 CHP
206 CHP
207 BOILER-1
208 U-1
209 ESP-1
210 U-1
211 U-1
9-Aug-18 212 U-1
213 U-1
214 U-1
OUTAGE UNIT -1
EQUIPMENT
Drag No 1
ID Fan 2
Drag No 2
CWP 1 - 5
RAF # 1
ESP Emiting & Colecting
ESP Field 4 & 6
WBA , WBC , SAC
PA Fan # 2
SA Fan # 2
Motor SA Fan 2
MotorID Fan 1 & 2
ESP Field 1 Elbow # 6
Lube Oil SA Fan & PA Fan # 2
ESP Field 1 & 3
Inlet Eco Area
Inlet Eco Area
Lube Oil SA Fan & PA Fan # 1 & 2
Switch Lube Oil SA & PA Fan 2
ON/OFF Valve All At Boiler
All Control Valve
MFT 1 & 2
Bed Material Gate Dumper
IGV ID Fan # 2
Cyclone Area
Motor PA Fan 2
Line Service Water Near LPG
BOILER-1 ALL transmiter
BOILER-1 ALL MOV
BOILER-1 SA FAN-2 IGV
Coal Feeder 1,2
ESP Field-2
ESP Field-2
Area MFT
Area ID fan 1,2
CT Fan 1,2
Feede Water Station
Main hole comb, SP, Cyclone, SP heater
Boiler
PA fan-1
SA Fan-1
STG All valve
Boiler all valve
LV PMCC cooling tower unit-1
Arae cyclone
Middle comb
LOPA-1 & LOSA-1 pump 1,2
ID Fan Area
Deaerator-1
CT fan-1
SAC, MIX Bed, SBA, WBA-B
Motor SAF-1
Coal Rotary Air Lock Motor 1,2
Motor PAF -1
Trafo GT-1 UAT-1 Busduct 11KV
Switch Yard ( BAY Trafo GT & GCB 10
Silo Fly Ash 1,2
Coal Rotary Air Lock feeder 1,2
SH Final
CT fan area
Coal Drag Chain Link 1&2 Motor & VSD Panel
Bed Material Bunker
Boiler # 1 O2 Analizer
SA FAN Control Damper
Combustor Nozle
SP Blower 1&2
U #1 shut Down BFW # 1
Boiler Drum # 1
Boiler # 1
Trafo Area Unit 1
Coal Bunker
Transfer Tower
Deaerator-2
OWS Unit 1
Inside Combustor
ESP Field 1 - 6
Generator 1
Lube Oil SAF & PAF
BM Air lock feeder
Condensor unit 1
Trafo LV Distribution
Fly Ash Silo 1
BC 4 & 5
PAF Ducting
Coal Bunker 1
APH 1 dan Dome valve ESP field 1
MCWP and ACWP
CTF 1 and 2
STG 1
Boiler 1
All MOV
Sealpot Blower 1 and 2
ESP 1 - 6
APH 1
Dome Valve APH
380 V MCC Switch Gear
Drain Sealpot
Sealpot
APH Manhole
Condensor unit 1
SwitchGear Boiler Emergency 380 V
SwitchGear MCC 380 V
LV MMCC
I D Fan 1
ACF & MCF
Expantion Join At Superheater
Condensor unit 1
BC 1, BC 2, BC 3
Generator Cooler
Super Heater
6.6 KV AC SwitchGear System
All Motor Turbine
Boiler FeedPump 1 & 2
Fire Alarm System Area Panel Trafo GT
Rotary & Bug Filter Coal Bunker 1
Vacuum Pump 1
Gland Steam Cond
HP BY Pass
Turbine Lube Oil System
Trafo LV Common
ESCP Panel
MV UAT RTCC Panel
CT fan-2
Deaerator-1
ID Fan-2
Dome Valve BM-1
MOV
Control Valve
MOV
Control Valve
Pneumatic dome valve
MCWP-3
Cyclone Area
Winchi
Roor Tube SH
Dome Valve Field 1,3,6
Sh Tube Roof
CT Fan 1
Boiler -1 ALL Valve
STG-1 ALL Valve
ACWP 1,2 ,3
MCWP 1-5
MCWP 3
Fire Alarm System Area Panel Trafo GT & Aux Trafo
Pipe Fire Hidrant at STG-1 To CHP street
APH Ducting
GCB
CEP 1,2
Coal bunker-2
Panel instrument
MCC ESP
ESP Dulux valve FFS
ID Fan 1 & 2
Swass Sampling
SAC,MCF Area
Id Fan 2
Fly Ash Silo 1
Press TX Steam Drum
Governor
ERV Valve
Comb Water Tube
Rotary Feeder Bed Material
Governor
Cyclone & Seal Pot Area
Deaerator area
BFP 1 & 2
CT FAN 3
Vacuum Pump 1
Fortex Fender Cyclone
STG AREA
Trafo LV Common
Deaerator
SUB 1 & 2
O2 Analizer
CEMS
GCP
Generator Excitation Panel
ID Fan Area
SH OutSide Area
Outlet Cyclone InSide
Seal Pot Drain Valve
Cyclone & Comb Area
ERV Valve
Press TX Exhaust
ID Fan 1 MOV
ID Fan 1
CT Fan 2
SUB 1 & 2
ID Fan 2
Combuster Area
CT FAN 3
STG 1
Belt Scale BC 5 To Bunker 1
SUB 1 & 2
MOV IBD
Press TX
CT Fan 4
BFP 1 & 2
Id Fan 1 Sigh Glass NDE
SH Final
GD 1,2,3
RSS area, Switch Yard,GT, UAT trafo Area
Modifikasi indikasi CB 6 & CB 7
Drain Valve Unit-1 SWASS
Level Condenser
Boiler & STG Protection
CCTV Ground Hopper
Comp Elgi
Dugting & Dumper SUB
APH
Roof Insulation
Elbow 4 BM
Elbow 4 BM
IDF 1&2 MCC
Condensor 1
RAF-1 stuck
OUTAGE UNIT -1
WORK TO BE DONE EXECUTOR
29-Nov-17
1850 U-1 & CHP PA Fan 1 lube oil & CHP Primary House
29-Nov-17 1851 U-2 SootBlower Steam Temp Low
1852 CHP BC-4
1853 U-1 ID afn-2 DE Fan
1854 U-2 Flanges Gasket BM Discharge Gate Valve
1855 U-1&2 Rotary Coal feeder Area 1&2
1856 U-1&2 Coal bunker Level Transmitter 1&2
1857 U-1 Bed Material Hopper
1858 U-2 Cyclone Area
30-Nov-17
1859 U-1&2 Coal Bunker Level 1&2
1860 U-2 Temperature After Desh 2
1861 U-2 Backpass Pressure Before ECO
1862 CHP Chute Block BC-1
1863 CHP PFFS-1
WORK TO BE DONE EXECUTOR DEPT
Cancel 03/11/17
Cancel 04/11/17
Cancel 04/11/17
Cancel 05/11/17
Cancel 05/11/17
Cancel 06/11/17
Cancel 07/11/17
Cancel 11/11/17
Cancel 07/11/17
Cancel 09/11/17
Cancel 08/11/17
Cancel 10/11/17
Cancel 09/11/17
Cancel 09/11/17
Cancel 09/11/17
Cancel 18/11/17
Cancel 14/11/17
Cancel 10/11/17
Cancel 12/11/17
Cancel 14/11/17
Cancel 19/11/17
Cancel 14/11/17
Cancel 15/11/17
Cancel 18/11/17
Cancel 18/11/17
Cancel 19/11/17
Cancel 18/11/17
Cancel 18/11/17
Cancel 20/11/17
Cancel 20/11/17
Cancel 23/11/17
Cancel 19/11/17
Cancel 19/11/17
Cancel 19/11/17
Cancel 27/11/17
Cancel 20/11/17
Cancel 23/11/17
Cancel 22/11/17
Cancel 27/11/17
Cancel 22/11/17
Cancel 22/11/17
Cancel 23/11/17
Cancel 22/11/17
Cancel 22/11/17
Cancel ( 15/12/17 )
Cancel 22/11/17
Cancel 23/11/17
Cancel 22/11/17
Cancel 23/11/17
Cancel 23/11/17
Cancel 23/11/17
Cancel 23/11/17
Cancel 23/11/17
Cancel 23/11/17
Cancel 23/11/17
Cancel 25/11/17
Cancel 23/11/17
Cancel 24/11/17
Cancel (11/12/17)
Cancel 25/11/17
Cancel (04/12/17)
Cancel 25/11/17
Cancel 25/11/17
Cancel 25/11/17
Cancel 26/11/17
Cancel 26/11/17
Cancel 28/11/17
Cancel 28/11/17
Cancel 27/11/17
Cancel 28/11/17
Cancel 27/11/17
Cancel 27/11/17
Cancel 28/11/17
Cancel 27/11/17
Cancel 27/11/17
Cancel 28/11/17
Cancel (29/11/17)
Cancel (29/11/17)
Cancel (29/11/17)
Cancel (30/11/17)
Cancel (29/11/17)
Cancel (29/11/17)
Cancel (29/11/17)
Cancel (29/11/17)
Cancel (30/11/17)
Cancel (30/11/17)
Cancel (30/11/17)
Cancel (3/12/17)
Cancel (30/11/17)
Cancel (30/11/17)
Cancel (30/11/17)
TANGGAL WO NO Plant EQUIPMENT
Cancel (2/12/17)
Cancel (03/12/17)
Cancel (12/12/17)
Cancel (05/12/17)
Cancel (03/12/17)
Cancel (05/12/17)
Cancel (04/12/17)
Cancel (04/12/17)
Cancel (04/12/17)
Cancel (04/12/17)
Cancel (04/12/17)
Cancel (05/12/17)
Cancel (05/12/17)
Cancel (05/12/17)
Cancel (05/12/17)
Cancel (05/12/17)
Cancel (07/12/17)
Cancel (07/12/17)
Cancel (05/12/17)
Cancel (06/12/17)
Cancel (10/12/17)
Cancel (07/12/17)
Cancel (13/12/17)
Cancel (08/12/17)
Cancel (08/12/17)
Cancel (08/12/17)
Cancel (08/12/17)
Cancel (08/12/17)
Cancel (08/12/17)
Cancel (09/12/17)
Cancel (11/12/17)
Cancel (09/12/17)
Cancel (09/12/17)
Cancel (09/12/17)
Cancel (13/12/17)
Cancel (10/12/17)
CANCEL
Cancel (10/12/17)
Cancel (10/12/17)
Cancel (12/12/17)
Cancel (12/12/17)
Cancel (12/12/17)
Cancel (10/12/17)
Cancel (12/12/17)
Cancel (11/12/17)
Cancel (11/12/17)
Cancel (11/12/17)
Cancel (12/12/17)
Cancel (12/12/17)
Cancel (12/12/17)
Cancel (12/12/17)
Cancel ( 15/12/17 )
Cancel ( 15/12/17 )
Cancel (13/12/17)
Cancel (13/12/17)
Cancel ( 18/12/17 )
Cancel ( 18/12/17 )
Cancel ( 18/12/17 )
Cancel ( 14/12/17 )
Cancel ( 14/12/17 )
Cancel (19/12/17)
Cancel ( 16/12/17 )
Cancel (19/12/17)
Cancel ( 15/12/17 )
Cancel ( 15/12/17 )
Cancel ( 15/12/17 )
Cancel ( 15/12/17 )
Cancel ( 16/12/17 )
Cancel ( 16/12/17 )
Cancel (20/12/17)
Cancel (19/12/17)
Cancel (19/12/17)
Cancel ( 18/12/17 )
Cancel ( 21/12/17 )
Cancel (19/12/17)
Cancel (19/12/17)
Cancel (19/12/17)
Cancel (19/12/17)
Cancel ( 21/12/17 )
Cancel ( 21/12/17 )
Cancel (20/12/17)
Cancel (20/12/17)
Cancel ( 21/12/17 )
Cancel ( 21/12/17 )
Cancel ( 21/12/17 )
Cancel ( 22/12/17 )
Cancel ( 22/12/17 )
Cancel ( 22/12/17 )
Cancel ( 22/12/17 )
Cancel ( 22/12/17 )
Cancel ( 23/12/17 )
Cancel ( 23/12/17 )
Cancel ( 25/12/17 )
Cancel ( 24/12/17 )
Cancel ( 25/12/17 )
Cancel (27/12/17)
Cancel (27/12/17)
Cancel (27/12/17)
Cancel (26/12/17)
Cancel (30/12/17)
Cancel (27/12/17)
Cancel (27/12/17)
Cancel (28/12/17)
Cancel (28/12/17)
Cancel (28/12/17)
Cancel (29/12/17)
Cancel (29/12/17)
Cancel (29/12/17)
Cancel (30/12/17)